Sandbag Construction US Army Corps of Engineers BUILDING STRONG ®

Transcript of 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags...

Page 1: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Sandbag Construction

US Army Corps of EngineersBUILDING STRONG®

Page 2: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Emergency ConstructionSandbagsSandbags

Typical uses:

• Where a low and relatively short barrier is required

• Constricted areas where there is no room for earthfill levees• ex. back yards, buildings close to channel

• Closures / temporary closures• ex. Roads, railroad tracks

BUILDING STRONG®

Page 3: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Emergency ConstructionSandbagsSandbags

Design section:

• 1:3 cross section (1 foot high for 3 foot width)

5 f t i h i ht• 5 foot maximum height

• 3 foot or less height preferred

BUILDING STRONG®

Page 4: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Filling Sandbags

Fill sacks approximately ½ full

Do not tie sacks

BUILDING STRONG®

Page 5: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Placement of Sandbags

Start upstream

Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Where possible, excavate bonding trench 1 sack deep by 2 sacks widesacks wide

Alternate direction of placement of bags with bottom layer parallel to flowp

Lap unfilled portion of sandbag under new sack

BUILDING STRONG®

Page 6: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Placement of Sandbags (cont.)

Overlap unfilled portion of sack with filled portion of next sack

BUILDING STRONG®

Page 7: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

dth: 3 t imes heightdth: 3 t imes height

Placement of Sandbags (cont.)Width: 3 t imes

Height

Width: 3 t imes

Height

Bonding trench:1sackdeep byBonding trench:1sackdeep by

Water side Strip sod before layingbottom layer, if possible

1 sack deep by2 sacks wideWater side Strip sod before laying

bottom layer, if possible

1 sack deep by2 sacks wide

BUILDING STRONG®

Page 8: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Placement of Sandbags (cont.)

Sandbags as weightsSandbags as weights

PolyPoly

Place poly on wet side of sandbag closure to prevent / reduce seepage

BUILDING STRONG®

Page 9: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Placement of Sandbags (cont.) Number of sandbags required per foot of closure vs.Number of sandbags required per foot of closure vs.

sandbag closure height

Height in Feet Bags Required

1 52 103 214 365 55

BUILDING STRONG®

Page 10: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Sandbag placement exercise

BUILDING STRONG®

Sandbag placement exercise

Page 11: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Sandbag ring levee with poly on inside face to

BUILDING STRONG®

prevent seepage

Page 12: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Sandbag ring le ee to contain seepage

BUILDING STRONG®

Sandbag ring levee to contain seepage

Page 13: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

BUILDING STRONG®

Sandbags placed at apartment building

Page 14: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Seepage/Erosion Protection:Polyethylene Sheeting and

SandbagsSandbags

BUILDING STRONG®

Page 15: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Seepage/Erosion Protection:Polyethylene Sheeting and SandbagsPolyethylene Sheeting and Sandbags Polyethylene (poly) Sheeting - ~6 mil thick

Sandbags used to anchor poly in place

Pl t i f i l i k Placement is fairly quick

Materials inexpensive

Place materials in the dry or in the wet

BUILDING STRONG®

Page 16: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Seepage/Erosion Protection:Seepage/Erosion Protection:Poly Sheeting and Sandbags (cont)

Placement of poly sheeting and sandbags in the dry

BUILDING STRONG®

Placement of poly sheeting and sandbags in the dry

Page 17: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Seepage/Erosion Protection:Seepage/Erosion Protection:Poly Sheeting and Sandbags (cont)

Placement of pol sheeting and sandbags in the dr

BUILDING STRONG®

Placement of poly sheeting and sandbags in the dry

Page 18: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Seepage/Erosion Protection:Poly Sheeting and Sandbags (cont)

Placement of poly sheeting and sandbags in the wet

BUILDING STRONG®

p y g g

Page 19: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Placement of poly on riverward side of levee to prevent seepage / erosion Poly weighted down with sandbags

BUILDING STRONG®

seepage / erosion. Poly weighted down with sandbags

Page 20: 5Sandbag Construction 2011 - United States Army Corps of ... Center... · Placement of Sandbags Start upstream Where possible strip sod / topsoilWhere possible, strip sod / topsoil

Placement of poly on riverside of levee to prevent erosion / seepage

BUILDING STRONG®

erosion / seepage