520 West Approach Bridge North (WABN) Restoration of Temporary Impacts USACE IP NWS-2008-1246 Northwest Region 2018 MONITORING REPORT Wetlands Program Issued March 2019 Environmental Services Office

Transcript of 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN...

Page 1: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 West Approach Bridge North (WABN) Restoration of Temporary Impacts

USACE IP NWS-2008-1246

Northwest Region

2018 MONITORING REPORT

Wetlands Program

Issued March 2019

Environmental Services Office

Page 2: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

Author: Kristen Andrews

Editor:

Jennie Husby

Contributors: Kristen Andrews

Jennie Husby Gretchen Lux

For additional information about this report or the WSDOT Wetlands Program, please contact:

Kristen Andrews, Wetlands Program WSDOT, Environmental Services Office P. O. Box 47332, Olympia, WA 98504 Phone: 360-570-2588 E-mail: [email protected]

Monitoring reports are published on the web at: http://www.wsdot.wa.gov/environment/technical/disciplines/wetlands/monitoring-reports

Page 3: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Restoration of Temporary Impacts

USACE IP NWS-2008-1246

1 Impact numbers sourced from WSDOT 2018, Final Wetland Mitigation Addendum #7, Appendix A, Figures A-2, A-3, Table 2. LWN-1,3,4 and LWS-4 2 Mitigation numbers sourced from polygons GPS’d in the field.

General Site Information

USACE IP Number NWS-2008-1246

Ecology WQC Order #9011

Mitigation Location West side of 520 bridge in Seattle, WA

LLID Number

Foster Island: E Montlake Shoreline: WSDOT Peninsula trestle:

Construction Date 2015-2018

Monitoring Period 2018-2027

Year of Monitoring 1 of 10

Type of Impact

Temporary Wetland Clearing

Temporary Wetland Shade

Temporary Wetland Fill

Area of Project

Impact1 0.841 acre 1.35 acres 0.042 acre

Type of Mitigation Wetland Restoration Buffer Restoration

Planned Area of

Mitigation2 0.76 acre 0.77 acre

Page 4: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

This Page Intentionally Left Blank

Page 5: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 1 2018 Annual Monitoring Report

Summary of Monitoring Results and Management Activities (2018)

Performance Standards 2018 Results3 Management

Activities

Native, wetland woody species will achieve an average density of at least four plants per 100 square feet in the revegetated wetland.

Foster Island:

Buffer: 9 plants/100ft² (CI80% = 6.4-11.5) Wetland: 10 plants/100ft² E. Montlake Shoreline:

8 plants/100ft² WSDOT Peninsula:

22 plants/100ft²

Control of garden loosestrife and purple loosestrife was performed within WSDOT ROW in August 2018

Cover of native, wetland emergent vegetation will provide at least 30 percent cover.

Temp Clearing area: 25 to 35% cover (Qualitative)

Report Introduction This report summarizes first-year (Year-1) monitoring activities at the 520 WABN Temporary Impact Mitigation areas. Included are a site description, the performance standards, an explanation of monitoring methods, and an evaluation of site establishment. Monitoring activities included vegetation surveys and photo-documentation on September 25, 2018.

3 Estimated values are presented with their corresponding statistical confidence interval. For example, 9 plants/100ft² (CI80% = 6.4-11.5) means we are 80% confident that the true density value is between 6.4 and 11.5.

Page 6: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 2 2018 Annual Monitoring Report

What are the 520 WABN Temporary Impact Mitigation Areas? These temporary impact restoration areas (Figure 1) restore areas of temporary impacts that occurred during the construction of the 520 West Approach Bridge North (WABN) project. A temporary work trestle was constructed and removed to facilitate construction on the bridge. The temporary impacts that occurred following the removal of this trestle include temporary wetland and buffer impacts to the southern edge of Foster Island and a shoreline near East Montlake Park. Another small trestle was constructed and removed on the WSDOT peninsula near the construction office that resulted in temporary impact to the aquatic bed wetland and the shoreline buffer.

Figure 1 Site Sketch The 520 WABN Temporary Impact Mitigation include areas that were planted as well as areas left to natural recruitment. Appendix 2 includes site directions

Page 7: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 3 2018 Annual Monitoring Report

What are the performance standards for this site? Year 1 Performance Standard 1 Native, wetland woody species will achieve an average density of at least four plants per 100 square feet in the revegetated wetland. Performance Standard 2 Cover of native, wetland emergent vegetation will provide at least 30 percent cover. Appendix 1 shows the As Built (WSDOT 2018).

Page 8: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 4 2018 Annual Monitoring Report

How were the performance standards evaluated? The table below documents the sample methods used for all of the performance standards as required by the mitigation plan or permits. For additional details on the methods see the WSDOT Wetland Mitigation Site Monitoring Methods Paper (WSDOT 2008). Density for the WSDOT peninsula and the E. Montlake shoreline area were estimated using the total count completed by the 520 project office and the area was derived from Polygons GPS’d in the field. Density for the bridge impact buffer area was sampled by the monitoring team using unequal belt transects. Density for the bridge impact PSS/PFO wetland area was qualitatively estimated.

Figure 2 Site Sampling Design (2018)

Placement of Baseline: The 81 meter baseline was placed parallel to the westbound lanes of the 520 bridge across the top of the buffer area. PS 1 PS 1 PS 2

Attribute Density Density Cover

Target population

Native woody species

Native woody species

Herbaceous species

Zone Buffer Wetland Wetland

Sample method UBT

Total Count/Area Qualitative

SU length N/A N/A N/A

SU width 1 N/A N/A

Points/SU N/A N/A N/A

Total # of SU 10 N/A N/A

Page 9: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 5 2018 Annual Monitoring Report

How are the restoration sites developing? The woody species planted at all of the temporary impact restoration areas are becoming established. Dead plants counted by the project office have been replaced. The willows (Salix spp.) and redosier dogwood (Cornus alba) planted in the WSDOT peninsula area in particular are thriving. The E. Montlake plantings had high survivability to begin with and those plantings appear to be on track to meet performance standards in the future as well. The Foster Island restoration area consists of buffer as well as scrub-shrub/forested (PSS/PFO) and emergent wetland (PEM). The buffer area is becoming established. Initially, this area suffered some mortality but the plants have been replaced and the area is meeting the standard. The PSS/PFO area is fairly small and was planted with willows (Salix spp.) and redosier dogwood (Cornus

alba). These species are thriving in the wet conditions in that area. The PEM on Foster Island was planted where accessible with a mix of native emergent species. These species are becoming established but have competition from many non-native and invasive species in the area. The PEM areas that were impacted by the bridge construction trestle, further out to the east and west of the buffer area is not accessible. This area was left to fill in with existing plants from the nearby communities.

Page 10: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 6 2018 Annual Monitoring Report

Results for Performance Standard 1 (Native, wetland woody species will achieve an average density of at least four plants per 100 square feet in the revegetated wetland): In the Foster Island area, the buffer area has a density of 9 plants/100ft² (CI80% = 6.4-11.5). This area meets the standard. Planted woody species are becoming established. The dominant species include salal (Gaultheria shallon), salmonberry (Rubus spectabilis), and dull oregongrape (Mahonia nervosa) (Photo 1). The scrub-shrub/forested wetland in this area is fairly small so it was estimated qualitatively at 10 plants/100ft². Dominant species include willows (Salix spp.) and redosier dogwood (Cornus alba).

The E. Montlake Shoreline has 8 plants/100ft². Survival of planed species is high in this area. The dominant species include Pacific ninebark (Physocarpus capitatus), redosier dogwood (Cornus alba), and willows (Salix spp.) (Photo3).

The WSDOT Peninsula restoration area is thriving with a density of 22 plants/100ft². This area is made up entirely of willows (Salix spp.) and redosier dogwood (Cornus alba) (Photo 2).

Photo 1 Woody cover at Foster Island (Sept 2018)

Photo 2 Woody cover at WSDOT Peninsula (Sept 2018)

Page 11: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 7 2018 Annual Monitoring Report

Photo 3 Woody cover at E. Montlake (Sept 2018)

Photo 4 Emergent cover at Foster Island (Sept 2018)

Results for Performance Standard 2 (Cover of native, wetland emergent vegetation will provide at least 30 percent cover): Temporary Clearing (PEM wetland) – This area was observed from above due to access issues. Native emergent vegetation seems to be recolonizing the area in addition to the plants installed nearest to the main path area (Photo 4). Cover in these two areas on either side of the path (out in the open water area) is qualitatively estimated at 25 to 35% cover overall. What is planned for this site? The project office has plans to continue weed control.

Page 12: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 8 2018 Annual Monitoring Report

Appendix 1 – As-Built (from WSDOT 2018)

Foster Island

Page 13: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 9 2018 Annual Monitoring Report

WSDOT Peninsula

Page 14: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 10 2018 Annual Monitoring Report

Appendix 2 – Photo Points The photographs below were taken on September 25, 2018 and document current site development.

Photo Point 1 PSS/PFO at Foster Is.

Photo Point 3 Recolonized PEM

Photo Point 2 Buffer at Foster Is.

Photo Point 4 Foster Is. From above

Page 15: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 11 2018 Annual Monitoring Report

Driving Directions:

East Montlake Park Shoreline trestle impact area • Driving – SR520 to Montlake Blvd, north to Hamlin Street, east to East Park Drive • Parking – Limited Street parking on Hamlin, East Park Drive, and Shelby • Access – Short walk from East Park Drive east down access road to the shoreline restoration area between the

Waterfront Trail and the WABN Bridge WSDOT Peninsula shoreline trestle impact area

• Driving – SR520 to Montlake Blvd, to Lk WA Blvd. 2510, Lk WA Blvd East • Parking – The location of the WABN Project office and CN staging area. During normal working hours the gate

should be open, there is parking inside the gated area. • Access – Short, less than 1 min., walk from the project office to the trestle restoration area in the CN staging area

Foster Island trestle impact area

• Driving - SR520 to Montlake Blvd, to Lk WA Blvd. to East Foster Is. Road. 2800 East Foster Is Road • Parking – Small Parking lot at the East Foster Is. Road end. • Access – From the Foster Is. Road parking lot, ¼ mile walk on the Foster Is. Trail

Page 16: 520 West Approach Bridge North Restoration of Temporary Impacts · 2019-04-01 · 520 WABN Restoration of Temporary Impacts USACE IP NWS-2008-1246 1 Impact numbers sourced from WSDOT

520 WABN Temporary Impact Mitigation 12 2018 Annual Monitoring Report

Literature Cited

1. [USACE] US Army Corps of Engineers. 2012. Department of the Army Individual Permit Number NWS-2008-1246.

2. [WSDOT] Washington State Department of Transportation. 2011, revised 2012. Final Aquatic Mitigation Plan, SR 520, I-5 to Medina: Bridge Replacement and HOV Project. Seattle (WA): Washington State Department of Transportation, Northwest Region.

3. [WSDOT] Washington State Department of Transportation. May 2018. Final Wetland Mitigation Report Addendum 7, SR 520, I-5 to Medina: Bridge Replacement and HOV Project. Seattle (WA): Washington State Department of Transportation, Northwest Region.

4. [WSDOT] Washington State Department of Transportation. 2018. SR 520 West Approach Bridge North Project, Restoration of Temporary Impacts As-built report.

5. [WSDOT] Washington State Department of Transportation. 2008. WSDOT Wetland Mitigation Site Monitoring Methods. http://www.wsdot.wa.gov/NR/rdonlyres/C211AB59-D5A2-4AA2-8A76-3D9A77E01203/0/MethodsWhitePaper052004.pdf