5e
Method StatementDemand Assessment & Master Planning
for Proposed Industrial Estates
Submitted to
Submitted by
5e Consulting
www.5econsulting.in
5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area super builtup mckinsey plants reuse recycling resource reduction Rajkot solid waste management ocean villa resort cottage tourism tourists survey opinion survey cvc classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process ModelingTransportation
HO & Registered Office
Mumbai
E-8, Suman Apartments, Opp Aggarwal Residency, Shankar Lane, Kandiwali West, Mumbai-64
Contact Mr. Parthiv SoniLandline Mobile +91-9930316916Email [email protected]
6 Mangal, 3A Vishrut Bunglows, Opposite A SchoolSubhash chowk, MemnagarAhmedabad 380052
Contact Mr. Sourabh AgarwalLandline +91-79-40055790Mobile +91-9662124866Email [email protected]
Ahmedabad
Tagore ApartmentTagore RoadRajkot
Contact Mr. Tushar VadodariaLandline Mobile +91-98987 06178Email [email protected]
Rajkot
Associated Companies
Wise Financial Solution Pvt. Ltd., Hyderabad
Varishta Consultants Pvt. Ltd., Hyderabad
Hyderabad
Contact Mr. Raghuram AVGLandline +91-04-27627607Mobile +91-9701010000Email [email protected]
Mr. Raghuram AVG102 A, Sri Dattasai Commercial Complex, Opp. Saptagiri Theatre, RTC ‘X’ Roads, Hyd - 500020
www.5econsulting.in
Approach & Methodology
Secondary Data Collection
Stake Holder’s Consultation
Data Collection Stage 2 -Primary Survey – Willingness/Plot
size/Rqmt. etc
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Physical SurveyData Analysis (Stage 1) – Demand Supply gap & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 11. Data Collection – Stage 1
Secondary Data Collection Stakeholder’s Consultation Physical Survey
•To collect basic profile of the proposed sites•To assess demand for Industry at state level & cluster level•To assess the basic supply of the spaces available•Collect of available onsite information
Collect Basic data•Site Profile•Design Guidelines•IE profile•GIDC data•Industry census•GIDC info on inflow outflow•Connectivity and linkages•Existing Industries•Existing Onsite Infrastructure•Current Logistics Trends•Identification of stake holders•Case Studies•Etc
a
Data on Demand for Industries•Historical Trends on GIDC performance – Macro, Micro, others•Future Projects planned through Vision Documents, Budgets, five year plans, Vibrant Gujarat, other studies, etc•Industries policies•Cluster wise trends of new upcoming industries•Sector wise study of trends•Impact of DMIC•Others
b
Data on Supply of Industrial Spaces•Historical Trends on absorption of spaces in the existing IEs•Expansion trends of vacant space •Inventory of planned spaces•Inventory of SEZs•Impact of DMIC on supply•Supply forecast available•Others
c
Data on site infrastructure, Connectivity, policies , etc•Design Year•Population Projections•Connectivity – Road, rails, Ports, airports•Manpower availability•Power availability•Subsidies and incentives available from GOI/GOG•Cluster specific Needs•Restrictions•Env. Issues
d
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 11. Data Collection – Stage 1
Secondary Data Collection Stakeholder’s Consultation Physical Survey
Indicative
Indicative
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 11. Data Collection – Stage 1
Secondary Data Collection Stakeholder’s Consultation Physical Survey
Two main objectives can be derived by willingness survey/stake holder consultation out put will be in terms of industrial sector identification, area of the unit and envisaged production for upcoming IE development.
Demand generators• Willingness to move to
another industrial estate• Intention to expand the
production unit in another industrial estate
• Ancillary demand generating from established industries to support the production
Out put of the consultation- Industry sector i.e
Engineering, textile, Automobile, Pharmaceutical etc
- Area (in terms of block requirement for expansion/relocation)
- Target production ( expected production from subject development
- Infrastructure requirement at macro level
- Amenities required for industrial estate
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 11. Data Collection – Stage 1
Secondary Data Collection Stakeholder’s Consultation Physical Survey
Indicative
Indicative Indicative
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1i. Demand Forecast
Indicative• Infrastructure agenda
vision 2020• CMIE time series data on
investment in Gujarat• Investment information
for INDEXT-B• Vibrant Gujarat MoU lists• Policy documents by
GoG• Growth statistics of
industrial areas from GIDB
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1ii. Supply trends and forecast
Indicative
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1i. Identifying Demand Supply Gaps
Indicative
• Infrastructure agenda vision 2020• CMIE time series data on investment in Gujarat• Investment information for INDEXT-B• Vibrant Gujarat MoU lists• Policy documents by GoG• Growth statistics of industrial areas from GIDB
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1iv. Plotting Sector wise/cluster wise demand supply gap
Sector 1
Sector 2
Sector 3
Sector 4
Sector 5
Sector 6
Sector 7
Cluster 1
Cluster 2
Cluster 3
Cluster 4
Cluster 5
Cluster 6
Cluster 7
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1v. Benchmarking of key parameters
Proposed site 1
Proposed site 2
Proposed site 3
SEZs Sample 1
Other GIDCs
National Benchm
ark
Int. Benchm
ark
Connectivity
Power
Human Resource
s
Land availabili
ty
Readiness
Others
Others
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1v. Benchmarking of key parameters
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1i. Product Mix
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1ii. Selection of TG for willingness survey
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1iii. Questionnaire Design
a b cOptions – Land Parcel
Options
Connectivity
Power
Human Res.
Land availability
Readiness
Readiness
Willingness
Investment
Requirements
Otherswww.5econsulting.in
5e
4 to 6. Data Collection, Analysis, &
Finalization of Standards
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1
Data Collection Stage – 2
•Identification of 500 nos of industries as target segment•Short listing of 150 as sample size considering 50 to drop out/no response•Field survey – questionnaire base interview of the industry representation
4
Data Analysis & Inferences•Analysis on willingness•Analysis on typical plot requirement•Analysis on supporting infra requirement•Analysis on Preference for site options•Indicative of power requirements•Indicative of proposed investments•Etc.
5
Finalization of design standards•Plot Sizes•Required Infra•Power Requirement•Env. Clearances•Sizing•Amenities •Etc
6
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1Project Milestones
Sub areas Deliverables/Output Remarks
Conceptual Layout
Finalizing Basis of design as per relevant standards
Identification of project components & Sizing
Preparation of conceptual layout & associated services
A Note on Basis of design
Associated details and calculations
CAD based layout
Physical Survey not to be part of the assignment
Cad format for to plot to be provided by the client
Conceptual layout not to include architectural detailing, structural layout, and services planning
Scope – Design Layouts
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1Proposed Land Use Distribution
UDPFI
USE
Percentage Area
actual area %
Transport Operators - Office, godown, loading/unloading 30Service Industry - Petrol pump, service area, weigh bridge, etc. 6Public/ Semi-public - Police, post office, telephone, first aid, etc. 3
Commercial 3Parking - idle, transit, other vehicles 18
Open Spaces 10
Circulation 28Others (Dormitories etc) 2
TOTAL 100
Sr.No
Infrastructure Component
1 Internal roads
2 Drainage
3 Compound wall
4 Land scapping
5 Waste Treatment system
6 Effluent treatment plant
7 Sewerage system
8 Waste collection system
9 Telecom
10 Medical center
11 Transport terminal & goods loading/unloading
12 Fire station
13 Bus terminal, stop etc.
14 Community center
15 Police station
16 Post telecommunication
17 Sewerage treatment plant
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1Alternative Layouts
a1
a2
Indicative
www.5econsulting.in
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1Conceptual Layouts
Indicative
www.5econsulting.in
www.5econsulting.in
5e
8. Cost Estimates
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) & Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) & Benchmarking
Product Mix Derivation & Survey Design
4
5
6
7
8
2
3
1 Data Collection – Stage 1Block Estimates
Indicative
www.5econsulting.in
helping execute your
projects
5e Consulting
Sample Property Information Memorandum
www.5econsulting.in5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area super builtup mckinsey plants reuse recycling resource reduction Rajkot solid waste management ocean villa resort cottage tourism tourists survey opinion survey cvc classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process ModelingTransportation