5.14.1.1 Air Quality Construction Routes Chapter 14 – Figure 1 National Grid (North Wales Connection Project) Regulation 5(2)(a) including (l) and (m) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 DOCUMENT September 2018 Application Reference EN020015

Transcript of 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh...

Page 1: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

5.14.1.1

Air Quality Construction Routes Chapter 14 – Figure 1

National Grid (North Wales Connection Project) Regulation 5(2)(a) including (l) and (m) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

DO

CU

MEN

T

September 2018 Application Reference EN020015

Page 2: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHHHHHHHHHHHHHH

HHHH

HHHHHHHHHHHHHHH

HHHH

HHHHHHHHHHHH

HHHH

HHHHHH

HHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHH

HHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHH

HHHH

HHHH

HHHH

HHHH

HHHH

HHHH

HHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHH

HHHH

HHHH

HHHHHHHHHH

HHHHHHHHH

LINK 27

LINK 35

LINK 23

LINK 3

LINK 25

A1A2

A4

A5

B5

A10

A3

A8

A9

B1B2

B4

A6A7

A5A

SECTION B

SECTION B

SECTION A

SECTION A

NWC ROUTE LEGEND

LEGENDORDER LIMITS

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION A Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A1 of 7 A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 3: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHHHHH

HHHH

HHHH

HHHH

HHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHH

HHHH

HHHH

HHHH

HHHH

HHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHH

HHHH

HHHHHH

HHHHHH

HHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHH

HHHH

HHHH

HHHH

HHHHHH

HHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHH

LINK 27

LINK 35

LINK 28

LINK 3

LINK4.1

LINK 29

LINK 25

B7 B8

B9

B12

B10

B11

B5

B13

C1

C3C4

A10

A8

A9

B1

B2

B4

C2

SECTION B

SECTION C

SECTION B

SECTION A

SECTION B

SECTION A

NWC ROUTE LEGEND

LEGENDORDER LIMITS

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION B Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A2 of 7 A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 4: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

LINK 2

LINK 26

SECTION CSECTION B

NWC ROUTE LEGEND

LEGENDSECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHH

ACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION B & C Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A3 of 7 A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 5: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHH

HHHH

HHHHHHHHH

HH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHH

LINK 33

LINK 28

LINK 24

LINK4.1

LINK 5

LINK 29

LINK 31

LINK 4

B12B13

C1

C3C4

C6C7

C9

C2

C8

C10

C5

SECTION C

SECT

ION D

SECTION B

SECTION C

NWC ROUTE LEGEND

LEGENDORDER LIMITS - OPTION A

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION C OPTION A Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A4 of 7 Option AA3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 6: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHH

HHHH

HHHHHHHHH

HH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHH

LINK 33

LINK 28

LINK 24

LINK4.1

LINK 5

LINK 29

LINK 31

LINK 4

B12B13

C1

C3C4

C6C7

C9

C2

C8

C10

C5

SECTION C

SECT

ION D

SECTION B

SECTION C

NWC ROUTE LEGEND

LEGENDORDER LIMITS - OPTION B

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION C OPTION B Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A4 of 7 Option BA3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 7: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHHHHHHHHHH

HHHH

HHHH

HHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHH

HH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHHHHH

HHHH

HHHH

HHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHH

HHHHHHHH

HHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHH

LINK 36

LINK36.1

LINK11.1

LINK 12

LINK 15

LINK 32

LINK 14

LINK 11

LINK15.1

LINK 17

LINK 6

LINK 7

LINK 16LINK 21

LINK 9

LINK8.2

LINK 8

LINK 22

LINK8.1

LINK 13

LINK 5

LINK7.1

F2

F1C

F1

D1

D3

D2

C9

D4

E5

E1

E2

E3E4

E6

C10

E7

E5A

SECT

ION

E

SECTION D

SECT

ION F

SECTION E

SECT

ION D

SECT

ION

D

SECT

ION E

SECTION D

SECT

ION C

SEENOTE 2

SEENOTE 3

SEENOTE 4

LINK AQ1

LINK AQ2

LINK AQ3

LINK AQ4

LINK AQ5

NWC ROUTE LEGEND

LEGENDORDER LIMITS - OPTION A

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION D & E OPTION A Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A5 of 7 Option AA3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 8: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHHHHHHHHHH

HHHH

HHHH

HHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHHHHH

HH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHH

HHHH

HHHH

HHHHHHHHHHHHHHH

HHHH

HHHH

HHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHH

HHHHHHHH

HHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHH

LINK 36

LINK36.1

LINK11.1

LINK 12

LINK 15

LINK 32

LINK 14

LINK 11

LINK15.1

LINK 17

LINK 6

LINK 7

LINK 16LINK 21

LINK 9

LINK8.2

LINK 8

LINK 22

LINK8.1

LINK 13

LINK 5

LINK7.1

F2

F1C

F1

D1

D3

D2

C9

D4

E5

E1

E2

E3E4

E6

C10

E7

E5A

SECT

ION

E

SECTION D

SECT

ION F

SECTION E

SECT

ION D

SECT

ION

D

SECT

ION E

SECTION D

SECT

ION C

SEENOTE 2

SEENOTE 3

SEENOTE 4

LINK AQ1

LINK AQ2

LINK AQ3

LINK AQ4

LINK AQ5

NWC ROUTE LEGEND

LEGENDORDER LIMITS - OPTION B

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION D & E OPTION B Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A5 of 7 Option BA3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 9: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

HHHHHHHHHHHH

HHHH

HHHHHHHHHHHH

HHHH

HHHH

HHHHHH

HHHHH

HHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHH

HHHHHH

HHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHH

HHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHHHHHHHHHHHHHHHHHHHHHHH

HHHHHHHHH

LINK11.1

LINK 15LINK 14

LINK 30

LINK 11

LINK 34

LINK15.1

LINK 18

LINK 17

LINK 16LINK 21

LINK18.1

LINK 9

LINK 13

LINK 19

LINK 20

F11F10

F3

F4 F5F6

F7

F8F9

F2

F1C

F1

E5

E6

E7

F14

SECTION F

SECT

ION F

SECTION E

SECT

ION E

SEENOTE 2

SEENOTE 3

SEENOTE 4

SEENOTE 5

SEENOTE 6

SEENOTE 3

LINK AQ3

LINK AQ4

LINK AQ5

LINK AQ6

LINK AQ7

LINK AQ8

NWC ROUTE LEGEND

LEGENDORDER LIMITS

SECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHHACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION F Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A6 of 7 A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 10: 5.14.1 - Planning Inspectorate · hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh hhhhhhhhhhhhh

1 of 7

7 of 76 of 7

5 of 7

4 of 73 of 7

2 of 7

LINK AQ8

NWC ROUTE LEGEND

LEGENDSECTION CUTLINES

CONSTRUCTION COMPOUND

HHHHHHHHH

ACCESS - NATIONAL GRID

INDICATIVE BELLMOUTHSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTE

PRIMARY LGV ROUTE

LGV / HGV ENABLING WORKS ROUTE

LGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS AppA 09/08/2018 ENVIRONMENTAL STATEMENT JB GH TS

Document Title: FIGURE 14.1AIR QUALITY CONSTRUCTION TRAFFIC ROUTES

SECTION F Creator:

JBDate:Approver:Date:Checker:Date:

24/07/2018 GH TS 24/07/201824/07/2018Document Type: Scale: Rev:Sheets:Format:

FIGURE A7 of 7 A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Air Quality\_ES Figs_DCO 2018\AQ_14-1_CONSTRUCTROUTES_Plan_Series_JB_20180809.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886

0 500 1,000250

Metres 1:32,000

Document Number:

Scheme:

5.14.1.1

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)