SIX WEEKS INDUSTRIAL TRAINING REPORT ON (CHP) COAL HANDLING PLANT SUBMITTED BY UTTAM KUMAR 1408310 B.TECH(ME)5 TH B 1

Transcript of 6 weeks it on ntpc

Page 1: 6 weeks it on ntpc

SIX WEEKS INDUSTRIAL TRAINING REPORT ON (CHP) COAL HANDLING PLANT

SUBMITTED BYUTTAM KUMAR

1408310 B.TECH(ME)5TH B

1

Page 2: 6 weeks it on ntpc

BRBCL NABINAGAR

2

Page 3: 6 weeks it on ntpc

PROJECT OVERVIEWLocation Nabinagar (District -Aurangabad), Bihar, (25 km South

of Barun off NH-2)

Capacity 4 x 250 MW

Project Cost Rs. 5,352.51 Crore @ 4th Qr 2006 Price Level

Expenditure (As on 30.11.14) Rs. 4143.81 Crores

Water 60 cusec from Sone River (Indrapuri Barrage).Water agreement signed with GoB on 26.11.12.

Coal Requirement 5 MTPA (Pachra & Pachra south block, North Karnpura)Fuel Supply Agreement signed with CCL, Ranchi on 29.08.2013 for Two units (for U# 1 & 2 - 250 MW each).

Project Clearances All Project Clearances available.

Power Evacuation Through transmission system - Nabinagar- Sasaram Line – executed by PGCIL

Beneficiaries Indian Railways – 90 % & State of Bihar – 10 %3

Page 4: 6 weeks it on ntpc

INTRODUCTION

What is CHP? CHP (C- Coal, H- Handling, P- Plant) Which properly handles the coal from its receipt to transferring it to bunkers.

Objective of CHP :-

To supply the quanta of processed coal to bunkers of Coal mills for Boiler operation.

To Stack the coal to coal yard.4

Page 5: 6 weeks it on ntpc

GENERAL LAYOUT OF CHP

5

Wagon Tippler Crusher House

Bunkers

Tripper Trolley

Conv. Belts Vibrating Screens

Crushers

Feeder Surge Hopper

Hopper

Page 6: 6 weeks it on ntpc

PROCESS

6

Page 7: 6 weeks it on ntpc

AVAILABILITY OF COAL IN INDIA. Mostly E and F grade coal used in India. Blending Is Done To get Average D Grade.

7

Grade C.V. ( K Cal / Kg. )

% Ash + Moisture

A > 6200 19.57

B 5601-6200 19.57 - 23.97

C 4941-5600 23.92 - 28.69

D 4201-5940 28.69 - 34.05

E 3361-4200 34.06 - 40.14

F 2401-3360 40.14 - 47.10

Page 8: 6 weeks it on ntpc

COAL STORAGE OR STOCKS IS THAT THE LARGE AMOUNT OF COAL WHICH IS STORAGE FOR THE USE OF THE THERMAL POWER PLANT IN THE GENERATION OF THE ELECTRICITY AND IT ALSO PROVIDE A BACKUP FOR THE USE IN FUTURE AS AFUEL IT IS ALSO KNOWN AS THE HEART OF THE THERMAL POWER PLANT

8

1. STOGAGE OF COAL

Page 9: 6 weeks it on ntpc

TRANSPORTATION OF COAL5 ways of Transportation.

• 1. Railways.• 2. Ropeways.• 3. Roadways.• 4. waterways.• 5. Airway.

9

Available only for TPS nearer to coal

mines

Have to build Runway near TPS which is very

costly.

waterway may not be possible till TPS and

Problem of recalling arises if coal dip in water

Best and Cheap facility at Doorstep

Fear of thief

Page 10: 6 weeks it on ntpc

WAGON TRIPLER IS A HEAVY MACHINE WHICH IS USE TO UNLOAD THE COAL FROM THE WAGON OF THE TRAIN AND DISCHARGE TO THE HOPPER FOR THE BETTER FULFILLMENT AND FOR NEXT OPERATION 10

2.WAGON TRIPLER

Page 11: 6 weeks it on ntpc

VIBRATING TYPE OR RECIPROCATING TYPE HOPPER ARE USED FOR COAL . AFTER COAL SENDING BY THE WAGON TRIPLER AND IT HELP TO MOVE FORWARD BY THE USE OF THE CONBVEYER BELT. FOR THE CRUSHING OF COAL IN THE CRUSHING HOUSE 11

3. HOPPER

Page 12: 6 weeks it on ntpc

CONVEYER BELT IS THE BELT WHICH IS USED TO TRANSFER THE COAL IN THE NEXT STATION FOR THE BETTER FULFILLMENT OF THE COAL IN THE BUNKER 12

4. CONVEYOR BELT

Page 13: 6 weeks it on ntpc

IT THAT TYPE OF CONICAL SECTION WHICH IS 6 OR 7 IN THE NUMBER IT STORE THE SMALL SIZE OF THE COAL WHICH IS LESS THAN 100 MM IT ALSO CONTROL THE SPEED OR FEED RATE OF THE COAL BEFORE ENTERING IN THE COAL MILL 13

5.BUNKER

Page 14: 6 weeks it on ntpc

COAL MILL IS THAT MILL WHICH IS USED TO PULVERISED THE COAL IN THE SMALL FORM WHICH IS LESS THAN THE SIZE OF 50 MM 14

6. COAL MILL

Page 15: 6 weeks it on ntpc

FURNACE IS A PLACE WHICH IS FOR THE BURNING OF THE COAL AS A FUEL TO INCREASE THE TEMPERATURE OF THE BOILER TO CONVERT THE WATER IN THE FORM OF STEAM

15

7. FURNACE

Page 16: 6 weeks it on ntpc

16