64 QYARTER

45
Estimate for each Quarter G-004 S.No. Description of Item Unit Repair(R) 1 Doors New(N) a) Hinges No Repair(R) b) Tower Bolt No. c) Gap in lower Portion/Stone Strip 2" thi rmt N d) Gate broken , Need to add wood sft e) Door Lock No. N f) Door swollen job j) Door Stopper No. N Glass Blind sqm N Door Handle 5 " No. 2 Window a) Hinges b) Tower Bolt c) Gate broken , Need to add wood cft d) Lock e) Window swollen sqm f) Glass broken sqm g) rft h) Handle i) Window stopper k) Door Curtain handle rmt 3 Electrical a) 16 A Power point No. b) 16 A power point with wiring No. N b) 5 A point No. c) Blanks d) Bulb Holder No. e) Tubelight f) Earthing Problem Job N g) Fan Regulator No. h) Switch i) 16 A Socket j) DB box screw K Door Bell No N 4 Bathroom/Shower Area a) Extension Nipple b) Bib cock c) Leakage from outer pipe d) Gate valve to block water supply Take Average of surveyed Quanitiies for general Quarters . That will be more accurate . Glass rubber strip to be fixed and glass putty to be removed

description

RATE ANALYSIS OF REPAIR WORK

Transcript of 64 QYARTER

Page 1: 64 QYARTER

Estimate for each Quarter 390

G-004 G-104

S.No. Description of Item Unit Repair(R) Qty Repair(R) /1 Doors New(N)

a) Hinges No Repair(R) 3b) Tower Bolt No. c) Gap in lower Portion/Stone Strip 2" thick rmt N 2.1336 Nd) Gate broken , Need to add wood sfte) Door Lock No. N Nf) Door swollen job Rj) Door Stopper No. N 1

Glass Blind sqm N 0.5574136 NDoor Handle 5 " No.

2 Window a) Hingesb) Tower Boltc) Gate broken , Need to add wood cftd) Lock e) Window swollen sqmf) Glass broken sqm

g) rft 35 rfth) Handle i) Window stopper k) Door Curtain handle rmt 1.38 rmt

3 Electrical a) 16 A Power point No.b) 16 A power point with wiring No. N 1 Nb) 5 A point No.c) Blanks d) Bulb Holder No.e) Tubelight f) Earthing Problem Job N Ng) Fan Regulator No.h) Switch i) 16 A Socket j) DB box screwK Door Bell No N 1 N

4 Bathroom/Shower Area a) Extension Nipple b) Bib cock c) Leakage from outer pipe d) Gate valve to block water supply e) PVC connection pipe

See First Quantity for calculation. Take Average of surveyed Quanitiies for general Quarters . That will be more accurate .

Glass rubber strip to be fixed and glass putty to be removed

Page 2: 64 QYARTER

f) CP waist pipe g) Short Body Bib cock h) Angle Valvei) Stone for keeping soap sft N 1.125 NJ bathroom tile to be changed sqm

5 WC Area a) Extension nipple b) Tap broken c) WC broken d) Flush broken e) GI line need replacement f) CP jali grouting No R 4 R

Cistern NoWC trap NoLong Bend No

6 Washbasin area a) Kitchen Washbasin cupboard Gap rmt N 2.48 Nb) Kitchen Washbasin new No.c) Blockage Job

7 Cupboard a) Al bihari Hinge Nb) Strip Repair 2.50 mtr No.c) handle 6 " No.

8 Outer Sanitary work a) RWH pipe for open area rmt N 0.25 Nb) Outer Rain water pipe blockage c) Overhead water Tank No. N 0.35 Nd) Gate valve No. N 0.35 Ne) Tank Nipple No. N 0.35 Nf) Float Valve No. N 0.35 Ng) New Steel light Door for Staircase area No. N 0.17 Nh) CI 4 " rft R 19 Ri) GI 1.5 " rft R 9.5 Rk) GI 1.75 " rft R 9.5 Rl) UPVC 4" rft R 19 R

9 Staircase area a) MS railing rft N 1.4 Nb) paint railing c) Glass sqm N 0.0634766 Nd) kota Stone N 0.3125 Ne) Cleaning of Roof

10 Civil work Plaster sft N 5 N

Page 3: 64 QYARTER

G-104 G-102 G-103 G-204 G-301

Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty

2.1336 N 2.1336 N 2.1336 N 2.1336 N 2.1336

0 N 0 N 0 N 0 N 01 R 1

0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136

R 2

35 rft 35 rft 35 rft 35 rft 35N 1

1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38

N 11 N 1 N 1 N 1 N 1

N 1 N 1 N 1

0 N 0 N 0 N 0 N 0

1 N 1 N 1 N 1 N 1

N 1 N 1

N 1

Page 4: 64 QYARTER

N 1N 1 N 1N 1 N 1 N 1 N 1

1.125 N 1.125 N 1.125 N 1.125 N 1.125

4 R 4 R 4 R 4 R 4

2.48 N 2.48 N 2.48 N 2.48 N 2.48N 1

2 N 2 N 4 N 4 N 8

0.25 N 0.25 N 0.25 N 0.25 N 0.25

0.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.17 N 0.17 N 0.17 N 0.17 N 0.17

19 R 19 R 19 R 19 R 199.5 R 9.5 R 9.5 R 9.5 R 9.59.5 R 9.5 R 9.5 R 9.5 R 9.519 R 19 R 19 R 19 R 19

1.4 N 1.4 N 1.4 N 1.4 N 1.4

0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 N 0.06347660.3125 N 0.3125 N 0.3125 N 0.3125 N 0.3125

5 N 5 N 5 N 5 N 5

Page 5: 64 QYARTER

G-302 G-303 H-004 H-002 H-101

Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) /

N 2.1336 N 2.1336 N 2.1336 N 2.1336 N

N 0 N 0 N 0 N 0 NN 1 N

N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N

rft 35 rft 35 rft 35 rft 35 rft

N 1rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt

N 1 N 1 N 1 N 1 NN 1 N 1 N 1 N 1 NN 1

N 0 N 0 N 0 N 0 N

N 1 N 1 N 1 N 1 N

N 1

Page 6: 64 QYARTER

N 1N 2 N 1 N 1N 1.125 N 1.125 N 1.125 N 1.125 N

N 1.491 N 1.491 N

R 4 R 4 R 4 R 4 RN 1

N 2.48 N 2.48 N 2.48 N 2.48 N

N 2 N 2 N

N 0.25 N 0.25 N 0.25 N 0.25 N

N 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.17 N 0.17 N 0.17 N 0.17 NR 19 R 19 R 19 R 19 RR 9.5 R 9.5 R 9.5 R 9.5 RR 9.5 R 9.5 R 9.5 R 9.5 RR 19 R 19 R 19 R 19 R

N 1.4 N 1.4 N 1.4 N 1.4 N

N 0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 NN 0.3125 N 0.3125 N 0.3125 N 0.3125 N

N 5 N 5 N 5 N 5 N

Page 7: 64 QYARTER

260

H-101 H-102 H-103 H-202 H-203

Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty

N 2

2.1336 N 2.1336 N 2.1336 N 2.1336 N 2.1336

0 N 0 N 0 N 0 N 01 N 1 N 1

0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136

N 1

35 rft 35 rft 35 rft 35 rft 35

1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38

1 N 1 N 1 N 1 N 11 N 1 N 1 N 1 N 1

0 N 0 N 0 N 0 N 0

1 N 1 N 1 N 1 N 1

N 1N 1

Page 8: 64 QYARTER

N 1N 1 N 1

1.125 N 1.125 N 1.125 N 1.125 N 1.1251.491 N 0.19 N 1.491

N 1

4 R 4 R 4 R 4 R 4

N 1

2.48 N 2.48 N 2.48 N 2.48 N 2.48

2 N 2 N 2

0.25 N 0.25 N 0.25 N 0.25 N 0.25

0.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.17 N 0.17 N 0.17 N 0.17 N 0.17

19 R 19 R 19 R 19 R 199.5 R 9.5 R 9.5 R 9.5 R 9.59.5 R 9.5 R 9.5 R 9.5 R 9.519 R 19 R 19 R 19 R 19

1.4 N 1.4 N 1.4 N 1.4 N 1.4

0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 N 0.06347660.3125 N 0.3125 N 0.3125 N 0.3125 N 0.3125

5 N 5 N 5 N 5 N 5

Page 9: 64 QYARTER

H-201 H-204 H-304 F-304 F-004

Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) /

NN 2.1336 N 2.1336 N 2.1336 N 2.1336 N

N 0 N 0 N 0 N 0 NN 1 N 1

N 1N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N

N 1

rft 35 rft 35 rft 35 rft 35 rftN 1

rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt

N 1 N 1 N 1 N 1 NN 1 N 1 N 1 N 1 N

N 1 N 1 N 1

N 0 N 0 N 0 N 0 NN

N 1 N 1 N 1 N 1 N

N 1 N 1 N 3

N 1

Page 10: 64 QYARTER

N 1 N 1 NN 1

N 1.125 N 1.125 N 1.125 N 1.125 NN 0.19 N 1.491 N 1.491

R 4 R 4 R 4 R 4 RN 1 N

N 2.48 N 2.48 N 2.48 N 2.48 N

N 0.25 N 0.25 N 0.25 N 0.25 N

N 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.17 N 0.17 N 0.17 N 0.17 NR 19 R 19 R 19 R 19 RR 9.5 R 9.5 R 9.5 R 9.5 RR 9.5 R 9.5 R 9.5 R 9.5 RR 19 R 19 R 19 R 19 R

N 1.4 N 1.4 N 1.4 N 1.4 N

N 0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 NN 0.3125 N 0.3125 N 0.3125 N 0.3125 N

N 5 N 5 N 5 N 5 N

Page 11: 64 QYARTER

130

F-004 F-302 F-303 F-301 F-202

Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty

N 11

2.1336 N 2.1336 N 2.1336 N 2.1336 N 2.1336

0 N 0 N 0 N 0 N 0N 1

0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136

0.45 N 1.1380528

35 rft 35 rft 35 rft 35 rft 35

1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38

1 N 1 N 1 N 1 N 11 N 1 N 1 N 1 N 1

N 1

0 N 0 N 0 N 0 N 01

N 1

1 N 1 N 1 N 1 N 1

N 1

Page 12: 64 QYARTER

1 N 1 N 2N 1

1.125 N 1.125 N 1.125 N 1.125 N 1.125N 1.491 N 1.491 N 1.491

4 R 4 R 4 R 4 R 41 N 1

2.48 N 2.48 N 2.48 N 2.48 N 2.48

R 1

N 5 N 4

0.25 N 0.25 N 0.25 N 0.25 N 0.25

0.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.17 N 0.17 N 0.17 N 0.17 N 0.17

19 R 19 R 19 R 19 R 199.5 R 9.5 R 9.5 R 9.5 R 9.59.5 R 9.5 R 9.5 R 9.5 R 9.519 R 19 R 19 R 19 R 19

1.4 N 1.4 N 1.4 N 1.4 N 1.4

0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 N 0.06347660.3125 N 0.3125 N 0.3125 N 0.3125 N 0.3125

5 N 5 N 5 N 5 N 5

Page 13: 64 QYARTER

390 520

F-201 F-203 F-204 F-104 F-101

Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) /

R 3 R 4N

N 2.1336 N 2.1336 N 2.1336 N 2.1336 N

N 0 N 0 N 0 N 0 N

N 1N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N

rft 35 rft 35 rft 35 rft 35 rft

rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt

N 1 N 1 N 1 N 1 NN 1 N 1 N 1 N 1 N

N 0 N 0 N 0 N 0 N

N 1 N 1 N 1 N 1 N

N 1

Page 14: 64 QYARTER

N 1

N 2 N 2N 1.125 N 1.125 N 1.125 N 1.125 N

N

R 4 R 4 R 4 R 4 R

N 2.48 N 2.48 N 2.48 N 2.48 N

N 4 N 4 N 4 N 2 N

N 0.25 N 0.25 N 0.25 N 0.25 N

N 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.17 N 0.17 N 0.17 N 0.17 NR 19 R 19 R 19 R 19 RR 9.5 R 9.5 R 9.5 R 9.5 RR 9.5 R 9.5 R 9.5 R 9.5 RR 19 R 19 R 19 R 19 R

N 1.4 N 1.4 N 1.4 N 1.4 N

N 0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 NN 0.3125 N 0.3125 N 0.3125 N 0.3125 N

N 5 N 5 N 5 N 5 N

Page 15: 64 QYARTER

520 390

F-101 F-102 F-202 J-004 F-003

Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty

R 4 R 31

2.1336 N 2.1336 N 2.1336 N 2.1336 N 2.1336

0 N 0 N 0 N 0 N 0

N 2 N 10.5574136 N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136

R 1N 0.836074

35 rft 35 rft 35 rft 35 rft 35

N 2 N 11.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38

1 N 1 N 1 N 1 N 11 N 1 N 1 N 1 N 1

N 1 N 1

0 N 0 N 0 N 0 N 0

N 1R 1

1 N 1 N 1 N 1 N 1

N 1 N 1

Page 16: 64 QYARTER

N 1N 1 N 1N 1

1.125 N 1.125 N 1.125 N 1.125 N 1.1251.491 N 1.491 N 0.19

4 R 4 R 4 R 4 R 4N 1 N 1

N 1

2.48 N 2.48 N 2.48 N 2.48 N 2.48

2 N 6 N 10N 1

0.25 N 0.25 N 0.25 N 0.25 N 0.25

0.35 N 0.35 N0.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.35 N 0.35 N 0.35 N 0.35 N 0.350.17 N 0.17 N 0.17 N 0.17 N 0.17

19 R 19 R 19 R 19 R 199.5 R 9.5 R 9.5 R 9.5 R 9.59.5 R 9.5 R 9.5 R 9.5 R 9.519 R 19 R 19 R 19 R 19

1.4 N 1.4 N 1.4 N 1.4 N 1.4

0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 N 0.06347660.3125 N 0.3125 N 0.3125 N 0.3125 N 0.3125

5 N 5 N 5 N 5 N 5

Page 17: 64 QYARTER

130 1170

J-103 J-102 J-104 J-204 General Quarters

Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) / Qty Repair(R) /

N 1 N 9N 2 N 1 N 1N 2.1336 N 2.1336 N 2.1336 N 2.1336 NN 7.25N 0 N 0 N 0 N 0 N

N 0.5574136 N 0.5574136 N 0.5574136 N 0.5574136 NN 1

rft 35 rft 35 rft 35 rft 35 rft

No 2rmt 1.38 rmt 1.38 rmt 1.38 rmt 1.38 rmt

N 1 N 1 N 1 N 1 NN 1 N 1 N 1 N 1 NN 1 N 1 N 1

N 1 No 1

N 0 N 0 N 0 N 0 N

No. 1

N 1 N 1 N 1 N 1 N

N 1 N 1 N 1N 1

N 1 N 1 N 1

Page 18: 64 QYARTER

N 1N 2 N 1 N 1

N 1.125 N 1.125 N 1.125 N 1.125 NN 0.29 N 0.4645113

R 4 R 4 R 4 R 4 R

N 1

N 2.48 N 2.48 N 2.48 N 2.48 N

N 10 N 2 N 4N 1

N 3 N 1

N 0.25 N 0.25 N 0.25 N 0.25 N

N 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.35 N 0.35 N 0.35 N 0.35 NN 0.17 N 0.17 N 0.17 N 0.17 NR 19 R 19 R 19 R 19 RR 9.5 R 9.5 R 9.5 R 9.5 RR 9.5 R 9.5 R 9.5 R 9.5 RR 19 R 19 R 19 R 19 R

N 1.4 N 1.4 N 1.4 N 1.4 N

N 0.0634766 N 0.0634766 N 0.0634766 N 0.0634766 NN 0.3125 N 0.3125 N 0.3125 N 0.3125 N

N 5 N 5 N 5 N 5 N

Page 19: 64 QYARTER

390

General Quarters Final Qty Calculation D2 102 D2 103 D2-201

Qty Qty Nos R/N Qty

Repair 0.789 64 51 N 3New 0.158 64 11

2.1336 New 2.077 64 133 N 1.8New 0.191 64 13 N 2.5

0 New 0.000 64 0 N 0.109Repair 0.237 64 16New 0.158 64 11

0.5574136 New 0.543 64 35 N 0.45New 0.026 64 2New 0.000 64 0New 0.000 64 0New 0.000 64 0New 0.000 64 0 N 0.265New 0.000 64 0Repair 0.132 64 9New 0.064 64 5 N 0.9579

35 New 34.079 64 2182 N 35 rft 35New 0.053 64 4New 0.158 64 11

1.38 New 1.344 64 86 rmt 1.35New 0.000 64 0

1 New 0.842 64 54 N 11 New 0.974 64 63 N 1

New 0.342 64 22New 0.000 64 0New 0.053 64 4New 0.000 64 0

0 New 0.000 64 0 N 1New 0.026 64 2New 0.026 64 2New 0.053 64 4Repair 0.026 64 2

1 New 0.974 64 63 N 1New 0.000 64 0New 0.079 64 6New 0.289 64 19 N 1New 0.000 64 0New 0.105 64 7New 0.132 64 9

Repair /New

Final Estimate Qty for 64 quarters

Page 20: 64 QYARTER

New 0.105 64 7New 0.421 64 27New 0.447 64 29

1.125 New 1.095 64 71 N 2.25New 0.466 64 30 N 8.97New 0.000 64 0New 0.000 64 0New 0.000 64 0New 0.000 64 0New 0.026 64 2New 0.000 64 0

4 Repair 3.895 64 250 R 4New 0.158 64 11 N 1New 0.026 64 2New 0.053 64 4New 0.000 64 0

2.48 New 2.415 64 155New 0.026 64 2New 0.026 64 2New 0.000 64 0New 2.289 64 147New 0.053 64 4New 0.105 64 7New 0.000 64 0

0.25 New 0.243 64 16New 0.000 64 0New 0.276 64 18

0.35 New 0.341 64 22 N 0.350.35 New 0.341 64 22 N 0.350.35 New 0.341 64 22 N 0.350.17 New 0.166 64 11

19 New 18.500 64 1184 R 19 R 19 R9.5 New 9.250 64 592 R 9.5 R 9.5 R9.5 New 9.250 64 592 R 9.5 R 9.5 R19 New 18.500 64 1184 R 19 R 19 R

New 0.000 64 01.4 New 1.363 64 88

New 0.000 64 00.0634766 New 0.062 64 4 N 0.063477

0.3125 New 0.304 64 20 N 0.3125New 0.000 64 0New 0.000 64 0

5 New 4.868 64 312

Page 21: 64 QYARTER

Factor 1.3

D2-201 D2-104

Labor cost Net Rate 0

54 100 13011 30 15 0

134.8 300 015.5 100 400 0

0.109375 016 0 190 011 60 15

35.45 500 0 02 00 000 0

0.264863 00 09 0 190

5.9579 0

2252 30 6 04 20 15 0

11 60 2087.35 40 0

0 055 06422 0

0 04 001 02 02 042 0

64 00 06

20 00 07 09

Total Qty for 64 Quarters and $ Dormitories

Material cost

Page 22: 64 QYARTER

7 027 029 0

73.2538.97248 0

0 00 000 02 00 0

25412 0

2 04 00

155 02 02 00

147 04 07 00

16 00 0

18 022.3522.35 022.35 0

11 019 R 19 1260

9.5 R 9.5 630 09.5 R 9.5 630 019 R 19 1260 0

088 0

0 04.063477 0

20.31250 00 0

312 0

Page 23: 64 QYARTER

Total Amount S.NO. Description of Item Unit Qty

1 Doors a) Hinges No 54b) Tower Bolt No. 11c) Gap in lower Portion/Stone Strip 2" thick rmt 135d) Gate broken , Need to add wood sft 16e) Door Lock No. 1f) Door swollen job 16j) Door Stopper No. 11

0 Glass Blind sqm 360 Door Handle 5 " No. 22 Window 0 0

a) Hinges No 0b) Tower Bolt No 0c) Gate broken , Need to add wood cft 1d) Lock No 0e) Window swollen sqm 9f) Glass broken sqm 6g) Glass rubber strip to be fixed and glass putty to be removed rft 2252h) Handle no 4i) Window stopper no 11k) Door Curtain handle rft 88

3 Electrical 0 0a) 16 A Power point No. 55b) 16 A power point with wiring No. 64b) 5 A point No. 22c) Blanks 0 0d) Bulb Holder No. 4e) Tubelight 0 0f) Earthing Problem Job 1g) Fan Regulator No. 2h) Switch 0 2i) 16 A Socket 0 4j) DB box screw 0 2K Door Bell No 64

4 Bathroom/Shower Area 0 0a) Extension Nipple No 6b) Bib cock No 20c) Leakage from outer pipe No 0d) Gate valve to block water supply No 7e) PVC connection pipe No 9f) CP waist pipe No 7g) Short Body Bib cock No 27h) Angle Valve No 29i) Stone for keeping soap sft 74J bathroom tile to be changed sqm 39

5 WC Area 0 0a) Extension nipple No 0b) Tap broken No 0c) WC broken No 0

Page 24: 64 QYARTER

d) Flush broken No 2e) GI line need replacement No 0f) CP jali grouting No 254

0 Cistern No 120 WC trap No 20 Long Bend No 46 Washbasin area 0 0

a) Kitchen Washbasin cupboard Gap rmt 155b) Kitchen Washbasin new No. 2c) Blockage Job 2

7 Cupboard 0 0a) Al bihari Hinge 0 147b) Strip Repair 2.50 mtr No. 4c) handle 6 " No. 7

8 Outer Sanitary work 0 0a) RWH pipe for open area rmt 16b) Outer Rain water pipe blockage 0 0c) Overhead water Tank No. 18d) Gate valve No. 23e) Tank Nipple No. 23f) Float Valve No. 23g) New Steel light Door for Staircase area No. 11h) CI 4 " rft 1260i) GI 1.5 " rft 630k) GI 1.75 " rft 630l) UPVC 4" rft 1260

9 Staircase area 0 0a) MS railing rft 88b) paint railing 0 0c) Glass sqm 5d) kota Stone 0 21e) Cleaning of Roof 0 0

10 Civil work 0 00 Plaster sft 3120 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 25: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 26: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 00 0 00 0 00 00 00 00 00 00 00 00 00 00 00 00 0

Page 27: 64 QYARTER

Total Amount 0 Factor 1.3 1Rate Amount Total Rate after Factor Labor Material 1 Material 2

0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 28: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 00 00 00 00 00 00 0

Page 29: 64 QYARTER

0 0

Page 30: 64 QYARTER

Repair and Maintenance of Quarter Total Amount S.NO. Description of Item Unit Qty

1 Wood Work a Doors

a) No 54

b) No. 11c) Providing and fixing of Granite stone strip in door cill rmt 135

d) sft 16

e) No. 1

f) job 16

j) No. 11Providing and fixing of glass film complete sqm 36

No. 2b Window 0 0

a) No 0

b) No 0

f) sqm 6

g) rft 2252

h) Providing and fixing of 150 mm long handle of ISI marked SS make no 4

i) no 11k) Providing and fixing of Curtain Door Curtain handle rft 88

3 Electrical 0 0a) 16 A Power point No. 55b) 16 A power point with wiring No. 64b) 5 A point No. 22c) Blanks 0 0d) Bulb Holder No. 4e) Tubelight 0 0f) Earthing Problem Job 1g) Fan Regulator No. 2h) Switch 0 2i) 16 A Socket 0 4j) DB box screw 0 2K Door Bell No 64

4 Bathroom/Shower Area 0 0

Providing and fixing of MS hinges 100mm long ,including opening of Door ,refixing after removal of damaged hinge and welding of New MS hinge in the MS door frame (Make ISI Marked Garg)

Providing and fixing of 200mm long Aluminium Tower Bolt(SS finished )

Removal and refixing of gate after cutting of damaged door from bottom and replacing it with 32mm thick board complete

Removal of lock from door and fixing of new lock complete (Make ISI Marked Godrej ,Doorset etc )

Removal of damaged board and fixing of 4mm thick PVC sheet on botton of the door up to height of 900mm

Providing and fixing of Door Stopper after removal of old damaged door stopper

Providing and fixing of 150 mm long handle of D section (SS make )including removal of old damaged handle

Providing and fixing of MS hinges 75mm long ,including opening of window ,refixing after removal of damaged hinge and welding of New MS hinge in the MS window frame (Make ISI Marked Garg)

Providing and fixing of 150 mm long Aluminium Tower Bolt(SS finished.Heavy )

Providing and fixing of 5mm thick plane glass including removal of broken glass complete

Providing and fixing of rupper strip on edges of glass windows including removal of glass putty complete

Providing and fixing of window hook including welding of it to window frame SS make

Page 31: 64 QYARTER

a) Extension Nipple No 6b) Bib cock No 20c) Leakage from outer pipe No 0d) Gate valve to block water supply No 7e) PVC connection pipe No 9f) CP waist pipe No 7g) Short Body Bib cock No 27h) Angle Valve No 29i) Stone for keeping soap sft 74J bathroom tile to be changed sqm 39

5 WC Area 0 0a) Extension nipple No 0b) Tap broken No 0c) WC broken No 0d) Flush broken No 2e) GI line need replacement No 0f) CP jali grouting No 254

Cistern No 12WC trap No 2Long Bend No 4

6 Washbasin area 0 0a) Kitchen Washbasin cupboard Gap rmt 155b) Kitchen Washbasin new No. 2c) Blockage Job 2

7 Cupboard 0 0a) Al bihari Hinge 0 147b) Strip Repair 2.50 mtr No. 4c) handle 6 " No. 7

8 Outer Sanitary work 0 0a) RWH pipe for open area rmt 16b) Outer Rain water pipe blockage 0 0c) Overhead water Tank No. 18d) Gate valve No. 23e) Tank Nipple No. 23f) Float Valve No. 23g) New Steel light Door for Staircase area No. 11h) CI 4 " rft 1260i) GI 1.5 " rft 630k) GI 1.75 " rft 630l) UPVC 4" rft 1260

9 Staircase area 0 0a) MS railing rft 88b) paint railing 0 0c) Glass sqm 5d) kota Stone 0 21e) Cleaning of Roof 0 0

10 Civil work 0 0Plaster sft 312

0 0 0 00 0 0 00 0 0 0

Page 32: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 33: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 00 0 00 0 00 00 00 00 00 00 00 00 00 00 00 00 0

Page 34: 64 QYARTER

Total Amount 0 Factor 1.3 1Rate Amount Total Rate after Factor Labor Material 1 Material 2

0 0

0 0 0 0

0 0 0 00 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 00 0 0 0

0 0 0 00 0 0 0

9068.8 0 6976 9068.8 6976

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 35: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 0

Page 36: 64 QYARTER

0 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 0 0 00 00 00 00 00 00 00 00 0