A Contractor’s Perspective Peter Trebilcock Director for Design and BIM 1

Transcript of 5 peter trebilcock, balfour beattie

Page 1: 5   peter trebilcock, balfour beattie

A Contractor’s PerspectivePeter Trebilcock

Director for Design and BIM

1

Page 2: 5   peter trebilcock, balfour beattie

A Framework for Collaboration & Integration

Page 3: 5   peter trebilcock, balfour beattie

© Balfour Beatty plc 2012

Asset Lifecycle

Simulation

Page 4: 5   peter trebilcock, balfour beattie

© Balfour Beatty plc 2012

Asset Lifecycle

One Data Set

Page 5: 5   peter trebilcock, balfour beattie

Delivering customer value by being industry leaders in Building Information Modelling and the use of the digital

toolset, to go Beyond Delivery through an integrated approach to the whole asset life-cycle

Beyond Delivery – Our Vision:

Page 6: 5   peter trebilcock, balfour beattie

Beyond Delivery

Create an end to end BIM process model

© Balfour Beatty plc 2012

Page 7: 5   peter trebilcock, balfour beattie

Building Information Modelling (BIM) is a delivery methodology that utilises digital tool sets to visualise, collaborate, simulate, optimise and integrateutilising an integrated data set (the building information model) through the whole asset lifecycle.

Building Information Modelling =

© Balfour Beatty plc 2012

Page 8: 5   peter trebilcock, balfour beattie

Integrated collaborative design

© Balfour Beatty plc 2012

Page 9: 5   peter trebilcock, balfour beattie

Solution iteration

© Balfour Beatty plc 2012

Page 10: 5   peter trebilcock, balfour beattie

Benefits for the Client

• Client sees what they will be getting• Is an excellent interactive engagement tool• Better quality as issues resolved in trade co-ordination• Enables earlier completion as it reduces rework• Provides intelligent data for FM support and asset

management• Lower costs via increased design efficiency and better

planning and supply chain integration

Page 11: 5   peter trebilcock, balfour beattie

Increased design efficiency• Reduces administrative work allowing focus on

design (using component based library)• Makes co-ordination & integration of all disciplines

easier and quicker• Reduced design re-work• Improved/ more efficient RDD (Reviewable Design

Data) process of signing-off designs with the end users

Page 12: 5   peter trebilcock, balfour beattie

Benefits for Balfour Beatty• Quicker/ more accurate response to proposed changes• Ease of demonstrating Phasing / Sequencing / logistics, site setup,

traffic routes• Full collaborative approach involving supply chain – clash

detection / easier co-ordination• Rehearse construction plans and sequences • Fewer surprises during operations• Fewer defects and snags • Increased safety• More competitive price• Building Model/Data constantly updated and current• FM Data available

Page 13: 5   peter trebilcock, balfour beattie

We become a Virtual Builder

The value of prototyping and construction simulations!

Page 14: 5   peter trebilcock, balfour beattie

1. Design in 3D with associated data attached.2. Concurrent Design and Solution Iteration through a collaborative

and integrated team.3. Undertake Virtual Construction Simulation - 4D.

3D geometry linked to a construction programme. 4. Visual Design and Construction Project Management around the

4D model.5. An Integrated Data Management and O&M Plan, that utilises

existing models and project learning.

A good BIM project should include:

Page 15: 5   peter trebilcock, balfour beattie

1. Project BIM Implementation Leader in post and trained.2. Project Director & Leadership Team BIM familiarisation workshop

held and strategy agreed.3. Project BIM Objectives defined and agreed with OPCO BIM Leader.4. Project BIM launch event held (continuation of the pre-contract

BIM strategy).5. BIM Execution Plan in place and approved OPCO BIM Leader.6. Training programme & resources in place.7. Software & Hardware in place.8. BIM implementation process continuously reviewed, benefits and

KPIs reported.9. BIM integrated into project delivery process.10. BIM success and best practice captured and shared.

BIM 10 Point Plan

Page 16: 5   peter trebilcock, balfour beattie

17

BIM Website

Page 17: 5   peter trebilcock, balfour beattie

18

Monthly Webex Knowledge Sharing Forums

Page 18: 5   peter trebilcock, balfour beattie

19

Clash Detection

Page 19: 5   peter trebilcock, balfour beattie

20

Integrated accommodation schedules

Page 20: 5   peter trebilcock, balfour beattie

_boundaries

Kelvin Hall, Hull (BBCL)

- Full NBS Specification linkages- Parametric detailing- Zero Harm integration and pilot study

Kelvin Hall School

Residual hazards added to models

Page 21: 5   peter trebilcock, balfour beattie

Skegness Academy

Space laser scanned existing building incl. roof space to assist with accuracy. Imported survey as revit model into BIM

Page 22: 5   peter trebilcock, balfour beattie

Telephone House

Shell and Core- everything new in BIM, with existing modelled from drawings and scans

Page 23: 5   peter trebilcock, balfour beattie

MOD Project

24

M&E BIM model used particularly for plant room area to aid sequencing and area planning. M&E model linked to off-site manufacturing.

Page 24: 5   peter trebilcock, balfour beattie

St Ambrose Academy, Trafford

25

M&E installation integrated by supply chain

Page 25: 5   peter trebilcock, balfour beattie

Gloucester EfW

26

Page 26: 5   peter trebilcock, balfour beattie

Gloucester EfW

Page 27: 5   peter trebilcock, balfour beattie

Gloucester EfW

Page 28: 5   peter trebilcock, balfour beattie

Ince Marshes EfW

29

Sequencing Integration of client process equipment

Page 29: 5   peter trebilcock, balfour beattie

Barnsley Markets

30

Example of 4D planning demonstrating phasing

Page 30: 5   peter trebilcock, balfour beattie

Visual ConstructionManagement

© Balfour Beatty plc 2012

Page 31: 5   peter trebilcock, balfour beattie

Planned v Actual4D Model showing Planned Construction – Jan. 2012

Aerial Site Photo – Jan. 2012© Balfour Beatty plc 2012

Page 32: 5   peter trebilcock, balfour beattie

MEP DfMA Module Installation

© Balfour Beatty plc 2012

Page 33: 5   peter trebilcock, balfour beattie

St Silas Primary School

34

Client engagement tool

Page 34: 5   peter trebilcock, balfour beattie

Client Engagement

Page 35: 5   peter trebilcock, balfour beattie

Client Testimonial

Page 36: 5   peter trebilcock, balfour beattie

Client Testimonial“Because we have been able to see exactly what it looks like we have been able to order the furniture now in advance, which would never have been able to with the use of flat plans.”

A lot of consultation has gone on, I certainly feel more confidentbecause we can actually see what it’s going to look like.

They have used the BIM model to help understand how to “Keeping the school looking good, knowing how much that’s going to cost, sustainability, knowing how long things will last, all of those have been within the conversations we have had and very much built into the planning”

Page 37: 5   peter trebilcock, balfour beattie

Our Client offer• Access to the BIM model

throughout the process• Access to the BB team to make a

film of the journey and record progress

• Engagement using the BIM model for review and sign off

• Ownership of the BIM ‘kit’ and the end of the project

• All the BIM asset data

38

Page 38: 5   peter trebilcock, balfour beattie

Using portable technology

Page 39: 5   peter trebilcock, balfour beattie

For Client, design and site staff

Page 40: 5   peter trebilcock, balfour beattie

Component Properties

Courtesy of Space0

Page 41: 5   peter trebilcock, balfour beattie

Component Properties

Courtesy of Space0

Page 42: 5   peter trebilcock, balfour beattie

Client Testimonial360 Gyroscopic Views

Courtesy of Space0

Page 43: 5   peter trebilcock, balfour beattie

Thank You