4Pipefitters TRAINING WITH FADU - Durlon

1
FREE TRAINING! GASKET INSTALLATION TRAINING WITH FADU IDEAL FOR: 4 Pipefitters 4 Maintenance Personnel 4 Engineers 4 Gasket Distributors & Fabricators TO REQUEST TRAINING DATES: email info@durlon.com LET US CUSTOM FIT YOUR NEEDS. TRAINING BENEFITS 4 Learn about bolted flange connections 4 Increase gasket life 4 Reduce maintenance costs 4 Become proactive to fugitive emissions & the environment 4 Increase plant pipeline safety & reliability Level 1 The bolted Joint (function of a gasket, mechanics of a bolted joint, function of bolts, studs and nuts, bolt relaxation) Evaluating joint failures Cleaning inspection and installation Basic installation using the modified legacy method Live installation with FADU rig Level 2 Gasket failure analysis/Root cause analysis What to look for when evaluating gasket installations PCC-1 Overview In depth understanding of forces acting upon BJFA Alternative torque control devices (Torque multipliers, hydraulic and stud tensions) pro’s and con’s Alternative methods of installation such as quadrant, circular and simultaneous multi bolt (why and where you would use them) Flange Assembly Demonstration Unit - 4” 150# flange * * 4 4 4 4 4 4 4 4 4 4 4

Transcript of 4Pipefitters TRAINING WITH FADU - Durlon

Page 1: 4Pipefitters TRAINING WITH FADU - Durlon

FREETRAINING!

GASKET INSTALLATION TRAINING WITH FADU

IDEAL FOR:4 Pipefitters4 Maintenance Personnel4 Engineers4 Gasket Distributors

& Fabricators

TO REQUEST TRAINING DATES: email [email protected]

LET US CUSTOM FIT YOUR NEEDS.

TRAINING BENEFITS4 Learn about bolted flange

connections4 Increase gasket life4 Reduce maintenance costs4 Become proactive to fugitive emissions & the environment4 Increase plant pipeline safety & reliability

Level 1 The bolted Joint (function of a gasket, mechanics of a bolted joint, function of bolts, studs and nuts, bolt relaxation)Evaluating joint failuresCleaning inspection and installationBasic installation using the modified legacy methodLive installation with FADU rig

Level 2Gasket failure analysis/Root cause analysisWhat to look for when evaluating gasket installationsPCC-1 OverviewIn depth understanding of forces acting upon BJFAAlternative torque control devices(Torque multipliers, hydraulic and stud tensions) pro’s and con’sAlternative methods of installation such as quadrant, circular and simultaneous multi bolt (why and where you would use them)

Flange Assembly Demonstration Unit - 4” 150# flange

*

*

4

4

4

4

4

4

4

4

4

4

4