€¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete...

65

Transcript of €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete...

Page 1: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 2: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 3: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 4: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 5: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 6: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 7: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 8: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 9: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 10: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 11: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 12: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 13: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 14: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 15: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 16: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 17: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 18: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 19: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 20: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 21: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 22: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 23: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 24: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 25: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 26: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 27: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 28: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 29: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 30: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 31: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 32: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 33: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 34: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 35: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 36: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 37: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 38: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 39: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 40: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 41: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 42: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 43: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 44: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 45: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 46: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 47: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 48: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 49: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 50: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 51: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 52: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 53: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 54: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 55: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 56: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 57: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 58: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 59: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 60: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 61: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 62: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 63: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 64: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.
Page 65: €¦ · 5' min. sidewalk width per plans broom finish on walk 270 1-1/270 min. slope concrete gutter volumes: curb and 24" gutter volume = i .544 = 0.0572 c.y./ft.