Trump Tower
Chicago, Illinois
10,000 psi @ 56 days - 10 ft. Thick Mat __________________________________________________________________
5000 cy. of SCC Placed in 23.5 Hours
Courtesy Skidmore, Owings, and Merrill LLP
10,000 psi @ 56 days (5000 cy.)
Cement 180 lbs.
Slag 480 lbs.
Sand As required
Crushed Dolomite Stone - 1/2" - 3/4" 1700 lbs.
HRWR Polycarboxylate - Type F & G As required
Viscosity Modifying Admixture, VMA As required
Air Content 1 - 2%
Spread 26" - 28"
J-Ring 24" - 27"
Peak Temperature Reached 155° F (68° C)
Maximum Temperature Differential 28° F (15° C)
W/cm 0.26 - 0.28
Paste Volume 28.3%
Compressive Strength Required: 10,000 psi
@ 56 days
They achieved
it in 7 days
Developer: Trump Organization
Architect: Adrian Smith - Skidmore, Owings and Merrill, Chicago, IL
Structural Engineer: William Baker - Skidmore, Owings and Merrill, Chicago, IL
Construction Manager: Bovis Lend Lease
Concrete Contractor: James McHugh Construction
Concrete Producer: Prairie Materials