67-08-121 Underground Utilities Survey Standard.RCN-D12^23434826

download 67-08-121 Underground Utilities Survey Standard.RCN-D12^23434826

of 18

description

67-08-121 Underground Utilities Survey Standard

Transcript of 67-08-121 Underground Utilities Survey Standard.RCN-D12^23434826

Services

Planning and Technical Services Directorate Road and Traffic Engineering Branch

Document No. 67/08/121Issue Date 30/8/2009

UNDERGROUND UTILITIES SURVEY STANDARD

This document is owned and controlled by the Survey & Mapping Manager.

The Data Manager is the delegated custodian.

All comments for revision should be submitted to the Data Manager.

Authorisation

As Executive Director of the Planning and Technical Services Directorate of Main Roads, I authorise the issue and use of this standard.

......................................................................EXECUTIVE DIRECTOR PLANNING TECHNICAL SERVICES DIRECTORATE

Date: ___/ ___/ ___

No controlled copies are issued for this standard.

The latest copy of this standard is located on the Main Roads Internet site.

REVISION STATUS RECORD

PageNoLatest RevisionNoLatest Revision DateRevisionDescription/Reference

30/8/09Full Standard Revision

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Authorised by: ________________________________Date____/____/____Survey & Mapping Manager

MAIN ROADS WA67/08/121 Underground Utility Survey StandardPage 10 of 18CONTENTS1.PURPOSE52.SCOPE53.REFERENCES54.DEFINITIONS AND INTERPRETATIONS55.UNDERGROUND UTILITY DATA66.Coordinate System67.Entry onto Land68.Environmental Impact79.original UTILITY SEARCH DATA.710.UNCOVERING UTILITIES711.ENTERING MANHOLES712.UTILITY Quality CLASS812.1Quality Class A812.2Quality Class B812.3Quality Class C912.4Quality Class D913.data format.913.1String Compression on MX data files.1013.2Utilities Extent Data File1013.3MX Utilities Data File naming convention.1014.utilities plots.1114.1Standard Overlay Colours1114.2Text1114.3Title Block1214.3.1Main Roads Logo and Disclaimer1214.3.2Scale1214.3.3North Point1214.3.4Metadata Box1314.3.5Company Logos1315.UTILITIES SURVEY Report1416.MEDIUMS FOR THE SUPPLY OF DIGITAL DATA.1417.DATA SUPPLY LIST.15APPENDIX A - FEATURE CODES16APPENDIX B - UTILITIES METADATA SHEET17APPENDIX C - PLOT LAYOUT FOR UTILITIES18

PURPOSE

The purpose of this Standard is to establish the requirements of all work related to the collection and presentation of subsurface utilities and utilities data for Main Roads. All work must be performed and presented in accordance with the following standard to ensure that Main Roads has continuity in standard, quality and procedure. This Underground Utilities Standard should be read in conjunction with the Underground Utilities Survey Guideline.

SCOPE

This Standard must apply to all work related to the supply of utility data.

Advice and further information on this standard can be obtained by contacting the Data Manager, Road and Traffic Engineering Branch, Main Roads.

REFERENCES

The following documents relate to this procedure:

Guide to the Relocation or Protection of Services67-08-33 Data License/Copyright 67-08-43 Digital Ground Survey 67-08-44 Mapping StandardEntry onto Land Process Guidelines

DEFINITIONS AND INTERPRETATIONS

The following terms used in this procedure have the specific meanings indicated:

Verified Utility Model utilities that have been surveyed in the field by a method to define its position and level. For example, a verified utilities model of a water pipe would result from the water pipe being located via ground penetrating radar or if the pipe had been uncovered and measured by survey instrumentation. Unverified Utility Model utility locations that have been derived from plans (as built) or digital data from the service provider but have not been measured too by Main Roads to confirm the service position. It is an indication that utilities are possibly in the general location.Main Roads - Main Roads Western Australia.Contractor - the party named in the contract to collect and present underground utility data.AHD - Australian Height Datum.3D Three Dimensional. (Easting, Northing and height)2D Two Dimensional. (Easting and Northing)MX - MX software (genio format).mm millimeter.GPS Global Positioning System.RTK Real Time Kinematic. A GPS survey technique utilising GPS.Project Manager the Main Roads officer responsible for the overall project.Contract Manager the Main Roads officer responsible to deliver the specific utilities data to the Main Roads project manager. Genio An ASCII file format used by MRWA to input data into MX road design software.

UNDERGROUND UTILITY DATA

The minimum requirements for a underground utility survey within a designated Main Roads project area are:

Collected utilities must comply with a nominated utility quality standard (A, B, C or D)

All original plans and digital files collected from the utility providers in their original format must be supplied to Main Roads.

All utility data must be converted to the requested local Main Roads project zone. The utility information shall be converted to digital MX data files with Main Roads string and point codes being utilised.

A utilities survey report must be supplied containing metadata statements for each type of utility supplied from each utility provider.

A utilities plot shall be supplied on request from the Main Roads project manager. The original brief will instruct the consultant if a utilities plot is required before commencing the work.

All data and reports generated from the use of this standard must be lodged with the Data Manager within the Road and Traffic Engineering Branch of Main Roads.

Coordinate System

All utilities data must be supplied in the local Main Roads approved project zone. The nominated local project zone will be provided by the Main Roads contract manager. Parameters for local main Roads project zones can be requested from the Senior Geodetic Surveyor or found on line within the Main Roads Survey Portal.

All utilities data must be 3D and relate to the Australian Height Datum (AHD). If the utility provider supplies 2D data, then the data must be converted to 3D and have -999 nominated as the height component.

Entry onto Land

It is the consultants responsibility to seek and obtain permission from landowners, occupiers or management authorities before entering any property to undertake survey work. Property includes Crown land which may consist of Reserves, National Parks or State Forests. Work may include, but is not limited to, traversing, investigation, surveying and uncovering utilities.

The consultant shall maintain a written report of all contacts. Details about each contact are to be outlined in the Underground Utilities Survey report.

Any queries made by land owners with respect to the project are to be referred to the Main Roads Project Manager.

If access onto land is refused by the owners the contractor will be required to immediately contact the Main Roads Project Manager to discuss the need for entry onto the land. If entry is required for the completion of the contract and there are no other alternatives, then Main Roads will arrange formal notification using delegated powers under the Land Administration Act. A formal notice of entry requires Main Roads to provide 7 days notice to the owners. The process to arrange the formal notice of entry may take some time and the consultant must liaise with the Project Manager to ensure disruption to the contract schedule is minimised.

Environmental Impact

All work is to be performed such that environmental impact is minimised. Any breach of environmental and heritage legislation during the execution of works is the sole responsibility of the consultant. The consultant shall ensure any disturbances are kept to an absolute minimum. The consultant shall reinstate, clean-up and leave the site as close to its pre-disturbed condition as possible on completion of any work or investigation.

New tracks shall not be formed, existing tracks altered, fencing cut, clearing carried out, or damage or disturbance made of any kind unless approved by the Main Roads Project Manager.

The consultant shall be responsible for the cost of reinstating any damage to property resulting from their work.

original UTILITY SEARCH DATA.

All original utilities search data provided from the utility provider must be supplied to Main Roads in addition to the final utilities data that has been altered to comply with Main Roads coordinate system, string codes and file format.

All hardcopy plans and digital files in the original data format and coordinate system must be provided to Main Roads.

UNCOVERING UTILITIES

Any utilities uncovered must be by a recognised licensed body that is qualified to uncover buried utilities (i.e. pot holing or vacuum dredge). The integrity of the service and the safety of the workers and public must be maintained at all times.

ENTERING MANHOLES

Man holes and underground areas are not to be entered.

UTILITY Quality CLASS

An underground utilities survey will be requested by the Main Roads project manager to one of the following quality classes to allow data to be customised to Main Roads requirements.

Quality Class A

Quality Class A is the highest accuracy order for a utilities survey. The consultant will be required to perform the following tasks to complete a quality class A utilities survey.

The consultant must perform a quality class D (see 12.4) or higher survey to search and identify all utilities in critical areas that have an impact on the scope of works. Liaise with the Main Roads contract manager to determine the most efficient way of exposing and locating the utilities. Expose / pot hole the utility and measure directly to it by total station, theodolite or GPS. Achieve accuracies of -/+30mm horizontally and vertically. The consultant must be licensed to expose the requested utilities or use a subcontractor who is. All necessary approvals must be in place to undertake the work. The consultant must ensure the integrity of the service and the safety of the workers and public are maintained at all times. Present the utilities survey in Genio format adopting MRWA codes and file format. Provide a utilities survey report.

The outcome of this survey is a verified utilities model.

Quality Class B

The consultant will be required to perform the following tasks to complete a quality Class B utilities survey.

The consultant must perform all tasks for a quality class D utilities search (see 12.4). All utilities shall be surveyed by an indirect survey method. This can involve locating gas, electric, phone, water, sewer and cables with methods such as ground penetrating radar or active and passive frequency detectors, electromagnetic detectors, acoustic detection systems. The accuracy of the utilities shall be located to -/+ 100 mm at a depth less than 1.2 meters and an accuracy of -/+200 mm for depths greater than 1.2 meters. Leave markings on the earths surface to denote the position of the service underground. Present the indirect utilities survey in Genio format adopting MRWA codes and file format. Provide a utilities survey report.

The outcome of this survey is a verified utilities model.

Quality Class C

The consultant will be required to perform the following tasks to conform to quality Class C.

Performed all tasks for a quality class D utilities search (see 12.4). Survey all surface utilities in accordance with the relevant Main Roads survey standard. Depending on the survey capture technique, either 67-08-43 Digital Ground Survey standard or 67-08-44 Mapping standard is to apply. Alter all subsurface utilities locations obtained from supplied plans to align with surveyed surface features to depict their location. These lines are to be clearly noted in the utilities report or on plots as probable location only. Liaise with the Main Roads project manager for requirements. Consultant may be required to lift service manhole lids to confirm pipe directions and measure pipe diameters. Sub surface man holes and areas are not to be entered for safety reasons. All observations and measurement are to be performed from outside the manhole. Supply all utility information in digital format adopting Main Roads codes and file formats. Provide a utilities survey report.

The outcome of this utilities survey is an unverified utilities model.

Quality Class D

The consultant will be required to perform the following tasks to complete a quality Class D utilities search.

The consultant is required to go to site to conduct a visual site survey of the requested area to identify any utilities in the area. The consultant shall perform a utilities search at the dial before you dig service. (Ph 1100 or web site http://www.dialbeforeyoudig.com.au.) Collect utilities data from custodians not covered by the dial before you dig site. This can include property owners, mine sites, local authorities etc that have been identified in the site visit. Supply all utility information in digital format adopting Main Roads codes and file formats. Supplying all raw data obtained from the service providers. Provide a utilities report.

The outcome of this utilities survey is an unverified utilities model.

data format.

All utilities are to be searched, converted and supplied as MX data files. Scaling of hard copy utility provider plans may only be performed when no electronic version exists with the utility provider.

Only Main Roads feature codes detailed at Appendix A can be used. Any additional codes required must be obtained from the Data Manager, Road and Traffic Engineering Branch, Main Roads. All additional approved codes must be clearly noted within the utilities survey report. Existing Main Roads codes must be used with text clearly denoting differences in details.

All utilities must be 3D. All original utilities without levels must be made 3D and given a null level of 999.000.

String Compression on MX data files.

All utility strings supplied in MX Genio files must be run through compression software to ensure that the number of Main Roads captured labels do not exceed the permutation of possible labels available.

Acknowledgement must be written within the utilities report that the MX Genio files supplied to Main Roads have been compressed.

Compression software can be obtained from the Data Manager, Road and Traffic Engineering Branch and Technical Services Branch, Main Roads.

Utilities Extent Data File

An outline of the utilities investigation area must be supplied in a single file and labelled as a two-dimensional B string. The string must form a closed polygon.

MX Utilities Data File naming convention.

All utilities data must be provided to Main Roads in MX format files.

Digital files shall be named in accordance with Main Roads Document 67-08-87 Data Model and String Naming Guideline and consist of two files. These are the utilities data (util) and the boundary of the search area (ext).

For example, if the Great Northern Highway had utilities collected within the road reserve corridor from SLK 25 55 then two data files would be supplied and labelled accordingly:

All utilities data would be supplied within

H6_25_55_util.gen.

Where:

H6 is the Main Roads code for the Great Northern Highway25 is the start SLK55 is the end SLK andutil is the annotation to denote a utilities file

Additionally a second file would outline the extent of the service survey and would be labelled

H6_25_55_ext.gen.

Where:

H6 is the Main Roads code for the Great Northern Highway25 is the start SLK55 is the end SLK andext is the annotation to denote that this file outlines the extent of the area that the service search was performed on.

Road numbers and SLKs for each project will be supplied by the project manager.

utilities plots.

If a plot of the utilities data is requested from the consultant then the following must apply:

The plot shall be supplied in hardcopy and as a digital tif or ecw file.

All service plots must be supplied on an A1 sized page. Scales shall be 1:500 or 1:1000 but can be altered on request.

The digital utilities models plot layout shall be presented in accordance with the following information. Please see Appendix C for layout requirements.

All utilities data is to overlay base data that will consist of SkyView imagery and cadastral data. The base data shall be the latest information available at the time of the plan creation and will be supplied by Main Roads WA. Consultants must request the base data from Main Roads if it has not been provided.

Standard Overlay Colours

Overlayed data is to conform to the following colours:

Cadastral boundaries GreenMRS boundaries RedContours including labels and spot heights YellowText Preferably black with a white halo otherwise black or whiteUtilities related to water blue and shades there of.Utilities related to sewerage brownUtilities related to telecommunication orangeUtilities related to electricity pinkUtilities related to gas - greyOther features can be any colour as long as it is clearly indicated in the legend of the plot.

Text

Text is to appear on all existing roads of interest and roads intersecting the road of interest. All areas of importance. (i.e. Lakes, Rivers etc) All natural water features are to labelled using italic font.

Text colour shall be black with a white halo otherwise a black or white font is to be used depending on what colour achieves the best visual display. All text is to be page orientated (not North orientated) and to face toward the top of the page. All text labelling features that are straight up and down are to be read from the RHS of the page. (i.e. Text to have their tops pointing toward the LHS.)

Title Block

A title block is to be located at the base of all images. All items in the title block are to be laid out as per Appendix C. The title block will contain the following items.

Main Roads Logo and Disclaimer

The Government of Western Australia and Main Roads Western Australia logo must appear on all plots. The Government of Western Australia logo must appear before the Main Roads Western Australia logo.

The logos must be accompanied with the following disclaimer below it:

Copyright and Intellectual property over the information displayed on this plan shall remain the property of Main Roads. The copying, exchange, sale or release of the information cannot be undertaken without prior notification and written agreement of Main Roads.

Please note: Text disclaimer and logo are not to scale with each other.

Scale

A clearly labelled scale and scale bar must appear with each image.

North Point

A standard Main Roads North point is to be located with each image.

North points are never to face downwards.

Metadata Box

A metadata box is to appear on all plot and raster images. The metadata box must contain a statement that it complies to Main Roads standard 67/08/121 and must state what quality level has been achieved for the utilities displayed.

All other data sources (other than utilities) must be acknowledged within the metadata box. As there may be too many types of utilities to practically display in the meta data box, the Main Roads utilities contract number must be stated to assist with the location of the utilities report which will contain the full utilities metadata details.

An example of a meta data box for a utilities plan is on the following page

DATASOURCEDATESCALEACCURACY

Aerial PhotographyLANDGATE1/1/20061:200002.0m

Utilities search-7/4/2007--

CadastralWALIS7/4/2006-

ContoursLANDGATE12/11/20061:20000.5m

DatumPCG94Contour Interval:2.0m

Plan No123456-12Main Roads Utilities contract No984/06

This utilities plan complies with MRWA standard 67/08/121 Quality level A

Company Logos

Company Logos and acknowledgements may be discretely placed on the utilities plot within the title bar or on the title pages of a booklet. The placement of the logos is as per Appendix C. A companies logo, address, phone numbers etc (combined) must not be larger than the Main Roads logo.

UTILITIES SURVEY Report

A utilities survey report must be supplied for each utility survey. The report must be in Microsoft Word (.doc) format and must be supplied digitally and in a hardcopy format.

The report must contain the following headings and information:

Main Roads contract number and any reference numbers. Scope of Work. - What class of utilities survey has been performed (A, B, C or D). A description or diagram of the area. How the utilities were collected and received i.e. were the utilities collected by field survey or was the data provided by the utilities custodian. If the data was received from a custodian, was the utilities data digitised from hard copy plans or already digitally formatted. Date of Utilities Search - The date the utilities search was performed. Project Zone the utilities data was submitted in. Survey method used to locate utilities if a field survey was performed. For example, was a hole dug and theodolite used to measure pipe heights or was ground penetrating radar used? Data file names list. The name of all MX files supplied and a note that string compression software had been used on all supplied files. A list of all raster image files. Contact names and numbers for each of the service providers contacted. Information Received - Copies of utilities faxes, original plans and information (digital and hard copy) received from the utilities provider in the original data format before being converted to MX format. Project Issues. - A statement that string compression was used on the MX Genio service file. Additionally, if there are any issues relating to entry onto land and / or contact with landowners. (E.g. the refusal of entry onto land.) Metadata Table - A metadata statement table (Appendix B) is to be submitted with a service description for each utility. Each utility must be addressed with a contact name and labelled accuracy for each utility.

MEDIUMS FOR THE SUPPLY OF DIGITAL DATA.

Digital Data must be presented on either of the following mediums:

CDs-CD-R or CD-RW-700 MB Windows XP compatible.and / orDVDs-DVD-R or DVD-RW-4.7 GB-Windows XP compatible.

DATA SUPPLY LIST.

The following items must be lodged with Main Roads for every utilities survey.

The utilities digital data in Main Roads codes and formats. A utilities report as outline in 15 Utilities Survey Report. Original utilities search data. If requested, hard copy utilities plot - consisting of utilities overlayed over SkyView imagery and cadastral boundaries.

APPENDIX A - FEATURE CODES

MULTIPLE LIGHT POLE LM1WATER BOREPWB1

ELECTRIC LIGHT POLE (ELP) EL1STANDPIPEPST1

ELP (MRWA)EM1WATER PIPEWP1

POWER POLE PPP1RETICULATION SPRINKLERPRT1

TRANSFORMER (SINGLE)PET1TAPPWT1

TRANSFORMER (DOUBLE)ET1WELLPWL1

STAY POLEPSP1WATER MAIN MARKERPWR1

STEEL WIRE ANCHORPWA1RETICULATION CONTROL VALVEPSU1

HIGH MAST LIGHTINGPHL1GAS MARKERPGM1

ELECTRIC CABLE MARKERPSC1GAS VALVEPGV1

MRWA CABLE MARKERPCM1GAS MANHOLEEG1

MRWA ELECTRIC CABLE BOXPRE1GAS LINEEH1

ELECTRIC CABLE BOX PEC1GAS TEST VALVEPGU1

HIGH TENSION PYLONEP1

MRWA DISTRIBUTION BOARDPDB1WATER CORP DRAINAGE MANHOLEDW1

OVERHEAD POWER LINESEA1MRWA DRAINAGE MANHOLEDR1

HIGH TENSION POWER POLEPHT1SIDE ENTRY PITDX1

MRWA ELECTRIC SUPPLY POLEPPE1UNDEFINED MANHOLEDU1

GROUND FLOODLIGHTPGF1GULLYDG1

MRWA ELECTRIC MANHOLEEU1LGA DRAINAGE MANHOLEDL1

DRAINAGE PIPEDP1

TELEPHONE MANHOLEVM1SEWERAGE PIPEDV1

TELEPHONE PIT OR BOXPPB1SEWERAGE MANHOLEDS1

TELEPHONE PILLARPTP1SEWER VENTPSW1

TELEPHONE MARKERPTM1SEWER LINE MARKERPSX1

TELEPHONE POLEPPT1

TELEPHONE BOOTHPFB1RAILWAY PLATFORMRZ1

EMERGENCY PHONEPEP1ON RAILRY1

TELEPHONE TOWERVT1RAIL TRAFFIC SIGNALSPRS1

TELEPHONE CABLEVC1RAIL TRAFFIC CONTROL BOXPRC1

ANTENNAPAN1RAIL TELEPHONE BOXPPR1

TELEPHONE ELEVATED JOINTPTJ1RAIL CABLE PIT OR BOXPRB1

WATER METERPWM1RAIL BOOM GATEGX1

STOP VALVEPSV1RAIL CABLE MARKERPRX1

HYDRANT (GROUND)PHG1RAIL CABLE MANHOLEDZ1

HYDRANT (PILLAR)PHP1RAIL UNDERGROUND CABLEER1

APPENDIX B - UTILITIES METADATA SHEET

Metadata CategoryCore Metadata ElementDescription

DatasetProject TitleGreat Eastern Highway SLK 25 55

Date of utilities search20/03/2006

CustodianSurvey and Mapping Branch

MRWA Contract number9999/99

Standard67/08/121 Rev 30/08/2009 Class D.

Description Utilities search provided over Murray Road. See following diagram Appendix?

Contact AddressOrganisationJohn Smith utilities Inc.

Contact PositionJohn Smith

Mail Address99 Smithdale CourtEast Perth WA 6005

Telephone9666 6666

Facsimile9666 6665

Electronic [email protected]

Utility DescriptionType of utilityWater Main

Custodian of utilityWater Corporation

Contact nameSplash Waters

Contact number9123 4567

Positional Accuracy2m

Date

Type of utilityElectricity

Custodian of utilityWestern Power

Contact nameHigh Voltage

Contact number9123 4567

Positional Accuracy2m

Date

Utilities ProjectionCoordinate SystemPerth Coastal Grid 94

Metadata DateMetadata Date

Further InformationApproved non standard codesNone

Problems encountedFred Bloggs refusing entry to land (see attachment)

Any relevant information or comment

Further Information

APPENDIX C - PLOT LAYOUT FOR UTILITIES