Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional Financing Prepared by International Development Consultants of the Islamic Republic of Pakistan for the Asian Development Bank. This internal monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Transcript of 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April...

Page 1: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Internal Monitoring Report

Project Number: 48402-002 April 2017

PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional Financing

Prepared by International Development Consultants of the Islamic Republic of Pakistan for the Asian Development Bank.

This internal monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian

Development Bank does not intend to make any judgments as to the legal or other status of any

territory or area.

Page 2: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional
Page 3: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

MINISTRY OF COMMUNICATIONS NATIONAL HIGHWAY AUTHORITY

PAK: NATIONAL MOTORWAY M-4 GOJRA–SHORKOT-KHANEWAL

PROJECT

Internal Monitoring Report (No.4)

for the

Implementation of Land Acquisition & Resettlement Plan and

Corrective Action Plan of M-4 Shorkot-Khanewal Section

(M-4 Section-III)

Chainage 120+268 – 194+487 (64 km)

(January - March 2017)

Consultancy Services for

Social Safeguard Management Consultant (SSMC) of

Faisalabad – Khanewal (M-4) Project

April 14, 2017

International Development Consultants Suite# 3, 11-Civic Centre, C-Block, Faisal Town, Lahore, Pakistan

Ph: +92-42-3517 4997; Fax: +92-42-3516-8449

E-mail: [email protected]

Page 4: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

MINISTRY OF COMMUNICATIONS NATIONAL HIGHWAY AUTHORITY

PAK: NATIONAL MOTORWAY M-4 GOJRA–SHORKOT-KHANEWAL

PROJECT

Internal Monitoring Report (No.4)

for the

Implementation of Land Acquisition & Resettlement Plan and

Corrective Action Plan of M-4 Shorkot-Khanewal Section

(M-4 Section-III)

Chainage 120+268 – 194+487 (64 km)

(January - March 2017)

Consultancy Services for

Social Safeguard Management Consultant (SSMC) of

Faisalabad – Khanewal (M-4) Project

April 14, 2017

International Development Consultants Suite# 3, 11-Civic Centre, C-Block, Faisal Town, Lahore, Pakistan

Ph: +92-42-3517 4997; Fax: +92-42-3516-8449

E-mail: [email protected]

Page 5: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

1

TABLE OF CONTENTS

TABLE OF CONTENTS 1

LIST OF ANNEXES 2

ABBREVIATIONS 3

1. INTRODUCTION 4

1.1 Background 4

1.2 Land Acquisition and Resettlement Impacts 4

1.3 Objectives of the IMR and Monitoring Indicators 6

1.4 Monitoring Methodology 6

2. LARP IMPLEMENTATION STATUS 7

2.1.1 Payment of Land Compensation for awarded land 8

2.1.2 Payment of Crop Compensation 8

2.1.3 Payment of Structures 8

2.1.4 Payment of Trees 8

2.1.5 Payment of Allowances 8

3 PENDING PAYMENTS 10

3.1 Reasons 10

3.2 Facilitation provided to DPs in Processing of Claims 11

3.3 Efforts exhausted to approach unpaid DPs for additional documentation 13

4 RELOCATION OF SCHOOLS 16

5 CONSULTATIONS, PARTICIPATION AND INFORMATION DISCLOSURE 17

5.1 Community Consultations 17

5.1.1 Community Consultations with Male and Female DPs 17

5.2 Issues/Concerns Discussed During Consultation Meetings: 17

5.3 Internal and External Coordination meetings to Facilitate Compensation Payment 19

6 GRIEVANCE REDRESS MECHANISM AND COMPLAINTS HANDLING 21

7 GENDER ISSUES/ ANALYSIS IN LARP IMPLEMENTATION 22

8 CONCLUSIONS& RECOMMENDATIONS 23

8.1 Conclusions 23

8.2 Recommendations 23

Pictorial Presentation 24

Page 6: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

2

LIST OF ANNEXES

Annex-1: Village-wise Summary of Awarded Land ........................................................ 30

Annex-2: Village-wise Summary of Crops Payments ..................................................... 32

Annex-3: Mouza-wise summary of Payment for Trees .................................................. 34

Annex-4: Village-wise Summary of Additional Crops ..................................................... 36

Annex-5: Village-wise Summary of Livelihood Allowance .............................................. 38

Annex-6: Village-wise Summary of Transport Allowance ............................................... 39

Annex-7: Village-wise Summary of Business Allowance ............................................... 40

Annex-8: Village-wise Summary of Vulnerable Allowance ............................................. 41

Annex-9: Village-wise Summary of Employment Allowance .......................................... 42

Annex-10: Village-wise Summary of Electricity Allowance ............................................. 43

Annex-11: Village-wise Summary of House Rent Allowance ......................................... 44

Annex-12: Efforts Exhausted to approach unpaid DPs for Additional Documentation (Certification Statement) ................................................................................................ 45

Annex-13: Certification Statement of Legal Heirs of Deceased DPs .............................. 46

Annex- 14: Statement by Natural Guardian of Underage DPsCNIC ............................. 47

Annex- 15 : Sample copy of Statement regarding Migrated/Untraceable DPs .............. 48

Annex- 16: Sample copy of Statement Having Meager Amount /Not Interested DPs ... 49

Annex-17: Sample copy of Statement by DPs Having Incorrect Name in Revenue Record .......................................................................................................................... 50

Annex-18: List of Consultation Meetings with Male DPs ................................................ 51

Annex-19: List of Consultation Meetings with Female DPs ............................................ 63

Annex-20: Grievance Registration Register ................................................................... 67

Annex-21: Complaint Handling and Processing by Type ............................................... 68

Annex-22: Detail of Pending Complaints of Last Quarter Complaint Handling and Processing by Type ....................................................................................................... 69

Page 7: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

3

ABBREVIATIONS

ADB Asian Development Bank

CAP Corrective Action Plan

DPC Displaced Persons Committee

DPs Displaced Persons

EA Executing Agency

EALS Environment, Afforestation, Land and Social Wing

GM General Manager

GOP Government of Pakistan

GRC Grievance Redress Committee

GRM Grievance Redress Mechanism

IDC International Development Consultants

IR Inception Report

LAA Land Acquisition Act

LAC Land Acquisition Collector

LAR Land Acquisition and Resettlement

LARF Land Acquisition and Resettlement Framework

LARP Land Acquisition and Resettlement Plan

MFF Multi -Tranche Financing Facility

NHA National Highway Authority

PIU Project Implementation Unit

PRM Pakistan Resident Mission

QAC Quality Assurance Committee

QPR Quarterly Progress Reports

RS Resettlement Specialist

SPS Safeguard Policy Statement

SSMC Social Safeguard and Management Consultant

TOR Terms of Reference

Page 8: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

4

FAISALABAD – KHANEWAL MOTORWAY PROJECT (M4)

4th Internal Monitoring Report for the Implementation of LARP & CAP of

National Motorway M-4 Shorkot-Khanewal Section Project

(120+268 – 184+487 = 64 km)

1. INTRODUCTION

1.1 Background

1. This report is the 4th internal quarterly monitoring report (January - March 2017) on the implementation of LARP for the National Motorway M-4 Gojra-Shorkot-Khanewal Section Project (Additional Financing) (hereinafter referred to as the Project) co-financed by ADB, AIIB and DFID.

2. TheProject starts at chainage120+268 at Mouza Kakki Kohna, crossing through various rural settlements, and ends at chainage184+487 km in Mouza Shamkot (near Khanewal city). Civil works include the construction of a four-lane dual carriage way with four (4) interchanges located at chainage 148+400 km (Abdul Hakeem Interchange), 166+00 km (Makhdoompur Interchange), 178+070 km (Kabirwala Interchange) and 184+00 km (Khanewal Interchange). The project is located in the districts of Jhang and Khanewal. The location map of the project is given in Figure 1.

Figure 1: Location Map of M-4

1.2 Land Acquisition and Resettlement Impacts

3. The project requires 64 km of 100 meter ROW for the carriageway and 40 meter ROW for the interchange loops. A Land Acquisition and Resettlement Plan (LARP) was finalized, approved and disclosed by ADB in January 2016.

4. Table 1.1 provides a summary of LAR impacts and number of DPs, while Table 1.2 shows the number of DPs entitled to various allowances.

Page 9: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

5

Table 1.1: Impacted Assets

S. No.

Impacted Assets Category

As per LARP Updated as of 4th

IMR

Assets Acquired

Compensation cost assessed

Number of DPs

Assets Acquired

Compensation cost assessed

Number of DPs

(Acre/No) (Rs. Million) (Nos.) (Acre/No) (Rs. Million) (Nos.)

1 Land

i) Carriageway + Interchange ROW (Awarded)

1486.6 1453.67 5876 1492.15 1431.909 6363

ii) Interchanges ROW (in 3 villages) (Unawarded)

51* 77.090 160 22.46 41.829 121

iii) Government Land 79.1 0 0 103 0 0 Total Land 1616.7 1530.76 6036 1617.61 1473.74 6484

1

2 Assets other than land 2

i) Residential structure

162 83.39 162 157 68.63 157

ii) Commercial structure

23 20.43 23 25 17.55 25

iii) Cattle yards 13 3.09 13 15 3.35 15 iv) Miscellaneous 33 2.70 33 51 3.52 51 v) Public (mosque &

schools)3

5 5.86 5 5 31.08 5

vi) Crops 1156.62 131.75 1005 1,345.18 102.94 1060 vii) Trees

91,661 62.85 1405 91,661 78.21 708

viii) Other assets/ hand pumps

143

2.82

143

141

2.38

141

ix) Tube wells 39 7.83 39 41 7.29 42

Table 1.2: DPs Entitled to Resettlement and Rehabilitation Allowances

S.No. Compensation Resettlement & Rehabilitation Entitlements

As per LARP Updated as of 4th IMR

Assessed cost

(Rs. Million)

Entitled DPS

Verified Cost

Verified DPs

A Additional crop compensation 39.903 1005 45.562 1060 B Livelihood assistance 6.420 162 5.905 149 C Transportation Allowance 3.20 224 2.920 206 D Business Loss Allowance 3.369 62 3.052 58 E Vulnerable Allowance 4.082 103 3.844 97 F Employment loss allowance 0.832 21 0.594 15 G Electricity Allowance 7.400 185 4.360 109 H House Rent Allowance 0.81 162 0.745 149

1 Additional 43 co-owners of the affected plots were identified after the announcement of land awards for the interchange loop in two villages (Alipur and 14-V) increasing the number of DPs losing land from 6438 to 6484. 2 Due to acquisition of land, the land owners/DPs also face loss for assets like structures, trees and crops that are appended to acquired land. So, the DPs mentioned against losses other than land are also counted above in the Land Owner DPs. 3 For two public schools total Rs: 30,103,687 (for Land Rs: 5,239,687 and for structure construction of both schools Rs: 24,864,000) and Rs: 972557 for three mosques has been paid to relevant authorities.

Page 10: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

6

5. The PMU Land Acquisition Unit for M-4 handles LARP implementation and internal monitoring, with support from its Social Safeguards Management Consultants (SSMC). Quarterly internal monitoring reports are prepared and shared with the NHA EALS and ADB for review and disclosure. This 4th internal monitoring report covers LARP implementation from January to March 2017.

1.3 Objectives of the IMR and Monitoring Indicators

6. This 4th Internal monitoring report (IMR) provides details of the following aspects:

i) Delivery of compensation against acquired assets and allowances; ii) Community consultations, and information dissemination measures for

effective safeguards management and disbursement of compensation. iii) Updates on the grievance redress mechanism; and iv) Recommendations to improve safeguards management and facilitate

disbursement of compensation payments and allowances

1.4 Monitoring Methodology

7. This quarterly monitoring report is based on a review of: i) LAR institutional arrangements, ii) monthly progress reports; iii) social mobilization activities and community consultation initiatives; iii) measures implemented to improve coordination between LAR implementation units in PMU/PIU and line government agencies; iv) DP outreach activities for LARP disclosure and compensation delivery; v) grievance redress mechanism and complaints recording/tracking systems; and vi) compensation records.

Page 11: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

7

2. LARP IMPLEMENTATION STATUS

8. Out of 1514.6 acres of privately owned land that need to be acquired, 1492.15 acres (1461.97 acres for the main carriageway ROW and 30.18 acres for Interchange loops ROW) has been awarded covering 6363 DPs (6218 DPs for the carriageway ROW and 145 DPs for interchanges ROW). The legal process for the announcement of award for the remaining 22.41 acres of land at the interchanges owned by 121 DPs is still under way. The acquired 30.2 acres of land for the interchanges include 16.55 acres in Alipur and Hassanpur villages for Makhdumpur interchange and 13.63 acres in village 14-V for one loop of Kabirwala interchange. The 16.92 acres in Jalapahore and Umeedgarh villages for Dinpur Interchange and 5.54 acres in village 15-V for Kabir wala interchange are yet to be awarded.

9. For the carriage ROW land the compensation payment is almost complete. Pending payments are for cases with legal and administerative impediments which can be paid following their resolution. Compensation has recently started for the awarded 30.2 acres of land on the interchages. Efforts are inprogress to compelete the land acquisition process for the 22.46 acres of unawarded land for two interchanges. By close of the monitoring period the legal process for unawarded interchanges land of each village is explained below:

Jalla Pahore: Corrigendum of Notifications u/s 5 and 6 are under process to correct some clerical mistake in the earlier notifications.

Umeedgarh: Notification u/s 6 has been published and cost approval is in process with BOR.

15-V: Corrigendum of Notifcation u/s 6 is being processed by the revenue authorities.

10. The demobilization of the LAC by BOR resulted in slow progress in payment of compensation and impeded issuance and publication of corrigendums to complete land acquisition process. The M-4 land staff and NHA EALS is coordinating with the BOR Punjab for the remobilization of the LAC for M-4 Project. It is expected that the LAC will be deputed again for the project by end of April 2017.

11. From January to 31 March 2017, Rs 13.277 million has been paid to 64 DPs for acquired assets i.e. land and land based assets, and Rs. 2.299 million was paid for various allowances. Highlights of the progress made during the reporting period are provided in the bullets below and a comparative summary of implementation progress since last monitoring report is provided in table 2.1:

Land Compensation: Compensation claims for 64 DPs were processed and

entitled compensation amount Rs.12.819 million was paid accordingly;

Payment of Crop Compensation: Compensation amount Rs. 0.324 million was

paid to 9 DPs entitled for crop compensation;

Payment of Trees: Compensation amount Rs. 0.135 million was paid to 6 DPs ;

Rehabilitation and livelihood restoration allowances: Additional Crop Compensation: Compensation amount Rs. 0.659million

has been paid to 5 DPs;

Payment of Livelihood Allowance: Compensation amount Rs. 0.555

million has been paid to 14 DPs and ;

Payment of Transport Allowance: Compensation amount Rs. 0.260

million has been paid to 19 DPs ;

Page 12: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

8

Payment of Business Allowance: Compensation amount Rs. 0.238

million has been paid to 4 DPs ;

Payment of Vulnerable Allowance: Compensation amount Rs. 0.119

million has been paid to 3 DPs ;

Payment of Employment Loss: Compensation amount of Rs. 0.079

million has been paid to 2 DPs.

Payment of lectricity Allowance: Compensation amount of Rs. 0.320

million has been paid to 8 DPs.

House Rent: Compensation amount of Rs. 0.070 million has been paid to

14 DPs

2.1.1 Payment of Land Compensation for awarded land

12. By end March 2017, Rs. 1303.659 million (91.043%) compensation payment for 1,368.86 acres (90.38%) of acquired land from 4509 entitled DPs (70.863%) has been paid. This includes compensation to 23 DPs for 7.41 acres of land out of 30.18 acres acquired land for Makhdumpur interchange and in one village (14-V) for Kabirwala interchange. For the unawarded 22.46 acres of land for the interchanges, compensation for the 121 DPs can start after announcement of land awards following publication of corrigendum notification of Section 5 and Section 6 of the LAA for correcting clerical ommissions. Continued follow-up is being made with the BOR for the remobilization of the LAC. It is expected that the LAC will be available by end of April 2017. After publication of corrigendum notifications, the land awards can be announced to ensure compensation payment could start by August 2017. Village wise payment details is added as Annex-1.

2.1.2 Payment of Crop Compensation

13. As of March 2017, Rs. 101.796 million for crop compensation for 1044 DPs was due for awarded crop area. Of which, Rs 82.923 million (81.46%) has been paid to 791 DPs (75.77%). Village-wise crop compensation payment status is in Annex-2.

2.1.3 Payment of Structures

14. The total amount of compensation for affected structures, including tube wells & hand pumps for 278 DPs is Rs. 108.606 million. Out of which, the payment of Rs. 94.047 million (86.59%) has been paid to 210 DPs (75.5%) as of March 2017.

2.1.4 Payment of Trees

15. For tree losses, compensation of Rs. 78.082 million is due to 737 DPs. This includes Rs 70.224 million for 705 DPs with land award and Rs 7.858 million for 32 DPs with pending land award. Of these, compensation for tree losses amounting to Rs. 64.94 million (92.48%) has been made to 545 DPs (77.305%). Village wise payment status is shown on Annex-3:

2.1.5 Payment of Allowances

16. Total amount of rehabilitation allowances is Rs 66.982 million. Of which, Rs 52.764 million (78.77%) has been disbursed up to March 2017. PIU/SSMC team will continue to to reach, motivate and guide DPs so they can receive these allowances. Focus will be made to those who are vulnerable and severely affected DPs. The village wise compensation payment status for entitled and paid different R&R allowances is given as Annex -4 to Annex -11.

Page 13: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

9

Table 2.1: Status of Implementation of LARP

Type of Payment Payable Amount DPs Total (as of 31st Dec, 2016) Progress (1st Jan to 31st Mar 2017) Total (as of 31st Mar, 2017)

Paid Amount

Unpaid Amount

Paid DPs

Unpaid DPs

Paid Amount

Unpaid Amount

Paid DPs

Unpaid DPs

Paid Amount

Unpaid Amount

Paid DPs

Unpaid DPs

(Rs. M) (No.) (Rs. M.) (Rs. M.) (No.) (No.) (Rs. M.) (Rs. M.) (No.) (No.) (Rs. M.) (Rs. M.) (No.) (No.)

i) Land Compensation* 1431.909 6363* 1,290.841 141.068 4,445 1,872 12.818 128.250 64 1,854 1,303.659 128.250 4,509 1,854

Un-awarded Land 41.829 121 - 41.829 - 121 - 41.829 - 121 - 41.829 - 121

Total Land 1473.738 6484 1,290.841 182.897 4,445 1,993 12.818 170.079 64 1,975 1,303.659 170.079 4,509 1,975

ii) Crop Compensation 101.796 1044 82.599 19.197 782 262 0.324 18.873 9 253 82.923 18.873 791 253

Un-awarded Crops 0.801 16 - 0.801 - 16 - 0.801 - 16 - 0.801 - 16

Total Crops 102.596 1060 82.599 19.998 782 278 0.324 19.673 9 269 82.923 19.674 791 269

iii) Affected Structures 104.112 271 94.047 10.064 210 61 0.000 10.064 - 61 94.047 10.064 210 61

Un-awarded Structures 4.494 7 - 4.494 - 7 - 4.494 - 7 - 4.494 - 7

Total Structures 108.606 278 94.047 14.559 210 68 0.000 14.559 - 68 94.047 14.558 210 68

iv) Affected Trees** 70.224** 705** 64.805 5.556 539 169 0.135 5.283 6 160 64.940 5.283 545 160

Un-awarded Affected Trees 7.858 32 - 7.796 - 29 - 7.858 - 32 - 7.858 - 32

Total Trees 78.082 737 64.805 13.352 539 198 0.135 13.142 6 192 64.940 13.141 545 192

Allowances – rehabilitation/ livelihood restoration

i) Additional Crop Compensation

45.161 1044 36.530 8.632 778 266 0.659 7.972 5 261 37.189 7.972 783 261

Un-awarded Additional Crop 0.4 16 - 0.400 - 16 - 0.400 - 16 - 0.400 - 16

Total Add Crops 45.562 1060 36.530 9.032 778 282 0.659 8.373 5 277 37.189 8.372 783 277

ii) Livelihood Allowance 5.905 149 4.221 1.684 109 40 0.554 1.129 14 26 4.775 1.129 123 26

iii) Transport Allowance 2.92 206 2.112 0.808 133 73 0.260 0.548 19 54 2.372 0.548 152 54

iv) Business Allowance 3.052 58 2.100 0.951 41 17 0.238 0.713 4 13 2.338 0.713 45 13

v) Vulnerable Allowance 3.844 97 1.427 2.417 36 61 0.119 2.299 3 58 1.546 2.299 39 58

vi) Employment losses allowance

0.594 15 0.198 0.396 5 10 0.079 0.317 2 8 0.277 0.317 7 8

vii) Electricity 4.36 109 3.340 1.020 84 25 0.320 0.700 8 17 3.660 0.700 92 17

viii) House rent 0.745 149 0.537 0.208 109 40 0.070 0.138 14 26 0.607 0.138 123 26

* 46 DPs increased as per actual revenue record due to announcement of award of two villages ( Ali Pur and14-v of interchanges) ** Change is due to announcement of award as per actual data

Page 14: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

10

3 Pending Payments

3.1 Reasons

17. The main reasons contributing towards the delay in payments are narrated below while number of unpaid DPs against each reason are sumarized in table 3.1:

Delay in land awards: As per the LAA, land is considered legally acquired once the land award has been notified and compensation payment has been made. Land award for the remaining 22.46 acres of interchanges ROW in three villages is still under process and delayed due to the demobilization of the LAC for M-4 since Feburary 2017. Civil works are on hold in areas where land award has not been notified and efforts to pay compensation have not been made. Compensation for around 122 DPs for recently issued land award for 30.2 acres4 at the interchanges is still being processed, while land award for 121 DPs for 22.46 acres is still not notified.

Inheritance mutation issues: Heirs of deceased land owner DPs can be compensated after recording of inheritance mutation in the land record. For 106 DP (heirs), the inheritance mutation has not been not recorded in the land records and land has not been transferred to the legal heirs. After inheritence mutation has been completed, heirs of deseased DPs will receive their payments.

Living out of project area: As per LAA 1894, DPs have to submit their claims and receive compensation after due verification of their documents. Currently, there are 159 absentee landowner DPs living in other places/cities in the country and are not following up to collect compensation.

Living overseas/abroad: There are 13 Landowner DPs who have migrated to other countries who have not come forward or designated an attorney to submit their claims and receive their compensation payments.

Meager compensation amounts and other reasons: About 1318 DPs living in the affected or nearby villages have not showed up to claim compensation either due to meager compensation amounts5 (593 DPs), lack of interest to submit claim or some other reasons well known to them (725 DPs).

Title Disputes/court cases: 112 Landowners/DPs have title disputes that have not been resolved. The compensation could not be paid to them until land title issues are resolved/decided by the competent revenue authorities/courts.

Underage DPs (Juvenile) or DPs lacking CNIC6: There are 24 DPs who are either of underage (juvenile) or lack identification documents like computerized national identity card (CNIC).

5 Compensation amount up to Rs. 5000 is defined as meager amount and it is likely most of the DPs in this category may lack

interest in claiming compensation following prevalent payment mode under LAA 1894. 6 CNIC, Computerized National Identity Card.

Page 15: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

11

Table 3.1: Reasons for Delay in Payment of Land Compensation

Sr. No. Unresolved Legal and Administrative Impediments DPs with Unresolved

Impediments

A Unpaid DPs for Carriageway ROW

1. Meager compensation/not interested 1,318

2. Underage (juvenile)/lacking CNIC 36

3. Out of the project area 159

4. Title dispute 112

5. Deceased (with pending inheritance mutation) 94

6. Living overseas 13

B Unpaid DPs for Interchanges Carriageway ROW

1 Delay in land award due to demobilization of LAC 243

Total 1,975

3.2 Facilitation provided to DPs in Processing of Claims

18. During reporting quarter, SSMC team in collaboration with M-4 Land and Resettlement Unit visited the project effected villages of districts Jhang and Khanewal to: i) locate, motivate and guide DPs and heirs of deceased DPs; ii) facilitate delivery of compensation to the remaining unpaid DPs; and iii) record current residential addresses of those living out of project area; and iv) obtain certification statements of the guardians of juvenile and legal heirs of deceased DPs regarding payment of compensation as and when they approach with requisite legal/title documents. The table 3.2 below highlights the payement progress achieved against different categories of unpaid DPs and number of remaining unpaid DPs as of 31 March 2017.

Page 16: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

12

Table 3.2: Compensation payment against each category of unpaid cases.

Sr No

Unpaid DPs with issues

Total (as of 31st

Dec, 2016)

Progress (During Jan-Mar, 2017)

Total (as of 31st

Mar, 2017)

Up to 5000

Above 5000

Total Up to 5000

Above 5000

Total Up to 5000

Above 5000

Total

1. Informed but not coming to collect compensation

595 762 1,357 2 37 39 593 725 1,318

2. Underage 17 19 36 - - - 17 19 36

3. Out of the project area

51 113 164 - 5 5 51 108 159

4. Title dispute and court reference against award

36 82 118 - 6 6 36 76 112

5. Pending inheritance mutation for heirs of deceased DP

19 75 94 - - - 19 75 94

6. Overseas 3 12 15 - 2 2 3 10 13

7. Delay in land award

7

10 199 209 - 12 12 22 221 243

Total 731 1,262 1,993 2 62 64 741 1,234 1,975

19. DPs and the legal heirs of deceased DPs were visited to facilitate mutations in the land records. DPs who got mutations of land were assisted in preparing their compensation claims. Accordingly, allowances compensation claim files for 10 DPs and 3 legal heirs of 1 deceased DP were finalized and submitted to PIU staff for further processing and delivery of entitled resettlement allowances. Table 3.3 below provides village-wise number of files processed and submitted for payment of entitled allowances.

Table 3.3: Efforts and facilitation to DPs for Processing Claims.

Sr.

No Village

Claim for Allowance Case Under Process (Status of case)

No. Of DPs/ Deceased DPs

No. Of Heirs/ files submitted

1. 17-D 2

2 files were prepared and submitted to NHA for issuance of compensation cheques for entitled allowances and compensation cheques can be issued and delivered in ensuing month and updated payment status will be reflected in next report.

2. 5 Ghagh 1 -do-

3. Thraili 1 -do-

4. Allah Hoo 1 -do-

5. Jalla Pahor 3 -do-

7 Based on the land award, the number of DPs increased by 46.

Page 17: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

13

Sr.

No Village

Claim for Allowance Case Under Process (Status of case)

No. Of DPs/ Deceased DPs

No. Of Heirs/ files submitted

6. Umeed

Garh

4

-do-

7. 14-D 1 -do-

8. Kalkanwala 5 -do-

9. Khanewal

Kohna

1 (Deceased) 3 -do-

10. 15-D 1 -do-

Total 10 9 3

3.3 Efforts exhausted to approach unpaid DPs for additional documentation

20. During the reporting period, thirty villages were visited by the PIU/PMU and unpaid DPs were approached through their relatives/local residents. The contact details of DP’s living outside the project were asked and recorded and the legal heirs of the deceased DPs were motivated for early mutations in land record. Certified statements from 277 DPs acknowledging their awareness that compensation will be provided upon resolution of the legal and administrative issues related to their compensation have been collected. Village wise detail of approached unpaid DPs and certification statements collected are shown in Annex-12. Scanned copies of (sample) filled forms are attached as Annex-13, 14, 15, 16 and 17. Table 3.4 below demonstrates the approaches made to address cases with legal and administrative impediments.

Page 18: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

14

Table 3.4 Efforts made on DPs with legal and administrative impediments

Sr.

No.

DPs with Legal and

Administrative

Impediments

Total No.

DPs

Previous

Format

Signed

Format

Signed

During

Reporting

Period

Total

Format

Signed

Remaining

DPs Remarks

1 Underage DPs and DPs with

CNIC issues8

36 36 0 36 0 DPs approached and motivated for getting their CNIC issued and payment of

compensation. Meeting with NADRA officials.

2 Out–of-project area (other

cities/overseas) 172 69 103 172 0

DP’s approached through village elders and their relatives living in villages to

collect contact addresses and motivate them to get their compensation. The

notables of village/ DPC heads were requested to assist in approaching

other remaining DPs. In next meetings the other DPs will be approached

3 Pending inheritance mutation

of heir of deceased DPs 94 45 47 92 2

Legal heirs available in village of the deceased DP’s were motivated for early mutations and submission of claims with valid title documents. The notables

of village/ DPC heads were requested to assist in approaching other

remaining DPs. In next meetings the other DPs will be approached.

4

Title disputes (Internal) and

court reference against

award 112 20 27 47 65

DPs approached through village elders and their relatives and motivated to

get their compensation. The notables of village/ DPC heads were requested

to approach other remaining DPs for purpose. In next meetings the other

DPs will be approached

5 Not Interested and Meager 1318 168 100 268 1050

DPs approached through village elders and their relatives and motivated to

get their compensation. The notables of village/ DPC heads were requested

to approach other remaining DPs for purpose. They agreed.

6 Recently Awarded 122 0 0 0 122

DPs approached through village headmen, notable persons and their

relatives and motivated to get their compensation. The notables of village/

DPC heads were requested to approach other remaining DPs for purpose.

Remaining DPs will be approached in coming meetings.

8 Among the underage DPs and DPs with CNIC issues, 12 signed formats/DPs of heirs of deceased DPs included on the basis of field verification.

Page 19: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

15

Sr.

No.

DPs with Legal and

Administrative

Impediments

Total No.

DPs

Previous

Format

Signed

Format

Signed

During

Reporting

Period

Total

Format

Signed

Remaining

DPs Remarks

7 Unawarded 121 0 0 0 121

During the reporting period, the process of land acqusition of remaining unawarded was continued but LAC was transferd. During this preporting period, detail of village wise actions taken for unawarded is as under: Jalla Pahore: Corrigendum of Notifications u/s 5 and 6 are under process to

correct some clarical mistake that happened in earlier notifications. Umeedgarh: Notification u/s 6 has been published and cost approval case is

under process with BOR.

15-V: Corrigendum of Notifcation u/s 6 is under process before revenue

authrities.

Total 1975 338 277 615 1360

Page 20: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

16

4 RELOCATION OF SCHOOLS

21. Two schools were affected including one partialy affected primary school at village Traili and one significantly affected elementary (middle) school at village Shahdat Kandla. Compensation for land and construction of building construction for the schools have been assessed and deposited at the district treasury at the disposal of the district administration.

Land acquisition of school: Land acquisition of school of Shahadat Kandla is in process.

Assistant Commissioner Kabirwala issued the final notices (Notices under Section-9 and 10

of LAA) before award. It is expected that the land award can be announced by April 2017

and the compensation can be paid after announcement of awards. So that construction of

the schools could be started.

Tender of construction: Tendering/bidding process for award of works for school construction has been completed. It is expected that the letter of acceptance of bids can be issued and by end of April and the contractor can be mobilized in May 2017 and works can be started accordingly after completing acquisition of land and taking possession thereto.

22. Construction of temporary required building of schools is continued and in process which can be seen in the pictures given below:

A view of start of School Construction of Shahadat Kandla.

A view of during School Construction of Shahadat Kandla.

A view of start of School Construction of Traili. A view of during School Construction of Traili.

Page 21: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

17

5 CONSULTATIONS, PARTICIPATION AND INFORMATION DISCLOSURE

5.1 Community Consultations

23. During the reporting quarter, the tasks performed by the LAR management team are discussed below:

5.1.1 Community Consultations with Male and Female DPs

24. The SSMC social mobilization team conducted consultation meetings/field visits in project affected villages of M-4 section-III. The purpose of these consultation meetings was to disseminate information about the project (including the grievance redress mechanism and role of DPCs), facilitate disbursement of compensation payment, collect updated status of DPs and to find out contact numbers & addresses of DPs who are out of the project area. A total 106 (75 M, 31 F) consultation meetings were held in which 662 (543 M, 119 F) DPs, members of DPCs, and local community residents were met.

25. The participants of the consultations meetings included, 461 DPs (395 male and 71 female), 117 DPC members (89 male and 28 female) and 79 (59 male and 20 female) local community representatives. The participants were informed about compensation payment process and DPs were motivated for submission of their claim and receiving compensation for the lost assets including land, crops, trees, and structures etc. These DPs were also informed and motivated to receive their income/livelihood restoration allowances as per LARP provisions. Besides LARP disclosure and information on compensation delivery mechanism, the DPs were also informed about grievance redress mechanism and role and functions of DPCs were elaborated during consultations. Table 5.1 below summrizes the consultations carried out during reporting period.

Table 5.1: Summary of Community Consultation with Male and Female DPs

S. No. Consultation Activities Carried out in Project Villages with DPs

No. of Activity

1: Community Consultation Meeting

I. Consultation with DPs 83

II. Session on payment disbursement 15

Total: 98

2: Field Visits: I. Grievance redress 8

Total: 8

Grand Total(Consultations+ Field Visits): 106

26. Detail of consultation meetings including venue date and list of participants belonging to the category of DPs/members of DPCs and representative of local community are presented in Annex-18 (Male), Annex-19 (Female) and photo log section.

5.2 Issues/Concerns Discussed During Consultation Meetings:

27. During consultation meetings, discussed issues concerns and their responses are given below in the table 5.2:

Table 5.2: Issues and Response from the project team

Sr.

No.

Discussion Points/Issues/ Summary of Concerns

Response from the PIU/SSMC

1. Issue on inheritance mutations: Legal heirs of deceased DPs

The PIU will coordinate and request the land

Page 22: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

18

were also contacted and motivated to get the compensation but they said they have to spend more money on mutation and compensation amount is less than the compensation. One shareholder will invest time and money and other all will get benefit. So mutation of land delays due the lack of cooperation of all shareholders.

revenue authorities for early mutations to facilitate

DPs with inheritance mutation issues, however, the

legal heirs of the DPs will have to submit request for

mutation and follow the procedures under law. The

compensation payment could only be paid when

legal heirs of diceased DPs can submit their claims

with valid title after inheritance mutations of land.

2. A number of DPs avoid to get

their entitled compensation.

SSMC is trying to locate, contact such DPs. In some

cases, they met the DPs and motivate them to get

the compensation.

3. Migrated DPs Many DPs have been shifted to other places.

Population in affected villages of section-III is

scattered. So it is time taking to locate the migrated

DPs. In some cases team find addresses and

contact numbers of DPs through village headmen,

notable persons and their relatives. In some cases

local community could not provide addresses and

contact numbers. Efforts are continued to locate and

disburse their payments.

4. Some contacted DPs do not have CNIC and are too old to go back and forth to the NADRA office to provide the prerequisites of CNIC.

Clarified that they have already coordinated with NADRA office and will facilitate the submission of required documents for DPs missing CNIC records.

28. Consultation plan for the succeeding quarter: The PIU and SSMC will continue consultation in all identified villages to facilitate processing of claims, delivery of compensation for land award and R&R allowances in all project villages. Under the supervision of a resettlement specialist, two teams of social mobilizers will coordinate with the unpaid DPs in all affected villages. The DPs will be guided on the submission of claims and supporting documents. DPs with legal and administrative impediments will be identified, and certification statements and whereabouts of DPs will be recorded. The future plan of field activities by the social mobilization team is given in Table 5.3.

Table 5.3: Tentative Community consultation/mobilization plan for 2nd Quarter of 2017

Month Weeks Villages to be visited

Name of villages to be visited

April 1st week

(02-04-2017 to 06-04-2017) 5 5 Ghagh,17-D,29 Ghagh,9-

V,Jamasabad

Page 23: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

19

5.3 Internal and External Coordination meetings to Facilitate Compensation Payment

29. During the reporting period, a total of 26 internal coordination meetings were held with ADB representatives, Director (L&S), Project Director of Section-III (A), Assistant Director (L&S) of NHA Faisalabad and SSMC team. Highlights of these meetings are given in below Table 5.4.

Table 5.4: Consultative Meetings with PIU and Revenue Officials

S.

No.

Department No. of

Meetings

Purpose/Issues Discussed Remarks

1. Director Land

of NHA

Faisalabad

3 Progress review and ongoing activities.

GRC Meeting to review

complaints and issues related to LARP implementation

Progress was shared with Director Land and SSMC RS agreed to make more efforts to motivate the DPs and boost up the payment disbursement.

Received complaints (new recorded and previously pending complaints) from DPs, were discussed. Next meeting was decided on as per schedule Last Friday of every month.

2. Assistant

Director Land

NHA

16 Discussion on field activities, updated progress, field related issues, updated status of MIS data, LAR data for MPR of January, February and March, review of MPR of Jan to Mar

As AD Land is focal person for this

project. SSMC is in contact with AD

land.

2nd week (09-04-2017 to 13-04-2017)

5 15-D,14-D,8-V, Jalla Pahor,Shahadat Kandla

3rd week (16-04-2017 to 20-04-2017)

4 17 Ghagh,18 Ghagh,kaki kohna, Nehalywala

4th week (23-04-2017 to 27-04-2017) & (30-04-2017)

5 Jahan Pur, Kalkanwala, Nehalywala, Allah Hoo, Sae Saho

May 1st week (01-05-2017 to 05-05-2017)

3 7-V,15-V,14-V,

2nd week (08-05-2017 to 12-05-2017)

4 Khanewal Kohna,10-D,9-D,8-D

3rd week (15-05-2017 to 19-05-2017)

4 9-V,Jamasabad,13-V,Hassan Pur

4th week (22-05-2017 to 26-05-2017 & 29-05-2017 to 31-05-2017)

5 10-D,9-D,8-D, Allah Hoo,Sae Saho

June 1st week (01-06-2017 to 02-06-2017)

5

5 Ghagh,17-D,29 Ghagh, Ali pur, Noor Pur

2nd week (05-06-2017 to 09-06-2017)

3 17 Ghagh,18 Ghagh,kaki kohna

3rd week (12-06-2017 to16-06-2017)

4 10-D,9-D,8-D, Kalkanwala

4th week (19-06-2017 to 23-06-2017)

4 Jalla Pahor,Shahadat Kandla,Umeed Garh,Taraili

5th week

(26-06-2017 to 30-06-2017) 4 15-D,14-D,8-V,Jamasabad

Page 24: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

20

S.

No.

Department No. of

Meetings

Purpose/Issues Discussed Remarks

2017, and review and discussion on 3

rd IMR of

section-III and Logistics etc. 3. IDC Head 4 Status of LARP

implementation, GRC. Progress review. Ongoing activities. Discussion on Field visit plan.

Four meeting was held with IDC head in PIU Toba Tek Singh.

Status of LARP implementation, GRC, information sharing and field activities were discussed during the meetings.

Monthly Field visit plan were also discussed.

4. ADB

representative

2 Discussion on LARP progress, payment disbursement to schools and status of schools construction, GRM and complaint handling process as well as grievance redress mechanism.

Progress regarding paid and unpaid DPs and amount was reviewed.

GRC process and documentation was reviewed. Pending complaints status was dicsussed

5. Meeting with

PD Section-III

(A) M-4

1 Meeting regarding GRC and construction plan.

A meeting with PD Section-III (A) M-4 was conducted. Purpose of the meeting was to discuss complaints and to get construction plan. He said after finalization construction plan will be shared.

Total 26

Page 25: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

21

6 GRIEVANCE REDRESS MECHANISM AND COMPLAINTS HANDLING

30. During this quarter, complaints about land measurement (3), demand for water course (2) and demand for compensation (2) were received. These complaints were logged in the grievance record register. Field investigations were carried-out. Complainants were reviewed and discussed in the monthly meeting of the grievance redress committee (GRC).

31. As of close of reporting period, three GRC meetings have been conducted under supervision of the Director Land M-4 to resolve complaints for both M-4 Section II and III. In these three GRC meetings, complaints received during the reporting period and previous pending complaints were discussed.

32. Complaints received during the reporting period are presented in the Table 6.1. Detail of complaint handled and processed by type is presented in Annex-21. Previously pending/in-process complaints have also been resolved and detail of the complaints handled and processed by type has been presented in Annex-22.

Table 6.1: Status of Complaints Resolution by Type over all complaints resolution

Previous Complaints During the Reporting Period (January to March 2017)

Total Remarks

Rece

ive

d

Reso

lve

d

Pe

nd

ing

To

tal

Reso

lve

d +

P

en

din

g)

Rece

ive

d

Reso

lve

d

Pe

nd

ing

To

tal

Reso

lve

d +

P

en

din

g)

Rece

ive

d

Reso

lve

d

Pe

nd

ing

To

tal

Reso

lve

d +

P

en

din

g)

22 16 6 22 7 (3+5)8* 4 7 29 24 5 29 Total 5 Complaints are under process.

* Three new received and Five pending complaints were also resolved during the reporting period

Table 6.2: Category wise Complaint Handling Status during Quarter

Category of Issues/ Complaints

Total No. of Unresolved complaints

received/recorded

Complaints resolved

(Nos.)

Complaints Pending

(No.)

Steps/ actions taken

to resolve issues

i. Demand for Structure payment

2 1 1 As per GRC verification and recommendation compensation paid to 1 DP and other two complaints were not eligible and complaints resolved.

ii. Measurement of Land

3 0 3 Issues discussed in GRC and forwarded to PD and SC for verfication and consideration as per design requirements.

iii. Water Course/Pipe Culvert

2 2 0 -do-

Total 7 3 4

Page 26: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

22

7 GENDER ISSUES/ ANALYSIS IN LARP IMPLEMENTATION

Female social mobilizers coordinated with female DPs and local female community members informing them about LAR implementation arrangements and ensure their participation in the ongoing consultative process. Meetings were conducted in project villages wherein 119 females participated in 31 meetings organized in different project villages. Detail of these consultation meetings is presented in Annex-19. The gender related issues of the project were highlighted and female DPs were asked to complete their documents to get their entitled compensation. They were also asked to participate in DPC consultation meetings at the village to discuss their concerns and raise their voices to get their issue resolved.

Page 27: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

23

8 CONCLUSIONS& RECOMMENDATIONS

8.1 Conclusions

33. Overall, 1,368.86 acre (91.7%) of the acquired land has been compensated, with 4509 DPs (70.86%) having received their compensation payments. Compensation for the remaining 123.31 acre (8.3%) of acquired land has yet to be disbursed to the 1,854 DPs (29.14%) due to legal and administrative impediments. For the interchanges, 22.46 acres of land owned by 121 DPs remains to be acquired mainly due to an error in the documentation and the temporary demobilization of the LAC team during the reporting period. Legal process for announcement of land awards for these remaining land for the interchanges is expected by June 2017.

34. Slight progress was achieved in the payment of R&R allowances. By close of the monitoring period, 78.77% of the allowances have been disbursed. DPs who already ollected their land compensation are being assisted to receive their claims for R&R allowance. Those with impediments are assisted in resolving their issues.

35. Site possession of the interchanges ROW land where land acquisition is not completed is not been issued to the contractor. However, some preparatory works like construction of pipe culverts at existing water courses and underpasses for farm tracks is is neededto ensure affected persons and local community can access and benefit from their land without any interruption during execution of project works.

8.2 Recommendations

36. The following actions will be initiated or continued to facilitate the completion of all pending compensation payments:

Unawarded 22.46 acres interchanges land: The NHA/PMU will ensure the remobilization of the LAC on the project. PIU will coordinate and assist the LAC to complete all requirments to ensure announcement of land awards for 121 DPs of 22.46 acres of unawarded land in three villages two interchanges preferably before 30 June 2017.

Pending Payment of Allowances and DPs with Legal and Administrative Impediments: PIU and SSMC will maintain a close liaison and shall continue the outreach activities for DPs in processing of their claim files and payment of entitled allowances. The PIU staff will also increase coordination with LAC/Revenue staff Sec-III to boost up payment process. During such field visits, additional documentation of DPs with different categories impediments will be recorded.

DPs living out of project area with country or overseas. With assistance of the locals and village notables notices will be delivered through registered mail on DPs known address and telephonically where possible. In case of DPs whose whereabouts are unknown, the certification statement form village notables will be recorded.

DPs with Inheritance Mutation issues: The legal heirs of the DPs will be coordinated and certification staments will be recorded confirming payment of compensation will be made as and when they will come-up with requiste title documents after mutation in land records. Legal heirs will be assisted for early inheritance mutations in land record and delivery of compensation as per recorded mutations.

Underage (Juvenile) DPs: The elders/natural guardians of underage DPs will be approached for getting legal guardians certificates. Statements will be recorded confirming DPs understanding that compensation will be made when they come-up with the required legal guardian certificate.

Page 28: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

24

DPs with meager compensation amounts or lack of interest to take compensation: Efforts will be ensured to motivate DPs to submit compensation claims with the required supporting documents. For DPs who are unwilling to claim meager compensation amounts, statements to that affect will be recorded from willing DPs.

Pictorial Presentation

Page 29: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

25

Pictorial Presentation of Selected Events

Pictorial View of Consultation Meetings and Information Sharing

Consultation meeting at Shahadat Kandla

Consultation meeting at Sahi Sahoo

Consultation meeting at village 7 Venioee

Consultation meeting at 9 D

Consultation meeting at Jahan Pur

Consultation meeting at village Jamesabad

Page 30: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

26

Consultation Meetings

Consultation meeting with female DPs at

village Allah Hoo

Consultation meeting with female DPs at

village 9 D

Consultation meeting with female DPs at

village 29 Gagh

Consultation meeting with female DPs at

village Tarali

Consultation meeting with female DPs at

village khanewal Kohna

Consultation meeting with female DPs at

village 13 Venioee

Page 31: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

27

Disbursement to DPs in Project Affected Villages

View of disbursement to DPs of 18 Gagh

View of disbursement at 17-Ghagh

View of disbursement at Kabeerwala Office

View of disbursement at 17 Gagh

View of disbursement at Kabeerwala Office

View of disbursement at Kabeerwala Office

Page 32: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

28

A view of GRC Meetings

View of GRC field visit at village 7 Venioee

View of GRC meeting at village 17 Gagh

View of GRC meeting at village Tarali

View of GRC meeting at village 17 Gagh

View of field visit for GRC in village 7 Venioee

View of GRC meeting at village Tarali

Page 33: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

29

ANNEXES

Page 34: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

30

Annex-1: Village-wise Summary of Awarded Land Location/ Village Acquire

d Land

(Acre)

Paid

Land

(Acre)

To be

Paid

(Acre)

Amount to be

Paid

Paid Balance Total

No. APs

Total

Paid

Not

paid

Awarded (A)

Kaki Kohna 33.5 28.03 5.46 56,236,006 54,166,473 2,069,533 301 199 102

17 Ghag 48.4 48.39 - 55,995,513 51,839,164 4,156,349 131 90 41

5-Gagh 19.3 16.43 2.85 16,181,363 14,557,866 1,623,497 73 60 13

18 Ghag 69.8 60.32 9.49 65,663,807 51,200,857 14,462,950 212 129 83

29 Ghag 21.4 20.41 1.00 25,909,500 23,048,323 2,861,177 105 60 45

23-GH 6.3 6.29 0.05 5,830,500 5,354,400 476,100 8 7 1

14-DH 38.7 33.83 4.86 40,767,500 39,526,850 1,240,650 64 63 1

15-DH 18.3 17.83 0.50 22,030,047 21,544,804 485,243 48 45 3

17-DH 64.1 62.41 1.65 66,182,500 64,650,704 1,531,796 175 147 28

8-DH 35.3 28.22 7.05 28,396,375 24,112,589 4,283,786 206 148 58

9-D 12.0 11.86 0.15 8,288,625 8,185,483 103,142 88 61 27

10-D 29.6 28.89 0.71 20,428,312 19,934,095 494,217 43 39 4

1-KM 13.2 13.20 - 7,582,813 7,582,813 - 21 21 -

Tarholi 78.5 73.82 4.66 74,267,000 71,060,430 3,206,570 328 252 76

Sai Sahu 33.9 33.25 0.66 31,883,750 30,812,442 1,071,308 133 94 39

Shahdat Kandla 66.9 58.36 8.53 76,920,625 69,132,238 7,788,387 593 468 125

Jalan Pahor 31.6 30.54 1.08 47,296,625 41,103,816 6,192,809 144 78 66

Umeedgarh 43.5 43.08 0.39 60,254,250 60,061,158 193,092 118 103 15

Din Pur 0.08 0.08 - 103,500 103,500 - 1 1 -

Allah Hoo 49.2 47.76 1.45 45,269,750 44,349,829 919,921 252 187 65

Nihalwala 36.5 36.15 0.32 33,551,250 33,269,563 281,687 296 81 215

Kalkan Wala 64.7 46.90 17.80 59,529,750 58,703,792 825,958 370 356 14

Jahan Pur 101.9 96.35 5.54 58,585,312 55,720,653 2,864,659 332 234 98

Nurpur 34.2 33.61 0.62 19,679,375 19,351,889 327,486 106 71 35

Ali Pur 69.9 61.87 7.99 38,537,937 33,224,553 5,313,384 196 121 75

Hussan Pur 53.5 50.46 3.01 30,744,531 24,695,978 6,048,553 266 155 111

13-V 54.6 51.27 3.28 50,315,950 47,644,655 2,671,295 285 226 59

14-V 57.4 55.37 2.01 66,648,250 65,644,454 1,003,796 239 194 45

Jamsaabad 78.7 75.88 2.80 72,386,750 71,464,982 921,768 308 214 94

Sham Kot 17.1 1.79 0.51 4,151,075 4,151,075 - 3 3 -

7-V 2.3 31.23 4.57 28,783,781 24,888,026 3,895,755 141 115 26

8-V 35.8 63.91 1.13 52,408,375 51,495,890 912,485 245 173 72

9-V 65.0 24.71 0.01 22,735,500 22,730,564 4,936 81 73 8

Khanewal Kuhna 24.7 52.14 0.13 61,297,156 59,653,324 1,643,832 226 157 69

Jamsaabad

Interchange

52.3 16.82 0.27 15,783,750 15,541,278 242,472 80 61 19

Page 35: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

31

Hassanpur

Interchange

8.62 6.39 2.23 15,858,500 11,750,097 4,108,403 44 18 26

Ali Pur Interchange 7.93 1.02 6.91 10,936,500 1,400,798 9,535,702 62 5 57

14-V Interchange 13.63 - 13.63 34,487,062 - 34,487,062 39 - 39

Sub Total (A) 1492.15 1,368.86 123.31 1,431,909,165 1,303,659,405 128,249,760 6,363 4,509 1,854

Un awarded (B)

15-Venoee 5.54 - 5.54 9,552,188 - 9,552,188 24 - 24

Jalla Pahore 16.36 - 16.36 31,047,844 - 31,047,844 95 - 95

Umeed Garh 0.56 - 0.56 1,229,063 - 1,229,063 2 - 2

Sub Total (B) 22.46 - 22.46 41,829,095 - 41,829,095 121 - 121

Grand Total (A+B) 1,514.61 1,368.86 145.77 1,473,738,260 1,303,659,405 170,078,855 6,484 4,509 1,975

Page 36: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

32

Annex-2: Village-wise Summary of Crops Payments

Location/ Village Amount to be

Paid

Paid Balance Total No.

APs

Total Paid Not paid

Awarded (A)

Kaki Kohna 2,360,075 1,603,800 756,275 32 16 16

17-Ghag 3,291,075 3,109,610 181,465 35 31 4

5- Ghag 1,263,500 1,144,150 119,350 20 11 9

18-Ghag 4,105,500 3,432,080 673,420 35 34 1

29/Ghag 1,242,125 1,168,470 73,655 19 17 2

23/ Ghag 166,250 166,250 - 1 1 -

14/D 1,633,419 1,184,973 448,446 25 17 8

15/D 1,215,950 1,051,433 164,517 20 17 3

17/D 3,003,650 1,978,946 1,024,704 37 26 11

8/D 1,777,550 1,348,425 429,125 24 14 10

9/D 619,100 502,352 116,748 7 7 -

10/D 751,350 712,350 39,000 18 16 2

1/KM 110,537 77,761 32,776 8 2 6

Tarholi 4,959,169 4,938,927 20,242 71 70 1

Sai Sahu 1,645,575 1,645,575 - 37 29 8

Shahadat Kandla 2,600,644 1,982,264 618,380 65 36 29

Jallah Pahore 1,379,338 852,501 526,837 23 19 4

Umeed Gharh 2,795,322 2,795,322 - 38 30 8

Din Pur 4,500 4,500 - 1 1 -

Allah Hoo 2,978,250 2,611,136 367,114 35 30 5

Nehaly Wala 2,174,275 2,094,300 79,975 20 9 11

Kalkan Wala 3,875,587 2,869,132 1,006,455 38 32 6

Jahan Pur 6,398,960 4,412,598 1,986,362 82 52 30

Noor Pur 2,095,050 1,876,050 219,000 12 10 2

Ali Pur 4,171,725 3,939,975 231,750 29 28 1

Hassan Pur 3,217,650 1,777,650 1,440,000 33 22 11

13/V 5,395,331 4,474,377 920,954 33 28 5

14/V 5,936,006 5,530,161 405,845 44 27 17

Jemsabad (ROW) 9,040,106 8,258,861 781,245 40 39 1

7/V 3,077,882 2,215,177 862,705 50 46 4

8/V 7,327,920 6,984,014 343,906 35 32 3

9/V 2,908,512 394,525 2,513,987 14 9 5

Khanewal Kohna 6,565,125 5,016,154 1,548,971 24 21 3

Hassanpur Interchange 78,331 14,400 63,931 5 2 3

14-V Interchange 635,569 - 635,569 16 - 16

Jemsabad (Interchange) 994,712 754,595 240,117 18 10 8

Sub Total (A) 101,795,620 82,922,794 18,872,826 1,044 791 253

Page 37: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

33

Un awarded (B)

15-Venoee 214,769 - 214,769 5 - 5

Jalla Pahore 585,903 - 585,903 11 - 11

Sub Total (B) 800,672 - 800,672 16 - 16

Grand Total (A+B) 102,596,292 82,922,794 19,673,498 1,060 791 269

Page 38: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

34

Annex-3: Mouza-wise summary of Payment for Trees

Location/ Village Amount to be Paid Paid Balance Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 1,280,838 1,031,877 248,961 28 13 15

17-Ghag 802,339 718,778 83,561 20 19 1

5- Ghag 888,449 825,952 62,497 15 10 5

18-Ghag 1,538,452 1,409,270 129,182 28 27 1

29/Ghag 730,119 470,278 259,841 15 14 1

14/D 840,859 538,869 301,990 17 10 7

15/D 591,996 525,332 66,664 16 15 1

17/D 1,672,367 1,602,877 69,490 28 27 1

8/D 1,243,823 1,122,934 120,889 24 15 9

9/D 268,350 168,081 100,269 6 6 -

10/D 269,491 242,187 27,304 12 8 4

Tarholi 17,402,217 15,894,909 1,507,308 53 49 4

Sai Sahu 244,369 240,206 4,163 18 17 1

Shahadat Kandla 3,870,139 3,226,480 643,659 56 33 23

Jallah Pahore 16,097,433 15,898,392 199,041 29 18 11

Umeed Gharh 739,654 657,156 82,498 22 15 7

Allah Hoo 575,862 539,961 35,901 16 12 4

Nehaly Wala 1,188,426 1,137,979 50,447 11 10 1

Kalkan Wala 1,877,570 1,729,085 148,485 23 19 4

Jahan Pur 4,551,027 4,157,095 393,932 58 37 21

Noor Pur 2,226,609 2,226,609 - 6 6 -

Ali Pur 842,063 803,078 38,985 21 14 7

Hassan Pur 413,318 352,408 60,910 20 14 6

13/V 370,327 284,068 86,259 20 17 3

14/V 946,604 794,862 151,742 24 22 2

Jemsabad (ROW) 3,681,653 3,669,870 11,783 23 23 -

Jemsabad (Interchange) 281,872 153,926 127,946 15 6 9

7/V 300,534 251,277 49,257 26 25 1

8/V 732,500 695,788 36,712 25 21 4

9/V 2,876,724 2,845,683 31,041 6 6 -

Khanewal Kohna 749,711 725,125 24,586 17 17 -

Hassanpur Interchange 64,226 - 64,226 4 - 4

Ali Pur Interchange 63,801 - 63,801 3 - 3

Sub Total 70,223,722 64,940,392 5,283,330 705 545 160

Un awarded (B)

Jalla Pahore 7,740,666 - 7,740,666 25 - 28

15-V Interchange 62,276 - 62,276 3 - 3

Page 39: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

35

Umeed Garh 55,310 - 55,310 1 - 1

Sub Total (B) 7,858,252 - 7,858,252 32 - 32

Grand Total (A+B) 78,081,974 64,940,392 13,141,582 737 545 192

Page 40: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

36

Annex-4: Village-wise Summary of Additional Crops

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 1,089,150 719,669 369,481 32 22 10

17 Ghag 1,534,400 1,181,396 353,004 35 30 5

5-Gagh 629,130 522,949 106,181 20 16 4

18 Ghag 2,135,059 1,866,182 268,877 35 30 5

29 Ghag 654,175 643,036 11,139 19 17 2

23-GH 66,359 66,359 0 1 1 -

14-DH 1,123,828 856,457 267,371 25 19 6

15-DH 573,688 477,353 96,335 20 15 5

17-DH 1,596,264 1,298,274 297,990 37 30 7

8-DH 850,470 592,090 258,380 24 14 10

9-D 384,028 342,497 41,531 7 7 -

10-D 441,825 416,343 25,482 18 16 2

1-KM 103,606 69,570 34,036 8 3 5

Tarholi 2,440,313 1,886,504 553,809 71 65 6

Sai Sahu 931,943 941,003 9061 37 35 2

Shahdat Kandla 2,029,098 1,527,044 502,054 65 42 23

Jallah Pahore 994,534 715,176 279,358 23 16 7

Umeedgarh 1,435,289 1,366,348 68,941 38 25 13

Din Pur 2,568 2,568 - 1 1 -

Allah Hoo 1,601,830 1,420,505 181,325 35 30 5

Nihalwala 1,216,945 1,193,822 23,123 20 9 11

Kalkan Wala 2,012,402 1,492,644 519,758 38 28 10

Jahan Pur 3,384,328 2,234,545 1,149,783 82 55 27

Nurpur 1,162,788 1,105,842 56,946 12 11 1

Ali Pur 2,343,342 2,159,881 183,461 29 21 8

Hussan Pur 1,780,358 1,323,319 457,039 33 27 6

13-V 1,557,305 1,162,774 394,531 33 26 7

14-V 1,789,991 1,632,675 157,316 44 24 20

Jamsaabad 2,550,555 2,556,955 6400 40 39 1

7-V 1,126,183 945,233 180,950 50 45 5

8-V 2,131,848 1,957,159 174,689 35 31 4

9-V 771,267 722,242 49,025 14 8 6

Khanewal Kuhna 1,715,069 1,346,662 368,407 24 16 8

Hassanpur Interchange 98,298 - 98,298 5 - 5

14-V Interchange 317,784 - 317,784 16 - 16

Jamsaabad Interchange 585,461 443,907 141,554 18 9 9

Total 45,161,480 37,188,983 7,972,497 1,044 783 261

Page 41: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

37

Un awarded (B)

15-Venoee 107,384 - 107,384 5 - 5

Jalla Pahore 292,952 - 292,952 11 - 11

Sub Total (B) 400,336 - 400,336 16 - 16

Grand Total (A+B) 45,561,816 37,188,983 8,372,833 1,060 783 277

Page 42: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

38

Annex-5: Village-wise Summary of Livelihood Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 435,930 237,780 198,150 11 6 5

17 Ghag 871,860 832,230 39,630 22 21 1

5-Gagh 198,150 198,150 - 5 5 -

18 Ghag 713,340 455,745 257,595 18 14 4

29 Ghag 237,780 198,150 39,630 6 5 1

15-DH 237,780 198,150 39,630 6 5 1

17-DH 198,150 158,520 39,630 5 4 1

8-DH 158,520 158,520 - 4 4 -

9-D 39,630 39,630 - 1 1 -

Tarholi 396,300 237,780 158,520 10 6 4

Sai Sahu 79,260 79,260 - 2 2 -

Shahdat Kandla 554,820 554,820 - 14 14 -

Jalan Pahor 39,630 39,630 - 1 1 -

Umeedgarh 277,410 237,780 39,630 7 6 1

Allah Hoo 237,780 237,780 - 6 6 -

Nihalwala 118,890 118,890 - 3 3 -

Kalkan Wala 317,040 277,410 39,630 8 7 1

Jahan Pur 198,150 158,520 39,630 5 4 1

Ali Pur 118,890 118,890 - 3 3 -

Jahan Pur 79,260 39,630 39,630 2 1 1

14-V 39,630 39,630 - 1 1 -

Jamsaabad 79,260 39,630 39,630 2 1 1

8-V 198,150 118,890 79,260 5 3 2

Khanewal Kuhna 79,260 - 79,260 2 0 2

Total 5,904,870 4,775,415 1,129,455 149 123 26

Page 43: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

39

Annex-6: Village-wise Summary of Transport Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 175,000 100,000 75,000 12 5 7

17 Ghag 370,000 355,000 15,000 26 22 4

5-Gagh 105,000 105,000 - 8 6 2

18 Ghag 300,000 202,499 97,501 21 16 5

29 Ghag 90,000 75,000 15,000 6 5 1

15-DH 140,000 95,000 45,000 11 6 5

17-DH 75,000 60,000 15,000 5 4 1

8-DH 90,000 90,000 - 6 6 -

9-D 45,000 25,000 20,000 3 2 1

1-KM 40,000 20,000 20,000 2 1 1

Tarholi 210,000 130,000 80,000 16 7 9

Sai Sahu 40,000 40,000 - 3 2 1

Shahdat Kandla 300,000 275,000 25,000 20 17 3

Jallah Pahore 25,000 25,000 - 2 2 -

Umeedgarh 125,000 110,000 15,000 9 8 1

Allah Hoo 120,000 110,000 10,000 9 6 3

Nihalwala 75,000 65,000 10,000 6 5 1

Kalkan Wala 160,000 155,000 5,000 12 11 1

Jahan Pur 105,000 90,000 15,000 7 5 2

Nurpur 10,000 10,000 - 1 1 -

Ali Pur 55,000 55,000 - 3 3 -

Jahan Pur 50,000 35,000 15,000 3 2 1

14-V 25,000 25,000 - 2 2 -

Jamsaabad 55,000 55,000 - 4 4 -

8-V 75,000 45,000 30,000 5 3 2

Khanewal Kuhna 60,000 20,000 40,000 4 1 3

Total 2,920,000 2,372,499 547,501 206 152 54

Page 44: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

40

Annex-7: Village-wise Summary of Business Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 39,630 39,630 - 1 1 -

17 Ghag 198,150 198,150 - 4 4 -

5-Gagh 118,890 118,890 - 3 3 -

18 Ghag 118,890 118,890 - 3 3 -

15-DH 317,040 79,260 237,780 5 2 3

8-DH 118,890 79,260 39,630 2 1 1

9-D 118,890 39,630 79,260 2 1 1

1-KM 158,520 79,260 79,260 2 1 1

Tarholi 237,780 158,520 79,260 6 4 2

Sai Sahu 39,630 39,630 - 1 1 -

Shahdat Kandla 435,930 435,930 - 6 6 -

Jallah Pahore 39,630 39,630 - 1 1 -

Umeedgarh 79,260 79,260 - 2 2 -

Allah Hoo 118,890 79,260 39,630 3 2 1

Nihalwala 158,520 118,890 39,630 3 2 1

Kalkan Wala 237,780 198,150 39,630 4 3 1

Jahan Pur 118,890 118,890 - 2 2 -

Nurpur 39,630 39,630 - 1 1 -

Ali Pur 39,630 39,630 - 1 1 -

Jahan Pur 79,260 79,260 - 1 1 -

14-V 39,630 - 39,630 1 - 1

Jamsaabad 158,520 158,520 - 3 3 -

Khanewal Kuhna 39,630 - 39,630 1 - 1

Total 3,051,510 2,338,170 713,340 58 45 13

Page 45: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

41

Annex-8: Village-wise Summary of Vulnerable Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 158,520 79,260 79,260 4 2 2

17 Ghag 158,520 158,520 - 4 4 -

5-Gagh 79,260 39,630 39,630 2 1 1

18 Ghag 39,630 - 39,630 1 - 1

29 Ghag 317,040 79,260 237,780 8 2 6

14-DH 79,260 - 79,260 2 - 2

15-DH 198,150 158,520 39,630 5 4 1

17-DH 158,520 39,630 118,890 4 1 3

8-DH 39,630 - 39,630 1 - 1

Tarholi 39,630 - 39,630 1 - 1

Shahdat Kandla 198,150 118,890 79,260 5 3 2

Jalan Pahor 277,410 39,630 237,780 7 1 6

Umeedgarh 198,150 79,260 118,890 5 2 3

Allah Hoo 118,890 79,260 39,630 3 2 1

Nihalwala 118,890 39,630 79,260 3 1 2

Kalkan Wala 594,450 118,890 475,560 15 3 12

Jahan Pur 277,410 118,890 158,520 7 3 4

Ali Pur 118,890 39,630 79,260 3 1 2

Jahan Pur 277,410 158,520 118,890 7 4 3

13-V 39,630 - 39,630 1 - 1

14-V 39,630 39,630 - 1 1 -

Jamsaabad 237,780 158,520 79,260 6 4 2

7-V 39,630 - 39,630 1 - 1

Khanewal Kuhna 39,630 - 39,630 1 - 1

Total 3,844,110 1,545,570 2,298,540 97 39 58

Page 46: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

42

Annex-9: Village-wise Summary of Employment Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 158,520 79,260 79,260 4 2 2

Jalan Pahor 39,630 - 39,630 1 - 1

Allah Hoo 79,260 79,260 - 2 2 -

Nihalwala 79,260 - 79,260 2 - 2

Kalkan Wala 79,260 - 79,260 2 - 2

Jahan Pur 158,520 118,890 39,630 4 3 1

Total 594,450 277,410 317,040 15 7 8

Page 47: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

43

Annex-10: Village-wise Summary of Electricity Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 200,000 200,000 - 5 5 -

17 Ghag 640,000 640,000 - 16 16 -

5-Gagh 320,000 80,000 240,000 8 2 6

18 Ghag 600,000 459,999 140,001 15 12 3

29 Ghag 240,000 200,000 40,000 6 5 1

15-DH 40,000 40,000 - 1 1 -

17-DH 40,000 40,000 - 1 1 -

9-D 40,000 40,000 - 1 1 -

Tarholi 240,000 160,000 80,000 6 4 2

Sai Sahu 80,000 80,000 - 2 2 -

Shahdat Kandla 480,000 480,000 - 12 12 -

Umeedgarh 280,000 240,000 40,000 7 6 1

Allah Hoo 200,000 200,000 - 5 5 -

Nihalwala 80,000 80,000 - 2 2 -

Kalkan Wala 320,000 280,000 40,000 8 7 1

Jahan Pur 160,000 120,000 40,000 4 3 1

Ali Pur 40,000 40,000 - 1 1 -

Jahan Pur 40,000 40,000 - 1 1 -

14-V 80,000 80,000 - 2 2 -

Jamsaabad 40,000 40,000 - 1 1 -

8-V 120,000 120,000 - 3 3 -

Khanewal Kuhna 80,000 - 80,000 2 - 2

Total 4,360,000 3,659,999 700,001 109 92 17

Page 48: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

44

Annex-11: Village-wise Summary of House Rent Allowance

Location/ Village Amount to be

Paid Paid Balance

Total No.

APs Total Paid Not paid

Awarded (A)

Kaki Kohna 55,000 30,000 25,000 11 6 5

17 Ghag 110,000 105,000 5,000 22 21 1

5-Gagh 25,000 25,000 - 5 5 -

18 Ghag 90,000 57,498 32,502 18 12 6

29 Ghag 30,000 25,000 5,000 6 5 1

15-DH 30,000 25,000 5,000 6 5 1

17-DH 25,000 20,000 5,000 5 4 1

8-DH 20,000 20,000 - 4 4 -

9-D 5,000 5,000 - 1 1 -

Tarholi 50,000 30,000 20,000 10 6 4

Sai Sahu 10,000 10,000 - 2 2 -

Shahdat Kandla 70,000 70,000 - 14 14 -

Jalan Pahor 5,000 5,000 - 1 1 -

Umeedgarh 35,000 30,000 5,000 7 7 -

Allah Hoo 30,000 30000 - 6 6 -

Nihalwala 15,000 15,000 - 3 3 -

Kalkan Wala 40,000 35000 5,000 8 7 1

Jahan Pur 25,000 20000 5,000 5 4 1

Ali Pur 15,000 15000 - 3 3 -

Jahan Pur 10,000 5000 5,000 2 1 1

14-V 10,000 10000 - 2 2 -

Jamsaabad 5,000 5000 - 1 1 -

8-V 25,000 15000 10,000 5 3 2

Khanewal Kuhna 10,000 0 10,000 2 0 2

Total 745,000 607,498 137,502 149 123 26

Page 49: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

45

Annex-12: Efforts Exhausted to approach unpaid DPs for Additional Documentation (Certification Statement)

Sr. No. Village No. of DPs Contacted/ Forms

Signed 1. Khanewal Kohna 8

2. Jamasabad 5

3. Shahadat Kandla 2

4. Allah Hoo 2

5. Umeed Garah 4

6. 17-D 9

7. 8-D 9

8. 9-D 18

9. Nehalywala 9

10. 14-D 3

11. Sai Saho 12

12. Jahan Poor 14

13. Kalkanwala 26

14. 9-D 5

15. 10-D 2

16. 17 Ghagh 1

17. 1 KM 2

18. Taraili 10

19. 14-V 4

20. Hassan Pur 48

21. Ali Pur 3

22. Noor Pur 16

23. 9-V 2

24. 17 Ghagh 7

25. 5 Ghagh 8

26. Jalla Pahor 19

27. 7-V 1

28. 29 Ghagh 13

29. 18 Ghagh 9

30. Taraili 6

Total 30 277

Page 50: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

46

Annex-13: Certification Statement of Legal Heirs of Deceased DPs

Page 51: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

47

Annex- 14: Statement by Natural Guardian of Underage DPsCNIC

Page 52: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

48

Annex- 15 : Sample copy of Statement regarding Migrated/Untraceable DPs

Page 53: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

49

Annex- 16: Sample copy of Statement Having Meager Amount /Not Interested DPs

Page 54: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

50

Annex-17: Sample copy of Statement by DPs Having Incorrect Name in Revenue Record

Page 55: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

51

Annex-18: List of Consultation Meetings with Male DPs Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

1. January 02, 2017 Chak 17-D DPCs/DPs/

Local

Communities

9 - Rab Nawaz S/O Sultan

- Allah Bakhsh S/O Muhammad Yousaf

- Mazhar S/O Allah Ditta

- Muhammad Azhar S/O Muhammad Zaffar

- Zuliqar S/O Khuda Bakhsh

- Faiz Ahmad S/O Muhammad Yousaf

- Muhammad Jamshaid S/O Muhammad Bux

- Muhammad Ashraf S/O Muhammad Rafiq

- Ghulam Fareed S/O Allah Ditta

2. January 03, 2017 Chak 8-D DPCs/DPs/

Local

Communities

6 - Munawar Hussain S/O Maqbool Hussain

- Ishtiaq Ahmad S/O Nazeer Ahmad

- Abdul Ghafar S/O Basheer Ahmad

- Muhammad Jahangeer Badar S/O Asgher Ali

- Abdul Sattar S/O Riasat Ali

- Sultan Alim S/O Muhammad Shabeer

3. January 04, 2017 Chak 9-D DPCs/DPs/

Local

Communities

13 - Muhammad Basheer S/O Gull Muhammad

- Muhammad Ramzan S/O Wali Muhammad

- Muhammad Aslam S/O Khushi Muhammad

- Ghulam Shabeer S/O Waryam

- Rab Nawaz S/O Wahg

- Muhammad Yaqoub S/O Allah Ditta

- Allah Bakksh S/O Khan

- Muhammad Bakhsh S/O Waryam

- Muhammad Aslam S/O Waryam

- Muhammad Arshad S/O Waryam

- Muhammad Shameer Shad S/O Gull Muhammad

- Dilawar Husssain S/O Muhammad Hussain

- Barkat Ali S/O Gull Muhammad

4. January 05, 2017 Chak 13-V DPCs/DPs/

Local

Communities

13 - Muhammad Ashraf S/O Haji Sultan

- Umar Daraz S/O Sultan Ali

- Abid Hussain S/O Muhammad Shameer

- Haq Nawaz S/O Ameer

- Muhammad Aslam S/O Ghulam Qadir

- Muhammad Saddiq S/O Allah Bakhsh

- Rab Nawaz S/O Sultan

- Mushtaq Ahmad S/O Muhammad Ameer Nasir

- Jumma S/O Muhammad Nawaz

- Sabir Hussain S/O Muhammad Shameer

- Shamshad Ali S/O Mubarak Ali

- Qudrat Ullah S/O Ghulam Muhammad

- Muhammad Hanif S/O Abdul Rahman

5. January 09, 2017 Moza Sai

Saho

DPCs/DPs/

Local

Communities

9 - Allah Yar S/O Wali Dad

- Muhammad Ramzan S/O Hoot

- Muhammad Ameer S/O Muhammad Azam

- Muhammad Asmail S/O Allah Bakhsh

- Mukhtiar Ahmad S/O Allah Yar

- Haq Nawaz S/O Nusrat

- Allah Bakhsh S/O Wali Dad

- Sabir Hussain S/O Hoot

- Muhammad Shahbaz S/O Muhammad Nawaz

Page 56: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

52

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

6. January 10, 2017 Moza Noor

Pur

DPCs/DPs/

Local

Communities

2 - Muhammad Asif S/O Muhammad Khan

- Tahir Mahmood S/O Maqbool Ahmad

7. January 11, 2017 Chak 17

Ghagh

Disbursemen

t Meeting

4 - Muhammad Ashraf S/O Haji Sultan

- Umar Daraz S/O Jevan Ali

- Shamshad Ali S/O Mubarak Ali

- Muhammad Hanif S/O Abdur Rahman

8. January 11, 2017 Moza

Shahadat

Kandla

Disbursemen

t Meeting

3 - Abid Hussain S/O Muhammad Shameer

- Haq Nawaz S/O Ameer

- Sabir Hussain S/O Shameer

9. January 11, 2017 Chak

Jahan Pur

Disbursemen

t Meeting

2 - Muhammad Aslam S/O Ghulam Qadir

- Mushtaq Ahmad S/O Muhammad Ameer

10. January 11, 2017 Chak 8-V Disbursemen

t Meeting

1 - Muhammad Sadiq S/O Allah Bakhsh

11. January 11, 2017 Chak 15-D Disbursemen

t Meeting

1 - Rab Nawaz S/O Sultan

12. January 11, 2017 Chak 5

Ghagh

Disbursemen

t Meeting

2 - Sarfraz S/O Muhammad Khan

- Ghulam Abbas S/O Sardol

13. January 11, 2017 Moza Allah

Hoo

Disbursemen

t Meeting

1 - Jumma S/O Muhammad Nawaz

14. January 11, 2017 Moza

Hassan

Pur

Disbursemen

t Meeting

1 - Qudrat Ullah S/O Ghulam Muhammad

15. January 12, 2017 Moza

Umeed

Garh

DPCs/DPs/

Local

Communities

7 - Muhammad Asghar S/O Rahmat Ali

- Muhammad Javeed S/O Akbar Ali

- Muhammad Ameer S/O Mian Waryam

- Muhammad Waryam S/O Ahmad Bakhsh

- Parvaiz Hussain S/O Akbar Ali

- Wasim S/O Asghar Ali

- Akbar Ali S/O Rahmat Ali

16. January 17, 2017 Moza Allah

Hoo

DPCs/DPs/

Local

Communities

5 - Muhammad Ameer S/O Noor Muhammad

- Muhammad Azhar S/O Abdul Kareem

- Muhammad Hussain S/O Muhammad Bakhsh

- Qaiser Abbas S/O Muhammad Ramzan

- Zaffar Hussain S/O Muhammad Bakhsh

17. January 18, 2017 Chak

Jamasaba

d

DPCs/DPs/

Local

Communities

8 - Hussain Raza Gardaizi S/O Ghulam Abbas

- Ghulam Hussain S/O Mahnoor

- Allah Ditta S/O Muhammad Ramzan

- Muhammad Murtaza S/O Muhammad Zaffar

- Muhammad Ramzan S/O Hadait

- Shoukat Ali S/O Abdul Hakim

- Muhammad Shareef S/O Talib Hussain

- Muhammad Iqbal S/O Muhammad Ismail

18. January 19, 2017 Moza

Shahadat

DPCs/DPs/

Local

14 - Muhammad Afzal S/O Rustam

- Ali Shar S/O Muhammad Afzal

Page 57: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

53

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

Kandla Communities - Asghar Hussain S/O Haji Abdul Bakhsh

- Muhammad Anwar S/O Shahamand

- Rab Nawaz S/O Shahamand

- Muhammad Yar S/O Muhammad Arif

- Mushtaq Ahmad S/O Muhammad Arif

- Muhammad Arif S/O Mahar Charagh

- Khizar Hiyyat S/O Mahmood

- Umar Daraz S/O Mahmood

- Mukhtar Ahmad S/O Nazeer Ahmad

- Muhammad Ali S/O Ghulam

- Liaqat Ali S/O Fareed

- Muhammad Aslam S/O Rajab Ali

19. January 23, 2017 Moza

Khanewal

Kohna

DPCs/DPs/

Local

Communities

13 - Noor Muhammad S/O Bahadur

- Muhammad Manzoor S/O Allah Bakhsh

- Muhammad Saeed S/O Muhammad Basheer

- Muhammad Ameen S/O Muhammad Machia

- Muhammad Nawaz S/O Ghulam Muhammad

- Muhammad Ramzan S/O Ghulam Muhammad

- Abdur Rahman S/O Muhammad Mansoor

- Allah Ditta S/O Ghulam Muhammad

- Babar Ali S/O Zaffar Iqbal

- Muhammad Iqbal S/O Allah Ditta

- Muhammad Aslam S/O Sohara

- Anwar ALtif S/O Umar Deen

- Muhammad Tayyab S/O Allah Yar

20. January 24, 2016 Chak 17

Ghagh

GRC

Meeting

6 - Muhammad Shafiq S/O Taj Muhammad

- Taj Muhammad S/O Naik Muhammad

- Riaz Ahmad S/O Noor Muhanmad

- Shoukat Ali S/O Mairaj Deen

- Abdur Razzaq S/O Muhammad Nawaz

- Azam S/O Bahadur Ali

21. February 01, 2017 Chak 10-D DPCs/DPs/

Local

Communities

4 - Zulfqar Ali S/O Muhammad Nawaz

- Zaheer Ahmad S/O Muhammad Ameer

- Muhammad Ramzan S/O Shoaib

- Muhammad Aslam S/O Muhammad Waryam

22. February 02, 2017 Chak 7-V DPCs/DPs/

Local

Communities

12 - Ashiq Hussain S/O Ghulam Saddiq

- Shakil Marjan S/O Muhammad Jan

- Faisal S/O Muhammad Shabeer

- Muhammad Imran S/O Akhtar Hussain

- Basheer Ahmad S/O Ghulam Sarwar

- Muhammad Ishaq S/O Faiz Ahmad

- Sher Ali S/O Ghulam Sarwar

- Saif Ullah S/O Sher Ali

- Amjad Ali S/O Basheer Ahmad

- Muhammad Hayyat S/O Mulazim Hussain

- Muhammad Arshad Hussain S/O Hakim Ali

- Shoukat Ali S/O Muhammad Mansha

23. February 02, 2017 Chak 8

Venoi

DPCs/DPs/

Local

Communities

5 - Muhammad Nawaz S/O Ghanda

- Abdul Razzaq S/O Muhammad Rustam

- Allah Ditta S/O Mahar Nusrat

- Allah Ditta S/O Ramzan

Page 58: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

54

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

- Muhammad Zaffar S/O Haq Nawaz

24. February 06, 2017 Chak 5

Ghagh

DPCs/DPs/

Local

Communities

3 - Sarfraz S/O Muhammad Khan

- Ghulam Hussain S/O Gull Muhammad

- Muhammad Irshad S/O Pathan

25. February 06, 2017 Chak 17

Ghagh

DPCs/DPs/

Local

Communities

10 - Riaz Ahmad S/O Noor Muhammad

- Muhammad Nawaz S/O Muhammad Ahmad

- Abdul Raheem S/O Muhammad Saddiq

- Azam S/O Bahadur Ali

- Abdul Hussain S/O Khalil Ahmad

- Umer Daraz S/O Naik Muhammad

- Muhammad Shafiq S/O Abdul Rasheed

- Muhammad Arshad

- Khadim Hussain S/IO Kabir

- Muhammad Aslam

26. February 07, 2017 Moza

Taraili

DPCs/DPs/

Local

Communities

24 - Muhammad Aslam S/O Muhammad Manzoor

- Salabat Ali S/O Sultan

- Shoukat Ali S/O Noor Muhammad

- Ghulam Abbas S/O Muhammad Latif

- Saqib Hussain S/O Muhammad Latif

- Muhammad Riaz S/O Muhammad Yar

- Ghulam Nabi S/O Muhammad Ali

- Muhammad Ajmal S/O Abdul Shakoor

- Ghulam Muhammad S/O Noor Muhammad

- Habib Ur Rahman S/O Charagh

- Saqib Hussain S/O Rab Nawaz

- Farooq Ahmad S/O Ghulam Muhammad

- Shahbaz Ahmad S/O Rab Nawaz

- Muhammad Ismail S/O Allah Dad

- Muhammad Anwar S/O Noor Muhammad

- Zulfqar Ali S/O Muhammad Hussain

- Aslam Parvaiz S/O Basheer Ahmad

- Abdul Ghafar S/O Muhabbat

- Maqbool Ahmad S/O Muhabbat

- Muhammad Faqeer S/O Shoukat Ali

- Muhammad Rafiq S/O Muhammad Ramzan

- Abdul Ghafoor S/O Siraj Deen

- Noor Muhammad S/O Chiragh

- Muhammad Rafiq S/O Chiragh

27. February 07, 2017 Chak 1

KM

DPCs/DPs/

Local

Communities

2 - Abdul Aziz S/O Allah Dad

- Muhammad Ramzan S/O Allah Ditta

28. February 08, 2017 Chak 17

Ghagh

GRC

Meeting

6 - Muhammad Nawaz S/O Ahmad

- Muhammad Manzoor S/O Allah Ditta

- Habib Ahmad S/O Abdul Rahman

- Ahsan Raza S/O Habib Ahmad

- Abdul Razzaq S/O Muhammad Nawaz

- Naseer Ahmad S/O Pahlwan

29. February 09, 2017 Chak

15-D

DPCs/DPs/

Local

8 - Muhammad Shahbaz S/O Allah Ditta

- Shafqat Ali S/O Muhammad Ameen

Page 59: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

55

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

Communities - Abid Hussain S/O Abdul Razzaq

- Muhammad Naveed S/O Abdul Razzaq

- Muhammad Waheed S/O Abdul Razzaq

- Abdul Basit S/O Abdul Razzaq

- Zaheer Abbas S/O Liaqat Ali

- Liaqat Ali S/O Anwar Ali

30. February 09, 2017 Moza

Taraili

GRC

Meeting

6 - Rab Nawaz S/O Sada

- Saqib Hussain S/O Rab Nawaz

- Abdul Ghafoor S/O Siraj Deen

- Azhar Iqbal S/O Allah Bakhsh

- Muhammad Adeel S/O Muhammad Aslam

- Muhammad Hashmat S/O Allah Ditta

31. February 10, 2017 Chak 9-

D

DPCs/DPs/

Local

Communities

5 - Muhammad Aslam S/O Warryam

- Haji Muhmmad Shameer S/O Gull Muhammad

- Dilawar Hussain S/O Muhammad Hussain

- Muhammad Basheer S/O Gull Muhammad

- Wali Muhammad S/O Jalal Deen

32. February 13, 2017 Moza

Sai

Saho

DPCs/DPs/

Local

Communities

16 - Sher Ali S/O Hoot

- Haq Nawaz S/O Nusrat

- Muhammad Shahbaz S/O Muhammad Nawaz

- Muhammad Ameer S/O Muhammad Azam

- Allah Yar S/O Wali Dad

- Muhammad Azhar S/O Allah Bakhsh

- Muhammad Nazeer Iqbal S/O Shah Muhammad

- Muhammad Nawaz S/O Nusrat

- Muhammad Safdar S/O Noor Muhammad

- Muhammad Mazhar S/O Allah Bakhsh

- Muhammad Ismail S/O Allah Dad

- Alam Sher S/O Muhammad Hussain

- Taswar Abbas S/O Ghulam Muhammad

- Muhammad Zulfqar S/O Allah Yar

- Muhammad Asghar S/O Ghulam Muhammad

- Muhammad Saddiq S/O Sher Muhammad

33. February 14, 2017 Chak

14-D

DPCs/DPs/

Local

Communities

10 - Shafqat Ali S/O Muhammad Ameen

- Akhtar Ali S/O Muhammad Ameen

- Nazeer Ahmad S/O Wali Muhammad

- Muhammad Zaffar S/O Khan Muhammad

- Haji Abdul Aziz S/O Wali Muhammad

- Muneeer Abbas S/O Rasheed Ahmad

- Allah Rakha S/O Abdul Aziz

- Ghulam Shabeer S/O Manak

- Munawar Hussain S/O Manzoor Hussain

- Muhammad Muneer S/O Lal Khan

34. February 17, 2017 Chak 5

Ghagh

DPCs/DPs/

Local

Communities

3 - Ghulam Muhammad S/O Muhammad Ameer

- Basheer Ahmad S/O Muhammad Ramzan

- Kareem Bakhsh S/O Muhammad Ameer

35. February 20 ,2017 Moza

Kaki

Kohna

Disbursemen

t Meeting

3 - Sajid Hussain S/O Talib Hussain

- Palwan S/O Ameer

- Muddaser S/O Muhmmad Nawaz

Page 60: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

56

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

36. February 20 ,2017 Chak 17

Ghagh

Disbursemen

t Meeting

6 - Naseer Ahmad S/O Pahlwan

- Azam S/O Bahadur Ali

- Muhammad Iqbal S/O Pahlwan

- Riaz Ahmad S/O Noor Muhammad

- Muhammad Ishaq S/O Allah Ditta

- Muhammad Basheer S/O Pahlwan

37. February 20 ,2017 Kabeerw

ala

Office

Disbursemen

t Meeting

19 - Muhammad Ameer S/O Rustam

- Muhammad Afzal S/O Khushi Muhammad

- Muhammad Hanif S/O Rajad

- Basheer Ahmad S/O Hamid

- Abdullah S/O Muhammad Ramzan

- Riaz Hussain S/O Muhammad Ishaq

- Sultan Ahmad S/O Muhammad Rafiq

- Zaffar Iqbal S/O Rustam

- Muhammad Afzal S/O Rustam

- Muhammad Mazhar S/O Rustam

- Abdul Reham S/O Ghulam

- Muhammad Ramzan S/O Rustam Ali

- Muhammad Asif S/O Abdul Ghani Javaid

- Muhammad Murad S/O Haq Nawaz

- Muhammad Iqbal S/O Allah Bakhsh

- Basheer Ahmad S/O Ghulam Fareed

- Shouq Muhammad S/O Waryam

- Muhammad Kameer S/O Khuda Bakhsh

- Haji Aslam S/O Abdul Sattar

38. February 22 ,2017 Moza

Taraili

GRC

Meeting

6 - Rab Nawaz S/O Sada

- Shahbaz Kamal S/O Rab Nawaz

- Muhammad Haneef S/O Shahmeer

- Muhammad Akmal S/O Haq Nawaz

- Muhammad Saqib S/O Rab Nawaz

- Ghulam Muhammad S/O Allah Ditta

39. February 22 ,2017 Moza

Kalkan

wala

DPCs/DPs/

Local

Communities

12 - Sher Muhammad S/O Muhammad Pahlwan

- Samar Iqbal S/O Sher Muhammad

- Hakam Ali S/O Noor Muhammad

- Muhammad Azhar S/O Noor Muhammad

- Umar Daraz S/O Manzoor Hussain

- Muhammad Farhan S/O Muhammad Azhar

- Muhammad Irfan S/O Muhammad Azhar

- Azhar Ul Haq S/O Umer Hayyat

- Muhammad Zaffar Iqbal S/O Pahlwan

- Muhammad Ilyas S/O Khan Muhammad

- Abdul Shakoor S/O Muhammad Ahmad

- Muhammad Numan S/O Muhammad Zaffar

40. February 21 ,2017 Moza

Nehalyw

ala

DPCs/DPs/

Local

Communities

15 - Noor Muhammad S/O Jalal

- Muhammad Noor Mustafa S/O Shah Muhammad

- Muhammad Umer S/O Muhammad Yaseen

- Muhammad Sultan S/O Noor Muhammad

- Abdul Sattar S/O Noor Muhammad

- Gulzar Ahmad S/O Noor Muhammad

- Ahmad Noor S/O Shah Muhammad

- Mukhtar Ahmad S/O Noor Muhammad

Page 61: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

57

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

- Ahsan Ul Haq S/O Noor Muhammad

- Muhammad Nawaz S/O Muhammad Ramzan

- Muhammad Manzoor S/O Jalal

- Muhammad Fazal S/O Sultan

- Muhammad Ali Raza S/O Anwar Ul Haq

- Muhammad Shaban S/O Rab Nawaz

- Muhammad Aslam S/O Mahmood

41. February 23, 2017 Chak

Jahan Poor

DPCs/DPs/

Local

Communities

15 - Muhammad Iqbal S/O Mahar Mughal

- Khursheed Abbas S/O Mahar Lal Muhammad

- Allah Bakhsh S/O Ghulam Muhammad

- Muhammad Akram S/O Muhammad Rustam

- Allah Ditta S/O Sher Muhammad

- Muhammad Tariq S/O Muhammad Nawaz

- Munawar Hussain S/O Ghulam Fareed

- Muhammad Shahbaz S/O Shakoor Ali

- Bahawal Manzoor S/O Manzoor Ali

- Ashiq Ali S/O Shoukat Ali

- Muhammad Sajid S/O Zahoor Hussain

- Muhammad Riaz S/O Karam Ali

- Mushtaq Ahmad S/O Muhammad Ramzan

- Muhammad Ajmal S/O Haq Nawaz

- Muzaffar Khan S/O Haq Nawaz

42. March 01, 2017 Moza Ali

Poor

DPCs/DPs/

Local

Communities

9 - Shahid Sohail S/O Khursheed Ahmad

- Muhammad Nawaz S/O Mian Nadir

- Gull Muhammad S/O Mian Gahna

- Irfan Kaleem S/O Shoukat Ali

- Khursheed Ahmad S/O Rahmat Ali

- Nadeem Shoukat S/O Shoukat Ali

- Zaffar Ali S/O Akbar Ali

- Nishan Ali S/O Allah Bakhsh

- Muhammad Asif S/O Muhammad Khan

43. March 02, 2017 Moza

Umeed

Garh

DPCs/DPs/

Local

Communities

7 - Akbar Ali S/O Rahmat Ali

- Muhammad Javaid Hussain S/O Akbar Ali

- Asghar Ali S/O Rahmat Ali

- Muhammad Iqbal S/O Asghar Ali

- Faiz Hussain S/O Akbar Ali

- Dildar Ahmad S/O Basheer Ahmad

- Basheer Ahmad S/O Abdul Aziz

44. March 02, 2017 Moza

Noor Pur

DPCs/DPs/

Local

Communities

10 - Tahir Mahmood S/O Manzoor Hussain

- Sohail Iqbal S/O Liaqat Ali Naseem

- Ishtiaq Hussain S/O Muhammad Hussain

- Khalid Mahmood S/O Dil Muhammad

- Muhammad Iqbal S/O Muhammad Aslam

- Rashid Ali S/O Muhammad Anwar

- Allah Rakha S/O Anwar Ali

- Mustansar Hussain S/O Ishtiaq Hussain

- Iftikhar Ul Hassan S/O Dil Muhammad

- Muhammad Abbas S/O Khan Muhammad

45. March 06, 2017 Chak 8

Venoi

DPCs/DPs/

Local

4 - Muhammad Ramzan S/O Haitam Ali

- Muhammad Saddiq S/O Allah Bakhsh

- Zaheer Ahmad S/O Zahoor Ahmad

Page 62: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

58

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

Communities - Ghulam Hussain S/O Mehmood Khan

46. March 07, 2017 Moza

Taraili

DPCs/DPs/

Local

Communities

7 - Muhammad Hashmat S/O Allah Ditta

- Muhammad Rafiq S/O Ahmad Bakhsh

- Muhammad Aurangzaib

- Muhammad Raza Hayat

- Muhammad Faisal Naeem

- Muhammad Saqib Hussain S/O Rab Nawaz

- Ghulam Ahmad S/O Allah Ditta

47. March 08, 2017 Chak 29

Ghagh

DPCs/DPs/

Local

Communities

12 - Falak Shar S/O Muhammad Ismail

- SaMarch Abbas S/O Gul Shar

- Muhammad Asif S/O Gul Shar

- Gul Shar S/O Muhammad Ismail

- Sarfraz S/O Ghulam Muhammad

- Muhammad Hussain S/O Muhammad Iqbal Khan

- Abdur Rahman S/O Abdul Ghafoor

- Muhammad Irshad S/O Waryam

- Muhammad Abbas S/O Noor Muhammad

- Muhammad Riaz S/O Rab Nawaz

- Rab Nawaz S/O Muhammad

- Muhammad Yousaf S/O Abdul Sattar

48. March 09, 2017 Chak

Hassan

Pur

DPCs/DPs/

Local

Communities

8 - Shabeer Hussian S/O Karam Elahi

- Sajjad Hussain S/O Habib Ali

- Imdad Hussain S/O Riaz Hussain

- Shawaz Ahmad S/O Maqbool Hussain

- Muhammad Saleem Bandasha S/O Abdul Majeed

- Muhammad Aslam S/O Muhabat Ali

- Masood Ahmad S/O Muneer Ahmad

- Zahoor S/O Shahamand

49. March 09, 2017 Moza

Taraili

GRC

Meeting

2 - Muhammad Ashraf S/O Qutab Deen

- Muhammad Akhtar S/O Qutab Deen

50. March 13, 2017 Chak 13-V DPCs/DPs/

Local

Communities

11 - Ghulam Yaseen S/O Faqeer Ahmad

- Zaffar Abbas S/O Ghulam Shabeer

- Noor Muhammad S/O Ghulam Akbar

- Muhammad Adrees S/O Abdul Sattar

- Muhammad Khursheed S/O Khalil Muhammad

- Basheer Muhammad S/O Mola Bakhsh

- Allah Bakhsh S/O Manzoor Hussain

- Muhammad Farooq S/O Muhammad Sharif

- Muhammad Saddiq S/O Mukhtar ahmad

- Muhammad Ramzan S/O Shameer

- Jamsheed Ahmad S/O Khalil Ahmad

51. March 14, 2017 Moza

Taraili

GRC

Meeting

2 - Muhammad Akram Shahzad S/O Ghulam Muhammad

- Muhammad Yaqoob S/O Bahadur Khan

-

52. March 15, 2017 Chak 18

Ghagh

DPCs/DPs/

Local

Communities

7 - Naseer Ahmad S/O Pahlwan

- Dilmeer S/O Shahamand

- Zaffar Hussain S/O Muhammad Ramzan

- Muhammad Afzal S/O Muhammad Ramzan

- Akhtar Abbas S/O Muhammad Afzal

Page 63: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

59

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

- Sajjad Haidar S/O Rab Nawaz

- Muhammad Shameer S/O Khan

53. March 16, 2017 Chak 14

Venoi

DPCs/DPs/

Local

Communities

5 - Basheer Ahmad S/O Muhammad Ali

- Abdul Ghafoor S/O Wali Muhammad

- Muhammad Iqbal S/O Allah Ditta

- Nasir Mahmood S/O Wali Muhammad

- Asif Irshad S/O Muhammad Irshad

54. March 20, 2017 Moza Jalla

Pahor

DPCs/DPs/

Local

Communities

8 - Ghazanfar ali Khan S/O Shouk Muhammad

- Muhammad Asif S/O Dost Muhammad

- Ghulam Yaseen S/O Ahmad Bakhsh

- Abdul Qayyom S/O Shouk Muhammad

- Abdul Latif S/O Haji Muhammad

- Dost Muhammad S/O Karam Khan

- Muhammad Rafiq Khan S/O Haq Nawaz

- Muhammad Altaf S/O Allah Ditta

55. March 22, 2017 Chak 17

Ghagh

DPCs/DPs/

Local

Communities

6 - Riaz Ahmad S/O Noor Muhammad

- Naseer Ahmad S/O Pahlwan

- Azam S/O Bahadur Ali

- Muhammad Arif S/O Fazil Deen

- Naseer Ahmad S/O Ghulam

- Muhammad UMarch Farooq S/O Muhammad Aslam

56. March 22, 2017 Moza

Shahadat

Kandla

GRC

Meeting

4 - Shoukat Ali S/O Muhammad Nawaz

- UMarch Hayat S/O Shahamand

- Liaqat Ali S/O Muhammad Nawaz

- Muhammad Hanif S/O Rustam

57. March 27, 2017 Moza 5

Ghagh

DPCs/DPs/

Local

Communities

7 - Ghulam Ghous S/O Frayad

- Shahamand Ali S/O Manzoor Ahmad

- Muhammad Naeem S/O Sattar Ali

- Muhammad Imran S/O Irshad

- Ghufran Muhi O Deen S/O Atta Jilani

- UMarch Daraz S/O Muhammad Nawaz

- Syed Ali Nawaz Shah

58. March 27, 2017 Moza Kaki

Kohna

DPCs/DPs/

Local

Communities

3 - Asghar Ali S/O Barkat Ali

- Khalid Mahmood S/O Abdul Ghafoor

- Muhammad Javaid S/O Abdul Ghafoor

59. March 28, 2017 Moza 1 KM DPCs/DPs/

Local

Communities

5 - Haq Nawaz S/O Allah Daad

- Muhammad Rafiq S/O Abdul Aziz

- Muhammad Bilal S/O Muhammad

- Abdul Aziz S/O Allah Daad

- Muhammad Sharif S/O Allah Daad

60. March 28, 2017 Moza

Taraili

DPCs/DPs/

Local

Communities

12 - Shoukat Ali S/O Basheer Ahmad

- Muneer Hussain S/O Talib Hussain

- Muhammad Zahoor S/O Muhammad Ismail

- Mahram S/O Muhammad Zahoor

- Muhammad Nadeem S/O Muhammad Tufail

- Muhammad Ramzan S/O Muhammad Saddiq

- Muhammad Ameen S/O Muhammad Arshad

- Muhammad Saddiq S/O Shar Muhammad

- Muhammad Maqbool S/O Ghulam Hussain

- Allah Ditta S/O Kareem Bakhsh

Page 64: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

60

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

- Imtiaz Hussain S/O Ghulam Muhammad

- Ghulam Muhammad S/O Shahzad

61. March 29, 2017 Chak 9-V DPCs/DPs/

Local

Communities

3 - Muhammad Arif S/O Muhammad Farooq

- Muhammad Rafiq S/O Rahmat Ali

- Muhammad Haseeb S/O Muhammad Iqbal

62. March 29, 2017 Chak 7-V DPCs/DPs/

Local

Communities

8 - Shoukat Hussain S/O Muhammad Nawaz

- Muneer Ahmad S/O Mian Shahra

- Farooq Muhammad S/O Abdul Ghani

- Haq Nawaz S/O Khan Muhammad

- Zulfiqar Ali S/O Shah Rasool

- Fatah Muhammad S/O Fareed Bakhsh

- Muhammad Ishaq S/O Fiaz Ahmad

- Muhammad Hayyat S/O Mulazim Hussain

63. March 30, 2017 17 Ghagh Disbursemen

t

3 - Naseer Ahamad S/O Muhammad Pehalwan

- Naseer ahmad S/O Ghulam

- Muhammad Abid S/O Muhammad Arif

64. March 30, 2017 Moza

Taraili

DPCs/DPs/

Local

Communities

10 - Muhammad Faisal S/O Muhammad Nazeer

- Allah Bakhsh S/O Shameer

- Muhammad Aurangzaib S/O Nazeer Ahmad

- Raza Hayat S/O Muhammad Zaffar

- Ghulam Muhammad S/O Allah Ditta

- Muhammad Zaffar S/O Ghulam Muhammad

- Muhammad Bakhsh S/O Pathana

- UMarch Daraz S/O Muhammad Bakhsh

- Muhammad Saqib S/O Rab Nawaz

- Zafar Iqbal S/O Muhammad Yar

65. March 30, 2017 Moza Kaki

Kohna

DPCs/DPs/

Local

Communities

9 - Muhammad Javaid S/O Abdul Ghafoor

- Abdul Ghafoor S/O Nazim Deen

- Muhammad Ramzan S/O Abdul Aziz

- Zulfiqar Ali S/O Muhammad Ramzan

- Qaisar Abbas S/O Makhan Ali

- Muhammad Aslam S/O Abdul Ghani

- Ghulam Hussain S/O Abdul Rahman

- Muhammad Rafiq S/O Nusrat Ali

- Abdul Razzaq S/O Abdul Rahman

66. March 30, 2017 Chak 17

Ghagh

DPCs/DPs/

Local

Communities

11 - Shoukat Ali S/O Mairaj Deen

- Abdul Razzaq S/O Muhammad Nawaz

- Naseer Ahmad S/O Manzoor Hussain

- Arshad Ali S/O Allah Ditta

- Muhammad Ashraf S/O Muhammad Khursheed

- Muhammad Saddiq S/O Muhammad Jamil

- Muhammad Waryam S/O Noor Muhammad

- Sajid Abbas S/O Muhammad Ameer

- Muhammad Zaffar S/O Ghulam Muhammad

- Muhammad Nawaz S/O Ahmad

- Ghulam Ghous S/O Muhamand

67. March 30, 2017 Chak 18

Ghagh

DPCs/DPs/

Local

Communities

10 - Nassar Anjum S/O Pahlwan

- Gull Muhammad S/O Shahmeer

- Sarfraz S/O Ghulam

- Ghulam Shabeer S/O Muhammad Khan

Page 65: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

61

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

- Muhammad Afzal S/O Muhammad Ramzan

- Nasir Hussain S/O Pahlwan

- Zaffar Hussain S/O Muhammad Ramzan

- Muhammad Nawaz S/O Muhammad Ramzan

- Allah Ditta S/O Dilmeer

- Mazhar Abbas S/O Muhammad Afzal

68. March 30, 2017 Chak 29

Ghagh

DPCs/DPs/

Local

Communities

5 - Fiaz S/O Muhammad Sultan

- Muhammad Ramzan S/O Allah Ditta

- Gull Shar S/O Muhammad Ismail

- Mazammal Hussain S/O Ahmad Nawaz

- Muhammad Asif S/O Gull Shar

69. March 30, 2017 Chak 14-D DPCs/DPs/

Local

Communities

10 - Muhammad Aslam S/O Abdul sattar

- Jewan Ali S/O Muhammad Ashiq Hussain

- Bahadur Ali S/O Ashiq Hussain

- Zaffar Iqbal S/O Bahadur Ali

- Laal Khan S/O Muhammad

- Faraz Hussain S/O Mushtaq Hussain

- Muhammad Ramzan S/O Allah Yar

- Azhar Hussain S/O Bahadur Ali

- Ali Zaib S/O Shar Khan

- Allah Ditta S/O Mashooq Ali

70. March 30, 2017 Chak 17-D DPCs/DPs/

Local

Communities

5 - Rab Nawaz S/O Sultan

- Muhammad Riaz S/O Sultan

- Mushtaq Ahmad S/O Muhammad Afzal

- Allah Ditta S/O Muhammad Arif

- Muhammad SaMarch S/O Muhammad Afzal

71. March 30, 2017 Chak 15-D DPCs/DPs/

Local

Communities

5 - Muhammad Zaffar S/O Khan Muhammad

- Abid Hussain S/O Abdul Razzaq

- Sarfraz Ahmad S/O Ghulam Muhammad

- Abdul Rahman S/O Khan Muhammad

- Abdul Basit S/O Abdul Razzaq

72. March 30, 2017 Chak 8-D DPCs/DPs/

Local

Communities

7 - Nasir Ahmad S/O Riasat Ali

- Khalid Saif Ullah S/O Muhammad Nazeer

- Abdul Sattar S/O Nazeer Ahmad

- Muhammad Asif S/O Muhammad Zaffar

- Zeshan Ali S/O Muhammad Aslam

- Abdul Ghaffar S/O Zaffar Ali

- Muhammad Tanveer S/O Abdul Ghaffar

73. March 30, 2017 Chak 9-D DPCs/DPs/

Local

Communities

7 - Muhammad Basheer S/O Gull Muhammad

- Muhammad Shameer S/O Gull Muhammad

- Muhammad Akbar S/O Talab Hussain

- Allah Ditta S/O Khan Muhammad

- Muhammad Iqbal S/O Wali Muhammad

- Muhammad Qaisar S/O Muhammad Aslam

- Muhammad Aslam S/O Khushi Muhammad

74. March 30, 2017 Chak 10-D DPCs/DPs/

Local

Communities

4 - Zahoor S/O Ameer

- Muhammad Noushar S/O Muhammad Kabeer

- Muhammad Arif S/O Muhammad Manzoor

- Muhammad Mansha S/O Muhammad Kabeer

Page 66: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

62

Sr. No.

Date Location/ Village

Category of Participant

No. Of

Participants

Name of Main Participant

75. March 30, 2017 Chak 1 KM DPCs/DPs/

Local

Communities

7 - Haq Nawaz S/O Allah Daad

- Muhammad Arif S/O Allah Daad

- Abdul Aziz S/O Allah Daad

- Muhammad Sharif S/O Allah Daad

- Muhammad Zaffar S/O Abdul Aziz

- Muhammad Tufail S/O Rab Nawaz

- Muhammad Rafiq S/O Abdul Aziz

Page 67: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

63

Annex-19: List of Consultation Meetings with Female DPs Sr. No. Date Location/

Village

Category of

Participant

No. Of

Participants

Name of Main Participant

1. January 02, 2017 Chak 8-D DPCs/DPs/

Local

Communities

3 - Mussarat W/O Afzal

- Sughran Bibi W/O Nazeer Ahmad

- Salma Bagum W/O Maqbool Hussain

2. January 04, 2017 Chak 9-D Female

DPCs/DPs/

Local

Communities

4 - Shamim Bibi W/O Nawab

- Khurshaid W/O Muhammad Nawaz

- Mumtaz D/O Nawab

- Balqees D/O Nawab

3. January 05, 2017 Chak 13-V Female

DPCs/DPs/

Local

Communities

4 - Manzooran Bibi W/O Allah Bakhsh

- Khursheed Bibi W/O Muhammad Ibrahim

- Hameedan Bibi W/O Abdul Rasheed

- Manzooran Bibi W/O Allah Bakhsh

4. January 10, 2017 Moza Noor

Pur

Female

DPCs/DPs/

Local

Communities

4 - Nazia W/O Muhammad Tahir Mahmood

- Shagufta W/O Muhammad Asif

- Asia Bibi W/O Muhammad Akram

- Riffat Bibi W/O Nazeer Ahmad

5. January 11, 2017 Chak Jahan

Pur

Disbursement

Meeting

1 - Manzooran Bibi W/O Allah Bakhsh

6. January 11, 2017 Moza

Jamasabad

Disbursement

Meeting

2 - Khursheed Bibi W/O Muhammad Ibraheem

- Hameedan Bibi W/O Abdur Rasheed

7. January 17, 2017 Moza Allah

Hoo

DPCs/DPs/

Local

Communities

4 - Sughran Bibi D/O Noor Muhammad

- Zakua D/O Muhammad Rafiq

- Abida W/O Allah Bakhsh

- Marrium W/O Muhammad Rafiq 8. January 18, 2017 Chak

Jamasabad

DPCs/DPs/

Local

Communities

4 - Shamoo Mai W/O Ghulam Rasool

- Zahra Mai W/O Khan

- Tasleem Mai W/O Waryam

- Aalam Mai W/O Habat 9. January 19, 2017 Moza

Shahadat

Kandla

DPCs/DPs/

Local

Communities

5 - Momna W/O Ali Shar

- Ghulam Sakina W/O Muhammad Afzal

- Hajra Bibi W/O Muhammad Arif

- Nazeeran Bibi W/O Abdul Shakoor

- Hajra Mai W/O Ali Shar 10. January 23, 2017 Moza

Khanewal

Kohna

DPCs/DPs/

Local

Communities

5 - Kaneez Mai W/O Muhammad Aslam

- Parveen W/O Allah Yar

- Shazia W/O Rafiq

- Sakina W/O Haq Nawaz

- Jannat Bibi W/O Machia 11. February 02, 2017 Chak 7-V Female

DPCs/DPs/

Local

Communities

4 - Nusrat Parveen W/O Akhtar Hussain

- Mukhtar Begum W/O Muhammad Hayyat

- Halima Bibi W/O Samar Hayyat

- Rashida Bibi W/O Irshad Hussain

12. February 06, 2017 Chak 17

Ghagh

Female

DPCs/DPs/

5 - Kaneean Bibi W/O Nadir

- Azra D/O Muhammad Nawaz

Page 68: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

64

Sr. No. Date Location/

Village

Category of

Participant

No. Of

Participants

Name of Main Participant

Local

Communities - Khatoon Bibi W/O Ahmad

- Rizwana Akhtar D/O Muhammad Nawaz

- Rukhsana D/O Muhammad Nawaz 13. February 07, 2017 Moza

Taraili

Female

DPCs/DPs/

Local

Communities

7 - Ishrat Bibi D/O Abdul Shakoor

- Azra W/O Muhammad Shoukat Ali

- Kishwar Bibi W/O Muhammad Asghar

- Riffat Bibi W/O Aziz Ur Rahman

- Qayyom Bibi W/O Shoukat

- Hanifan Bibi W/O Muhammad Anwar

- Waras D/O Muhammad Anwar 14. February 09, 2017 Chak 15-D Female

DPCs/DPs/

Local

Communities

4 - Manzooran Bibi W/O Abdul Razzaq

- Panan Mai D/O Kabir

- Fatah Bibi D/O Wali Dad

- Abida Bibi W/O Nasir

15. February 13, 2017 Moza Sai

Saho

Female

DPCs/DPs/

Local

Communities

11 - Fatima Mai W/O Allah Yar

- Sughra W/O Ghulam Rasool

- Haleema Bibi W/O Muhammad Ameer

- Hafizan Bibi W/O Muhammad Shareef

- Asia Bibi W/O Azhar Abbas

- Amina D/O Muhammad Ameen

- Mumtaz W/O Ismail

- Shahnaz W/O Muhammad Ameen

- Zahran Bibi W/O Nusrat

- Rani Mai W/O Nawza

- Kosar W/O Ramzan 16. February 14, 2017 Chak 14-D Female

DPCs/DPs/

Local

Communities

5 - Haseena Bibi D/O Wali Muhammad

- Anwar Bibi D/O Shahmeen

- Sarwar D/O Shahmeen

- Shahnaz Bibi W/O Nazeer Ahmad

- Alam Khatoon W/O Samand 17. February 20, 2017 Kabeerwala

Office

Disbursement

Meeting

1 - Shagufta Anjum W/O Khalid Rasheed

18. February 21, 2017 Moza

Nehalywala

Female

DPCs/DPs/

Local

Communities

4 - Kalsoom Akhtar W/O Noor Mustafa

- Najma D/O Shah Muhammad

- Arifa D/O Shah Muhammad

- Nasira D/O Shah Muhammad

19. March 02, 2017 Moza

Umeed

Garh

Female

DPCs/DPs/

Local

Communities

3 - Rehana Kosar W/O Safdar Ali

- Robina Akram W/O Muhammad Akram

- Jamila Shoukat W/O Shoukat Ali

20. March 08, 2017 Chak 29

Ghagh

Female

DPCs/DPs/

Local

Communities

5 - Amina Bibi W/O Noor Muhammad

- Sahib Khatoon W/O Rab Nawaz

- Nasreen W/O Muhammad Riaz

- Kalsoom W/O Muhammad Ijaz

- Suriaya W/O SaMarch Abbas 21. March 09, 2017 Moza Noor

Pur

Female

DPCs/DPs/

1 - Shamim Akhtar W/O Naeem Akhtar

Page 69: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

65

Sr. No. Date Location/

Village

Category of

Participant

No. Of

Participants

Name of Main Participant

Local

Communities

22. March 09, 2017 Chak

Hassan Pur

Female

DPCs/DPs/

Local

Communities

1 - Majeedan Bibi W/O Ghulam Hussain

23. March 13, 2017 Chak 13-V Female

DPCs/DPs/

Local

Communities

1 - Tasneem Akhtar W/O Ahmad Ali

24. March 14, 2017 Moza

Taraili

GRC Meeting 1 - Saima Kanwal W/O Muhammad Shamsher

25. March 15, 2017 Chak 18

Ghagh

Female

DPCs/DPs/

Local

Communities

5 - Shamim Bibi W/O Muhammad Zaffar

- Jannat D/O Namdar

- Naseem D/O Iqbal

- Ameer D/O Mapal

- Shamim D/O Mapal 26. March 16, 2017 Chak 14

Venoi

Female

DPCs/DPs/

Local

Communities

3 - Nasreen Akhtar W/O Abdul Ghafoor

- Abida Naveed W/O Naveed Akhtar

- Fozia Yasmeen W/O Abdul Quyyom

27. March 20, 2017 Moza Jalla

Pahor

Female

DPCs/DPs/

Local

Communities

1 - Basheeran D/O Palhwean

28. March 27, 2017 Chak 5

Ghagh

Female

DPCs/DPs/

Local

Communities

2 - Shabnam Zawar W/O Syad Ali Shah

- Muddasra Jabeen W/O Syad Abid Ali Shah

29. March 27, 2017 Moza Kaki

Kohna

Female

DPCs/DPs/

Local

Communities

3 - Munaza Fatima D/O Ghulam Hussain

- Basheeran Bibi W/O Abdul Ghafoor

- Parveen Akhtar W/O Nishan Ali

30. March 28, 2017 Moza Taraili Female

DPCs/DPs/

Local

Communities

12 - Parveen W/O Munawar Hussain

- Bushra D/O Muhammad Saddiq

- Farzana D/O Muhammad Saddiq

- Muneeran Bibi W/O Hakim Ali

- Naila W/O Muhammad Nadeem

- Jameela Shaheen W/O Muhammad Saddiq

- Abida Bibi W/O Zulfiqar

- Sumaira Bibi W/O Arif Hussain

- Shahnaz Mai W/O Muhammad Khan

- Anwar Mai W/O Allah Ditta

- Nasreen Akhtar W/O Muhammad Ramzan

Page 70: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No. 4

66

Sr. No. Date Location/

Village

Category of

Participant

No. Of

Participants

Name of Main Participant

- Irshad Mai W/O Aslam 31. March 29, 2017 Chak 9-V Female

DPCs/DPs/

Local

Communities

4 - Saima Noreen W/O Muhammad Nasir

- Nasreen W/O Muhammad Riaz

- Sobia Bibi W/O Zahoor Ahmad

- Suriaya W/O Muhammad Rafiq

Page 71: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal Motorway Project (M4) Section-III: Shorkot-Khenewal Internal Monitoring Report No. 4

67

Annex-20: Grievance Registration Register

Page 72: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal Motorway Project (M4) Section-III: Shorkot-Khenewal Internal Monitoring Report No. 4

68

Annex-21: Complaint Handling and Processing by Type S.# Month Village Complainants name Issues Action Taken Remarks

1. January 17- Gagh Muhammad Shafique

S/O Taj Muhammad

Demand for Payment

residential structure.

Complaint received and registered in

grievance register

In process

2. January 1-KM Sher Ali S/O Hoot Demand For re-

measurement of Land.

Complaint received and registered in

grievance register

In process

3. February Jalla Pahor Iqbal Hussain S/O Noor

Shah

Demand for re-

measurement of Land.

Complaint received and registered in

grievance register

In process

4. February Umeed

Garh

M. Saifal Khan S/O

Murad Khan

Demand For re-

measurement of Land.

Complaint received and registered in

grievance register

In process

5. February 15-D Abdul Rehman S/O

Khan Meher

Demand For water Course Complaint received from complainant.

Recorded in grievance register.

Discussed in GRC meeting.

Fact finding report was prepared after field

visit to resolve the issue.

Water Course provided at nearby RD#

131+422.

Complaint stands

resolved

The complainant was

informed accordingly

6. February 17- Ghagh Habib Ahmad S/O

Abdul Rehman and

others

Demand For water Course Complaint received from complainant.

Recorded in grievance register.

Discussed in GRC meeting.

Fact finding report was prepared after field

visit to resolve the issue.

Water Course already provided in

construction plan.

Complaint stands

resolved

The complainant was

informed accordingly

7. February 8-D M. Arshad S/O Abdul

Jabbar

Demand for compensation

payment of fish Farm.

Complaint received from complainant.

Recorded in grievance register.

Fact finding report was prepared after field

visit to resolve the issue.

Complaint stands

resolved

The complainant was

informed accordingly

Page 73: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal Motorway Project (M4) Section-III: Shorkot-Khenewal Internal Monitoring Report No. 4

69

Annex-22: Detail of Pending Complaints of Last Quarter Complaint Handling and Processing by Type S.# Month Village Complainants name Issues Action Taken Remarks

1. July Saie Sahu

Sec-III

Manzoor s/o Rajad,

Zulfiqar s/o Allah Ditta

and others

Demand for Under Pass Complaint received from

complainant.

Recorded in grievance register.

Discussed in GRC meeting.

GRC recommended site

verification.

Fact finding report was prepared

after field visit to resolve the

issue.

Under pass/ Cattle creep

provided at nearby RD#

143+154.

Complaint stands

resolved

The complainant was

informed accordingly

2. August Kalkanwala Ghulam Farid S/O M.

Yaar

Demand for under pass/

Cattle creep.

Complaint received from

complainant.

Recorded in grievance register.

Discussed in GRC meeting.

Fact finding report was prepared

after field visit to resolve the

issue.

Under pass/ Cattle creep

provided at nearby RD#

157+160.

Complaint stands

resolved

The complainant was

informed accordingly

3. November Umeed Garh Akbar Ali S/O

Rehmat Ali

Amjad Ali S/O M.

Sharif

Zulfiqar S/O Basaar

Khan

Demand for subway

towards graveyard and

Imam bargah / Cattle

creep..

Complaint received from

complainant.

Recorded in grievance register.

Discussed in GRC meeting.

Fact finding report was prepared

after field visit to resolve the

Complaint stands

resolved

The complainant was

informed accordingly

Page 74: 48402-002 Internal Monitoring Report · Internal Monitoring Report Project Number: 48402-002 April 2017 PAK: National Motorway M-4 Gojra–Shorkot– Khanewal Section Project - Additional

Faisalabad –Khanewal Motorway Project (M4) Section-III: Shorkot-Khenewal Internal Monitoring Report No. 4

70

Shaukat Ali S/O Ali

Ahmad

issue.

Under pass/ Cattle creep

provided in revised construction

plan.

4. November Shahadat Kandla Ali Sher S/O M. Afzal Demand for under pass/

Cattle creep.

Complaint received from

complainant.

Recorded in grievance register.

Discussed in GRC meeting.

Fact finding report was prepared

after field visit to resolve the

issue.

Under pass/ Cattle creep

provided at nearby RD#

146+700.

Complaint stands

resolved

The complainant was

informed accordingly

5. December Chak 8-V M. Imran S/O Habib Demand for Subway. Complaint received and

registered in grievance register

Discussed in GRC meeting

Fact finding report was prepared

after field visit to resolve the

issue.

Subway is already provided at

said location in construction plan

The complaint stands

resolved

The complainant is

informed accordingly