7 Form Pipe Work Line Check Punc List

4
PABRIK DERIVATIF GONDORUKEM & TERPENTIN PERUM PERHUTANI DI PEMALANG CLIENT : PERHUTANI Test Package PROJECT T : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - TA - PERUM PERHUTANI DI PEMALANG JOB NO : 12-1702 Area: PABRIK - PIPE WORK LINE CHECK PUNC LIST SHEET ISOMETRIC NO DESCRIPTION CLEAREN CATEGORY REKIND I NO SIGN DATE S NAME N NOTE: CATEGORY "A": ITEM SHALL BE CLEARED PRIOR TO PRESSURE TEST CATEGORY "B": ITEM CAN CLEARED AFTER TEST PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTAN Date: Date: Date: Date:

Transcript of 7 Form Pipe Work Line Check Punc List

Page 1: 7 Form Pipe Work Line Check Punc List

PABRIK DERIVATIF GONDORUKEM & TERPENTINPERUM PERHUTANI DI PEMALANG

CLIENT : PERHUTANI Test Package No:PROJECT TI : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - TA - 052

PERUM PERHUTANI DI PEMALANGJOB NO : 12-1702 Area: PABRIK - 04

PIPE WORK LINE CHECK PUNC LIST

SHEET ISOMETRIC NO DESCRIPTION

CLEARENCE

CATE

GO

RY REKIND INDAH KARYANO SIGN DATE SIGN DATE

NAME NAME

NOTE:CATEGORY "A": ITEM SHALL BE CLEARED PRIOR TO PRESSURE TEST

CATEGORY "B": ITEM CAN CLEARED AFTER TEST

PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED BY,TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTANI

Date: Date: Date: Date:

Page 2: 7 Form Pipe Work Line Check Punc List