44 Time and Work Problems - Competition Gurukul
-
Upload
competition-gurukul -
Category
Education
-
view
98 -
download
4
Transcript of 44 Time and Work Problems - Competition Gurukul
Competition Gurukul Quick Review
1 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
Time and work
1. A can do piece of work in 30 days while B alone can do it in 40 days. In
how many days can A and B working together do it?
(a)120 (b)40/7 (c)60 (d) 171/7
2. A and B together can complete a piece of work in 35 days while A alone can
complete the same work in 60 days. B alone will be able to complete the same
working in how many days?
(a)80 (b)45 (c)80 (d)84
3. A can do a piece of work in 7days of 9 horse each and B can do it in 6 days
of 7 hours each. How long will they take to do it, working together 8 2/5 hours a
day ?
(a)5 (b)4 (b)3 (d)8
4. A can do a piece of work in 15 days and B alone can do it in 10 days. B
works at it for 5 days and them leaves. A alone can finish the remaining in?
(a)75/6 (b)71/7 (c)80 (d)75
5. A can do 1/3 of the work in 5 days and B can do 2/5 of the work in 10 days
in how many days both A and B toether can do the work ?
(a)93/8 (b)15 (c)27 (d)45
6. A can do a piece of work in 80 days. He works at it for 10 days and then B
alone finished the remaining work in 42 days. The two togther could complete the
work in how many days?
Competition Gurukul Quick Review
2 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
(a)48 (b)15 (c)30 (d)45
7. A and B can together finish a work in 30 days. They workd at it for 20 days
and then B left. The remaining work was done by A alone in 20 more days A alone
can finish the work in ?
(a)60 (b)22 (c)48 (d)25
8. A and B can do a piece of work in 45 days and 40 days respectively. They
began to go the work together but A leaves after some days and than B completed
the reaminnig work in 23 days. The number o days after which A left the work
was ?
(a)15 (b)45 (b)3 (d)9
9. A does half as much work as B in three fourth of the time. If together they
take 18 days to complete the work, how much time shall B take to do it ?
(a)46 (b)15 (c)30 (d)45
10. A can do a certain job in 12 days. B is 60% more efficient than A . The
number of days, it takes B to do the same piece of work is?
(a)15/2 (b)25 (c)28 (d)20
11. A can do a certain job in 25 days which B alone can do in 20 days. A stared
the work and was joined by B after 10 days. The number odays tkane in
completing the work was?
(a)68/3 (b)162/3 (c)48 (d)28/3
Competition Gurukul Quick Review
3 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
12. A is twice as good a work man as B and together they finish a piece of work
in 14 days The number of days taken by A alone to finish the work. ?
(a)45 (b)21 (c)36 (d)49
13. A is thrice as good a workman as B and Takes 10 days less to do a piece of
work than B takes.B alone can do the while work work in ?
(a)15 (b)25 (b)3 0 (d)27/6
14. A can do a piece work in 14 days which B can do in 21 days. They being
together but 3 days the completion of the work. A leaves of the total number of
days to complete the work is ?
(a)175/6 (b)101/7 (c)101/5 (d)75
15. If ramesh, suresh and hairsh can do a piece of work in 15 days, 10 days and
6 days respectively. How long will they take to do it, if all the three work it
together?
( a)9 (b)03 (b)30 (d)15
16. A and B can do a piece of working 72 days : B and C and do it in 120 days ;
A and C can do it in 90 days. In what time can A alone do it ?
(a)120 (b)150 (c)45 (d)125
Competition Gurukul Quick Review
4 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
17. A and B and C together can finish a piece of work in 4 days: alone can do it
in 12 days and B in 18 days, then C alone can do it in ?
(a)15 (b)65 (c)09 (d)14
18. A and B can do a piece of work in 18 days: B and C can do it in 24 days : A
and C can do it in 36 days. In how many days can they do it all working together?
(a)16 (b)42 (c)30 (d)90
19. A is twice as good as workman as B and together they complete a work in
15 days . in how many days can the work be complete by B alone ?
(a)45 (b)25 (c)20 (d)28
20. 45 men can complete a wok in 16 days. Six days after they started working
30 more men joined them. How many days will they now take to complete the
remaining work?
(a)16 (b)14 (b)6 (d)9
21. 12 men can complete a work in 18 days six days after they started working
men joined them. How many days will all of them together complete the remaining
work?
(a)15 (b)18 (b)03 (d)9
22. Twelve men can complete a work in 8 days. Three days after started the
work 3 more men joined. In how many days will all of them together complete the
Competition Gurukul Quick Review
5 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
remaining work .
(a)16 (b)04 (b)06 (d)09
23. A,B and C are employed to do apiece of work for Rs.529. A and C are
supposed to finish 19/23 of the work together. How much shall be paid to B?
(a)15 (b)65 (c)09 (d)14
24. A job is completed by 10 men in 20 days and by 20 women in 15 days. The
days will it take for 5 men and 10 women to finish that work?
(a)120 (b)40/7 (c)60 (d) 171/7
25. A and B can do a piece of work in 5 days. B and C can do it in 7 days, A and C
can do it in 4 days. Who among these will take the least time if put to do it alone?
(a)A (b)B (b)C (d)not possible
26. A and B take 8 days, B and C 12 days. A, B and C take 6 days. A and C
take .
(a)5 (b)4 (b)3 (d)8
27. A and B take 12 days, B and C 15 days, C and A 20 days. A, B and C
together take.
( a)15 (b)03 (b)10 (d)25
28. A and B can complete a work in 4 days. A alone takes 12 days, in how many
days B alone can complete the work?
Competition Gurukul Quick Review
6 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
(a)5 (b)3 (b)7 (d)6
29. 10 men and 15 women together can complete a work in 6 days. It takes 100
days for one man alone to complete the same work. How many days will be
required for one woman alone to complete the same work?
( a)225 (b)325 (b)215 (d)425
31. X can do in 40 days. He worked for 8 days and then Y finished it in 16 days.
How long together take to finish the work?
(a)131/3 (b)104/7 (c)101/5 (d)175/3
32. A does 4/5 of the work in 20 days. He then calls in B and they together
finish the remaining work in 3 days. How long B alone take to finish the whole
work? ½
(a)5 8 (b)42 (b)39 (d)37½
33. A takes 3 days and B 2 days. Both finished the work and got Rs.150. What
is the share of A ?
(a)45 (b)60 (c)09 (d)15
34. A can lay railway track between given stations in 16 days and B can do the
same job in 12 days. With the help of C, they did the job in 4 days only. Then, C
alone can do the job in :
a. 95
days b. 95
days c. 95
days d. 10 days
1 2 3
Competition Gurukul Quick Review
7 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
35. Ronald and Elan are working on an assignment. Ronald takes 6 hours to type
32 pages on a computer, while Elan takes 5 hours to type 40 pages. How much
time will they take, working together on two different computers to type an
assignment of 110 pages?
a. 7 hours 30 minutes
c. 8 hours 15 minutes
b. 8 hours
d. 8 hours 25 minutes
Competition Gurukul Quick Review
8 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
36. A works twice as fast as B. If B can complete a work in 12 days independently,
the number of days in which A and B can together finish the work is:
a. 4 days b. 6 days c. 8 days d. 18 days
37. Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than
Sakshi. The number of days taken by Tanya to do the same piece of work .
(a)15 (b)65 (c)09 (d)14
Competition Gurukul Quick Review
9 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
a. 15
38. A is 50% as efficient as B. C does half of the work done by A and B together.
If C alone does the work in 40 days, then A, B and C together can do the work in:
a. 133
days b. 15 days c. 20 days d. 30 days
39. A and B can complete a work in 15 days and 10 days respectively. They started
doing the work together but after 2 days B had to leave and A alone completed the
remaining work. The whole work was completed in:
a. 8 days b. 10 days c. 12 days d. 15 days
40. A and B can do a piece of work in 30 days, while B and C can do the same
work in 24 days and C and A in 20 day. They all work together for 10 days when B
and C leave. How many days more will A take to finish the work?
a. 18 days b. 24 days c. 30 days d. 36 days
41. A, B and C are employed to do a piece of work for Rs.529. A and B together
are supposed to do 19
23
of the work and B and C together 8
23
of the work. What
1
Competition Gurukul Quick Review
10 Competition Gurukul, Janak Puri, Metro Pillar No.636| www.competitiongurukul.in
amount should A be paid?
a. Rs.315 b. Rs.345 c. Rs.355 d. Rs.375
42. A and B together can complete a work in 12 days. A alone can complete it in
20 days. If B does the work only for half a day daily, then in how many days A and
B together will complete the work?
a. 10 days b. 11 day c. 15 days d. 20 days
43. Twenty women can do a work in sixteen days. Sixteen men can complete the
same work in fifteen days. What is the ratio between the capacity of a man and
woman?
a. 3 : 4 b. 4 : 3 c. 5 : 3 d. Data inadequate
44. 12 men can complete a piece of work in 4 days, while 15 women can complete
the same work in 4 days. 6 men start working on the job and after working for 2
days, all of them stopped working. How many women should be put on the job
complete the remaining work, if it is to be completed in 3 days?
a. 15 b. 18 c. 22 d. None of these