5 Form Test Piping Package Data Sheet Combine

4
PABRIK DERIVATIF GONDORUKEM & TERPENTIN PERUM PERHUTANI DI PEMALANG CLIENT : PERHUTANI Test Packag PROJECT TITLE : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - PERUM PERHUTANI DI PEMALANG JOB NO : 12-1702 Area: PABR PIPING TEST PACKAGE DATA SHEET Test Package Description Units Service Design Pressure/Operating Pressure Barg Design Temperature/Opreating Temperature Flushing/Blowing Flushing Blowing Flushing/Blowing Medium Water Air Service Visual Hydro Test Pressure Barg Psi Test Medium Water Air Duration of Test Minute Item Decription No Line No Sheet No Spool No PID No 1 2 3 4 5 6 7 8 9 ## PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED BY TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTANI Date: Date: Date: Date: o C

Transcript of 5 Form Test Piping Package Data Sheet Combine

Page 1: 5 Form Test Piping Package Data Sheet Combine

PABRIK DERIVATIF GONDORUKEM & TERPENTINPERUM PERHUTANI DI PEMALANG

CLIENT : PERHUTANI Test Package No:PROJECT TITLE : PABRIK DERIVATIF GONDORUKEM DAN TERPENTIN TP - 04 - WP - 001

PERUM PERHUTANI DI PEMALANGJOB NO : 12-1702 Area: PABRIK -04

PIPING TEST PACKAGE DATA SHEET

Test Package Description UnitsServiceDesign Pressure/Operating Pressure BargDesign Temperature/Opreating Temperature

Flushing/Blowing Flushing Blowing

Flushing/Blowing Medium Water Air

Service Visual Hydro Pneumatic

Test Pressure BargPsi

Test Medium Water Air

Duration of Test Minute

Item Decription

No Line No Sheet No Spool No PID No

123456789

###

PREPARE BY, REVIEWED BY, APPROVED BY, VERIFIED BY,TRACON PT. REKAYASA INDUSTRI PT. INDAH KARYA PERHUTANI

Date: Date: Date: Date:

oC

Page 2: 5 Form Test Piping Package Data Sheet Combine