KUWAIT OIL COMPANY (K.S.C.)PRE-QUALIFICATION QUESTIONNAIRE
CATEGORY: GAS SWEETENING GAS COMPRESSION SYSTEM
___________________________________________________________________________________
TECHNICAL SECTION –
PART IIISubcategory A: GAS Sweetening System
Complete the following questionnaire relating to your current Technical, Manufacturing
and other related facilities.
(If space provided is insufficient, attach additional sheets)
1. SPECIALISATION:
1.1 Confirm that your present ability and field of specialisation includes:
Pre-Engineered Package [ ] YES [ ] NO
Manufacturing [ ] YES [ ] NO
Assembling/Packaging [ ] YES [ ] NO
FAT Inspection & Testing [ ] YES [ ] NO
Installation & pre-Commissioning [ ] YES [ ] NO
Supply & Delivering [ ] YES [ ] NO
Commissioning & Performance Testing [ ] YES [ ] NO
Operation & Maintenance [ ] YES [ ] NO
1.2 Confirm if your main line of field of specialisation(manufacture/assembling/packaging/ business) is:
a) Pumps:
i.
Pump [ ] YES [ ] NOii. w/ Driver (see b below) [ ] YES [ ] NO
b) Driver (Gas Engine/ Electric Motor)
i. Gas Engine [ ] YES [ ] NO
ii. Electric Motor [ ] YES [ ] NO
iii. Gas Turbine [ ] YES [ ] NO
c) Sulfur Recovery Unit (SRU) [ ] YES [ ] NO
d) Acid Gas Disposals (Incinerators) [ ] YES [ ] NO
e) Tail Gas Treatment Unit (TGTU) [ ] YES [ ] NO
f)
Sulfur Handling Systems [ ] YES [ ] NOg) Pressure Vessels (e.g. Absorbers, Columns & Towers) [ ] YES [ ] NO
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 2/35
Page 2 of 35 Tech: GS & GC System – July 2014
h) Air Cooler/ Fin-Fan Coolers [ ] YES [ ] NO
i) Regeneration / Chillers (Heat Exchanger-Shell & Tube) [ ] YES [ ] NO
j) Complete System (incl. Structural Steel Skids) [ ] YES [ ] NO
1.3 Confirm the list of “Main / Typical / Standard / Pre-engineered” Supplied Skid-
mounted Modules indicating its Major Equipment or Long Lead Items.
1.4 Please outline the Modules Assembling Procedure /framework / Workflow
1.5 Please specify available Delivery Options:
a. EX Works
b. FOB
c. CIF-Kuwait Port
2. MAJOR EQUIPMENT / LONG LEAD ITEM DETAILS
State the type/types of Major Equipment / Long Lead Items (LLIs)
details normally supplied within your Modules/ Packaged for which
pre-qualification is sought:
2.1 PUMP(S)
2.1.1 Centrifugal Pumps (Thick in the appropriate box)
2.1.1.1 Horizontal
a) Single stage (volute) [ ]
b) Multistage [ ]
c) End suction [ ]
2.1.1.2 Vertical
a) Non-clog [ ]
b) Sump [ ]
c) Vertical turbine/canister [ ]
d) Submersible [ ]
2.1.1.3 Large Vertical [ ]
2.1.1.4 Self-priming [ ]
2.1.1.5 High Pressure [ ]
2.1.1.6 Others:(specify the
type):_____________________ [ ]
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 3/35
Page 3 of 35 Tech: GS & GC System – July 2014
2.1.2 Rotary Pumps
a) Screw (single rotor) [ ]
b) Screw (multiple rotor) [ ]
c) Progressive cavity type [ ]
d) Rotary vane type [ ]
e) Gear type [ ]
f) Vacuum Type [ ]
g) Rotor-jet type [ ]
h) Other (state the type) _______ ______________________ [ ]
2.1.3 Reciprocating Pumps
a) High pressure [ ]
b) Horizontal plunger [ ]
c) Vertical plunger [ ]
2.1.4 Controlled Volume Pumps (for metering, chemical
dosing & injection)
a) Diaphragm type [ ]
b) Piston/Plunger type [ ]
c) Simplex/Duplex type [ ]
d) Others (specify the type ________________________ [ ]
2.1.5 Special Effect Pumps (for special application)
a) Jet (Eductor Pumps) [ ] b) Gas Lift-Pumps [ ]
c) Hydraulic Turbine Driven Pumps [ ]
2.2 MOTORS
a) Induction Squirrel Motor (TEFC) [ ]
b)
Other Specify [ ]
2.3 SRU(s)
a)
Clauss [ ] b) Others [ ]
3. Oil & Gas Industry ExperienceState your experience with the following:
a)
Chemical / Petro-Chemical Industries [ ]
b) Hydrocarbon Process [ ]
c)
Fuel Gas [ ]
d) Refrigeration Service [ ]
e)
Hydrocarbon (Sour Service in accordanceWith NACE : MR-01-75 / ISO 151 56-1) [ ]
f) Others (State the type______________________________)
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 4/35
Page 4 of 35 Tech: GS & GC System – July 2014
4. CLIENT INFORMATION
State the client to whom you supplied various types of GAS Sweetening
System, complete the following table separately for each type of GAS
Sweetening system for last five (5) years.
Client
Country
Gas
Sweeting
Systems(pumps type,
motor types,
insulation, and
other Tech.
details)
Note 1& 2
Service(incl. Sour
Service in
accordance with
NACE MR-
0175/ ISO 15156
Part I, II & III)
Operating
Conditions(Pressure, flow
etc.)
Year Installed
capacity
total Plant
/ Modules
(e.g.MMSCFD; Power;
KW;
Molten/Sol
id/
Granular
Sulfurs
MTPD)
Quantity
incl. #
modules
Notes:1. Actual in Rental skid-mounted fleet (sour/non-sour)
2.
Number of sold skid-mounted fleet (sour/non-sour), designing, fabrication,inspection, testing, packaging & supply:
a. As per Vendor Specs b. As per Purchaser Specs
Please inform details of your oldest in operation owned / designed /
supplied Sweetening Skid-mounted Modules / Facility
Please indicate average / mean Useful Life of the Skid-mounted Modules
& under which conditions, Operating & Maintenance System.
5. CODES
5.1
State the number of GAS Sweetening Systems supplied in accordancewith the listed Codes/ Standard/ Specifications:
International Standard / RP/ Publ. a) b) c)
API Std 610
Centrifugal Pumps For Petroleum, Heavy Duty Chemical and GasIndustry Services
API Std 660Shell-and-Tube Heat Exchangers
API Std 661Petroleum, Petrochemical, and Natural Gas Industries — Air-Cooled Heat
ExchangersAPI Std 662Plate Heat Exchangers for General Refinery Services, Part 1 — Plate-
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 5/35
Page 5 of 35 Tech: GS & GC System – July 2014
and-Frame Heat Exchangers
API Std 662Plate Heat Exchangers for General Refinery Services, Part 2 — Brazed
Aluminium Plate-Fin Heat Exchangers
API Std. 670
Machinery Protection Systems
API Std. 671Special Purpose Coupling for Refinery Service
API Std 672
Packaged, Integrally Geared Centrifugal Air Compressors for
Petroleum, Chemical, and Gas
Industry Services
API Std. 674
Positive Displacement Pumps - Reciprocating
API Std. 676
Positive Displacement Pumps - Rotary
API Std. 677General-Purpose Gear Units for Petroleum, Chemical and Gas Industry
ServicesAPI Std 680
Packaged Reciprocating Plant and Instrument Air Compressorsfor General Refinery Services
API 682Shaft Sealing System for Centrifugal and Rotary Pumps
ISO 8010
“Compressors for the Process Industry-Screw ……”
BS 7316
Specification for Design & Construction of Screw related typecompressors PIPASME B73.1M
Horizontal,End Suction Centrifugal Pumps
ASME B73.2M
Vertical In-line Centrifugal Pumps
API Std. 613
Special Purpose Gear Units for Refinery Services
API Std. 614
Lubrication, Shaft-Sealing and Control Oil Systems for Special Purpose
Application
API Std. 615
Sound Control of Mechanical Equipment for Refinery Services
API RP. 684
API Standard Paragraphs Rotor dynamic Tutorial: Lateral CriticalSpeeds, Unbalance Response,
Stability, Train Torsional, and Rotor Balancing
API Std. 685
Sealless Centrifugal Pumps for Petroleum, Petrochemical, and Gas
Industry Process Service
API RP 688
Pulsation and Vibration Control in Positive Displacement Machinery
Systems for Petroleum, Petrochemical, and Natural Gas IndustryServices
BS 5500
Specification for unfired fusion welded pressure vessels
BS 5169Specification for unfired fusion welded steel air receiver
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 6/35
Page 6 of 35 Tech: GS & GC System – July 2014
API 12 J
Specification for oil & gas separators
API 510
Pressure Vessel Inspection Program
WRC Bulletin # 107Local Stresses in Spherical & Cylindrical Shell due to External Loading
WRC Bulletin # 297Local Stresses in Spherical & Cylindrical Shell due to External Loading
on Nozzles
IEC 34 Part 1/ 5/6/7/8/9 & 14
Rotating Electrical Machines
ISO 8528
Reciprocating Internal Combustion Engineer Driven A/C Generating Set
BS 4999
General requirement for Rotating Electrical Machines: Specification for
Rating & Performance
BS 5000
“Generator…….to be driven by Reciprocating Internal CombustionEngines”
BS 5501/ IEC79
Electrical Apparatus for Potentially Explosive Atmospheres
IEC79
Electrical Apparatus for Explosive Gas Atmospheres
ASME
Section II
Materials Specifications
Part A Ferrous Materials
Part B Non-Ferrous Materials
Part C Welding Rods, Electrodes and Filler Metal
Part D Properties
Section V Non-Destructive Examination
Section VIII
Pressure Vessels
Division 1
Division 2
Section IX
Welding and Brazing Qualifications
Columns stand for:
a) Within the last 2 years
b) Within the last 10 years
c) At Middle East last 20 years
For each Standard please specify main details & features selected by the purchaser (eithervendor or final user).
Please indicate full compliance with each international Standard / RP/ PIP/ Code, ifnegative, please provide deviations list and implemented option / alternative designfeature.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 7/35
Page 7 of 35 Tech: GS & GC System – July 2014
5.2 Also, state any experience with other Codes, Standards & Specification
Codes/ Standards Within last 2 years Within last 5 years
API RP 686
Machinery Installation andInstallation Design
API Std. 689
Collection and Exchange of
Reliability and Maintenance
Data for Equipment
API Std. 752
Management of Hazards
Associated with Location ofProcess Plant Permanent
Buildings
API Std. 753
Management of Hazards
Associated with Location ofProcess Plant Portable
Buildings
API Std. 754Process Safety Performance
Indicators for the Refining and
Petrochemical Industries
API TR 949-A
Research Report on
Characterization and
Monitoring of Cracking in Wet
H2S Service
API TR 949-B
Repair and RemediationStrategies for Equipment
Operating in Wet H2S Service
API RP 945
Avoiding Environmental
Cracking in Amine Units
API RP 2218
Fireproofing Practices in
Petroleum and Petrochemical
Processing Plants
API Publ 4679
Amine Unit Air Emissions
Model and User‟s Guide,
AMINE Calc, Version 1.0
API Publ 4679
Amine Unit Air Emissions
Model Evaluation
Others
5.3 Submit valid copies of API / ISO and /or BS or any other certificate,which you may hold for the manufacture of any of the major equipment.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 8/35
Page 8 of 35 Tech: GS & GC System – July 2014
5.4 State whether Driver of Rotating / Positive Displacement Equipmenthave been supplied in accordance with the following standards.
a) Drive Motors: BS 4999 [ ]BS 5000 Part 2 [ ]BS 4683 [ ]
NEMA7 [ ]
b) Drive Turbines API 611 [ ]API 612 [ ]API 616 [ ]
c) Gas Engine API 7B-11C [ ]BS 5514/ISO 3046 [ ]
d) Others _____________________________________________
i) Please list out the other reference standards applied for the major
items of the Compressor system supplied by you. ___________________________________________________________
___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ________________________________________________________
6 QUALITY ASSURANCE/CONTROL
6.1 Do you have a formally documented quality system? [ ] YES [ ] NO
6.2
Do you have a Quality Assurance Manual/If yes, to which National/ International Standard is it developed?
-ISO 90001-BS 5751-If other, please specify.
6.3 Is your quality assurances system approved by any inspection/certifying agency?Such as Lloyds, TUV, B. Veritas or by any large well known Agency or Co.;such as Major oil Companies. Attach copies of letter the above, if any.
6.4 Are quality plans used as controlling documents on the shop floor?-if not
State the reason
6.5 Is your manufacturing plant approved by ISO 9000 series or BS 5750 series?Specifically state the approval status & provide documentary evidence.
7.0 MATERIAL
7.1 Submit typical sectional views for each type of Major Equipment / LLIsmanufactured by you, showing all design features. The views shouldclearly state full compliance to API/BS standard specified above. If thereare deviations/exception to above standards, these are to be clearlyhighlighted.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 9/35
Page 9 of 35 Tech: GS & GC System – July 2014
7.2 The sectional views should also be marked with appropriate material(ASTM/AISI/BS/ any other) grades for individual components& size.
7.3 Are defective castings/forgings always returned to the foundry/forge shopfor repair or replacement or are some or all repair performed in- house?
_____________________________________________________________
_____________________________________________________________
7.4 Are weld repairs (including foundry repairs) routinely documented? _____________________________________________________________ _____________________________________________________________
7.5 Are repair records available for review? _____________________________________________________________ _____________________________________________________________
7.6 Are castings for „Sour Service‟ treated differently or segregated? _____________________________________________________________
_____________________________________________________________
7.7 Is supplementary heat treatment provided for sour service? State the heattreatment process used. ________________________________________________________
7.8 Are casting thicknesses routinely checked?
_____________________________________________________________ ___________________________________________________________
7.9 Can material test certificates be provided for compressor components ifrequired? _____________________________________________________________ _____________________________________________________________
7.10 What supplementary tests can be additionally performed on materials for
sour service & on surfacing treatments on request?
7.11 Submit catalogues for each type of Motor manufactured by you, showing all
features. This should clearly state full compliance to the applicableIEC/BS/ISO or any other applicable standard. Any deviations to the
specified standard, should be clearly highlighted.
7.12
Do you manufacture Motors for special services? If yes; state applicablecode/standard, e.g.
1. Suitable for hazardous areas [ ] YES [ ] NO
2. Any other (specify) [ ] YES [ ] NO
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 10/35
Page 10 of 35 Tech: GS & GC System – July 2014
7.13 Provide your statement of compliance/limitation/exceptions to the relevant portions of the attached KOC Standard Specification No.: KOC-E-001
Compliance [ ] Limitation [ ]State limitations, if any (Provide complete details)
7.14 Do you supply refurbished/reconditioned products.[ ] YES [ ] NO
If Yes, please provide details _____________________________________________________________
_____________________________________________________________
7.15 Indicate your experience with material specification for the following
Major Equipment / LLIs / Part / Component:
AIR COOLED HEAT EXCHANGER (FIN-FAN COOLER/ ACHE)
Part Material Specifications (API/ASTM/BS) DIN or others
2 Years 5 Years
Shell
Header
Nozzles
Tubes
Fin
FansSpeed reducer
PRESSURE VESSELS
Specification/Standard Within last 2 years Within last 5 years
API
ASME
ASTM
BS
DINBuyers Own ( Give detail)
Vendors Own ( Give detail)
Other National Standards
(Pl. Specify which)
8.0 DESIGN
Complete the following questions as applicable for the each Major Equipment /LLIs for which approval is sought.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 11/35
Page 11 of 35 Tech: GS & GC System – July 2014
8.1 Provide design details in respect to the each types of Major Equipment /LLIs in your production range.
8.2 What design work is normally or always contracted out? ___________________________________________________________ ___________________________________________________________
8.3 Are typical Major Equipment / LLIs sectional views provided, clearlyshowing all design features for all sizes? ___________________________________________________________
____________________________________________________________
8.4 Are the bearings anti-friction type or sleeve type? Can alternative bearings be provided, if required? What is your experience regarding magnetic bearings? ___________________________________________________________
____________________________________________________________
8.5 Is Critical Speed Verification &Tensional Analysis carried out for allCompressors?
___________________________________________________________ ___________________________________________________________
8.6 Is standardization and inter-changeability of components practiced between Major Equipment / LLIs of same types but for different duties?
___________________________________________________________ ___________________________________________________________
8.7 Advise the type of surface protection provided on un- machined exteriorsurface and on machined& threaded surfaces. ___________________________________________________________ ___________________________________________________________
8.8 Provide the details of marking provided on the Major Equipment / LLIs.
State the method of marking and also provide a typical Nameplatedrawing incorporating the marking. ___________________________________________________________
___________________________________________________________
8.9 What design approaches do you use for pulsation and vibration control.Can you carryout acoustic and mechanical system response analysis or do
you get a third party to do it?
8.10 All Electrical Equipment shall be suitable rated for hazardous areas
classification in accordance with IEC 60079 on NFPA 70. Specify Exd,Exe, Exn and any other categories
8.11 For reciprocating compressor, advise your specific construction details forthe following item:
- Cylinder & Cylinder appurtenances ____________________________- Cylinder Cooling (Air/ water both) ____________________________- Valve& Unloaders_________________________________________
- Piston & Crankshaft________________________________________-Pulsation Suppression Devices_________________________________
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 12/35
Page 12 of 35 Tech: GS & GC System – July 2014
8.12 Engineering / Design Capability:
a. Please explain and provide evidence of your StandardizedSystem / pre-Engineered for ModularDesign/Transportable, skid-mounted gas processingequipment fully instrumented/ automated
b.
Proprietary Design, please explain & provide evidencesc. Please indicate the Engineering for Customized Modules,
limitations and its interfaces on your standardizedmodules, if any.
d. Specialized Software & handing over the native files:i. Pressure Vessel Design (e.g. PVElite, Codecalc)
ii. CAESAR or equivalentiii. 3-D Modelingiv. PDMS/PDS & Intelligent P&IDsv. Structural Steel Design for Modules Skids
vi. ETAPvii. Hysis, Promax
viii.
Smart & Intelligent Documentationsix. Optimum Plant Footprint according with
international acceptable risk level for People &Assets (specify your reference levels), preferablesupported by a third party report like QRA-quantitative risk analysis.
x. Vendor‟s Best Practice / Lessons Learned
Systeme. Are any of your equipments specify as a Lethal Service?
If yes, please provide details.f. Please detail the Internals Selection Procedure & key
decision parameters, in terms of why, when used them,for:
i. Trays
ii. Structured Packing
9.0 INSPECTION AND TESTING
9.1 For each Major Equipment / LLIs please list all the components forwhich material test certificates are furnished.Submit sample test certificate for Chemical Composition, PhysicalProperties etc.
9.2 Provide detailed of “Positive Material Identification” Procedure
9.3
Furnish detailed procedure for all the main shop tests carried out.9.4 Confirm that third party inspection will be permitted if required,
and specify limitations, if any.9.5 Specify the NDE of fabrication welds and body castings normally
carried out with respect to the standards adopted, technique, areasconsidered critical, extent of examination, acceptance criteria,
repair procedures etc.9.6 Are safe facilities available for high pressure gas pneumatic
testing?
9.7 Are facilities available for sensitive leak testing? Which techniquesand fluids are used?
9.8
Are facilities available for test running of Major Equipment / LLIsPackages under load?
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 13/35
Page 13 of 35 Tech: GS & GC System – July 2014
9.9 Are facilities available to test the Major Equipment / LLIs withshop driver?
9.10 Submit sample inspection and test certificates & performancecurves.
9.11 Detail what services are available for Third PartyInspection/Testing
9.12
State whether the type tests are carried out[ ] In house [ ] Third Party.
9.13 List testing facilities available In-house
Factory-built modular units
9.14 Manufacturing of Major Equipment or Long Lead Itemsa. Please provide details & evidences of the In-house fabrication
facilities for:i) LLIs,
ii)
Modular construction / assembles b. Others means / arrangements, explain
9.15 Is it workshop owned by you?9.16 Is it on Rented?9.17 Other agreements e.g. Joint Ventures, Process Licensor, Long-
Term relationship with sub-vendor and so on? Explain
9.18 Are your Modularized solutions 100% (or a near value) fabricated before gas composition or site identified? How, explain?, pleasespecify features of your standardized / pre-engineered packaged /modules.
Compliance with the ASME Performance Test Codes, please specify
their uses and details as applicable
PTC 1 General Instructions PTC 2 Definitions and Values
PTC 4.1 Steam Generating Units PTC 8.2 Centrifugal Pumps PTC 9 Displacement Compressors, Vacuum Pumps and Blowers
PTC 10 Compressors and Exhausters PTC 22 Gas Turbine Power Plants
10.0 OPERATION & MAINTENANCE
Amine Management System:
10.1 Sour gas inlet specifications:
i. Please specify the / brief about acceptable contaminants levels in
order to prevent / minimize foaming, corrosion, solid particles
entrained, and other contactor / absorption process upsets.
ii. Please indicate the optimum range temperature of stripping /
contacting sour gas & lean amine
10.2 Amine Absorption & Amine Type as per sour gas predominant
composition:iii. Specify Amine Selective Type normally used for H2S-rich Sour Gas
& the max handling (v/v) % capacity installed by you
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 14/35
Page 14 of 35 Tech: GS & GC System – July 2014
iv. Specify Amine Selective Type normally used for CO2-rich Sour Gas
& the max handling (v/v) % capacity installed by you
v. Specify Amine Non-selective Balanced Type (generic) and the max
handling (v/v) % capacity installed by you
10.3 Established limits of the Amine Quality:
vi. Please provide Amine Supplier Management System in term of
optimum process parameter (inputs) & recommendation of the Amine
handling
vii. Please indicate the average of contaminated amine circulation,
monitoring, control and preventive measurements
10.4 Annual mean amine losses
10.5 Based on your experience please establish the impact on the AminePlant Performance of seasonal changes i.e. Kuwait Extreme
Weather
Integrity Management System:
10.6 Furnished the applicable Material selection diagram, PMI &encountered / identify corrosion types / phenomena
10.7 Furnished detailed Piping Class (specs for piping/ pipes, valves,fittings, connections, design & testing)
10.8 Main features & details for Material Used for LLIs10.9 Please indicate the overall corrosion rate for each system as
follows:10.9.1
Saturated Sour Rich Gas-Wet Sweet Gas Circuit includingoutlet KOD
10.9.2 Rich Amine Circuit10.9.3 Acid Gas Circuit10.9.4 Lean Amine Circuit10.9.5 Absorber Column / Tower10.9.6 Regenerator Tower
10.10 Minimal consideration for Turndown Ratio / Low Flow OperationCondition
Reliability, Constructability, Availability, Maintainability &
Functionality please specify
10.11 Main Plant Failures as follows :10.11.1 Failure to meet specification10.11.2 Foaming10.11.3 Amine Losses10.11.4 Corrosion
10.12 Mean Time Between Failure (MTBF)10.13 Mean Time to Repair (MTR)10.14 Average Operating Availability, as defined in ISO/IEC Std.
10.15
Availability Features:10.15.1 Promptly Diagnostic / Root Cause Failure Analysis
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 15/35
Page 15 of 35 Tech: GS & GC System – July 2014
10.15.2 Repair Order & Crew for pre-Repair & Post-Repairtasks
10.15.3 Availability of Spare Parts:10.15.3.1 At Job Site10.15.3.2 At nearby Vendor Workshop
10.15.4 Critical items contributing with high plant
availability & sustainable full throughput:10.15.4.1 Lean Amine Circulating Pumps:
1. Main Pumps2. Booster Pumps
10.15.4.2 Acid Gas Disposal / Incinerator / Emissions10.15.4.3 Control of Amine Contamination & Foaming10.15.4.4 Absorption Temperature10.15.4.5 Flash Tank Operational Upsets10.15.5 Recommended Spare Parts inventory10.15.5.1 Commissioning10.15.5.2 3 Year in Operation
10.15.6 Please specify operation & maintenance philosophy
& control system10.15.7 Planned / Major Maintenance, explain
10.15.8 Preventive / Proactive Maintenance, Inspection &Monitoring System, explain
10.15.9 Precaution during Start-up & Shutdown10.15.10 Warming Period up to get Sweet Gas on full
specification
11.0 PERSONNEL
State names, numbers, qualifications and experiences of following
categories of personnel employed (as applicable).
- Design/ Specialist engineer/s
- Welding engineer/s
- Metallurgist
- Quality Assurance/Quality Control engineer/s
- Provide the Organisation chart showing thesefunctions
12.0 PURCHASING
12.1 State which materials do you purchase from- Mills- Stockists- Foundry
- Others(Specify)
12.2 State your regular sources of purchase of castings, forgings, bars, plates and normal delivery time.
12.3 State your regular source of purchase of fittings, gears, actuators,etc.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 16/35
Page 16 of 35 Tech: GS & GC System – July 2014
12.4 State how your purchase orders for bought-out items are expeditedand the nature of inspection that is carried-out at sub-vendor‟s
works.12.5 State how you undertake QA/QC auditing on material suppliers
(mills, stockists, foundry, others).
13.0 JOB RECORDS
State how long after a purchase order has been completed that thedocumentation is retained in your records.
State techniques of recording (microfilms, floppies etc.)
___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ______________________________________________________
14.0 UPDATED VENDOR INFORMATION
The vendor is requested to submit with this questionnaire all literaturethat will define the scope of the vendors facilities.
Updated literature to be sent to KOC as it becomes available.
15.0
SPARES
15.1 Are spares stocked or manufactured to order? Give lead time forsupply of parts, particularly major components such as rotors, piston, rings, valves, bearings, seals, couplings etc.
15.2 How long do you guarantee availability and supply of spares fromthe date of supply of Major Equipment / LLIs?
15.3 Do you have any facility to stock spares in Kuwait or Gulf-region?[ ] YES [ ] NO
15.4
Provide address of your Spares Supply Facility (If not in Kuwait/Gulf Area, the nearest one)
____________________________________________________ ____________________________________________________ ____________________________________________________
16.0 SERVICE FACILITY
16.1 Do you have a Technical Representative in Kuwait or Gulf region?[ ] YES [ ] NO
If YES, give contact details.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 17/35
Page 17 of 35 Tech: GS & GC System – July 2014
16.2 Do you have any Service/ Repair Shop facility in Kuwait or Gulf
region?[ ] YES [ ] NO
16.3 Provide address of your Service/ Repairs Facility (if not in Kuwait /
Gulf Area, the nearest on). _____________________________________________________ _____________________________________________________
17.0 HEALTH AND SAFETY
17.1 Is Health and Safety related information always marked on or sent
with goods?
17.2 Are checks performed to ensure no radioactive contamination is present in the finished product originating from scrap?
17.3
Please specify environmental regulation compliances Local orInternational (EPA or similar)
HSE Management System
a. Identified Major Risks / Hazards & provide write-up evidences:i. Hazardous flames
ii. Emissions Measurementiii. Control toxic chemical usage
b. Define the Critical Safety Elements
c.
Furnished Hazardous Areas Classificationd. Explain implementation of the Passive & Active Barrierse. Main HSE Management System & Lessons Learned System details of
established proceduref. List of your Major Accidents or Incidentsg. HSE Statistics
18.0 PROCESS GUARANTEE / PERFORMANCE
GUARANTEE, LIABILITY & WARRANTY
Advise the standard warranty offered by you for the main compressorunit/ spares.
___________________________________________________________ ___________________________________________________________
18.1 Process Guarantee / Performance Guarantee:
a. Provide the Protocol of testing b. Product / Material / Manufacturer Supplier Role
c. Guarantee Periodd. Limitations as per following condition:
i. If the Modules / Packaged Facility is installed by
Third Parties
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 18/35
Page 18 of 35 Tech: GS & GC System – July 2014
ii. If the Modules / Packaged Facility is pre-commissioning, commissioning and start-up by
Third Partiesiii. If the Performance Test for Modules / Packaged
Facility is conducted by Third Parties18.2 Liability & Warranty:
18.2.1
How is transferred to end users?18.2.2
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 19/35
Page 19 of 35 Tech: GS & GC System – July 2014
19.0 CLIENT UP-DATE/ AFTER SALES SERVICES
Do you distribute all relevant Technical, Operating and Maintenance up-
dates and Bulletins routinely and automatically to all your customers?
After Sales Service, Capabilities at Middle East, parts supply, retrofit,safety notice & Setup
Training Services, Operator Training‟s Programs including real timeoperation simulator.
Completed by (Name) :
Designation :
Signature :
Date :
Company Seal
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 20/35
Page 20 of 35 Tech: GS & GC System – July 2014
KUWAIT OIL COMPANY (K.S.C.)PRE-QUALIFICATION QUESTIONNAIRE
CATEGORY: GAS SWEETENING GAS COMPRESSION SYSTEM
___________________________________________________________________________________
TECHNICAL SECTION – PART III
Subcategory B: GAS Compression System
Complete the following questionnaire relating to your current Technical, Manufacturingand other related facilities.
(If space provided is insufficient, attach additional sheets)
1.0 SPECIALISATION:
1.1 Confirm that your present ability and field of specialisation includes:
Pre-Engineered Package [ ] YES [ ] NO
Manufacturing [ ] YES [ ] NO
Assembling/Packaging [ ] YES [ ] NO
FAT Inspection & Testing [ ] YES [ ] NO
Installation & pre-Commissioning [ ] YES [ ] NO
Supply & Delivering [ ] YES [ ] NO
Commissioning & Performance Testing [ ] YES [ ] NO
Operation & Maintenance [ ] YES [ ] NO
1.2 Confirm if your main line of field of specialisation (manufacture/assembling/packaging/ business) is:
a) Compressors:i. Compressor [ ] YES [ ] NO
ii.
w/ Driver (b select below) [ ] YES [ ] NO
b) Driver (Gas Engine/ Electric Motor)
i. Gas Engine [ ] YES [ ] NO
ii. Electric Motor [ ] YES [ ] NO
iii. Gas Turbine [ ] YES [ ] NO
c) Pressure Vessels (e.g. Scrubbers/Coalescer Filter /Strainers) [ ] YES [ ] NO
d) Air Cooler/ Fin-Fan Coolers [ ] YES [ ] NO
e) Complete System (incl. Structural Steel Skids) [ ] YES [ ] NO
1.3
Confirm the list of “Main / Typical / Standard / Pre-engineered” Supplied Skid-mountedModules indicating its Major Equipment or Long Lead Items.
1.4 Please outline the Modules Assembling Procedure /framework / Workflow
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 21/35
Page 21 of 35 Tech: GS & GC System – July 2014
1.5 Please specify available Delivery Options:
a. EX Works
b. FOB
c. CIF-Kuwait Port
2.0 MAJOR EQUIPMENT / LONG LEAD ITEM DETAILS
State the type/types of Major Equipment / Long Lead Items (LLIs)
details normally supplied within your Modules/ Packaged for which
pre-qualification is sought:
2.1 COMPRESSOR(S)
2.1.1 Centrifugal Compressor:
a) Barrel type: [ ]
b) Horizontally split: [ ]
c)
Single stage [ ]d) Multi stage [ ]
e) Recycle type [ ]
2.1.2 Rotary Type Positive Displacement Compressors
a) Screw(single rotor) [ ]
b) Screw (multiple rotor) [ ]
c) Straight Lobed [ ]
d)
Helical Screw [ ]
e) Scroll [ ]
f)
Oil Flooded [ ]
g) Oil Free (Dry) [ ]
h) Others (state the type____________)
2.1.3 Reciprocating Compressors
a) Horizontal Cylinder [ ]
b) Vertical Cylinder [ ]
c) Multi Cylinder [ ]
2.2
ENGINE (S)
a) Horizontal cylinder block (opposed position) [ ]
b) Vertical in-line /V-type cylinders [ ]
c) Two/Four stroke engine [ ]
3.0 Oil & Gas Industry ExperienceState your experience with the following:
a) Chemical / Petro-Chemical Industries [ ]
b)
Hydrocarbon Process [ ]
c) Fuel Gas [ ]
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 22/35
Page 22 of 35 Tech: GS & GC System – July 2014
d) Refrigeration Service [ ]
e) Hydrocarbon (Sour Service in accordance
With NACE : MR-01-75 / ISO 151 56-1) [ ]
f) Others (State the type______________________________)
4.0 CLIENT INFORMATION
State the client to whom you supplied various types of GAS Compression
Systems, complete the following table separately for each of GAS
Compression Systems for last five (5) years.
Client
Country
Gas
Compression
Systems(driven by,
compressors
type,
engine/turbine
/types and
other Tech.
details)
Note 1& 2
Service(incl. Sour
Service in
accordance with
NACE MR-
0175/ ISO 15156
Part I, II & III)
Operating
Conditions(Pressure, flow
etc.)
Year Installed
capacity
total Plant
/ Modules
(e.g.MMSCFD; Power)
Quantity
incl. #
modules
Notes:3. Actual in Rental skid-mounted fleet (sour/non-sour)4. Number of sold skid-mounted fleet (sour/non-sour), designing, fabrication,
inspection, testing, packaging & supply:a. As per Vendor Specs b. As per Purchaser Specs
Please inform details of your oldest in operation owned / designed /supplied Gas Compression Skid-mounted Modules / Facility
Please indicate average / mean Useful Life of the Skid-mounted Modules
& under which conditions, Operating & Maintenance System.
5.0 CODES
5.1 State the number of GAS Compression Systems supplied in accordance withthe listed Codes/ Standard/ Specifications:
International Standard / RP/ Publ. a) b) c)
API Std 610
Centrifugal Pumps For Petroleum, Heavy Duty Chemical and Gas
Industry Services
API Std 660Shell-and-Tube Heat Exchangers
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 23/35
Page 23 of 35 Tech: GS & GC System – July 2014
API Std 661Petroleum, Petrochemical, and Natural Gas Industries — Air-Cooled Heat
Exchangers
API Std 662Plate Heat Exchangers for General Refinery Services, Part 1 — Plate-and-Frame Heat Exchangers
API Std 662Plate Heat Exchangers for General Refinery Services, Part 2 — Brazed
Aluminium Plate-Fin Heat Exchangers
API Std. 670
Machinery Protection Systems
API Std. 671
Special Purpose Coupling for Refinery Service
API Std 672Packaged, Integrally Geared Centrifugal Air Compressors for
Petroleum, Chemical, and Gas
Industry Services
API Std. 674
Positive Displacement Pumps - Reciprocating
API Std. 676
Positive Displacement Pumps - Rotary
API Std. 677General-Purpose Gear Units for Petroleum, Chemical and Gas Industry
Services
API Std 680
Packaged Reciprocating Plant and Instrument Air Compressorsfor General Refinery Services
API 682Shaft Sealing System for Centrifugal and Rotary Pumps
ISO 8010
“Compressors for the Process Industry-Screw ……” BS 7316
Specification for Design & Construction of Screw related type
compressors PIPASME B73.1M
Horizontal,
End Suction Centrifugal Pumps
ASME B73.2M
Vertical In-line Centrifugal Pumps
API Std. 613Special Purpose Gear Units for Refinery Services
API Std. 614
Lubrication, Shaft-Sealing and Control Oil Systems for Special PurposeApplication
API Std. 615
Sound Control of Mechanical Equipment for Refinery Services
API RP. 684
API Standard Paragraphs Rotor dynamic Tutorial: Lateral Critical
Speeds, Unbalance Response,
Stability, Train Torsional, and Rotor Balancing
API Std. 685
Sealless Centrifugal Pumps for Petroleum, Petrochemical, and GasIndustry Process Service
API RP 688
Pulsation and Vibration Control in Positive Displacement Machinery
Systems for Petroleum, Petrochemical, and Natural Gas Industry
Services
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 24/35
Page 24 of 35 Tech: GS & GC System – July 2014
BS 5500
Specification for unfired fusion welded pressure vessels
BS 5169
Specification for unfired fusion welded steel air receiver
API 12 J
Specification for oil & gas separators
API 510Pressure Vessel Inspection Program
WRC Bulletin # 107
Local Stresses in Spherical & Cylindrical Shell due to External Loading
WRC Bulletin # 297
Local Stresses in Spherical & Cylindrical Shell due to External Loading
on Nozzles
ASME
Section II
Materials Specifications Part A Ferrous Materials
Part B Non-Ferrous Materials
Part C Welding Rods, Electrodes and Filler Metal Part D Properties
Section V
Non-Destructive Examination
Section VIII
Pressure Vessels
Division 1
Division 2
Section IX
Welding and Brazing Qualifications
Columns stand for:a) Within the last 2 years b) Within the last 10 years
c)
At Middle East last 20 yearsFor each Standard please specify main details & features selected by the purchaser (eithervendor or final user).Please indicate full compliance with each international Standard / RP/ PIP/ Code, ifnegative, please provide deviations list and implemented option / alternative design
feature.
5.2 Also, state any experience with other Codes, Standards & Specification
Codes/ Standards Within last 2 years Within last 5 years
API RP 686
Machinery Installation and
Installation Design
API Std. 689
Collection and Exchange of
Reliability and Maintenance
Data for Equipment
API Std. 752
Management of HazardsAssociated with Location of
Process Plant Permanent
Buildings
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 25/35
Page 25 of 35 Tech: GS & GC System – July 2014
API Std. 753
Management of Hazards
Associated with Location ofProcess Plant Portable
Buildings
API Std. 754
Process Safety Performance
Indicators for the Refining andPetrochemical Industries
API TR 949-AResearch Report on
Characterization and
Monitoring of Cracking in Wet
H2S Service
API TR 949-B
Repair and Remediation
Strategies for Equipment
Operating in Wet H2S Service
API RP 2218
Fireproofing Practices in
Petroleum and Petrochemical
Processing Plants
Others
5.3 Submit valid copies of API / ISO and /or BS or any other certificate,which you may hold for the manufacture of any of the major equipment.
5.4 State whether Driver of Rotating / Positive Displacement Equipmenthave been supplied in accordance with the following standards.
a) Drive Motors: BS 4999 [ ]
BS 5000 Part 2 [ ]BS 4683 [ ] NEMA7 [ ]
b) Drive Turbines API 611 [ ]API 612 [ ]
API 616 [ ]c) Gas Engine API 7B-11C [ ]
BS 5514/ISO 3046 [ ]
d) Others _________________________________________________
i) Please list out the other reference standards applied for the major
items of the Compressor system supplied by you. ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ________________________________________________________
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 26/35
Page 26 of 35 Tech: GS & GC System – July 2014
6.0 QUALITY ASSURANCE/CONTROL
6.1 Do you have a formally documented quality system? [ ] YES [ ] NO
6.2 Do you have a Quality Assurance Manual/If yes, to which National/ International Standard is it developed?
-ISO 90001
-BS 5751-If other, please specify.
6.3 Is your quality assurances system approved by any inspection/certifying agency?Such as Lloyds, TUV, B. Veritas or by any large well known Agency or Co.;
such as Major oil Companies. Attach copies of letter the above, if any.
6.4 Are quality plans used as controlling documents on the shop floor?-if notState the reason
6.5 Is your manufacturing plant approved by ISO 9000 series or BS 5750 series?Specifically state the approval status & provide documentary evidence.
7.0 MATERIAL
7.1 Submit typical sectional views for each type of Major Equipment / LLIsmanufactured by you, showing all design features. The views shouldclearly state full compliance to API/BS standard specified above. If there
are deviations/exception to above standards, these are to be clearlyhighlighted.
7.2
The sectional views should also be marked with appropriate material(ASTM/AISI/BS/ any other) grades for individual components& size.
7.3 Are defective castings/forgings always returned to the foundry/forge shopfor repair or replacement or are some or all repair performed in- house? _____________________________________________________________ _____________________________________________________________
7.4 Are weld repairs (including foundry repairs) routinely documented?
_____________________________________________________________ _____________________________________________________________
7.5 Are repair records available for review? _____________________________________________________________
_____________________________________________________________
7.6 Are castings for „Sour Service‟ treated differently or segregated? _____________________________________________________________ _____________________________________________________________
7.7 Is supplementary heat treatment provided for sour service? State the heattreatment process used. _____________________________________________________________
_____________________________________________________________
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 27/35
Page 27 of 35 Tech: GS & GC System – July 2014
7.8 Are casting thicknesses routinely checked? _____________________________________________________________
___________________________________________________________
7.9 Can material test certificates be provided for compressor components ifrequired?
_____________________________________________________________ _____________________________________________________________
7.10 What supplementary tests can be additionally performed on materials forsour service& on surfacing treatments on request?
7.11 Do you supply refurbished/reconditioned products.[ ] YES [ ] NO
If Yes, please provide details _____________________________________________________________ _____________________________________________________________
7.12
Indicate your experience with material specification for the followingMajor Equipment / LLIs / Part / Component:
AIR COOLED HEAT EXCHANGER (FIN-FAN COOLER/ ACHE)
Part Material Specifications (API/ASTM/BS) DIN or others
2 Years 5 Years
Shell
Header
Nozzles
Tubes
Fin
Fans
Speed reducer
PRESSURE VESSELS
Specification/Standard Within last 2 years Within last 5 years
API
ASME
ASTM
BS
DIN
Buyers Own ( Give detail)
Vendors Own ( Give detail)
Other National Standards
(Pl. Specify which)
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 28/35
Page 28 of 35 Tech: GS & GC System – July 2014
8.0 DESIGN
Complete the following questions as applicable for the each Major Equipment /LLIs for which approval is sought.
8.1 Provide design details in respect to the each types of Major Equipment /
LLIs in your production range.
8.2 What design work is normally or always contracted out? ___________________________________________________________ ___________________________________________________________
8.3 Are typical Major Equipment / LLIs sectional views provided, clearlyshowing all design features for all sizes? ___________________________________________________________
____________________________________________________________
8.4 Are the bearings anti-friction type or sleeve type? Can alternative bearings be provided, if required? What is your experience regarding magnetic bearings? ___________________________________________________________
____________________________________________________________
8.5 Is Critical Speed Verification &Tensional Analysis carried out for allCompressors? ___________________________________________________________
___________________________________________________________
8.6 Is standardization and inter-changeability of components practiced between Major Equipment / LLIs of same types but for different duties? ___________________________________________________________ ___________________________________________________________
8.7 Advise the type of surface protection provided on un- machined exteriorsurface and on machined& threaded surfaces. ___________________________________________________________ ___________________________________________________________
8.8 Provide the details of marking provided on the Major Equipment / LLIs.State the method of marking and also provide a typical Nameplatedrawing incorporating the marking. ___________________________________________________________ ___________________________________________________________
8.9 What design approaches do you use for pulsation and vibration control.Can you carryout acoustic and mechanical system response analysis or do
you get a third party to do it?
8.10 For reciprocating compressor, advise your specific construction details for
the following item:
- Cylinder & Cylinder appurtenances ____________________________
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 29/35
Page 29 of 35 Tech: GS & GC System – July 2014
- Cylinder Cooling (Air/ water both) ____________________________- Valve& Unloaders_________________________________________
- Piston & Crankshaft________________________________________-Pulsation Suppression Devices_________________________________
8.11
Engineering / Design Capability:
a. Please explain and provide evidence of your Standardized System / pre-Engineered for Modular Design/Transportable, skid-mounted gas processing equipment fully instrumented/ automated
b. Proprietary Design, please explain & provide evidencesc. Please indicate the Engineering for Customized Modules, limitations
and its interfaces on your standardized modules, if any.d. Specialized Software & handing over the native files:
i. Pressure Vessel Design (e.g. PVElite, Codecalc)ii. CAESAR or equivalent
iii. 3-D Modeling
iv.
PDMS/PDS & Intelligent P&IDsv. Structural Steel Design for Modules Skids
vi. ETAPvii. Hysis, Promax
viii. Smart & Intelligent Documentationsix. Optimum Plant Footprint according with international
acceptable risk level for People & Assets (specify your
reference levels), preferable supported by a third party reportlike QRA- quantitative risk analysis.
x. Vendor‟s Best Practice / Lessons Learned System
9.0 INSPECTION AND TESTING
9.1 For each Major Equipment / LLIs please list all the components for whichmaterial test certificates are furnished.Submit sample test certificate for Chemical Composition, PhysicalProperties etc.
9.2 Furnish detailed procedure for all the main shop tests carried out.9.3 Provide detailed of “Positive Material Identification” Procedure 9.4 Confirm that third party inspection will be permitted if required, and
specify limitations, if any.9.5 Specify the NDE of fabrication welds and body castings normally carried
out with respect to the standards adopted, technique, areas considered
critical, extent of examination, acceptance criteria, repair procedures etc.9.6 Are safe facilities available for high pressure gas pneumatic testing?
9.7 Are facilities available for sensitive leak testing? Which techniques andfluids are used?
9.8 Are facilities available for test running of Major Equipment / LLIsPackages under load?
9.9 Are facilities available to test the Major Equipment / LLIs with shopdriver?
9.10 Submit sample inspection and test certificates & performance curves.9.11 Detail what services are available for Third Party Inspection/Testing9.12 State what Material testing facilities are available In-house.
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 30/35
Page 30 of 35 Tech: GS & GC System – July 2014
Factory-built modular units
9.13 Manufacturing of Major Equipment or Long Lead Itemsa. Please provide details & evidences of the In-house fabrication
facilities for:i. LLIs,
ii)
Modular construction / assembles b. Others means / arrangements, explain
9.14 Is it workshop owned by you?9.15 Is it on Rented?9.16 Other agreements e.g. Joint Ventures, Process Licensor, Long-Term
relationship with sub-vendor and so on? Explain9.17 Are your Modularized solutions 100% (or a near value) fabricated before
gas composition or site identified? How, explain?, please specify featuresof your standardized / pre-engineered packaged / modules.
Compliance with the ASME Performance Test Codes, please specify
their uses and details as applicable
PTC 1 General Instructions
PTC 2 Definitions and Values PTC 4.1 Steam Generating Units PTC 8.2 Centrifugal Pumps PTC 9 Displacement Compressors, Vacuum Pumps and Blowers PTC 10 Compressors and Exhausters
PTC 22 Gas Turbine Power Plants
10.0 OPERATION & MAINTENANCE
Integrity Management System:
10.1 Furnished the applicable Material selection diagram, PMI &encountered / identify corrosion types / phenomena
10.2 Furnished detailed Piping Class (specs for piping/ pipes, valves, fittings,connections, design & testing)
10.3 Main features & details for Material Used for LLIs10.4 Please indicate the overall corrosion rate for each system as follows:
10.4.1 Saturated Sour Rich Gas-Wet Sweet Gas Circuit including outletKOD
10.4.2 Rich Amine Circuit10.4.3 Acid Gas Circuit
10.4.4
Lean Amine Circuit10.4.5 Absorber Column / Tower10.4.6 Regenerator Tower
10.5 Minimal consideration for Turndown Ratio / Low Flow OperationCondition
Reliability, Constructability, Availability, Maintainability & Functionality
please specify
10.6 Please indicate the Main Plant Expensive Failures, downtime experience
and preventive measurements.
10.7
Mean Time Between Failure (MTBF)10.8 Mean Time to Repair (MTR)
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 31/35
Page 31 of 35 Tech: GS & GC System – July 2014
10.9 Average Operating Availability, as defined in ISO/IEC Std.10.10 Availability Features:
10.10.1 Promptly Diagnostic / Root Cause Failure Analysis10.10.2 Repair Order & Crew for pre-Repair & Post-Repair tasks10.10.3 Availability of Spare Parts:
10.10.3.1 At Job Site
10.10.3.2
At nearby Vendor Workshop10.10.4 Critical items contributing with high plant availability &
sustainable full throughput:10.10.5 Recommended Spare Parts inventory
10.10.5.1 Commissioning10.10.5.2 3 Year in Operation
10.10.6 Please specify operation & maintenance philosophy &control system
10.10.7 Planned / Major Maintenance, explain10.10.8 Preventive / Proactive Maintenance, Inspection &
Monitoring System, explain10.10.9 Precaution during Start-up & Shutdown
10.10.10
Warming Period up to get Sweet Gas on fullspecification
11.0 PERSONNEL
State names, numbers, qualifications and experiences of followingcategories of personnel employed (as applicable).
- Design/ Specialist engineer/s- - Welding engineer/s-
-
Metallurgist- - Quality Assurance/Quality Control engineer/s- - Provide the Organisation chart showing these
functions
12.0 PURCHASING
12.1 State which materials do you purchase from
- Mills- Stockists
-
Foundry- Others(Specify)
12.2 State your regular sources of purchase of castings, forgings, bars, plates and normal delivery time.
12.3 State your regular source of purchase of fittings, gears, actuators, etc.
12.4 State how your purchase orders for bought-out items are expedited andthe nature of inspection that is carried-out at sub-vendor‟s works.
12.5 State how you undertake QA/AC auditing on material suppliers (mills,
stockists, foundry, others).
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 32/35
Page 32 of 35 Tech: GS & GC System – July 2014
13.0 JOB RECORDS
State how long after a purchase order has been completed that the
documentation is retained in your records.
State techniques of recording (microfilms, floppies etc.)
___________________________________________________________ ___________________________________________________________
___________________________________________________________ ___________________________________________________________
___________________________________________________________ ______________________________________________________
14.0 UPDATED VENDOR INFORMATION
The vendor is requested to submit with this questionnaire all literature that willdefine the scope of the vendors facilities.
Updated literature to be sent to KOC as it becomes available.
15.0 SPARES
15.1 Are spares stocked or manufactured to order? Give lead time for supplyof parts, particularly major components such as rotors, piston, rings,valves, bearings, seals, couplings etc.
15.2 How long do you guarantee availability and supply of spares from the
date of supply of Major Equipment / LLIs?
15.3
Do you have any facility to stock spares in Kuwait or Gulf-region?[ ] YES [ ] NO
15.4 Provide address of your Spares Supply Facility (If not in Kuwait /GulfArea, the nearest one)
____________________________________________________ ____________________________________________________ ____________________________________________________
16.0 SERVICE FACILITY
16.1 Do you have a Technical Representative in Kuwait or Gulfregion?
[ ] YES [ ] NO
If YES, give contact details.
16.2 Do you have any Service/ Repair Shop facility in Kuwait or Gulfregion?
[ ] YES [ ] NO
16.3 Provide address of your Service/ Repairs Facility (if not in
Kuwait / Gulf Area, the nearest on). _____________________________________________________
_____________________________________________________
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 33/35
Page 33 of 35 Tech: GS & GC System – July 2014
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 34/35
Page 34 of 35 Tech: GS & GC System – July 2014
17.0 HEALTH AND SAFETY
17.1 Is Health and Safety related information always marked on or sent
with goods?
17.2 Are checks performed to ensure no radioactive contamination is
present in the finished product originating from scrap?
17.3 Please specify environmental regulation compliances Local orInternational (EPA or similar)
HSE Management System
a. Identified Major Risks / Hazards & provide write-up evidences:i. Hazardous flames
ii. Emissions Measurementiii. Control toxic chemical usage
b. Define the Critical Safety Elementsc.
Furnished Hazardous Areas Classificationd. Explain implementation of the Passive & Active Barrierse. Main HSE Management System & Lessons Learned System details of
established proceduref. List of your Major Accidents or Incidentsg. HSE Statistics
18.0 PROCESS GUARANTEE / PERFORMANCE
GUARANTEE, LIABILITY & WARRANTY
Advise the standard warranty offered by you for the main compressor
unit/ spares.
___________________________________________________________ ___________________________________________________________
18.1 Process Guarantee / Performance Guarantee:a. Provide the Protocol of testing b. Product / Material / Manufacturer Supplier Rolec. Guarantee Periodd. Limitations as per following condition:
i. If the Modules / Packaged Facility is installed by
Third Partiesii. If the Modules / Packaged Facility is pre-commissioning, commissioning and start-up byThird Parties
iii. If the Performance Test for Modules / PackagedFacility is conducted by Third Parties
18.2 Liability & Warranty:
18.2.1 How is transferred to end users?
8/21/2019 (5) PQ Questionnaire Part III GS & GC SYSTEM 1 July 2014
http://slidepdf.com/reader/full/5-pq-questionnaire-part-iii-gs-gc-system-1-july-2014 35/35
19.0 CLIENT UP-DATE/ AFTER SALES SERVICES
Do you distribute all relevant Technical, Operating and Maintenance up-dates and Bulletins routinely and automatically to all your customers?
After Sales Service, Capabilities at Middle East, parts supply, retrofit,safety notice & Setup
Training Services, Operator Training‟s Programs including real time
operation simulator.
Completed by (Name) :
Designation :
Signature :
Date :
Company Seal