    Ind-Barath 660MW Power Plant Project Schedule

    0Pubilic System

    Validate contract

    Preliminary design

    Detailed investigation

    Pile foundation construction

    Main plant excavation

    Pour the first side of concrete

    The main plant on the basis of zero meter

    Begin lifting main plant steel structure

    Install dust removing system

    Center control building preparation

    Chimney top sealing

    Install turbine pedestal

    Chemical water workshop preparation

    Main plant close

    Air cooler island foundation preparation

    Chemical qualified demineralized water

    oiler installation startsBoiler drum lifting in position

    ST bedplate in positionAuxiliary power receivingFinish boiler water pressure test

    --- limestone

    (Design, Civil work, Supply, Installation & Commisioning)

  • 7/27/2019 660 MW Schedule

    2/7

    Activity

    Description

    Mont hs

    -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

    Months

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Sheet 2 of 7

    0

    Pubilic System

    --- limestone

    Turbine coveringBoiler acid cleaning starts

    Boiler ignition pipe blowingInitial synchronization

    Whole set test run endPAC end

    Design

    Preliminary detailed investigationPreliminary designConstruction general drawing

    Boiler drawingPreliminary design review

    Construction drawing of five open one flat Construction drawing of plant underground equipment Technology construction drawing Electric heat control drawing Drawing design of pile foundation project

    --- progress

    Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)

  • 7/27/2019 660 MW Schedule

    3/7

    Activity

    Description

    Mont hs

    -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

    Months

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Sheet 3 of 7

    0

    Equipment Purchasing

    ain equipment bid invitingoiler equipment purchasingTG equipment purchasing

    The first batch purchasingP heater

    LP heatereaeratoran

    Electrical equipmentable bracket/cable

    P pipe & valves,pipe fittings

    /L P pipe & valves,pipe fittingsESPCondensate pumpElectrically driven feed pumpOther pressure vesselsCirculating water pumpBoiler elevator

    Thermal control equipmenthemical water equipment

    Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)

  • 7/27/2019 660 MW Schedule

    4/7

    Activity

    DescriptionMont hs

    -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

    Months

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Sheet 4 of 7

    0

    Transportation

    Boiler steel structureurbine foundation embedded part

    an & pumpSP

    Deaerator & Coal MillsContinuous Blowdown & Intermittent Blowdown SystemAUX of Turbine

    urbine properenerator proper

    Drumoiler proper

    pipe & thermal controlAir cooler island equipment

    Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)

  • 7/27/2019 660 MW Schedule

    5/7

    Activity

    Description

    #1

    #2

    Mont hs

    -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

    Months

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Sheet 5 of 7

    0

    4-8

    4-8

    5-7

    8-15

    9

    4-7

    6-10

    4-7

    9-11

    7-16

    8-13

    8-14

    8-11

    7-10

    11-15

    6-11

    15

    15

    8-14

    11-19

    Engineering Progress Schedule

    --- progress

    Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)

  • 7/27/2019 660 MW Schedule

    6/7

    Activity

    Descript on

    #1

    #2

    Mont hs

    -1 1 2 3 4 5 6 7 8 9 10 11 1 2 13 1 4 15 16 17 1 8 19 20 21 22 2 3 24 25 2 6 27 2 8 29 30 3 1 32 33 34 3 5 36 37 3 8 39 40 41 4 2 43

    Months

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Sheet 6 of 7

    0

    6-11

    14-20

    14-22

    10-18

    15

    15-20

    15-20

    16-20

    17-22

    15-21

    15-21

    15-21

    17-21

    16

    18-20

    19-21

    11-18

    14-19

    16-20

    19-20

    15-21

    Engineering Progress Schedule

    Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)

  • 7/27/2019 660 MW Schedule

    7/7

    D ip

    #1

    #2

    Mont hs

    -1 1 2 3 4 5 6 7 8 9 10 11 1 2 13 1 4 15 16 17 1 8 19 20 21 22 2 3 24 25 2 6 27 2 8 29 30 3 1 32 33 34 3 5 36 37 3 8 39 40 41 4 2 43

    Months

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Sheet 7 of 7

    0

    20

    20-22

    20-22

    20-22

    21-22

    21-22

    21-22

    22

    21

    21

    21

    21

    22

    22

    24

    The first four months is equipment bid inviting and design stage

    and the 22nd month is test run period.

    In china, generating power within 24 months for this project is feasible.But the foundation construction depends on the geological condition,if you want to generate power within this period,

    the erection works must keep up with the whole progress.

    Engineering Progress Schedule

    Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)