7 Form Pipe Work Line Check Punc List

download 7 Form Pipe Work Line Check Punc List

of 1

Transcript of 7 Form Pipe Work Line Check Punc List

  • 5/27/2018 7 Form Pipe Work Line Check Punc List

    1/2

    CLIENT : PERHUTANI Test Package No:

    PROJECT TI : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - TA - 052

    PERUM PERHUTANI DI PEMALANG

    JOB NO : 12-1702 Area: PABRIK - 04

    INDAH KARYA

    SIGN DATE SIGN DATE

    NAME NAME

    NOTE:

    CATEGORY "A": ITEM SHALL BE CLEARED PRIOR TO PRESSURE TEST

    CATEGORY "B": ITEM CAN CLEARED AFTER TEST

    PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED BY,

    TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTANI

    Date: Date: Date: Date:

    SHEET

    NOISOMETRIC NO DESCRIPTION

    PABRIK DERIVATIF GONDORUKEM & TERPENTIN

    PERUM PERHUTANI DI PEMALANG

    REKIND

    CLEARENCE

    PIPE WORK LINE CHECK PUNC LIST

    CATEGOR

  • 5/27/2018 7 Form Pipe Work Line Check Punc List

    2/2