7 Form Pipe Work Line Check Punc List
4
PABRIK DERIVATIF GONDORUKEM & TERPENTIN PERUM PERHUTANI DI PEMALANG CLIENT : PERHUTANI Test Package PROJECT T : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - TA - PERUM PERHUTANI DI PEMALANG JOB NO : 12-1702 Area: PABRIK - PIPE WORK LINE CHECK PUNC LIST SHEET ISOMETRIC NO DESCRIPTION CLEAREN CATEGORY REKIND I NO SIGN DATE S NAME N NOTE: CATEGORY "A": ITEM SHALL BE CLEARED PRIOR TO PRESSURE TEST CATEGORY "B": ITEM CAN CLEARED AFTER TEST PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTAN Date: Date: Date: Date:
-
Upload
mashudi-fikri -
Category
Documents
-
view
22 -
download
6
Transcript of 7 Form Pipe Work Line Check Punc List
PABRIK DERIVATIF GONDORUKEM & TERPENTINPERUM PERHUTANI DI PEMALANG
CLIENT : PERHUTANI Test Package No:PROJECT TI : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - TA - 052
PERUM PERHUTANI DI PEMALANGJOB NO : 12-1702 Area: PABRIK - 04
PIPE WORK LINE CHECK PUNC LIST
SHEET ISOMETRIC NO DESCRIPTION
CLEARENCE
CATE
GO
RY REKIND INDAH KARYANO SIGN DATE SIGN DATE
NAME NAME
NOTE:CATEGORY "A": ITEM SHALL BE CLEARED PRIOR TO PRESSURE TEST
CATEGORY "B": ITEM CAN CLEARED AFTER TEST
PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED BY,TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTANI
Date: Date: Date: Date: