PROCUREMENT PLAN Basic Data Project Name: Local Government Enhancement Sector Project Project Number: 42459-013 Approval Number: 2790 Country: Sri Lanka Executing Agency: Ministry of Provincial Councils & Local Government Project Financing Amount: US$ 68,770,000 ADB Financing: US$ 59,000,000 Cofinancing (ADB Administered): Non-ADB Financing: US$ 9,770,000 Implementing Agency: N/A Project Closing Date: 31 December 2016 Date of First Procurement Plan: 29 September 2011 Date of this Procurement Plan: 22 December 2015, Version 2 A. Methods, Thresholds, Review and 18-Month Procurement Plan 1. Procurement and Consulting Methods and Thresholds Except as the Asian Development Bank (ADB) may otherwise agree, the following process thresholds shall apply to procurement of goods and works. Procurement of Goods and Works Method Threshold Comments International Competitive Bidding for Goods US$ 2,000,000 and Above Prior Review National Competitive Bidding for Goods Between US$ 100,000 and US$ 1,999,999 The first two NCB packages subject to prior review, thereafter post review. Shopping for Goods Up to US$ 99,999 The first two NCB packages subject to prior review, thereafter post review. International Competitive Bidding for Works US$ 15,000,000 and Above Prior review National Competitive Bidding for Works Between US$ 100,000 and US$ 14,999,999 The first two NCB packages subject to prior review, thereafter post review. Shopping for Works Up to US$ 99,999 The first two NCB packages subject to prior review, thereafter post review. Consulting Services Method Comments Least-Cost Selection for Consulting Firm Prior review Quality- and Cost-Based Selection for Consulting Firm Prior review Individual Consultants Selection for Individual Consultant Prior review 2. Goods and Works Contracts Estimated to Cost $1 Million or More The following table lists goods and works contracts for which the procurement activity is either ongoing or expected to commence within the next 18 months. Package Number General Description Estimated Value Procurement Method Review (Prior/ Post) Bidding Procedure Advertisement Date (quarter/year) Comments PMU-VE-0 9 Procurement of 28 Compactors 1,400,000.00 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N Domestic Preference Applicable: N

Transcript of 42459-013: Local Government Enhancement Sector Project · Project Name: Local Government...

PROCUREMENT PLAN

Basic DataProject Name: Local Government Enhancement Sector ProjectProject Number: 42459-013 Approval Number: 2790Country: Sri Lanka Executing Agency: Ministry of Provincial Councils &

Local Government

Project Financing Amount: US$ 68,770,000ADB Financing: US$ 59,000,000Cofinancing (ADB Administered): Non-ADB Financing: US$ 9,770,000

Implementing Agency:N/A

Project Closing Date: 31 December 2016

Date of First Procurement Plan: 29 September 2011

Date of this Procurement Plan: 22 December 2015,Version 2

A. Methods, Thresholds, Review and 18-Month Procurement Plan

1. Procurement and Consulting Methods and Thresholds

Except as the Asian Development Bank (ADB) may otherwise agree, the following process thresholds shall apply to procurement of goods and works.

Procurement of Goods and WorksMethod Threshold Comments

International Competitive Bidding for Goods US$ 2,000,000 and Above Prior Review National Competitive Bidding for Goods Between US$ 100,000 and US$ 1,999,999 The first two NCB packages subject

to prior review, thereafter post review.

Shopping for Goods Up to US$ 99,999 The first two NCB packages subjectto prior review, thereafter post review.

International Competitive Bidding for Works US$ 15,000,000 and Above Prior review National Competitive Bidding for Works Between US$ 100,000 and US$

14,999,999The first two NCB packages subjectto prior review, thereafter post review.

Shopping for Works Up to US$ 99,999 The first two NCB packages subjectto prior review, thereafter post review.

Consulting ServicesMethod Comments

Least-Cost Selection for Consulting Firm Prior review Quality- and Cost-Based Selection for Consulting Firm Prior review Individual Consultants Selection for Individual Consultant Prior review

2. Goods and Works Contracts Estimated to Cost $1 Million or More

The following table lists goods and works contracts for which the procurement activity is either ongoing orexpected to commence within the next 18 months.

PackageNumber

General Description EstimatedValue

Procurement Method

Review(Prior/Post)

Bidding Procedure

AdvertisementDate

(quarter/year)Comments

PMU-VE-09

Procurement of 28 Compactors

1,400,000.00 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Bid document ready and being tendered

3. Consulting Services Contracts Estimated to Cost $100,000 or More

The following table lists consulting services contracts for which the recruitment activity is either ongoing orexpected to commence within the next 18 months.

PackageNumber General Description

EstimatedValue

Recruitment Method

Review(Prior/Post)

AdvertisementDate

(quarter/year)

Type of Proposal Comments

DSC-SP-AT-01

Design and SupervisionConsultancy (Southern Province-Additional Towns[Pura Neguma])

115,384.62 QCBS Prior Q1 / 2016 STP Assignment: National

Quality-Cost Ratio: 80:20

Comments: Southern Province-Additional Towns

DSC-WP-AT-01

Design and SupervisionConsultancy (Western Province-Additional Towns[Pura Neguma])

115,384.62 QCBS Prior Q1 / 2016 STP Assignment: National

Quality-Cost Ratio: 80:20

Comments: Western Province-Additional Towns

4. Goods and Works Contracts Estimated to Cost Less than $1 Million and Consulting Services Contracts Less than $100,000 (Smaller Value Contracts)

The following table lists smaller-value goods, works and consulting services contracts for which the activity iseither ongoing or expected to commence within the next 18 months.

Goods and Works

PackageNumber

GeneralDescription

EstimatedValue

Number of Contracts

Procurement Method

Review(Prior/Post)

Bidding Procedure

AdvertisementDate (quarter/year)

Comments

CP-NCB-CKD-WS-06

WSS for CKD Affected areas - CP

430,769.23 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document:

Small Works

Comments: Designing in progress

CP-NCB-FRN-01

Furniture and Equipment for CPPMU

192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

CP-NCB-WIL-29

Construction of Access Road with Bridge for Naminioya Crematoria for Wilgamuwa PS

130,769.23 1 NCB Post 1S2E Q1 / 2016 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

NCP-NCB-CKD-WS-01A

WSS for CKD Affected areas in NCP-01A

182,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

NCP-NCB-CKD-WS-01B

WSS for CKD Affected areas in NCP-01B

868,461.54 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments:

Designing in process

NCP-NCB-CKD-WS-02

WSS for CKD affected areas -NCP-P2

353,846.15 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in progress

NCP-NCB-CKD-WS-03

WSS for CKD Afected areas - NCP-P3

238,461.54 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in progress

NCP-NCB-CKD-WS-04

WSS for CKD Affected areas in NCP-04

384,615.39 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

NCP-NCB-FRN-02

Furniture and equipment for NCP PMU

192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

NWP-NCB-CKD-WS-05A

WSS for CKD Affected areas in NWP-05A

426,923.08 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

NWP-NCB-CKD-WS-05B

WSS for CKD Affected areas in NWP-05B

196,923.08 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

NWP-NCB-FRN-03

Furniture and Equipment for NWP PMU

153,846.15 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

NWP-NCB-RDM-22

Construction of Retain wall and access road to bus stand

77,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid document under preparation

PMU-EQ-08

Procurement of Dot Matrix Printerfor 108 Pradeshiya Sabhas

26,923.08 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

PMU-EQ-10

Procurement of IT Hardware and Related Services for Pura Neguma Management Centre

80,000.00 1 NCB Post 1S2E Q1 / 2016 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

PMU-VE-13

Vehicles for SPCU & PMU

723,076.92 1 NCB Post 1S2E Q1 / 2016 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

SAB-NCB-FRN-04

Furniture and Equipment for SAB PMU

192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

SP-NCB-FRN-05

Furniture and Equipment for SPPMU

192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

SP-NCB-IMA-30

Construction of Multipurpose building - Imaduwa

230,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid document under preparation

UVA-NCB-BAN-13A

Water Supply, Bandarawela - Part 1

566,652.92 1 NCB Post 2S2E Q2 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid evaluation in progress

UVA-NCB-BAN-13B

Water Supply, Bandarawela - Part 2

484,512.05 1 NCB Post 1S2E Q2 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid evaluation in progress

UVA-NCB-BAN-13C

Water Supply, Bandarawela -

484,512.05 1 NCB Post 1S2E Q2 / 2015 Prequalification of

Part 3 Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid evaluation in progress

UVA-NCB-BAN-13D

Water Supply, Bandarawela - Part 4

484,512.05 1 NCB Post 1S2E Q2 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid evaluation in progress

UVA-NCB-CKD-WS-07A

WSS for CKD Affected areas in Uva - Part A

407,692.31 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

UVA-NCB-CKD-WS-07B

WSS for CKD Affected areas in Uva - Part B

300,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Designing in process

UVA-NCB-FRN-06

Furniture and Equipment for UVA PMU

292,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

UVA-NCB-MEE-29

Construction of Access Road to Meeghakiula Busstand

250,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Comments: Bid document under preparation

WP-NCB-FRN-07

Furniture and Equipment for WP PMU

153,846.15 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Comments: Requirementbeing workedout

Consulting Services

PackageNumber

GeneralDescription

EstimatedValue

Number of Contracts

Recruitment Method

Review(Prior/Post)

AdvertisementDate

(quarter/year)

Type of Proposal Comments

None

B. Indicative List of Packages Required Under the Project

The following table provides an indicative list of goods, works and consulting services contracts over the life ofthe project, other than those mentioned in previous sections (i.e., those expected beyond the current period).

Goods and Works PackageNumber

General Description Estimated Value

Estimated Number of

ProcurementMethod

Review (Prior/Post)

Bidding Procedure

Comments

(cumulative) ContractsTBD-Goods

Provisional of Goods 3,500,000.00 10 NCB Post 1S2E Prequalification of Bidders: N

Domestic Preference Applicable: N

Bidding Document: Goods

Lot 1: A 350,000.00

Lot 2: B 350,000.00

Lot 3: C 350,000.00

Lot 4: D 350,000.00

Lot 5: E 350,000.00

Lot 6: F 350,000.00

Lot 7: G 350,000.00

Lot 8: H 350,000.00

Lot 9: I 350,000.00

Lot 10: J 350,000.00

TBD-Works Civil works in 7 Province 3,500,000.00 10 NCB Post 1S2E Prequalification of

Bidders: N

Domestic Preference Applicable: N

Bidding Document: Small Works

Lot 1: A 350,000.00

Lot 2: B 350,000.00

Lot 3: C 350,000.00

Lot 4: D 350,000.00

Lot 5: E 350,000.00

Lot 6: F 350,000.00

Lot 7: G 350,000.00

Lot 8: H 350,000.00

Lot 9: I 350,000.00

Lot 10: J 350,000.00

Consulting Services

PackageNumber General Description

Estimated Value

(cumulative)

Estimated Number of Contracts

RecruitmentMethod

Review (Prior/Post)

Type of Proposal Comments

None

C. List of Awarded and On-going, and Completed Contracts

The following tables list the awarded and on-going contracts, and completed contracts.

1. Awarded and Ongoing Contracts

Goods and Works

PackageNumber

General Description

EstimatedValue

Awarded Contract

Value

Procurement Method

AdvertisementDate

(quarter/year)

Date of ADB Approval of

Contract Award

Comments

PMU-EQ-02

Procurement of 10,800 New Compost Bins, for 108 PSs

357,230.77 227,497.85 NCB Q3 / 2014 15-DEC-14 $1 @ LKR130/-

PMU-EQ-12

Home Composting Bins - Part 2

357,230.77 245,292.92 NCB Q4 / 2014 31-AUG-15 $1 @ LKR130/-

SP-NCB-IMA-11

Construction of Bus Stand & Comfort Centre, Imaduwa

109,666.09 111,859.41 NCB Q3 / 2013 20-DEC-13 $1 @ LKR130/-

CP-NCB-PAN-14

Construction of Health Centre atHuluganga, Panvila

83,843.40 83,503.08 NCB Q2 / 2014 18-AUG-14 $1 @ LKR130/-

CP-NCB-AMB-04

Construction of Multipurpose Building, Ambanganga Korale

357,714.74 347,590.47 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-

CP-NCB-THU-19

Construction of Multipurpose building,

396,315.70 373,076.92 NCB Q3 / 2013 25-NOV-13 $1 @ LKR130/-

ThumpaneSP-NCB-HAK-06

Construction of the roads, Hakmana

134,665.93 129,659.56 NCB Q1 / 2014 02-JUL-14 $1 @ LKR130/-

CP-NCB-WIL-25

Development of Internal Roads, Wilgamuwa

76,923.47 76,797.33 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-

CP-NCB-DAM-01

PS Building with Community Hall

375,186.54 368,607.19 NCB Q3 / 2013 23-NOV-13 $1 @ LKR130/-

UVA-NCB-SIY-23

Bus stand with Comfort Centre, Siyambalanduwa

162,215.80 68,912.79 NCB Q1 / 2014 04-AUG-14 $1 @ LKR130/-

UVA-NCB-HAL-08

Completion of Multipurpose Building, Haldummulla

112,459.70 102,281.73 NCB Q2 / 2014 04-JUN-14 $1 @ LKR130/-

NCP-NCB-KEB-13

Completion of a Balance work of PS Building, Kebithigollewa

190,697.98 193,357.78 NCB Q1 / 2014 16-MAY-14 $1 @ LKR130/-

SAB-NCB-KOL-25

Construcion of Multi-purpose building, Kolonna

360,285.84 393,929.53 NCB Q3 / 2014 17-NOV-14 $1 @ LKR130/-

UVA-NCB-BDL-03

Construciton of Multi-purpose building, Badulla

379,254.08 339,031.52 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-

NCP-NCB-WKD-23

Construction of Agro Based Economic Centre, Welikanda

315,408.86 285,673.74 NCB Q4 / 2013 17-FEB-14 $1 @ LKR130/-

NWP-NCB-GIR-09

Construction of Bus Stand and Drainage, Giribawa

105,939.81 97,766.97 NCB Q2 / 2014 22-SEP-14 $1 @ LKR130/-

SP-NCB-KAT-15

Construction of Bus Stand at Kirana, Katuwana

311,059.59 279,155.72 NCB Q3 / 2014 09-DEC-14 $1 @ LKR130/-

SP-NCB-KAM-12

Construction of Bus Stand, Kamburupitiya

423,720.38 384,615.38 NCB Q4 / 2013 23-JAN-14 $1 @ LKR130/-

NWP-NCB-MAW-14

Construction of Bus Stand, Mawathagama

374,703.76 328,821.32 NCB Q1 / 2014 26-MAY-14 $1 @ LKR130/-

UVA-NCB-MEE-11

Construction of Bus Stand, Meegahakivula

191,744.17 175,003.95 NCB Q2 / 2014 04-AUG-14 $1 @ LKR130/-

NWP-NCB-RID-18

Construction of Bus stand and Multi-purpose building, Rideegama

354,042.90 282,474.82 NCB Q2 / 2014 17-JUN-14 $1 @ LKR130/-

NWP-NCB-CHI-07

Construction of Bus stand and Public Toilets, Chilaw

250,743.02 232,250.90 NCB Q1 / 2014 28-MAY-14 $1 @ LKR130/-

UVA-NCB-MDL-18

Construction of Bus stand with Comfort Centre, Madulla

351,352.68 321,101.39 NCB Q1 / 2014 11-APR-14 $1 @ LKR130/-

SP-NCB-KIR-16

Construction of Bus stand with few shops, Kirinda

297,325.87 283,331.52 NCB Q1 / 2014 17-JUN-14 $1 @ LKR130/-

NCP-NCB-CC-03

Construction of Comfort Center, Welikanda

34,403.71 36,111.09 NCB Q3 / 2013 13-DEC-13 $1 @ LKR130/-

NCP-NCB-CC-02

Construction of Comfort Centre,

88,720.89 88,914.86 NCB Q3 / 2013 20-NOV-13 $1 @ LKR130/-

ThirappaneWP-NCB-PAL-01

Construction of Comfort centre, Palindanuwara

65,771.26 77,621.80 NCB Q4 / 2013 07-MAR-14 $1 @ LKR130/-

NCP-NCB-THI-25

Construction of Community hall, Thirappane

338,816.55 325,653.02 NCB Q1 / 2014 03-MAR-14 $1 @ LKR130/-

NCP-NCB-CC-01

Construction of Confort Center, Padaviya

99,214.39 109,033.64 NCB Q3 / 2013 15-NOV-13 $1 @ LKR130/-

CP-NCB-WIL-26

Construction of Crematorium at Hettipola, Wilgamuwa

107,692.31 118,614.77 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-

UVA-NCB-WLW-26

Construction of Crematorium, Wellawaya

115,537.81 119,964.34 NCB Q2 / 2014 24-SEP-14 $1 @ LKR130/-

CP-NCB-MED-09

Construction of Internal Roads at Theldeniya, Medadumbara

265,343.90 309,649.41 NCB Q4 / 2014 16-FEB-15 $1 @ LKR130/-

UVA-NCB-UPG-15

Construction of Internal road at, Lunuwatta, Uva Paranagama

341,925.73 285,862.04 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-

NCP-NCB-PAD-17

Construction of Internal roads, Padaviya

169,293.92 136,706.42 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-

WP-NCB-AGA-04

Construction of Library Bldg., Agalawatta

114,179.10 121,805.94 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-

WP-NCB-MAD-10

Construction of Library Building Madurawala Pradeshiya Sabha

110,455.28 119,511.21 NCB Q3 / 2014 19-NOV-14 $1 @ LKR130/-

NWP-NCB-ARA-05

Construction of Library Building and Weekly fair, Arachchikattuwa

337,211.17 314,485.27 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-

NWP-NCB-KAL-11

Construction of Library Building, Kalpitiya

157,915.93 152,664.51 NCB Q2 / 2014 07-AUG-14 $1 @ LKR130/-

NWP-NCB-POL-16

Construction of Library Building, Polpithigama

143,766.84 138,168.78 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-

CP-NCB-GAN-05

Construction of Multi-Purpose Bldg, Gangawata Korale

384,596.48 349,740.27 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-

NWP-NCB-POL-17

Construction of Multi-Purpose Building with Public Toilets, Polpithigama

201,416.00 188,699.75 NCB Q2 / 2014 22-SEP-14 $1 @ LKR130/-

WP-NCB-BIY-06

Construction of Multi-Purpose Building, Biyagama

403,892.66 390,286.37 NCB Q4 / 2013 10-JAN-14 $1 @ LKR130/-

SAB-NCB-ARN-01

Construction of Multi-pourpose building, Aranayaka

363,243.18 365,798.07 NCB Q1 / 2014 08-APR-14 $1 @ LKR130/-

WP-NCB-MAD-09

Construction of Multi-purpose Building at Anguruwathota, Madurawala

199,814.10 171,695.27 NCB Q2 / 2014 09-SEP-14 $1 @ LKR130/-

SP-NCB-KAR-13

Construction of Multi-purpose buiding,

256,645.40 262,550.63 NCB Q2 / 2014 08-JUL-14 $1 @ LKR130/-

KarangeniyaSAB-NCB-PEL-26

Construction of Multi-purpose building, Pelmadulla

349,012.59 349,131.67 NCB Q1 / 2014 11-APR-14 $1 @ LKR130/-

WP-NCB-WLT-19

Construction of Multi-purpose building, Walallawita

179,702.77 179,684.39 NCB Q2 / 2014 03-SEP-14 $1 @ LKR130/-

NCP-NCB-IPA-12

Construction of Multipurpose Bldg., Ipalogama

339,972.12 314,527.63 NCB Q1 / 2014 21-APR-14 $1 @ LKR130/-

UVA-NCB-LNG-06

Construction of Multipurpose Bldg., Lunugala

380,164.89 366,941.25 NCB Q1 / 2014 26-MAR-14 $1 @ LKR130/-

CP-NCB-MIN-11

Construction of Multipurpose Bldg., Minipe

486,639.11 375,384.62 NCB Q4 / 2013 24-FEB-14 $1 @ LKR130/-

SAB-NCB-KEG-23

Construction of Multipurpose Bldg., Moronthota, Kegalla

350,973.18 346,718.31 NCB Q2 / 2014 05-SEP-14 $1 @ LKR130/-

UVA-NCB-RDM-12

Construction of Multipurpose Building

336,363.07 305,295.40 NCB Q2 / 2014 17-JUN-14 $1 @ LKR130/-

NCP-NCB-GAL-07

Construction of Multipurpose Building and Refurbishment, Galenbindunuwewa

262,472.37 246,480.38 NCB Q3 / 2014 08-SEP-14 $1 @ LKR130/-

SP-NCB-KOT-17

Construction of Multipurpose Building, Kotapola

337,241.84 346,904.14 NCB Q3 / 2014 23-OCT-14 $1 @ LKR130/-

NCP-NCB-PGL-19

Construction of Multipurpose Building, Palagala

352,798.93 336,798.05 NCB Q1 / 2014 28-MAY-14 $1 @ LKR130/-

NWP-NCB-UDU-19

Construction of Multipurpose Building, Udubaddawa

383,427.89 356,610.60 NCB Q1 / 2014 01-APR-14 $1 @ LKR130/-

CP-NCB-WLP-28

Construction of Multipurpose Building, Walapane

350,181.88 326,947.05 NCB Q3 / 2014 01-DEC-14 $1 @ LKR130/-

SP-NCB-PIT-24

Construction of Multipurpose building with auditorium, Pitabeddara

346,179.86 376,923.33 NCB Q4 / 2014 14-JAN-15 $1 @ LKR130/-

CP-NCB-NAU-12

Construction of Multipurpose building, Naula

373,033.80 353,773.82 NCB Q2 / 2014 08-AUG-14 $1 @ LKR130/-

NCP-NCB-PAD-18

Construction of Multipurpose building, Padaviya

138,259.86 133,569.34 NCB Q1 / 2014 28-MAY-14 $1 @ LKR130/-

NCP-NCB-RAM-22

Construction of Multipurpose building, Rambewa

230,520.26 218,879.11 NCB Q1 / 2014 20-MAY-14 $1 @ LKR130/-

SP-NCB-WEL-29

Construction of Multipurpose building, Welivitiya, Divithura

344,987.34 305,183.74 NCB Q1 / 2014 24-JUL-14 $1 @ LKR130/-

CP-NCB-YTW-27

Construction of PS Building Upper floor and

349,237.87 337,776.36 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-

Library, Yatawatta

UVA-NCB-KTG-17

Construction of PS Building and Comfort Centre, Katharagama

390,987.66 380,417.68 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-

WP-NCB-DOD-08

Construction of PS Building, Dodangoda

382,108.69 345,163.21 NCB Q4 / 2013 13-JAN-14 $1 @ LKR130/-

CP-NCB-HAR-06

Construction of PS Building, Harispattuwa

371,977.86 353,377.27 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-

SP-NCB-PAS-23

Construction of PS Building, Pasgoda

367,330.75 371,155.49 NCB Q4 / 2013 07-JAN-14 $1 @ LKR130/-

NWP-NCB-VAN-20

Construction of PS Office

198,221.24 182,904.62 NCB Q3 / 2013 27-NOV-13 $1 @ LKR130/-

UVA-NCB-KAN-05

Construction of PS Office Building with a Library, Kandaketiya

359,965.96 338,542.55 NCB Q2 / 2014 18-AUG-14 $1 @ LKR130/-

UVA-NCB-WLW-25

Construction of PS Office building, Wellawaya

250,553.94 236,660.30 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-

NWP-NCB-KUL-13

Construction of PS Office with Library and Health Centre, Kuliyapitiya

331,690.69 298,587.83 NCB Q1 / 2014 17-JUN-14 $1 @ LKR130/-

UVA-NCB-HAL-01

Construction of PS Office, Haldummulla

261,859.44 269,015.50 NCB Q2 / 2013 02-SEP-13 $1 @ LKR130/-

UVA-NCB-HAP-09

Construction of PS Office, Haputale

278,880.80 284,212.92 NCB Q3 / 2013 06-DEC-13 $1 @ LKR130/-

NWP-NCB-KAL-12

Construction of PS Office, Kalpitiya

215,906.68 200,884.11 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-

SP-NCB-MUL-19

Construction of PS Office, Weekly fair, Mulatiyana

464,619.83 475,362.06 NCB Q3 / 2013 20-DEC-13 $1 @ LKR130/-(ADB Fin.LKR42,000,000)

UVA-NCB-SIY-22

Construction of PS Office,Siyambalanduwa

300,192.40 315,211.17 NCB Q3 / 2013 05-DEC-13 $1 @ LKR130/-

UVA-NCB-BAN-04

Construction of Pradeshiya Sabha Office Building, Bandarawela

290,714.26 275,813.93 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-

SAB-NCB-RTP-27

Construction of Pradeshiya Sabha Office Building, Ratnapura

361,712.25 330,713.71 NCB Q2 / 2014 15-AUG-14 $1 @ LKR130/-

UVA-NCB-THA-24

Construction of Pradeshiya Sabha Office Building, Thanamalvila

384,159.99 332,064.39 NCB Q3 / 2014 22-OCT-14 $1 @ LKR130/-

SP-NCB-MAL-18

Construction of Pradeshiya Sabha Office, Malimbada

353,323.68 321,057.12 NCB Q3 / 2014 28-NOV-14 $1 @ LKR130/-

SP-NCB-AKU-02

Construction of Pradeshiya Sabha, Akuressa

267,104.36 261,843.11 NCB Q2 / 2014 07-AUG-14 $1 @ LKR130/-

SP-NCB-H Construction of 439,878.77 486,796.41 NCB Q4 / 2014 14-JAN-15 $1 @ LKR130/-

AM-08 Pradeshiya Sabha, Bellagaswewa, Hambantota

UVA-NCB-MDL-19

Construction of Road, Drain & Pavement, Makulla, Madulla

53,503.04 52,240.49 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-

CP-NCB-LAG-13

Construction of WSS, Laggala-Pallegama

427,613.87 455,721.09 NCB Q4 / 2014 18-FEB-15 $1 @ LKR130/-

CP-NCB-UPT-22-P2

Construction of WSS, Udapalatha

292,282.28 304,434.93 NCB Q4 / 2014 12-FEB-15 $1 @ LKR130/-

CP-NCB-UPT-22-P3

Construction of WSS, Udapalatha

460,267.93 446,257.77 NCB Q4 / 2014 12-FEB-15 $1 @ LKR130/-

NCP-NCB-GAL-08

Construction of Water Supply Scheme for Galenbindunuwewa

322,873.04 338,988.72 NCB Q3 / 2014 02-DEC-14 $1 @ LKR130/-

NCP-NCB-LAN-15

Construction of Weekly Fair, Bus stand, Lankapura

269,541.75 235,934.35 NCB Q3 / 2014 08-SEP-14 $1 @ LKR130/-

SAB-NCB-GLG-17

Construction of Weekly Fair, Health Clinic, Galigamuwa

209,552.12 229,834.20 NCB Q1 / 2014 05-JUN-14 $1 @ LKR130/-

NWP-NCB-CHI-08

Construction of Weekly fair at Madampe,Chilaw

120,308.38 106,401.59 NCB Q1 / 2014 30-JUN-14 $1 @ LKR130/-

NCP-NCB-GLN-09

Construction of Weekly fair, Galnewa

141,770.91 130,674.70 NCB Q4 / 2013 03-FEB-14 $1 @ LKR130/-

CP-NCB-LAG-08

Construction of Weekly fair, Public Toilet, Internal roads, Laggala-Pallegama PS

219,035.55 206,834.09 NCB Q3 / 2014 21-NOV-14 $1 @ LKR130/-

SAB-NCB-IMB-20

Construction of a Mult-purpose building, Imbulpe

293,154.78 271,563.77 NCB Q3 / 2014 22-OCT-14 $1 @ LKR130/-

SAB-NCB-DER-11

Construction of a Multi-purpose building, Deraniyagala

345,059.52 338,440.33 NCB Q2 / 2014 10-JUL-14 $1 @ LKR130/-

UVA-NCB-BAD-16

Construction of a PS Sub Office,Badalkumbura

271,402.85 258,182.01 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-

SAB-NCB-AYA-04

Construction of a bus stand with community hall, Ayagama

275,667.29 266,592.75 NCB Q2 / 2014 15-AUG-14 $1 @ LKR130/-

NWP-NCB-BIN-06

Construction of daily fair, Bingiriya

143,430.66 139,505.06 NCB Q1 / 2013 23-MAY-14 $1 @ LKR130/-

CP-NCB-UDA-20

Construction of library, health centre, Udadumbara

288,115.93 287,187.09 NCB Q1 / 2014 05-JUN-14 $1 @ LKR130/-

NCP-NCB-HOR-11

Construction of multipurpose building, Horowpathana

351,018.72 295,705.49 NCB Q1 / 2014 22-MAY-14 $1 @ LKR130/-

SAB-NCB-BUL-08

Construction of the Multipurpose

230,090.40 227,260.19 NCB Q4 / 2014 18-DEC-14 $1 @ LKR130/-

Building, Bulathkohupitiya

WP-NCB-SEE-17

Construction of the second phase of the PS Office, Seethawaka

305,247.16 282,297.53 NCB Q1 / 2014 17-JUN-14 $1 @ LKR130/-

NCP-NCB-RAJ-20

Construction of the weekly fair and Drainage, Rajanganaya

283,874.95 281,673.32 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-

SP-NCB-THG-26

Construction of the weekly fair, Thihagoda

311,074.20 341,869.26 NCB Q2 / 2014 10-JUL-14 $1 @ LKR130/-

CP-NCB-WIL-24

Construction of water supply scheme at Hettipola, Wilgamuwa

361,881.80 347,298.54 NCB Q4 / 2014 18-FEB-15 $1 @ LKR130/-

CP-NCB-RAT-16

Construction of water supply scheme, Rattota

227,095.09 228,594.21 NCB Q3 / 2014 03-DEC-14 $1 @ LKR130/-

WP-NCB-WLT-18

Construction of weekly fair and confort centre, Walallawita

212,655.12 199,935.85 NCB Q4 / 2013 08-JAN-14 $1 @ LKR130/-

SP-NCB-NAG-20

Construction of weekly fair and multipurpose building, Nagoda

363,458.52 379,184.62 NCB Q3 / 2014 06-JAN-15 $1 @ LKR130/-

SAB-NCB-EMB-15

Construction of weekly fair and toilets, Embilipitiya

242,258.77 237,249.18 NCB Q1 / 2014 20-MAY-14 $1 @ LKR130/-

SP-NCB-ATH-05

Construction of weekly fair at Thibbotuwewa, Thuraliya

175,715.47 187,096.62 NCB Q2 / 2014 12-AUG-14 $1 @ LKR130/-

NCP-NCB-DIM-06

Construction of weekly fair with toilet facility, Dimbulagala

131,103.39 122,874.33 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-

NCP-NCB-RAM-24

Construction of weekly fair with toilet facility, Rambewa

137,621.95 129,429.39 NCB Q1 / 2014 16-MAY-14 $1 @ LKR130/-

SAB-NCB-AYA-03

Construction of weekly fair, Ayagama

349,012.59 75,547.77 NCB Q4 / 2013 24-FEB-14 $1 @ LKR130/-

NCP-NCB-KEB-14

Construction of weekly fair, Kebithigollewa

114,492.27 111,158.71 NCB Q1 / 2014 23-MAY-14 $1 @ LKR130/-

UVA-NCB-MEE-28

Construction of weekly fair, Meegahakivula

125,107.78 155,803.63 NCB Q1 / 2014 09-APR-14 $1 @ LKR130/-

SP-NCB-TMR-27

Construction of weekly fair, Thissamaharama

358,495.38 384,615.38 NCB Q4 / 2013 03-FEB-14 $1 @ LKR130/-

WP-NCB-MAT-13

Construction of weekly fair, comfort centre, Mathugama

384,775.07 355,524.25 NCB Q1 / 2014 23-MAY-14 $1 @ LKR130/-

SAB-NCB-KAH-22

Construction of weekly fair,Drainage system, Kahawatta

323,052.04 371,281.82 NCB Q1 / 2014 20-MAY-14 $1 @ LKR130/-

UVA-NCB-HAP-10

Consturction of Road, Retaining wall & PavementImprovement,

59,776.81 59,779.81 NCB Q4 / 2014 22-JAN-15 $1 @ LKR130/-

HaputaleSP-NCB-NEL-22

Development of Internal Roads and Three wheeler park, Neluwa

56,286.60 59,076.57 NCB Q4 / 2014 06-JAN-15 $1 @ LKR130/-

CP-NCB-AMG-02

Development of Internal Roads, Ambagamuwa

319,190.88 297,149.37 NCB Q2 / 2014 09-SEP-14 $1 @ LKR130/-

WP-NCB-PAL-15

Improvement of Internal Road at Baduraliya, Palindanuwara

239,029.69 215,948.29 NCB Q3 / 2014 04-NOV-14 $1 @ LKR130/-

NCP-NCB-LAN-16

Improvement of Internal Roads, Lankapura

75,559.32 71,920.08 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-

NWP-NCB-ALA-04

Improvement of Roads at Alawwa Town, Alawwa

367,255.75 287,187.73 NCB Q2 / 2014 22-SEP-14 $1 @ LKR130/-

SAB-NCB-DEH-10

Improvement of the Drainage system, Dehiovita

353,581.16 230,244.64 NCB Q3 / 2014 02-DEC-14 $1 @ LKR130/-

CP-NCB-UDA-21

Improvement to Existing water supply scheme, Udadumbara

370,663.27 395,983.43 NCB Q4 / 2014 23-FEB-15 $1 @ LKR130/-

UVA-NCB-MDG-02

Improvement to Weekly fair with retaining wall, Medagama

117,125.24 102,982.55 NCB Q2 / 2014 04-AUG-14 $1 @ LKR130/-

SP-NCB-IMA-10

Improvement to existing shops, Imaduwa

250,168.69 261,153.85 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-

SP-NCB-SOO-25

Improvement to weekly fair and entrance roads, Sooriyawewa

318,236.42 349,920.72 NCB Q4 / 2014 30-JAN-15 $1 @ LKR130/-

SAB-NCB-BUL-09

Improvements tothe Internal roads, Bulathkohupitiya

160,928.10 151,990.89 NCB Q2 / 2014 18-AUG-14 $1 @ LKR130/-

NWP-NCB-NAW-15

Improvements toweekly fair and drainage system, Nawagattegama

342,091.49 308,141.25 NCB Q2 / 2014 04-AUG-14 $1 @ LKR130/-

WP-NCB-DIV-03

PS Office Building, Divulapitiya

443,913.53 419,964.26 NCB Q3 / 2013 27-AUG-13 $1 @ LKR130/-

NWP-NCB-GIR-03

PS Office Building, Giribawa

248,159.96 220,495.53 NCB Q2 / 2013 02-SEP-13 $1 @ LKR130/-

SP-NCB-LUN-01

PS Office Building, Lunugamvehera

376,639.83 351,901.29 NCB Q2 / 2013 16-AUG-13 $1 @ LKR130/-

SAB-NCB-RUW-28

PS Office Building, Ruwanwella

383,579.94 387,714.36 NCB Q3 / 2013 04-NOV-13 $1 @ LKR130/-

SP-NCB-NEL-21

PS Office Building, Weeklyfair, Neluwa

301,937.48 320,000.00 NCB Q1 / 2014 02-JUL-14 $1 @ LKR130/-

SAB-NCB-EMB-14

PS Office and Library - Embilipitiya

26,865.67 27,437.76 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-

WP-NCB-MIR-02

PS Sub Office & Library Building, Pallewelaa

182,500.84 166,692.43 NCB Q2 / 2013 16-AUG-13 $1 @ LKR130/-

SAB-NCB-GLG-19

Rehabilitation of Ahakiyatha Road,

77,494.37 76,078.85 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-

GaligamuwaSAB-NCB-EMB-16

Rehabilitation of Danduhathakma-Kaparalla Rd, Embilipitiya

88,762.83 93,250.55 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-

SAB-NCB-DER-13

Rehabilitation of Pavement and Drainage System, Deraniyagala

43,972.85 46,175.05 NCB Q3 / 2014 05-DEC-14 $1 @ LKR130/-

SAB-NCB-IMB-21

Rehabilitation of Samanalagama Rd, Imbulpe

84,568.59 88,490.77 NCB Q4 / 2014 10-FEB-15 $1 @ LKR130/-

SP-NCB-ATH-04

Rehabilitation of existing suspension bridge, Thibbotuwawa, Athuraliya

78,427.65 90,090.05 NCB Q3 / 2014 02-DEC-14 $1 @ LKR130/-

NWP-NCB-VAN-21

Vanathavilluwa Water Supply Scheme

564,118.00 453,502.23 NCB Q4 / 2014 22-JUN-15 $1 @ LKR130/-

WP-NCB-AGA-05

Waste Management Centre, Agalawatta

242,388.06 201,018.94 NCB Q1 / 2015 20-MAY-15 $1 @ LKR130/-

CP-NCB-UPT-22-P1

Water Supply Scheme (Intake and Raw Water Main) for Udapalatha PS-Part 1

622,119.00 541,169.02 NCB Q4 / 2014 26-MAY-15 $1 @ LKR130/-

NCP-NCB-DIM-04A

Water Supply Scheme for Dimbulagala

170,036.01 166,315.84 NCB Q4 / 2014 09-JAN-15 $1 @ LKR130/-

NCP-NCB-DIM-04B

Water Supply Scheme for Dimbulagala PS,Dimbulagala

257,710.97 240,801.64 NCB Q4 / 2014 09-JAN-15 $1 @ LKR130/-

NCP-NCB-GLN-10

Water Supply Scheme for Galnewa

301,992.62 324,556.71 NCB Q2 / 2014 22-JAN-15 $1 @ LKR130/-

NCP-NCB-RAJ-21

Water Supply Scheme for Rajangane Town, Rajanganaya

157,409.51 161,974.60 NCB Q3 / 2014 19-DEC-14 $1 @ LKR130/-

WP-NCB-MAD-11

Water Supply, Madurawala

197,835.82 193,381.18 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-

WP-NCB-MIR-16

Water Supply, Mirigama

183,283.58 187,252.42 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-

WP-NCB-PAL-14

Water Supply, Palindanuwara

196,044.78 200,307.87 NCB Q1 / 2015 16-MAR-15 $1 @ LKR130/-

NCP-NCB-DIM-04C

Water Sypply Scheme for Dimbulagala

274,426.95 258,560.97 NCB Q4 / 2014 08-JAN-15 $1 @ LKR130/-

SAB-NCB-YAT-29

Weekly Fair and Comfort Centre -Yatiyantota

359,134.21 326,669.52 NCB Q3 / 2014 19-NOV-14 $1 @ LKR130/-

NWP-NCB-GIR-10

Weekly Fair and Comfort Centre, Giribawa

60,281.71 59,518.54 NCB Q1 / 2014 31-MAR-14 $1 @ LKR130/-

SP-NCB-HAM-09

Compost Plant - Hambantota

27,360.54 30,105.42 NCB Q1 / 2015 14-JUL-15 $1 @ LKR130/-

SAB-NCB-BAL-07

Compost Plant, Balangoda

77,351.68 70,750.73 NCB Q1 / 2015 12-JUN-15 $1 @ LKR130/-

SAB-NCB-GLG-18

Compost Plant, Galigamuwa

67,800.00 65,911.64 NCB Q1 / 2015 09-JUN-15 $1 @ LKR130/-

UVA-NCB-MDG-20

Construction of Library Building, Medagama

197,598.80 189,254.16 NCB Q2 / 2013 13-NOV-13 $1 @ LKR130/-

SAB-NCB- Construction of 278,134.72 272,330.91 NCB Q4 / 2014 12-FEB-15 $1 @ LKR130/-

BAL-05 Multipurpose Bldg. and Pre-school, Balangoda

CP-NCB-PAT-15

Multipurpose Building, PS Office and Library - Pathahewaheta PS

353,460.53 353,460.51 NCB Q3 / 2014 10-JUL-15 $1 @ LKR130/-

UVA-NCB-BAD-21

Road Improvement, Badalkumbura

88,463.53 98,679.70 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-

SP-NCB-HAK-07

Water Supply Scheme, Hakmana

544,463.82 559,890.74 NCB Q1 / 2015 12-JUN-15 $1 @ LKR130/-

SP-NCB-TWM-28

Weekly Fair busstand, PS office and toilet, Thawalama

401,538.46 354,043.92 NCB Q1 / 2015 13-AUG-15 $1 @ LKR130/-

Consulting Services

PackageNumber

General Description

EstimatedValue

Awarded Contract

Value

Recruitment Method

AdvertisementDate

(quarter/year)

Date of ADB Approval of

Contract Award

Comments

DSC02 Design and Supervision Consultants - North Central Province (DSC 02)

310,000.00 576,911.17 QCBS Q1 / 2013 16-OCT-13 $1 @ LKR130/-(LKR74,998,452.55)

DSC03 Design and Supervision Consultants - North Central Province (DSC 03)

200,000.00 453,586.53 QCBS Q1 / 2013 22-OCT-13 $1 @ LKR130/-(LKR58,966,249.10)

DSC04 Design and Supervision Consultants - Sabaragamuwal Province (DSC 04)

370,000.00 470,174.98 QCBS Q1 / 2013 16-OCT-13 $1 @ LKR130/-(LKR61,122,746.90)

DSC05 Design and Supervision Consultants - Southern Province (DSC 05)

320,000.00 324,737.58 QCBS Q1 / 2013 15-OCT-13 $1 @ LKR130/-(LKR42,215,886.00)

DSC06 Design and Supervision Consultants - Uva Province (DSC 06)

240,000.00 648,132.32 QCBS Q1 / 2013 09-OCT-13 $1 @ LKR130/-(LKR84,257,201.28)

DSC 07 Design and Supervision Consultants - Western Province (DSC 07)

70,000.00 78,997.81 LCS Q1 / 2013 10-SEP-13 $1 @ LKR130/-(LKR10,269,715.00)

DSC01 Design and Supervision of consultants - Central Province(DSC 01)

400,000.00 614,466.39 QCBS Q1 / 2013 16-OCT-13 $1 @ LKR130/-(LKR79,880,631.20)

PMC-01 Project Management Consultant

1,640,000.00 1,814,794,244.00

QCBS Q1 / 2012 03-AUG-12 $1 @ LKR130/-(LKR117,589,159.28&$910,262.25)

2. Completed Contracts

Goods and Works

PackageNumber

General Description

EstimatedValue

Awarded Contract

Value

ProcurementMethod

AdvertisementDate

(quarter/year)

Date of ADB

Approval of

Contract Award

Date of Completion

Comments

NWP-NCB-BIN-01

Construction of PS Office - Bingiriya (PCSS5)

213,846.15 212,135.66 NCB Q1 / 2013 06-AUG-13 09-APR-14 $1 @ LKR130/-(LKR27,577,635.72)

CP-NCB-PAN-07

Construction of Huluganga Bridge(PCSS7)

300,000.00 289,303.47 NCB Q1 / 2013 21-JUN-13 05-MAY-14 $1 @ LKR130/-(LKR37,609,451.40)

SP-NCB-KAR-14

Improvement of Comfort Center, Karandeniya

30,063.05 18,031.11 NCB Q3 / 2013 20-NOV-13 06-JUN-14 $1 @ LKR130/-(LKR2,344,044.58)

UVA-NCB-RDM-14

Construction of weekly fair, Rideemaliyadda

37,483.58 33,798.17 NCB Q1 / 2014 27-MAR-14 30-AUG-14 $1 @ LKR130/-(LKR4,613,959.50)

UVA-NCB-MEE-07

Construction of Comfort Center, Meegahakivula

34,489.76 28,913.75 NCB Q3 / 2013 14-NOV-13 03-SEP-14 $1 @ LKR130/-(LKR3,758,787.84)

PMU-EQ-11

Procurement of 306 Unit Desktop computers

304,615.38 312,276.55 NCB Q1 / 2014 21-APR-14 15-NOV-14 $1 @ LKR130/-(LKR40,595,952.00)

CP-NCB-AMG-03

Construction of Comfort Centre, Ambagamuwa

53,941.68 53,551.70 NCB Q1 / 2014 27-MAR-14 03-DEC-14 $1 @ LKR130/-(LKR6,961,721.49)

UVA-NCB-MDG-27

Comfort Centre, Medagama

28,672.85 23,793.19 NCB Q3 / 2013 03-OCT-13 18-DEC-14 $1 @ LKR130/-(LKR3,093,115.18)

CP-NCB-RAT-17

Construction of Health and Maternity Centre, Rattota

123,061.40 119,093.37 NCB Q1 / 2014 27-MAR-14 22-JAN-15 $1 @ LKR130/-(LKR15,482,137.87)

CP-NCB-WIL-23

Construction of CommunityCentre on PS Office, Wilgamuwa

102,307.69 87,240.97 NCB Q1 / 2014 27-MAR-14 11-FEB-15 $1 @ LKR130/-(LKR11,341,325.86)

CP-NCB-RAT-18

Development of Weekly Fair, Rattota

100,000.00 92,807.16 NCB Q1 / 2014 17-JUN-14 17-MAR-15 $1 @ LKR130/-(LKR12,064,930.55)

PMU-VE-EQ-01

Solid Waste Managment -31 Nos 4-wheel tractors, othertractors and trailers (PCSS2)

400,000.00 375,235.39 NCB Q1 / 2013 17-MAY-13 28-JUN-13 $1 @ LKR130/-(LKR48,780,600)

PMU-VE-03

Solid Waste Management -Procurement of Gully Bowsers

90,000.00 56,538.46 SHOPPING Q1 / 2013 19-AUG-13 20-AUG-13 $1 @ LKR130/-(LKR7,350,000.00)

PMU-VE-0 Solid Waste 390,000.00 371,600.28 NCB Q1 / 2013 03-JUL-13 12-SEP-13 $1 @

4 Management - Procurementof Tippers

LKR130/-(LKR48,308,036.00)

PMU-VE-05

Truck Mounted Water Bowser(PCSS3)

110,000.00 111,689.85 NCB Q1 / 2013 17-MAY-13 28-NOV-13 $1 @ LKR130/-(LKR14,519,680.00)

PMU-EQ-06

Procurement of Office Equip. for PMU

69,230.77 65,752.57 NCB Q3 / 2013 27-NOV-13 31-MAR-14 $1 @ LKR130/-(LKR8,547,833.93)

PMU-EQ-07

Procurement of Office Equipment forPMU

30,769.23 30,140.62 NCB Q3 / 2013 13-DEC-13 05-APR-14 $1 @ LKR130/-(LKR3,918,280.00)

Consulting Services

PackageNumber

General Description

EstimatedValue

Awarded Contract

Value

Recruitment Method

AdvertisementDate

(quarter/year)

Date of ADB

Approval of

Contract Award

Date of Completion Comments

None

D. National Competitive Bidding

A. Regulation and Reference Documents

1. The procedures to be followed for national competitive bidding shall conform to the provisions prescribed in the Procurement Guidelines 2006 for Goods and Works issued in January 2006 by the National Procurement Agency,and the specific procedures prescribed by the Procurement Manual issued in March 2006, with the clarifications andmodifications described in the following paragraphs required for compliance with the provisions of the ADB Procurement Guidelines.

B. Procurement Procedures

1. Eligibility

2. The eligibility of bidders shall be as defined under Section I of ADB's Procurement Guidelines (2015, as amended from time to time) (the "Guidelines); accordingly, no bidder or potential bidder should be declared ineligible forreasons other than those provided in Section I of the Guidelines.

2. Registration and Sanctioning

3. Registration is acceptable under the following conditions:

(i) Bidding shall not be restricted to pre-registered firms under the national registration system of the Institute forConstruction, Training and Development (ICTAD), and such registration shall not be a condition for the submission of bids in the bidding process.

(ii) Where registration is required prior to award of contract, bidders: (i) shall be allowed a reasonable time to complete the ICTAD registration process; and (ii) shall not be denied registration for reasons unrelated to their capability and resources to successfully perform the contract, which shall be verified through post-qualification.

(iii) National sanction lists or blacklists may be applied only with prior approval of ADB.

3. Prequalification

4. Prequalification is discouraged for NCB. When used, particularly for works contracts, an individual prequalification exercise is acceptable for each contract as is the use of a registration system (or approved standing list) of contractors based on criteria such as experience, financial capacity, and technical capacity. Foreign bidders from eligible countries must, however, be allowed to register and to bid without unreasonable cost or additional requirements.

4. Advertising

5. The posting of NCB specific notices for contracts valued at less than $1 million on ADB's website is not required but is highly recommended.

5. Preferences

6. The following shall be observed:

(i) No preference of any kind shall be given to domestic bidders or for domesticallymanufactured goods.

(ii) Foreign suppliers and contractors from ADB member countries shall be allowed to bid, without registration, licensing, and other government authorizations, leaving compliance with these requirements for after award and before signing of contract.

6. Participation by Government-Owned Enterprises

7. Government-owned enterprises in the Democratic Socialist Republic of Sri Lanka shall be eligible to participate only if they can establish that they are legally and financially autonomous, operate under commercial law, and are not a dependent agency of the procuring entity, or the Project Executing Agency or Implementing Agency.

7. Rejection of Bids and Rebidding

8. Bids shall not be subjected to a test for unrealistic rates. No lowest evaluated and substantially responsive bid shall be rejected on the basis of comparison to rates, including but not limited to market, historical, or agency established rates, without prior approval of ADB.

9. Bids shall not be rejected and new bids solicited without the ADB's prior concurrence.

8. Price Negotiations

10. Price negotiation shall be allowed only where the price offered by the lowest evaluated and substantially responsive bidder substantially exceeds costs estimates. Approval of ADB is required prior to any negotiation of prices.

C. Bidding Documents

9. Acceptable Bidding Documents

11. Procuring entities shall use standard bidding documents acceptable to ADB for the Procurement of Goods,Works and Consulting Services, based ideally on the standard bidding documents issued by ADB.

10. Bid Security

12. Where required, bid security shall be in the form of a certified check, a letter of credit or a bank guarantee from a reputable bank.

11. ADB Policy Clauses

13. A provision shall be included in all NCB works and goods contracts financed by ADB requiring suppliers andcontractors to permit ADB to inspect their accounts and records and other documents relating to the bid submissionand the performance of the contract, and to have them audited by auditors appointed by ADB.

14. A provision shall be included in all bidding documents for NCB works and goods contracts financed by ADB stating that the Borrower shall reject a proposal for award if it determines that the bidder recommended for award has,directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in competing for the contract in question.

15. A provision shall be included in all bidding documents for NCB works and goods contracts financed by ADB stating that ADB will declare a firm or individual ineligible, either indefinitely or for a stated period, to be awarded a contract financed by ADB, if it at any time determines that the firm or individual has, directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices or any integrity violation in competing for, or in executing, ADB-financed contract.