6 Sigma Lean

download 6 Sigma Lean

of 61

Transcript of 6 Sigma Lean

  • 7/29/2019 6 Sigma Lean

    1/61

    [email protected] Copyright - ISandR Services and Accelper 1

    6-Sigma & Lean 101

    6-Sigma

    Lean

    Other ProcessImprovement

    Tools

    A Lean-SS Overview

    Introduction of 6-Sigma Tools

    DMAIC process & tools discussion

    Introduction of Lean Concepts

    Identification of Waste

    Workplace Lean Improvements

    Sustainability

    Business Score Card

    A Business Case Example

    please contact [email protected] for an animated PowerPoint presentation

  • 7/29/2019 6 Sigma Lean

    2/61

    [email protected] Copyright - ISandR Services and Accelper 2

    6-Sigma & Lean 101

    A Lean-SS overview, not detailed presentation

    Introduction of Six-Sigma Tools without stats

    DMAIC process & tools associated with each phase

    Introduction of Lean Concepts Identification of Waste

    Lean Improvements in Gemba (Workplace)

    Sustainability

    Business Score Card

    ISandR Services Presents -

  • 7/29/2019 6 Sigma Lean

    3/61

    [email protected] Copyright - ISandR Services and Accelper 3

    When you can measure what you are speaking

    about, and express it in numbers, you know something about

    it; but when you cannot measure it, when you cannot express

    it in numbers, your knowledge is of a meager and

    unsatisfactorykind.William Thompson (Lord Kelvin), 1824-1907

    If you can't describe what you are doing as a

    process, you don't know what you're doing.W. Edwards Deming, 1900-1993

    6-Sigma & Lean 101Process Improvement Describe & Measure

  • 7/29/2019 6 Sigma Lean

    4/61

    [email protected] Copyright - ISandR Services and Accelper 4

    6-Sigma & Lean 101The Average and the Standard Deviation are Most Important

    1

    )(2

    nXxS

    i

    nxX i /)(

    These metrics are important, but we will keep this simple

    AVERAGE

    STANDARDDEVIATION

  • 7/29/2019 6 Sigma Lean

    5/61

    [email protected] Copyright - ISandR Services and Accelper 5

    6-Sigma & Lean 101Process Improvement The Family Vacation Example

    Start with the end in mind THE GOAL Analogy of the family vacation

    Would you start with how to pack better?

    Where, What, Who - Destination, Activities, You & ? DEFINE Activities, Accommodations, Alt Options, Where is Start

    Route - how far/long, transport vehicle MEASURE

    Cost of alternatives ANALYZE

    What to take - backpacks or suitcase ANALYZE

    What can be done better from last time IMPROVE

    Stick to budget & plan CONTROL

  • 7/29/2019 6 Sigma Lean

    6/61

    [email protected] Copyright - ISandR Services and Accelper 6

    6-Sigma & Lean 101What is 6-Sigma? A Short History

    Improvement tools known for a LONG time

    Popularized by GE, Motorola, et al

    Collection of tools with standardize usage!

    About BEST in class About dramatic improvement not stats

    ASQ 80% of tools are not statistical

    Process based on D M A I C

    - Define - Measure - Analyze - Improve - Control

    Presentation parallels book Stat Free Six Sigma P. Gupta (Accelper)

  • 7/29/2019 6 Sigma Lean

    7/61

    [email protected] Copyright - ISandR Services and Accelper 7

    6-Sigma & Lean 101What is the Significance of the Words 6-Sigma?

    What does 6-Sigma imply?

    Process of 3 defective parts per million (3ppm)

    Depends on

    Customers specified limits (Upper & Lower Bound) Average in the process (Average or Mean)

    Variability in the process (Standard Deviation)

    Not all processes need to be 6-Sigma Capable

    A process that meets customer specifications by providingconsistent accurate results with no variation - near zero defects

    Not all processes need to be 6-Sigma Capable

  • 7/29/2019 6 Sigma Lean

    8/61

    [email protected] Copyright - ISandR Services and Accelper 8

    Process Capability

    CpK = [ Closest Limit X ]

    3

    Closest Limit X

    6-Sigma & Lean 101What is 6-Sigma? Statistics Concepts, Without Statistics

    Good Mean

    Good Variability

    Higher sigma is better to avoid quality escapes!

    Customerspecifies

    LL and UL

    LowLimit

    HiLimit

    Variation = 2

    Mean = XExamples

    Production

    size & location

    of hole in a part

    Service -

    preparation of

    tabloid content& distribution,

    early vs late

    1 sigma ( ) width at height

    6

    Good Capability

    Distribution:Gaussian

    RandomNormal

    Error

    The ProcessCharacterizing The Process

  • 7/29/2019 6 Sigma Lean

    9/61

    [email protected] Copyright - ISandR Services and Accelper 9

    6-Sigma & Lean 101What Process Capability?

    Good MeanGood Variability

    Poor MeanGood Variability

    Poor MeanPoor Variability

    Good Capability Poor Capability Poor Capability

    mean

    variation

    LL HL

    This is previous slide

  • 7/29/2019 6 Sigma Lean

    10/61

    [email protected] Copyright - ISandR Services and Accelper 10

    6-Sigma & Lean 101What Makes 6-Sigma Work?

    When everyone understands the Cost of Poor Quality

    In / ext failures, inspection, testing, rework (calc $$s)

    Align VOC and biz needs for big improvements

    S M A R T goals

    Specific why, what, when, who, where, finallyhow

    Measurable which metrics: how much / many, B4 & after

    Attainable have resources: attitudes, abilities, finances

    Realistic challenging believable & achievable

    Timely* reasonable duration to complete with urgency

    Visible with Executive Management Support

    Employees encouraged to take risks (Deming, Drive out fear)

    * Could be Tangible can experience with senses makes it more realistic and measurable

  • 7/29/2019 6 Sigma Lean

    11/61

    [email protected] Copyright - ISandR Services and Accelper 11

    The energy to overcome an existing culture, make improvementsand sustain change takes

    Organization A

    Organization B

    6-Sigma & Lean 101What makes 6-Sigma Work? Culture Change Response Curve

    Present Time Future

    E

    ffort/Cost/Resistance

    effort, time and money

    The paths are different for each organization.

    DM

    A I

    C

  • 7/29/2019 6 Sigma Lean

    12/61

    [email protected] Copyright - ISandR Services and Accelper 12

    6-Sigma & Lean 101Customer Surveys Voice Of the Customer (VOC)

    Research on customer satisfaction: Determine what is quality [Q is what the customer says it is] Find out what competitors are doing [better] Define quality performance measures to identify defects [Pareto] Identify factors to give a competitive edge [SWOT] Identify urgent problems [low hanging fruit 1st with best ROI]

    Use multiple instruments to ID customer satisfaction. Theopportunity to collect misleading or useless information is possiblewith just one instrument.

    Surveys, Focus Group, Face-to-face, (Dis)satisfaction cards,Competitive Shopping

    - to gain information on - Stated Needs, Real Needs, Perceived Needs, Cultural/Unstated

    Needs, Unintended Needs (Distinguish: Wants, Needs, Dissatisfiers)

  • 7/29/2019 6 Sigma Lean

    13/61

    [email protected] Copyright - ISandR Services and Accelper 13

    6-Sigma & Lean 101Customer Surveys - VOC

    Feature/Process Satisfaction

    FeatureImpor

    tance

    Customer Response to Survey

    LO HI

    HI

    Maintain Good Work

    & Performance

    Maintain Current

    Status

    Over-effort for littlevalue

    MUST Improve

    Opportunity BeingLost

    What was expected and experienced, what was the level of satisfaction and importance

  • 7/29/2019 6 Sigma Lean

    14/61

    [email protected] Copyright - ISandR Services and Accelper 14

    6-Sigma & Lean 101

    How to look for and improve the PROBLEMS

  • 7/29/2019 6 Sigma Lean

    15/61

    [email protected] Copyright - ISandR Services and Accelper 15

    6-Sigma & Lean 101What is DMAIC?

    Define the charter: why do this (ROI / VOC), which process(Pareto), achieve what, measure what (errors, FTT), whichresources, whos involved, how to accomplish (brainstorm /fishbone), what is goal, when complete, whats not included,

    Measure specify info sources to measure, precision, frequency

    of measurement, instruments used to measure, Analyze examine patterns, correlate dependent & independent

    variables (SIPOC / histograms / scatter-plots), root-cause, failureinfluence (FMEA-SOD),

    Improve development ofalternatives to reduce cost, variation,& waste or for faster delivery,

    Control sustaining gains from project and maintaining processcontrol

    Define

    Measure

    Analyze

    Improve

    Control

  • 7/29/2019 6 Sigma Lean

    16/61

    [email protected] Copyright - ISandR Services and Accelper 16

    Phase Tools Brief Description

    D Project Priority Index PPI = (Benefit/Cost) X (Probability of Success/Time to complete in years)Time < .5

    Estimated Savings/Cost > 2.0Recommended PPI > 4.0

    D Pareto A graphical tool to prioritize various defects to identify the most important one

    D Process Map A graphical description of activities and decision points

    D Kano's Analysis A graphical tool to identify customer critical requirements, including customers' love to have' requirements

    D SIPOC An excel lent tabular capture of most of the process constraints

    D CTQ Operational critical-to-quality characteristics related to the customer expectation

    D Project Charter Project plan with clearly-defined goals and milestones

    M Cost of Quality Breakdown of product or service cost related to appraisal, failures and prevention

    M DPU A product measurement, which is a ratio of the number of defects observed per unit verified

    M Yie ld The percent o f process output wi th no error or defect .

    A DPMO A process measurement, which is the DPU normalized to the product or process complexity

    A Sigma Level A business measurement, estimated from DPMO, commonly used for benchmarking

    A Average Typical performance

    I Range Range of performance (maximum minimum)

    6-Sigma & Lean 101What are Tools Used with DMAIC?

    Define Measure Analyze Improve

    Stat Free Six Sigma, Gupta

  • 7/29/2019 6 Sigma Lean

    17/61

  • 7/29/2019 6 Sigma Lean

    18/61

    [email protected] Copyright - ISandR Services and Accelper 18

    6-Sigma & Lean 101Good Charter Components?

    Business need - cost reduction, margin increase, governmentcompliance or increased customer satisfaction.

    Business advantage ROI? - case should show the businessneed as dollars ($$s) to substantiate which projects selection.

    High-level project scope sponsors vision of the project. Critical to success factors ID project, team, deliverables,

    schedule, what is needed for project success: scope, schedule,cost, or quality.

    Project constraints, risks and assumptions document theseconjectures; revisit during project to see if these remain true.

    Authority of the project manager what is the responsibility ofthe project manager, to clarify their role assists with future decisions(controversial?) dealing with the stakeholders and organization.

    Signatures demonstrates management importance & supportExample of form to assist in

    addressing items to consider

    Constitution

    Bill of Rights

    Plans Change

  • 7/29/2019 6 Sigma Lean

    19/61

    [email protected] Copyright - ISandR Services and Accelper 19

    Customer's OrderComplaints *

    Late 192

    Defective 44

    Rude CS 37

    No call back 23

    Wrong Item 72

    Incomplete 101

    Refund late 17

    Wrong Price 15

    No Gift Card 3

    Missing item 2

    Not New - Used 12

    Never Received 7

    6-Sigma & Lean 101DMAIC Tools PARETO Ranking of Issues

    Minitab

    ExcelFigure out cost/benefit

  • 7/29/2019 6 Sigma Lean

    20/61

  • 7/29/2019 6 Sigma Lean

    21/61

    [email protected] Copyright - ISandR Services and Accelper 21

    6-Sigma & Lean 101What is SIPOC?

    Reference DocsLibrary

    MagazinesSuggested Adds &

    DeletesEditors

    Educators &Trainers

    Training

    InstructionalInfo

    ScholarlyReferences

    Researchers

    ConsultantsExercisesOriginal Written

    ManuscriptAuthors

    LibrariesAlbum of Related

    workBinders

    Web Whit PapersAbstractsElectronic DocsElectronics

    Audio booksDVDs & CDsFigs & PhotosGraphics

    BookclubsCliffnotesPaper

    CustomersOutputsProcessInputsSuppliers

    Reference DocsLibrary

    MagazinesSuggested Adds &

    DeletesEditors

    Educators &Trainers

    Training

    InstructionalInfo

    ScholarlyReferences

    Researchers

    ConsultantsExercisesOriginal Written

    ManuscriptAuthors

    LibrariesAlbum of Related

    workBinders

    Web Whit PapersAbstractsElectronic DocsElectronics

    Audio booksDVDs & CDsFigs & PhotosGraphics

    BookclubsCliffnotesPaper

    CustomersOutputsProcessInputsSuppliers

    Shipmentof Orders>

    Process

    Distributor Orders

    >

    First

    PrintingPromotion

    >

    Publisher

    Approval& PrintingSchedule

    >

    Editor

    checkscontent

    >

    Graphicssubmits

    figuresand

    photos

    >

    Authors

    submitcontent

    Process for Publishing and Distribution of Scholarly Research and Textbook Materials

    Shipmentof Orders>

    Process

    Distributor Orders

    >

    First

    PrintingPromotion

    >

    Publisher

    Approval& PrintingSchedule

    >

    Editor

    checkscontent

    >

    Graphicssubmits

    figuresand

    photos

    >

    Authors

    submitcontent

    Process for Publishing and Distribution of Scholarly Research and Textbook Materials

    Look forrelationships so Input improves stability in Output

    Suppliers individuals providingresources

    Inputs info, materials &Services

    Process value addedtransformation steps

    Outputs final product or service

    Customers entity finding valuein output

  • 7/29/2019 6 Sigma Lean

    22/61

  • 7/29/2019 6 Sigma Lean

    23/61

    [email protected] Copyright - ISandR Services and Accelper 23

    The cost of quality isnt the price of creating a quality product orservice. Its the cost of NOT creating a quality productor service.

    Prevention Costs - New product review, Quality planning, Supplier capabilitysurveys, Process capability evaluations, Quality improvement team meetings, Qualityimprovement projects, Quality education and training, Appraisal Costs

    Inspection Costs - measuring, evaluating or auditing products or services toassure conformance to quality standards and performance requirements; Incomingand source inspection/test of purchased material; In-process and final inspection/test;Product, process or service audits; Calibration of measuring and test equipment;

    Associated supplies and materials; Failure Costs

    Internal Failure Costs - Failure costs occurring prior to delivery or shipment of theproduct, or the furnishing of a service, to the customer. Scrap, Rework, Re-inspection, Re-testing, Material review, Downgrading

    External Failure Costs - Failure costs occurring after delivery or shipment of theproduct -- and during or after furnishing of a service -- to the customer. Processingcustomer complaints, Customer returns, Warranty claims, Product recalls

    6-Sigma & Lean 101Cost of Quality

    Prevention Costs

    Inspection Costs

    Internal Failure Costs

    External Failure Costs

  • 7/29/2019 6 Sigma Lean

    24/61

    [email protected] Copyright - ISandR Services and Accelper 24

    This is a way of analyzing problem and get to the root cause

    The effect is usually negative - a problem

    The problem should be specific and clearly stated

    The ideas are generated by using brainstorming (vocal or silent)

    Keep the group to asking themselves what would cause the problem?

    Keep attention on the effect of the problem not criticism or how to fix

    The goal is to find as many sources for variation as possible that cause theproblem

    6-Sigma & Lean 101Brainstorming Fishbone / Cause-Effect / Ishikawa

    Measurements

    Methods

    PM vs AM

    Temp

    Shift

    PreparationSeasonStorage

    Effect

    Machine Man

    Mother Nature Materials

    RMAs

  • 7/29/2019 6 Sigma Lean

    25/61

    [email protected] Copyright - ISandR Services and Accelper 25

    Cause of FailureControl for Failure

    Potential Failure

    Effect of Failure

    Risk AssessmentProbability ofOccurrenceSeverityAbility to Detect

    Risk Priority NumberCorrective Actions & Re-evaluation

    Part Number & Function

    6-Sigma & Lean 101FMEA Failure Mode Effects Analysis

    Determine what can go wrong, the severity, and how to avoid it

    QCI Indiana Quality Council

    FMEA Number: This should be a log controlled number for tracking thedocument

    The part number, name, or other description

    The design responsibility: Which department or group is responsible forthis design?

    The person responsible for FMEA preparationThe date the FMEA was prepared and any necessary revision level

    The subsystem or component part number getting detailed analysis

    The component functionThe potential failure mode

    The potential effect of failureThe potential cause of failure

    What are the current controls in place to prevent the cause from

    occurring?O is the probability this failure mode will occur. This index is from 1 to 10

    with 1 being virtually no chance and 10 being near certainty ofoccurrence.

    S is the severity of the effect of the failure on the rest of the system if the

    failure occurs. Values are from 1 to 10. A value of 1 means the userwill be unlikely to notice with a 10 meaning that the safety of the

    user is in jeopardy.D is a measure of the effectiveness of the current controls to identify the

    potential weakness or failure prior to release to production. This

    index ranges from 1 to 10. A value of 1 means this will certainly becaught whereas a value of 10 indicates the design weakness

    would most certainly make it to final production without detection.RPN The Risk Priority Number is the product of the indices from the

    previous three columns. RPN = OSD

    The actions then are based upon what items either have the highest RPNand/or where the major safety issues are.

    There is a column for actions to be taken to reduce the risk, a column forthe responsibility and finally a column for the revised RPN once

    corrective action is implemented.

    FMECA provides a disciplined approach for the engineering team toevaluate designs to ensure that all the possible failure modes have

    been taken into consideration.

  • 7/29/2019 6 Sigma Lean

    26/61

    [email protected] Copyright - ISandR Services and Accelper 26

    6-Sigma & Lean 101Average, Standard Deviation, Max Value, Min Value in Data Sets

    Active Cell

    AverageStandardDeviation

    Maximum Minimum

  • 7/29/2019 6 Sigma Lean

    27/61

    [email protected] Copyright - ISandR Services and Accelper 27

    6-Sigma & Lean 101Evaluating Data

    Quantify what you want to improve and make decisions based on the data.

  • 7/29/2019 6 Sigma Lean

    28/61

    [email protected] Copyright - ISandR Services and Accelper 28

    6-Sigma & Lean 101Comparative Tests - Improving Means & Variance - Visualization

    Data

    sample6sample5sample4sample3sample2sample1

    2.0

    1.8

    1.6

    1.4

    1.2

    1.0

    6 Samples - Comparison of Means andV ariation

    Data

    sample6sample5sample4sample3sample2sample1

    2.0

    1.8

    1.6

    1.4

    1.2

    1.0

    1.45738

    1.52912

    1.68022

    1.78123

    1.47119 1.47366

    6 Samples - Comparisonof Meansand Variation

    Same Mean

    Same Vari(1)

    Same Mean

    Same VariDiff Mean

    Same Vari(2)

    Diff Mean

    Same Vari

    Same Mean

    Diff Vari(3)

    Same Mean

    Diff Vari

    Use Methods to Visualize the Data to Make decisions Easier

    Data RangeMeanMiddle 50% of Data

    T-test for determining significant difference in Means

    F-test for determining significant difference in Variance

  • 7/29/2019 6 Sigma Lean

    29/61

    [email protected] Copyright - ISandR Services and Accelper 29

    6-Sigma & Lean 101Yield - Efficiency of the Process

    100*r

    Pr%

    ducedUnits

    nitsDefectiveUoducedUnitsYield

    %8.94100*00

    26500% Yield

    %Yield

    ducedUnits

    tsObservedTotalDefecDPUUnitDefectsPer

    r

    106.00

    53DPU

    DPU

    Defect per Million Opportunities (DPMO) - the number of ways a defect can occur.If each item could have 8 ways to fail (label, scratch, color, wrong info, performance, ) then

    250,138

    000,106

    8

    000,000,1*106.0

    #

    000,000,1*

    iveanBeDefectofWayUnitC

    DPUDPMO

    Rolled Throughput Yield (RTY)

    Yield

    Process1

    = .9

    Yield

    Process 2 = .9

    Yield

    Process 3 = .9

    Yield

    Process4

    = .9(.90)x(.90)x(.90)x(.90)= .656

    65.6%

    Y1 x

    Y1=0.90

    Y2 x

    Y2=0.90

    Y3 x

    Y3=0.90

    Y4

    Y4=0.90 Guess

    These are formulas

    with examples from

    this table. Pleaselook at these offline.

    most familiar for defect eval

    What is overall yield in chain of processes?

  • 7/29/2019 6 Sigma Lean

    30/61

    [email protected] Copyright - ISandR Services and Accelper 30

    6-Sigma & Lean 101Scatter Plot Visualize Process Data & Look for Trends

    0

    5

    10

    15

    20

    25

    0 5 10 15 20 25

    Independent Variable X

    DependentVaria

    bleY

    Y has equivalent response to X andsimilar variation along response curve

    Y has varying response to X and

    different variation along response curve

    What is different

    about processes?

    y=f(x)

    x

    y

  • 7/29/2019 6 Sigma Lean

    31/61

    [email protected] Copyright - ISandR Services and Accelper 31

    6-Sigma & Lean 101Control/Run Chart - Variable & Attribute - Track/React to Trends

    UCL (3)

    LCL (3)

    Average & Range SPC Chart

    17

    19

    21

    23

    25

    27

    29

    31

    Average

    0

    2

    4

    6

    1 3 5 7 9 11 13 15 17 19 21 23 25 27 29

    R

    ange

    UCL

    You would look into why

    these extremes happened

    Attribute

    Fraction Defective

    Number Defective

    Number of Defects

    Percent Defective

    Variable

    Median & Range

    Average & Range

    Average & Std Deviation

    Short Run Charts

    Continuous

    Discrete

    Diameter of Hole

    P.O. with Errors

  • 7/29/2019 6 Sigma Lean

    32/61

    [email protected] Copyright - ISandR Services and Accelper 32

    6-Sigma & Lean 101Objectives of Design of Experiments (DOE)

    DOE is a systematic approach to determine & optimize the responsebetween process inputs & outputs (independent and dependent variables).

    S & H and Delivery TimePart Size

    The objective - optimize S&H of different part sizes for best delivery time.

    DOE experiments do not change only one variable - variables can interact

    Consider the interactionoftemperature and wind velocity in the wind chillfactor; more wind makes it feel colderand an engine requires the rightamount of both gasoline and air to get the maximum performance.

    The experiment that changes variables one-at-a-time (OAAT) requires moreexperiments and cannot evaluate interactions; it is inefficient at best.

    PROCESS

  • 7/29/2019 6 Sigma Lean

    33/61

    [email protected] Copyright - ISandR Services and Accelper 33

    86

    88

    90

    92

    94

    96

    P1 P2 T1 T2

    6-Sigma & Lean 101Two Factor DOE Variable Influence

    Plot the response.

    RESULT

    P T Yield

    P1 T 1 Y1P1 T 2 Y2

    P2 T 1 Y3

    P2 T 2 Y4

    INPUT

    RESULT

    P T Yield

    50 25 94

    50 75 92

    100 25 96

    100 75 88

    INPUT

    If you want to know the affects from two factors(i.e. temperature and pressure), then vary both Tand P then record the results of the dependentvariable (i.e. yield).

    Dont just change one factor at a time.

    Introduce terms, select levels, run experiment.

    Change the pressure between 50 and 100 psi and

    the temperature between 25 and 75 degrees F;record the yield results.

    Calculate the meanyield for each factor level

    This experiment is with 2 levels of P & T with a yieldresult

    It could be Internal vs External S&H with big vs small parts and delivery time result

    Y@P1 = 93 Y@P2 = 92 Y@T1 = 95 Y@T2 = 90

    From the main effects pressure has lowerinfluence on the yield, while temperature has alarger effect on the yield (more slope, more effect).

  • 7/29/2019 6 Sigma Lean

    34/61

    [email protected] Copyright - ISandR Services and Accelper 34

    6-Sigma & Lean 101Two Factor DOE Hi vs Lo Importance

    OK. Some of you are saying Wait a second!When P is changing so is T!? WHAT???????

    EXAMPLE - Calculate the effect of P change.

    Yield at P1 = (Result Y1) + (Result Y2)Yield at P2 = (Result Y3) + (Result Y4)

    Yield at P1 = (P1 + T1) + (P1 + T2)Yield at P2 = (P2 + T1) + (P2 + T2)

    Yield at P1 = (P1 + P1 ) + (T1 + T2)Yield at P2 = (P2 + P2 ) + (T2 + T2)

    Yield at P1 = 2P1 + (T1 + T2)Yield at P2 = 2P2 + (T1 + T2)

    or consider, the difference removes T effect(Yield at P1) - (Yield at P2) = 2P1 - 2P2

    RESULT

    P T Yield

    P1 T1 Y1P1 T2 Y2

    P2 T1 Y3

    P2 T2 Y4

    INPUT

    RESULT

    P T Yield

    50 25 94

    50 75 92

    100 25 96

    100 75 88

    INPUT

    REARRANGING & REASSOCIATING

    SIMPLIFYING

    GRAPHICAL DEPICTION

    SUBSTITUTING VARIABLES PRODUCING THOSE YIELDS

    This is what is important!!!!T1 & T2 contribute the

    same amount to P1 or P2

    Y@P1 Y@P2T1+T2 T1+T2

    2P12P2

  • 7/29/2019 6 Sigma Lean

    35/61

    [email protected] Copyright - ISandR Services and Accelper 35

    6-Sigma & Lean 101More Factorial Experiment Designs 3 & 4 Variables

    INPUT OUTPUT INPUT OUTPUT

    A B C D Result1 Result2 A B C Result1 Result2

    A1 B1 C1 D1 R1 R2 A1 B1 C1 R1 R2

    A1 B1 C1 D2 R1 R2 A1 B1 C2 R1 R2

    A1 B1 C2 D1 R1 R2 A1 B2 C1 R1 R2

    A1 B1 C2 D2 R1 R2 A1 B2 C2 R1 R2

    A1 B2 C1 D1 R1 R2 A2 B1 C1 R1 R2

    A1 B2 C1 D2 R1 R2 A2 B1 C2 R1 R2

    A1 B2 C2 D1 R1 R2 A2 B2 C1 R1 R2

    A1 B2 C2 D2 R1 R2 A2 B2 C2 R1 R2

    A2 B1 C1 D1 R1 R2

    A2 B1 C1 D2 R1 R2

    A2 B1 C2 D1 R1 R2

    A2 B1 C2 D2 R1 R2

    A2 B2 C1 D1 R1 R2

    A2 B2 C1 D2 R1 R2

    A2 B2 C2 D1 R1 R2

    A2 B2 C2 D2 R1 R2

    Exercise for later

    these are balanced experiments equal number of each variable (A1,

    A2, B1, B2, C1, C2), within all

    experiments that are also unique withrespect to the arrangement of these

    variables note: check out the colors.

  • 7/29/2019 6 Sigma Lean

    36/61

    [email protected] Copyright - ISandR Services and Accelper 36

    6-Sigma & Lean 101Lean

    Document the process

    Find the waste

    Make a plan toeliminate the waste

  • 7/29/2019 6 Sigma Lean

    37/61

    [email protected] Copyright - ISandR Services and Accelper 37

    6-Sigma & Lean 101What Are Key Concepts of Lean?

    Get the big picture of the process to Improve Quality Eliminate Waste - ID Value Added vs. Non-Value Added Activities

    Reduce Lead Time Reduce Total Costs

    Give customers what they want, when they want it, for what they want to pay, and withoutmore inve$tment by your company

  • 7/29/2019 6 Sigma Lean

    38/61

    [email protected] Copyright - ISandR Services and Accelper 38

    6-Sigma & Lean 101Create a Value Stream Map Present (Need Future State)

    item Description

    1 ID Customer, Supplier, and Production

    2 Customer Requirements per Time Interval

    3 Production & Containment Requirements

    4 Shipping

    5 Delivery

    6 Sequence of Processes

    7 Data specific to each Sequence

    8 Communication Methods

    9 Process Attributes: times, Efficiency

    10 Operator Symbol - number

    11 Inventory & Work in Process (WIP)

    12 "Push" vs "Pull" Operations

    13 Other Info

    14 Working Hours Availability

    15 Cycle & Lead TimesExample from - www.strategosinc.com

    You will probably do this with pencil & paper

    4

    3

    2

    1 1

    1

    5

    6

    7

    8

    11

    1210

    14

    14

    15

    15

    9

    This is the value streamprocess for the entire

    plant. You can also

    make a value streammap for a sub-process.

    Eventually you need tolook at the entire

    process to make sure

    changes did not shiftwaste or problems to

    another process andonly created a local

    optimum.

  • 7/29/2019 6 Sigma Lean

    39/61

    [email protected] Copyright - ISandR Services and Accelper 39

    6-Sigma & Lean 101How to Identify Waste TIMWOOD or DOWNTIME

    TIMWOOD Transportation

    Inventory

    Motion

    Waiting Over-processing

    Over-production Defects

    DOWNTIME Defects Over-production

    Waiting

    Not Utilizing Employees* Transportation Inventory

    Motion

    Excessprocessing

    *skills, ideas, creativity

    Look for these forms of waste in the Value Stream Map

  • 7/29/2019 6 Sigma Lean

    40/61

    [email protected] Copyright - ISandR Services and Accelper 40

    6-Sigma & Lean 101How does 5S Help Eliminate Waste? Makes Waste Visible.

    5 S - seiri, seiton, seiso, seiketsuand shitsuke

    Sort, separate needed from unneeded items & remove the latter

    Set-in-Order*/Straighten, arrange items for ease of use

    Shine/Scrub, means to cleanup Standardize/Systemize, disciplined structured routines

    Sustain/Self-Discipline, create a new habit

    * 6 S adds Safety (part of Set-in-Order) make safety equipment easy to use

  • 7/29/2019 6 Sigma Lean

    41/61

    [email protected] Copyright - ISandR Services and Accelper 41

    6-Sigma & Lean 101Relation of What We Learned wrt Process Improvement

    6-Sigma

    Lean

    Other PI Tools

    There is more

  • 7/29/2019 6 Sigma Lean

    42/61

  • 7/29/2019 6 Sigma Lean

    43/61

  • 7/29/2019 6 Sigma Lean

    44/61

    [email protected] Copyright - ISandR Services and Accelper 44

    6-Sigma & Lean 101How to Sustain Progress with Lean & 6-Sigma

    Keep employees motivated,customers happy,

    processes running smoothly, and

    the company making money

    LEAN is NOT

  • 7/29/2019 6 Sigma Lean

    45/61

    [email protected] Copyright - ISandR Services and Accelper 45

    BusinessScorecard

    Management Provides Vision & Strategy so the Business Can: #1 Take Care ofCustomers (VOC), #2 Take Care ofEmployees (Training, Resources, Rewards)

    Employees Take Care ofProcesses (Process Control & Improvement) Processes Take Care ofFinances (Efficient Value Added Processes = $$s) Finances Take Care of Stakeholders and Provide $$s for Growth and

    Improvements that add value for the customer

    6-Sigma & Lean 101What are Components of Sustained Profitable Growth

    Customer

    Employees

    Processes

    Financials Vision & Strategy

  • 7/29/2019 6 Sigma Lean

    46/61

    [email protected] Copyright - ISandR Services and Accelper 4646

    But Some Measurements Tend to Matter More than Others

    Sturdy averages seem impressive from inside the

    organization (the inside-out perspective)

    But it is variability that the customer feels and fears (the outside-in perspective)

    6-Sigma & Lean 101Six Sigma: Objective Quality Measures All Matter

  • 7/29/2019 6 Sigma Lean

    47/61

    [email protected] Copyright - ISandR Services and Accelper 47

    Challenges with Six Sigma for TransactionalFunctions like Purchasing/Procurement, SRM

    Projects tend to lack objective data. What data there istends to be attribute (pass fail/ no. of shortcomings) andcategorical Solution: work with continuous data when possible to mimic

    previously shown production charts. There are more options forstat. tool use; yield more guidance information. ROThumb:consider converting if at least 10 different values occur and nomore than 20% of the data set are repeat values

    You may have a defined process and goal, but no tangible

    spec limits. Arbitrary metric or soft target setting canmislead, distort. Example: 1-5 supplier rating.

    6-Sigma & Lean 101

    *SRM = Supplier Relationship Mgmt

  • 7/29/2019 6 Sigma Lean

    48/61

    [email protected] Copyright - ISandR Services and Accelper 48

    Challenges with Six Sigma for TransactionalFunctions like Purchasing/Procurement, SRM

    -Data integrity problems of attribute data. MSA may beneeded

    -Meaningful metrics may take more doing and trial and errorearly on

    -Regression, DOE and ANOVA can be applied to multi-variable situations with lots of moving and interacting partsDCs, office locations, site specific paperwork procedures,carrier selection, suppliers with different lead time averagesand extremes, etc.

    6-Sigma & Lean 101

  • 7/29/2019 6 Sigma Lean

    49/61

  • 7/29/2019 6 Sigma Lean

    50/61

  • 7/29/2019 6 Sigma Lean

    51/61

    [email protected] Copyright - ISandR Services and Accelper 5151

    6-Sigma & Lean 101Pareto Diagram: Example

    Days Delayed

    PO Cycle Time - Unapproved Vendors

    COUNT

    PERCENT

    Total Count = 895

    0

    90

    180

    270

    360

    450

    540

    630

    720

    810

    900

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Raw Material

    324

    (36%)

    Equipment

    255

    (65%)

    Engr. Matl.

    135

    (80%)

    OTHER

    92

    (90%)

    Admin

    89

  • 7/29/2019 6 Sigma Lean

    52/61

    [email protected] Copyright - ISandR Services and Accelper 5252

    Cause and Effect Diagram

    Methods

    Man

    Measurement

    Materials

    Disorganized

    Untrained

    Too few

    No step by step documentation

    No established methods

    Improper use of e-mail

    Always running out of materials

    Materials outdated

    Proper materials never ordered

    System errors in reporting

    Wait time not comprehensive

    6-Sigma & Lean 101Poor Customer Response Time

    Poor CustomerResponse Time

  • 7/29/2019 6 Sigma Lean

    53/61

    [email protected] Copyright - ISandR Services and Accelper 5353

    0

    10

    20

    30

    40

    50

    60

    70

    Suppl 1 Bids Suppl 2 Bids Suppl 3 Bids Suppl 4 Bids Suppl 5 Bids

    Hi for Mo

    Q3 for Mo

    Q1 for MoLo for Mo

    Similar Items Over Course of 1 Month (These patterns may be congruentwith other Supplier Behaviors such as RFQ Cycle Times, etc.)

    6-Sigma & Lean 101Box Plots of Supplier Bids

  • 7/29/2019 6 Sigma Lean

    54/61

    [email protected] Copyright - ISandR Services and Accelper 5454

    New/ECO

    Product

    Devlpt

    Customer

    Issue

    Resolution

    Waste, Rework

    Unused Inv.

    Supplier

    Supplier

    IssueResolution

    Sales

    Personnel

    In House

    Plant

    Customer

    Service DeptMarketing

    Conveyance,

    FreightCarrier

    Customer

    !!

    6-Sigma & Lean 101Supply Chain Basic Flow Chart for Component Assembly Value Stream

  • 7/29/2019 6 Sigma Lean

    55/61

    [email protected] Copyright - ISandR Services and Accelper 5555

    Days

    6-Sigma & Lean 101Variation in RFQ Cycle Times for Critical Part

  • 7/29/2019 6 Sigma Lean

    56/61

    [email protected] Copyright - ISandR Services and Accelper 5656

    Province of

    Lean Sigma Manufacturing

    Ed

    Start

    End

    Collect Information

    From Customer

    3 hours

    1 day

    Collect Cost Info

    From Outsourced Mfg

    0.25 hours

    5 days

    Generate Quote

    0.5 hours

    2 hours

    Negotiate

    Price

    1 day

    3 days

    Enter Order

    0.25 hours

    1 day

    Assemble &

    Delivery

    1 week

    10 weeks

    Province of

    Lean Sigma SRM

    6-Sigma & Lean 101Component RFQ Process Time-Value Diagram

  • 7/29/2019 6 Sigma Lean

    57/61

    [email protected] Copyright - ISandR Services and Accelper 5757

    Component

    Company

    Outsourced

    Supplier

    Support

    Office

    Outsourced

    Supplier

    Start SubmitCompile,

    Send RFQ

    Send to

    Support

    Office

    Process

    request

    Return to

    Own Plant

    Compile

    Information

    Assemble

    Quote

    6-Sigma & Lean 101As Is Process Lane Map For Component RFQ

  • 7/29/2019 6 Sigma Lean

    58/61

    [email protected] Copyright - ISandR Services and Accelper 5858

    SESStComponent

    Company

    Outsourced

    Supplier

    Start SendCompile

    Request

    Apply

    Costing

    Table

    Assemble

    Quote

    Maintain

    Costing

    Tables

    6-Sigma & Lean 101Future State Process Map For Component RFQ

  • 7/29/2019 6 Sigma Lean

    59/61

    [email protected] Copyright - ISandR Services and Accelper 5959

    AFTER CHANGES

    Process Shift, New Avg, New CLs

    6-Sigma & Lean 101Variation in RFQ Cycle Times for Key Part

  • 7/29/2019 6 Sigma Lean

    60/61

    [email protected] Copyright - ISandR Services and Accelper 6060

    Before

    Changes

    AfterChanges

    Cycle Time, Days

    6-Sigma & Lean 101Supplier Quote Time, Before and After Change

  • 7/29/2019 6 Sigma Lean

    61/61

    ISandR@usa com Copyright - ISandR Services and Accelper 6161

    New Quote Time, Days

    6-Sigma & Lean 101Normal Probability Plot for RFQ Time