500-1840 Equipment Manufacturer - Playworld · 500-1840 CATALOG PRE-DESIGN 500-1840 3/16"=1'-0" M....
Transcript of 500-1840 Equipment Manufacturer - Playworld · 500-1840 CATALOG PRE-DESIGN 500-1840 3/16"=1'-0" M....
Equipment Manufacturer500-1840
Equipment Manufacturer500-1840
0.5 1.0
05'
Meters2.0 3.0
10'
TRANSFER
STATION
W/ STEP
48"
1,22M
60"
1,53M
72"
1,83M
60"
1,53M
66"
1,68M
108"
2,75M
40'-6"
[12.35M]
39'-6"
[12.05M]
6'-1"
[1.86M]
8'-2"
[2.49M]
6'-1"
[1.86M]
6'
[1.84M]
6'-5"
[1.96M]
6'-2"
[1.88M]
7'-2"
[2.18M]
6'-2"
[1.89M]
6'-4"
[1.92M]
LEG
LIFT
SKY
LINK
TOWER
CLIMBER
360°
SPIRAL
SLITHER
SLIDE
BUBBLE PANEL
(deck)
ACTIVITY PANEL
W/ SLIDE & SOLVE
INSERT (ground)
RIBBON
CLIMBER
SILO
CLIMBER
HOPSCOTCH
CLIMBER
CANYON
CROSSING
POST
MOUNT
WHEEL
ADA
STAIRS
POST
CLIMBER
ACCESS
GATE
RUMBLE
SEAT
SLIDE
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
500-
1840
CA
TA
LO
G P
RE
-D
ES
IG
N
500-1840 3/16"=1'-0"
M. MERTZ
18-MAY-18
28'4" x 25'4" x 18'5"8,63M x 7,72M x 5,61M
40'6" x 39'6"12,35M x 12,05M
1180 SqFt.109,62 SqM.
126 Ft.38,4M
9 Ft.2,75M
44 5-12
11
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 8
4
4
3
3
3
3
3
0.5 1.0
05'
Meters2.0 3.0
10'
48"
1,22M
60"
1,53M
72"
1,83M
60"
1,53M
66"
1,68M
108"
2,75M
40'-6"
[12.35M]
39'-6"
[12.05M]
6'-1"
[1.86M]
8'-2"
[2.49M]
6'-1"
[1.86M]
6'
[1.84M]
6'-5"
[1.96M]
6'-2"
[1.88M]
7'-2"
[2.18M]
6'-2"
[1.89M]
6'-4"
[1.92M]
12
12
13
14
1414
15
16
17
18
21
19
22
24
20
24
25
26
27
28
29
30
32
31
33
9
10
11
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
500-
1840
CA
TA
LO
G P
RE
-D
ES
IG
N
500-1840 3/16"=1'-0"
M. MERTZ
18-MAY-18
28'4" x 25'4" x 18'5"8,63M x 7,72M x 5,61M
40'6" x 39'6"12,35M x 12,05M
1180 SqFt.109,62 SqM.
126 Ft.38,4M
9 Ft.2,75M
44 5-12
11
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 8
4
4
3
3
3
3
3
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
1
9
2
"
1
9
2
"
1
4
4
"
1
4
4
"
1
4
4
"
1
4
4
"
1
4
4
"
ZZU
N
3247
Z
Z
U
N
3
2
5
6
Z
Z
P
M
0
2
9
7
1
4
4
"
G
Z
2
0
1
"
2
0
1
"
2
0
1
"
2
0
1
"
1
5
6
"
1
5
6
"
SHADE HAT
SEE FOOTING DETAIL #8
48"48" 72" 48"48" 26"
12"
24"
5"
20"
14"
75"
26"
11"
29"
38"
13"
16"
32"
19"
16"
24"
39"
35"
21" 15"
101" 26"
16"
24"
12"
22"
21"
13"
48"
48"
48"
48"
48"
48"
70"
24"
TRANSFER
STATION
W/ STEP
SKY
LINK
TOWER
CLIMBER
360°
SPIRAL
SLITHER
SLIDE
RIBBON
CLIMBER
SILO
CLIMBER
HOPSCOTCH
CLIMBER
CANYON
CROSSING
POST
CLIMBER
RUMBLE
SEAT
SLIDE
165"
103"
215"
190"
ADA
STAIRS
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
500-
1840
CA
TA
LO
G P
RE
-D
ES
IG
N
500-1840 1/4"=1'-0"
M. MERTZ
28-JUN-18
1. Consult the local code authority for permitting requirements prior to order.Stamped engineering drawings are available for a fee if required.
2. A crane will be needed for the installation of free-standing shade (>20' x 20').Ensure site is crane accessible. See dealer sheets on crane and tools.
3. Footings need special consideration:a. Footings are substancial. See installtion instructions for specifications.b. A seven day cure time is required.c. Must be located at least 72" from other equipment unless subterranean.d. Anchor bolts must be embedded accurately to ensure proper assembly.
4. A height clearance of 84" must be maintained over existing equipment.Consult your Customer Satisfaction Representative prior to ordering free-standingshade not previously quoted."
Please review all installation instructions for your specific shade model(s) on the BBS.
Thank You,
Megan MertzPlayground Designer1.800.233.8404Playworld Systems, Inc.
Tuesday, November 05, 2019
PLAYWORLD SYSTEMS, INCSales and Marketing 1000 BUFFALO ROAD LEWISBURG, PA 17837 Phone: 1-570-522-9800 Fax: 1-570-522-0268
Re: Shade Hat footing concrete volume for drawing 500-1840
Project: 500-1840
Dear Sales and Marketing,
This design contains shade product. Please note the following as applicable:
Hat Shade
Posts supporting the hat shade will require deeper than usual footings. To assist with your installation cost
estimations, please note the following:
4.00 posts in this drawing will require a combined total of 1.63 cubic yards of concrete per a 150 mph wind speed factor.
The amount of concrete noted is limited to the posts which support the hat shade only. It does not include any concrete needed to install the remaining posts in this design.
Consult the local stipulations for the proposed installation site to ensure the hat shade meets or exceeds these requirements (wind speed, etc.) prior to placing the order.
Free Standing Shade
Page of1 1Tuesday, November 05, 2019 www.PlayworldSystems.com
Posts
ZZPM0036 51 5in OD X 144in STEEL POST W/ RIVETED CAP
ZZPM0036GZ 12 5in OD X 144in STEEL POST (GROUND ZERO)
ZZPM0046 23 5in OD X 156in STEEL POST W/ RIVETED CAP
ZZPM0128 24 5in OD x 192in STEEL POST W/RIVETED CAP
ZZPM0247 45 5in OD x 201in SWAGED STEEL POST
ZZPM0367 46 2ft POST EXTENSION FOOTER & CLAMP SUPPORT
Decks & Kick Plates
ZZPM0616 27 SQUARE COATED DECK ASSEMBLY
ZZPM0617 38 TRIANGULAR COATED DECK ASSEMBLY
ADA Items
ZZPM2027 19 TRANSFER STATION (48in DECK)
ZZUN2019 110 APPROACH STEP FOR TRANSFER STATION
Slides
ZZPM2737 111 RUMBLE SEAT (60in DECK)
ZZPM3216 112 SLITHER SLIDE 2.0 BALCONY ENTRY/EXIT
ZZUN3207 113 SLITHER SLIDE 2.0 (STRAIGHT SECTION)
ZZUN3217 314 SLITHER SLIDE 2.0 (RIGHT 120° SECTION)
ZZUN3247 115 SLITHER SLIDE 2.0 SUPPORT LEG 5ft-6in
ZZUN3256 116 SLITHER SLIDE 2.0 SUPPORT LEG 2ft-6in
Activity Panels
ZZPM4290 117 STEERING WHEEL (POST MOUNT)
ZZPM4672 118 PM PANEL FRAME- GROUND LEVEL
ZZUN4678 119 SLIDE & SOLVE INSERT
Barriers
ZZPM4288 120 ACCESS GATE
ZZPM4811 121 OVAL BUBBLE PANEL (DECK MOUNT)
Climbers
ZZPM6210 122 36in DECK TO DECK CLIMBER
ZZPM6388 123 6ft CANYON CROSSING (DK TO DK - 12in RISE)
ZZPM7168 124 6ft TOWER CLIMBER
ZZPM7956 125 SILO CLIMBER (60in DECK)
ZZPM8270 126 HOPSCOTCH CLIMBER (60in DECK)
ZZPM8300 127 RIBBON CLIMBER (60in DECK)
Ground Zer0 Climbers
ZZPM0297 128 POST W/ LADDER CLIMBER (36in OR 48in DECK)
Overhead Events
ZZPM5770 129 LEG LIFT
GroundZer0 Overhead Events
ZZPM8450 130 THE SKY LINK
Roofs & Arches
ZZPM9716 131 SQUARE HAT SHADE (PM)
ZZPM9726 132 PM SQUARE HAT POST BRACES
Part No. Description
Design Number: 500-1840 - Bill Of Material
500-1840
Ref.No. Quantity
Monday, May 04, 2020 Page of1 2 Playworld.com
Stairs and Ladders
ZZPM9189 133 18in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZUN1471 134 INSTALLER HARDWARE KIT
ZZUN9910 135 SURFACING WARNING LABEL KIT
ZZUN9930 136 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 137 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 138 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 500-1840 - Bill Of Material
500-1840
Ref.No. Quantity
Monday, May 04, 2020 Page of2 2 Playworld.com
CertifiedZZPM00361 5in OD X 144in STEEL POST W/ RIVETED CAP
5 404.55 587 0 5.00 0.65 0
CertifiedZZPM0036GZ2 5in OD X 144in STEEL POST (GROUND ZERO)
1 80.41 117 0 1.50 0.18 0
CertifiedZZPM00463 5in OD X 156in STEEL POST W/ RIVETED CAP
2 175.42 253 0 2.00 0.26 0
CertifiedZZPM01284 5in OD x 192in STEEL POST W/RIVETED CAP2 212.62 307 0 2.00 0.24 0
CertifiedZZPM02475 5in OD x 201in SWAGED STEEL POST4 474.84 618 0 4.00 0.48 0
CertifiedZZPM03676 2ft POST EXTENSION FOOTER & CLAMP SUPPORT
4 82.32 132 0 1.00 0.00 0
CertifiedZZPM06167 SQUARE COATED DECK ASSEMBLY 2 180.72 441 8 2.00 0.00 0
CertifiedZZPM06178 TRIANGULAR COATED DECK ASSEMBLY3 139.20 508 6 3.00 0.00 0
CertifiedZZPM20279 TRANSFER STATION (48in DECK)1 287.44 567 3 2.00 0.09 0
CertifiedZZUN201910 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZPM273711 RUMBLE SEAT (60in DECK) 1 203.20 768 4 3.00 0.06 1
CertifiedZZPM321612 SLITHER SLIDE 2.0 BALCONY ENTRY/EXIT1 166.60 648 2 2.50 0.03 1
CertifiedZZUN320713 SLITHER SLIDE 2.0 (STRAIGHT SECTION)1 19.59 128 0 0.25 0.00 0
CertifiedZZUN321714 SLITHER SLIDE 2.0 (RIGHT 120° SECTION)3 125.04 695 0 0.75 0.00 0
CertifiedZZUN324715 SLITHER SLIDE 2.0 SUPPORT LEG 5ft-6in1 19.41 70 0 0.25 0.03 0
CertifiedZZUN325616 SLITHER SLIDE 2.0 SUPPORT LEG 2ft-6in1 12.81 59 0 0.25 0.03 0
CertifiedZZPM429017 STEERING WHEEL (POST MOUNT) 1 8.67 47 1 0.25 0.00 1
CertifiedZZPM467218 PM PANEL FRAME- GROUND LEVEL 1 47.44 235 0 1.00 0.00 0
CertifiedZZUN467819 SLIDE & SOLVE INSERT 1 17.61 761 2 0.25 0.00 1
CertifiedZZPM428820 ACCESS GATE 1 34.38 92 0 0.50 0.00 0
CertifiedZZPM481121 OVAL BUBBLE PANEL (DECK MOUNT) 1 45.15 265 0 1.00 0.00 0
CertifiedZZPM621022 36in DECK TO DECK CLIMBER 1 81.88 200 1 1.00 0.00 1
CertifiedZZPM638823 6ft CANYON CROSSING (DK TO DK - 12in RISE)
1 91.36 818 2 3.00 0.00 1
CertifiedZZPM716824 6ft TOWER CLIMBER 1 112.11 256 2 2.00 0.90 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1840 - Compliance and Technical Data
500-1840
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Monday, May 04, 2020 Page of1 3 Playworld.com
CertifiedZZPM795625 SILO CLIMBER (60in DECK) 1 81.77 164 2 1.50 0.07 1
CertifiedZZPM827026 HOPSCOTCH CLIMBER (60in DECK) 1 96.46 179 2 2.00 0.06 1
CertifiedZZPM830027 RIBBON CLIMBER (60in DECK) 1 58.88 139 2 1.50 0.06 1
CertifiedZZPM029728 POST W/ LADDER CLIMBER (36in OR 48in DECK)
1 74.81 131 1 0.50 0.13 1
CertifiedZZPM577029 LEG LIFT 1 7.20 33 1 0.50 0.00 1
CertifiedZZPM845030 THE SKY LINK 1 55.09 129 2 0.50 0.00 1
CertifiedZZPM971631 SQUARE HAT SHADE (PM) 1 370.47 3,083 0 9.00 0.00 0
CertifiedZZPM972632 PM SQUARE HAT POST BRACES 1 104.30 330 0 1.00 0.00 0
CertifiedZZPM918933 18in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
1 136.32 430 1 1.00 0.00 0
N/AZZUN147134 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991035 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993036 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXX067837 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID38 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1840 - Compliance and Technical Data
500-1840
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
624 1,296 13,409 43 57.33 3.314,043.99 13Totals:
13 Metric Tons583 Kg281 Kg1,819.80 Kg 2.52 m3
Monday, May 04, 2020 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1840 - Compliance and Technical Data
500-1840
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 500-1840, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Monday, May 04, 2020 Page of3 3 Playworld.com