5.Project Guiddfdelines of MBA (1)

18
MBA Program Guide Page No.: 1 Project Guidelines of MBA FLEXI A) Introduction: This guide will provide you all the information you need to know for developing a project dissertation. The Project work for MBA course curriculum has been marked four credits. The following guidelines are to be adopted for MBA and MBA specializations 1. The duration of the project is two semesters starting from 3 rd Semester with synopsis preparation and ending with evaluation during the 4 th Semester. 2. It must be a live project either done at the place of work or some other organization. 3. The project must be taken up under a guide of student`s choice. 4. Student must select two guides (i) Organization guide (ii). Academic Guide 5. Eligibility criteria for guides Organization Guide: Guide from the organization should have minimum 5 years of corporate experience. Academic Guide: Guide should be a post graduate Guide should have minimum 5 years academic experience / corporate experience. It is not compulsory but it is desired that the guide has specialized or working in the area of the project chosen. Academic guide should sign the project report vouching that the project is done by the student 6. It is desirable that the project relate to the specialization pursued.

description

dfdf

Transcript of 5.Project Guiddfdelines of MBA (1)

Page 1: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 1

Project Guidelines of MBA FLEXI

A) Introduction:

This guide will provide you all the information you need to know for

developing a project dissertation. The Project work for MBA course

curriculum has been marked four credits.

The following guidelines are to be adopted for MBA and MBA

specializations

1. The duration of the project is two semesters starting from 3rd Semester

with synopsis preparation and ending with evaluation during the 4th

Semester.

2. It must be a live project either done at the place of work or some other

organization.

3. The project must be taken up under a guide of student`s choice.

4. Student must select two guides

(i) Organization guide

(ii). Academic Guide

5. Eligibility criteria for guides Organization Guide: Guide from the organization should have minimum 5 years of corporate experience. Academic Guide:

Guide should be a post graduate

Guide should have minimum 5 years academic experience /

corporate experience. It is not compulsory but it is desired that the

guide has specialized or working in the area of the project chosen.

Academic guide should sign the project report vouching that the

project is done by the student

6. It is desirable that the project relate to the specialization pursued.

Page 2: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 2

B) The Project Flowchart:

Selection of the Project Topic

Prepare Project Synopsis

Submit the Project Synopsis

Feedback from the University

Corrections Carried Out

Prepare the Executive summary, Project Report and the PowerPoint presentation

Viva Voce / Project Presentation – Student should submit the hardcopy of the Executive summary, Project Report and soft copy of the PowerPoint

presentation

30 Days from Registration in to the 3

rd Semester

Viva Voce will be conducted on the date

specified by the University in the 4

th Semester

Submit the Soft copy of the Executive summary, Project Report and the PowerPoint presentation

Page 3: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 3

C) Selection of Project title:

– The title selected should be coherent with the stream of study or

specialization

– A list of suggested topics is provided at the end of this document.

However, the student and the guide have the freedom to identify an

appropriate topic

– The title should be specific and focus towards the objectives of the

project

D) Project Process:

1. Prepare Project Synopsis:

The project synopsis needs to be submitted within the deadline specified

by the university. Student can refer to the “Project Synopsis Template”

document for standard template.

It needs to be prepared with the following components:

Should be of approximately 1000 words

Title of the project

Introduction

Research problem

Significance of the research

Should outline the methodology to be used

Expected results

Should mention the tools / techniques to be used for data analysis

Literature review / related research outcomes (a brief review of

similar or related studies conducted elsewhere. (should not be more

than 500 words )

Work done:- visits to company; list of functionaries met; documents

received from company; registers and files seen; observations made;

field visits; number of samples collected/questionnaires filled;

Books, sites, journals, magazines referred

Page 4: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 4

2. The actual Project study can be completed after getting the feedback

from the university on the synopsis.

3. The Final report:

The Soft copy of the final project report, executive summary and the

power point presentation should be submitted to the University at least

20 days before the VIVA VOCE. The date for submission of the reports

will be intimated by mail to you by the university.

4. Viva Voce / Presentation:

Viva will be conducted as per the schedule given by the Office of

Additional Registrar – Student Evaluation. Hard copy of the final project

report and the executive summary should be submitted along with the

softcopy of the power point slides. The student should demonstrate or

make a power point presentation of the project to the University

approved External and Internal Examiners.

The project work terminates with the viva voce / presentation. A

summary of the project is to be submitted.

Executive summary: Should be 500 words, besides being a part of the

project report, a copy of the executive summary should be submitted

separately also. The following are the constituents of the summary:

o Title

o Statement of the problem

o Methodology used

o Main findings / outcome of the study with respect to objectives

o Recommendations

E) Project Report:

The final project report should consist of the following components:

Cover page

Title page

Acknowledgement

Page 5: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 5

Bonafide Letter (from the company where the project was

undertaken)

Table of contents

List of Tables & List of Figures

List of Symbols, Abbreviations and Nomenclature

Executive Summary

Chapters

o Introduction

o Project details

Title of the project

Aims and objectives of the study

Problem statement

Scope of the study

Significance of the Study

o Literature review / related research outcomes (should not be

more than 500 words)

o Methodology used: Data collection method, research tools used,

sampling methodology, validity of the data

o Data analysis and interpretation / Research findings

o Recommendations and conclusions

o Limitations of the study and scope for further research if any

References/Bibliography

Format for Bibliography:

Books:

Author’s or Editor’s Names, Title of the Book, Place of Publication,

Publisher, Year of Publication, Page number

Example:

R.C.Goyal, Hospital Administration and Human Resource

Management, New Delhi: Prentice Hall Publication, 2008, Pg. 75

S. K. Joshi, Quality Management in Hospitals, New Delhi: Jaypee

Brothers, 2009, pg 89-93

Journals:

Author, “Article Title”, Periodical Title, Date of Publication, Page

Numbers of the article.

Page 6: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 6

Example:

Bronwyn Fryer, “The Layoff”, Harvard Business Review, March

2009, pg 17-24.

Keila Rooney, “Consumer Driven Healthcare Marketing: Using the

Web to get up close and Personal”, Journal of Healthcare

Management, Chicago: July 2009. Vol 54, Pg 241

F) Project Duration:

Activities Semester 3 Semester 4

1 2 3 4 5 6 1 2 3 4 5 6

Synopsis

Conduct Study

Final Project Preparation

Viva / Presentation

The project duration is 2 semesters. It starts immediately after the

registration into the 3rd semester and ends with a viva that will be

conducted in the 4th semester.

G) Project Evaluation:

Evaluation Pattern for the project is as given below:

Evaluation Criteria Internal External

Synopsis 5 5

Methodology 10 10

Analysis / Findings 25 25

Project Report 25 25

Viva 35 35

Total 100 100

Page 7: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 7

H) Suggested Project topics for MBA but are not limited to:

Sl No. Project Topics

PROJECT TOPICS RELATED TO HUMAN RESOURCES MANAGEMENT

1. A study of performance appraisal / performance management system in XYZ organization

2. Assessment of role stress amongst the employees of XYZ organization

3. Job satisfaction survey at XYZ organization

4. Competency mapping in an organization

5. Training effectiveness in an organization

6. Study of organizational culture OCTAPACE profile.

7. Motivational analysis of organization

8. A comparative study of team effectives in an organization: Team effectiveness assessment measure.

9. A study of Compensation Management System

10. A detailed study of promotion and reward policy of organization

11. A study of quality of work life in an organization.

12. Mapping training need of employees: Training Need Analysis

PROJECT TOPICS RELATED TO MARKETING

13. Formulation of marketing strategies to improve the market share of the organization

14. Improving the effectiveness & efficiency of sales operations of the organization.

15. Developing a service delivery model to bridge the gap between services expected & provided by the organization.

16. Strategies for increasing the occupancy rate of the hotel

17. A market feasibility study for new product of an organization.

18. Distribution mapping & dealer satisfaction survey.

19. A study of marketing strategies & distribution channels of an organization.

20. A study to increase penetration level & brand loyalty among existing consumers of an organization.

Page 8: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 8

PROJECT TOPICS RELATED TO FINANCE

21. The impact of Global recession on Information Technology sector in India.

22. The impact of recent global economic slump on Indian capital market.

23. A comparative study of bancassurance products in banks.

24. A Comparative study of Equity linked Savings Schemes floated by domestic Mutual fund players.

25. A Comparative Study of cost of capital in Automobile/Steel/Pharma/ Finance industry.

26. A comparative study of Finance performance of banks using various ratios.

27. Profitability and Operational Efficiency of Public Sector banks.

28. Profitability and Operational Efficiency of banks in India.

29. A study of working capital management in small scale industries.

30. The scope of Microfinance in Indian context.

31. Financial Inclusion- The scope and effect in Indian economy.

32. Rural banking in India.

33. Dematerialization – The scope and effect.

34. The future of Investment banks in the post Lehman Brothers era.

PROJECT TOPICS RELATED TO INFORMATION SYSTEMS

35. Role of software agents as a collaborative tool - Ecommerce

36. Hospital Management System- Database Approach

37. Automation of Banking database, XYZ Bank.

38. Automation of Customer Relation Database, A SAP Product

39. A study on Electronic data storage

40. A webpage design using JAVA-Google page

PROJECT TOPICS RELATED TO MBA-HCS

41. A study on the identification of high risk groups prone to spinal disorders / diabetes / heart attacks (or any other lifestyle condition) and corresponding prevention recommendations.

42. A study on the wellness practices in a target group (MNC employees, school children, and adults) and recommendations on wellness practices.

Page 9: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 9

43. A study on the identification of causes of delays in in-patient discharges and recommendations to avoid delays and increase patient satisfaction.

44. A comparative study on patient satisfaction in (executive suites, VIP suites, Out-patient department, General ward, Laboratory services, etc.) and recommendations to increase patient satisfaction.

45. A study on the identification of causes of delays in patient transfer (internal/ external) and recommendations to decrease waiting time and increase patient satisfaction.

46. A comparative study on waiting time in various hospital departments and recommendations to decrease waiting time (Out-patient dept, billing, etc).

47. A study on job satisfaction of nurses / paramedic staff in ICU / Operation Theatre/ wards / etc. and corresponding recommendations to improve job satisfaction.

48. A study of sickness absenteeism among various groups of hospital employees (nurses, House-keeping staff, ward boys, CSSD employees, doctors, etc

49. A study on work safety for employees in the radiology department / waste disposal department / lab / housekeeping / etc. and corresponding recommendations to improve work safety. A comparative study may also be undertaken between the departments.

50. A study on Waste disposal management in a hospital and recommendations for safe disposal.

51. A study on hospital acquired infections and prevention recommendations.

52. A study on the efficiency of CSSD (or any other department of a multi-specialty hospital)

53. A cost analysis study in general ward (or any other department) of a hospital to develop user charges.

54. A comparative study on cost analysis of the various departments in a hospital and cost-cutting recommendations.

55. A study on formulation of marketing strategies to promote a healthcare service (e.g.: ‘Women Wellness check-up’ promotion).

56. A study on involvement of Doctors / nurses / paramedics in rural healthcare and suggestions to improve involvement.

Page 10: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 10

57. A study on medical representative triumphs and trials. Recommendation to improve liaison of medical reps and doctors.

58. A comparative study of in-house pharmacy and retail pharmacy.

59. A Study on the identification of the causes of delays in cashless hospitalization and suggest recommendations to reduce time lags.

PROJECT TOPICS RELATED TO INTERNATIONAL BUSINESS

60.

Market entry strategies and programs for a particular sector/ Company/ Product

61. Cross cultural issues and managing cross border teams

62. Strategies adopted by MNCs to cope with Indian brands

63. Impact of FDI on any particular sector

64. Multinational mergers and acquisitions

65. HR policies – Global and Local

66. Transfer pricing- issues and government policies

67. Impact of HRM practices on operational performance in MNCs

68. Changes in banking industry after incorporation of FEMA

PROJECT TOPICS RELATED TO PROJECT MANAGEMENT

69. Application of project management to Global product

development system

70. Application of project management to software development

cycle

71. Project cost estimation

72. Project Scheduling

73. Information Risk Management

74. Knowledge management in project management

75. Project administration

76. Force field analysis

77. Critical path analysis to software projects

78. Importance of Human resource Management in project

management

79. Importance of communication in project management

Page 11: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 11

I) Templates / Details of the Project Report

1. Cover page and Title page

2. Acknowledgement

3. Bonafide Letter

4. Executive Summary

5. Table of contents

6. List of Tables

7. List of Figures

8. List of Symbols, Abbreviations and Nomenclature

9. Chapters

10. References/Bibliography

11. Instructions

Page 12: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 12

1) Cover Page and Title page:

About Cover page and Title Page:

<TITLE OF PROJECT REPORT>

A PROJECT REPORT

Under the guidance Of

______________________________

Submitted by

______________________________

in partial fulfillment o f the requirement

for the award of the degree

Of

MBA

IN

[Finance/Marketing/Human Resource Management/Information Systems/ Banking/Retail

Operations/ Operations Management/ Project Management/ Total Quality Management]

<MONTH> & <YEAR>

Page 13: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 13

2) Acknowledgement:

Acknowledgment is the regards given to the people and organization who

have helped you in completing the project undertaken. Mainly it must

acknowledge the organization in which you carried out the study, followed

by the people who have helped you in the process.

3) Bonafide Certificate

Bonafide Certificate:

BONAFIDE CERTIFICATE

Certified that this project report titled ……………………………………………..” is the bonafide

work of “…………..<NAME OF THE CANDIDATE(S)>.…………” who carried out the project

work under my supervision.

SIGNATURE SIGNATURE HEAD OF THE DEPARTMENT FACULTY IN CHARGE

<Academic Designation> <Department> <Department> <<Full address of the Dept & College >> <Full address of the Dept & College >

<<Full address of the Dept. of College>> <Full address of the Dept. &

College>

Page 14: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 14

4) Executive Summary:

Executive summary should be of one page summary of the project report. It

should consist of the statement of the problem, main findings, and

recommendations for the further use. It should be typed in double line

spacing, Font Style-Times New Roman and Font Size-14.

5) Table of contents:

It is the list of all the contents in the report and all the detailed content

precedes this table of content. A Specimen is shown below

TABLE OF CONTENTS

Chapter No.

Title Page No.

1 Introduction

1.1 Detail 1

1.2 Detail 5

1.3 Detail 10

2 Literature review.

2.1 Detail 14

2.2 Detail 21

6) List of Tables:

Give the same name for the table as they exactly appear above the tables in

the text. The caption of the Table must be present above the table. 1.5 line

spacing should be adopted for typing the matter under this head.

Table 1 <Caption of the table>

Field 1 Field 2 Field 3 Field 4 Field 5 Field 6

Page 15: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 15

List of tables

1. Table 1: <caption the table1>

2. …

Note: By the word ‘Table’, we mean tabulated numerical data in the body of

the project report as well as in the appendices (if any). All other non-verbal

materials used in the body of the project work and appendices such as

charts, graphs, maps, photographs and diagrams may be designated as

figures.

7) List of Figures:

Give the same name for the table as they exactly appear below the figures

in the text. The caption of the figure must be present below the figure. 1.5

line spacing should be adopted for typing the matter under this head.

Figure 1: < Caption of the Figure>

List of Figures

1. Figure 1: <caption the Figure 1>

2. ….

Page 16: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 16

8) List of Symbols, Abbreviations and Nomenclature:

1.5 line spacing should be adopted for typing the matter under this head.

Standard symbols, abbreviations etc. should be used.

9) Chapters:

Mainly the chapters can be broadly classified into 3 parts

1. Introductory chapter

2. Chapter(s) on the main content of the project

3. Concluding chapter.

The main text will be divided into several chapters and each chapter can be

further divided into several divisions and sub-divisions.

Each chapter should be given a relevant title.

Tables and figures in a chapter should be placed in the position with

respect to the reference where they are cited.

Headers and Footnotes should be used sparingly. The title of the

project must be reflected in the left side of the header and chapter

name must be in the right side of the headers. Page numbers are to

be placed in the right side of the footer. They should be typed single

space and placed directly underneath in the very same page, which

refers to the material they annotate.

Note: Always the report must be ended with the concluding chapter and

future enhancements

Page 17: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 17

10) References/Bibliography:

The listing of references should be typed 4 spaces below the heading

“REFERENCES” in alphabetical order in single spacing left – justified. The

reference material should be listed in the alphabetical order of the first

author. The name of the author/authors should be immediately followed by

the year and other details. Any website reference must be referred preceded

by the publications reference.

11) Instructions:

The text in the printed copies must in black color.

1.5 line spacing should be used for typing the general text. The general

text shall be typed in the Font style ‘Times New Roman’ and Font

size 14.

Page 18: 5.Project Guiddfdelines of MBA (1)

MBA Program Guide Page No.: 18

ANNEXURE – 1

No Objection Certificate

This is to certify that the project titled

_______________________________________ is the bonafide work of

Mr./Ms. _________________________________ with roll number

________________ carried out for/in

________________________________________ (Organization Name).

We have no objection with he/she selecting

___________________________________ (project title) as his/her Project

for the requirements of his/her MBA degree. He / She will be allowed to

present the necessary technical details to the panel of examiners for the

purpose of evaluation.

Signature of the Organization Guide

(Name, Designation and Organization Details)