DF001 SIGN. SIGN. SIGN. CLIENT : ADANI POWER LIMITED 2 x 330MW THERMAL POWER PLANT MUNDRA SEZ, TUNDA, SIRACHA VILLAGE, KUTCHH DIST. GUJARAT CONTRACT No.: PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ CONSULTANT FICHTNER CONSULTING ENGINEERS (INDIA) PRIVATE LIMITED, CHENNAI TITLE : AREVA T&D India Limited A-7, SECTOR-65 NOIDA - 201301 This drawing and design is the property of AREVA T&D and must not be copied or lent without prior permission in writing File: PG725000- REV. B DINESH 06/08/2008 06/12/2006 Name EMI-7604PG754-4-028 APPROVED 400 KV CONTROL & INTERLOCK LOGIC DIAGRAM TOTAL SHEET 92 001 APL / 130001 / VJ / 967 / 07 DATED 21.11.2007 STATUS DESCRIPTION FC DRAWN SHEET DRAWING NO. CHECKED MHB Date Name Name Date Date Name Date Name Name Date Name Date Name Date Name Name Name Date 13/6/2006 RJR Date 06/08/2008 MHB Name Date 06/08/2008 REV. Name Name Date Date A B Date RSD Date UPDATED BASED UPON CUSTOMER'S COMMENTS FIRST ISSUE 06/12/2006 Date Name RJR FA

Transcript of 400 KV-Interlock Logic Diagram_RevB

Page 1: 400 KV-Interlock Logic Diagram_RevB

DF001

SIG

N.

SIG

N.

SIG

N.

CLIENT :ADANI POWER LIMITED2 x 330MW THERMAL POWER PLANT

MUNDRA SEZ, TUNDA, SIRACHA VILLAGE, KUTCHH DIST. GUJARAT

CONTRACT No.:PROJECT :

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CONSULTANT FICHTNER CONSULTING ENGINEERS (INDIA) PRIVATE LIMITED,

CHENNAITITLE :

AREVA T&D India LimitedA-7, SECTOR-65NOIDA - 201301

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

File

: PG

7250

00-

REV.

B

DINESH06/08/2008

06/12/2006Name

EMI-7604PG754-4-028

APPROVED

400 KV CONTROL & INTERLOCK LOGIC DIAGRAM

TOTAL SHEET

92001

APL / 130001 / VJ / 967 / 07 DATED 21.11.2007

STATUSDESCRIPTION

FC

DRAWN

SHEETDRAWING NO.

CHECKED

MHBDateName

NameDate

Date

NameDateName

NameDate

NameDate

NameDate

NameName

NameDate

13/6/2006RJR

Date

06/08/2008MHB

NameDate

06/08/2008

REV.

Name

NameDate

DateA

B

Date

RSDDate

UPDATED BASED UPON CUSTOMER'S COMMENTS

FIRST ISSUE06/12/2006

DateName

RJRFA

Page 2: 400 KV-Interlock Logic Diagram_RevB

DF002

A B C D E F G H I A B C D E F G H I001 X X 042 X X

002 X X 043 X X

003 X 044 X X

004 X 045 X X

005 X 046 X X

006 X 047 X X

007 X 048 X X

008 X 049 X X

008A X 050 X X

008B X 051 X X

008C X 052 X X

008D X 053 X X

009 X X 054 X X

010 X 055 X X

011 X X 056 X X

012 X 057 X X

013 X X 058 X X

014 X X 059 X X

015 X X 060 X X

016 X X 061 X X

017 X X 062 X X

018 X X 063 X X

019 X X 064 X X

020 X X 065 X X

021 X X 066 X X

022 X X 067 X X

023 X X 068 X X

023A X X 069 X X

024 X X 070 X X

025 X X 071 X X

026 X X 072 X X

027 X X 073 X X

028 X X 074 X

029 X X 075 X X

030 X X 076 X X

031 X X 077 X X

032 X X 078 X X

033 X X 079 X X

034 X X 080 X X

035 X X 081 X

036 X X 082 X

037 X X 083 X

038 X X 084 X

039 X X 085 X

040 X X 086 X

041 X X

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1 (CONTD.)

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-2

File

: PG

7250

00-0

02.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-2

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-2

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-2 (CONTD.)

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-2

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE2

003

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1 (CONTD)

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE1

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-1

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-1

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-1

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-1

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-2

PROTECTION TRIP LOGIC FOR GT PROTECTIONS(TYPICAL)

PROTECTION TRIP LOGIC FOR ICT PROTECTIONS(TYPICAL)

CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM BCU/ BAY CONTROL & PROTECTION PANEL *

002

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-1

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-2

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3 (CONTD.)

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN GT-3

CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER INGT-3

CONTROL LOGIC FOR LOCAL OPERATION OF CKT. BKRS FROM EQP M. BOX

CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM BCU/BAY CONTROL & PROTECTION PANEL *

PROTECTION TRIP LOGIC FOR LINE PROTECTIONS(TYPICAL)

PROTECTION TRIP LOGIC FOR TIE PROTECTIONS(TYPICAL)

CONTROL LOGIC FOR LOCAL OPERATION OF ISOLATORS FROM EQP M.BOX

CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM BCU

CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM HMI

CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM SCADA

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN ICT-2

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN ICT-2

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN ICT-2

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-4

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-4

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4

IMPLEMENTATION OF AUTORECLOSE FUNCTION IN BCU

INTERLOCK LOGIC FOR OPERATION OF BUS-2 CVT ISOLATOR & EARTH SWITCH

IMPLEMENTATION OF SYNCHROCHECK IN BCU

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-3

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN ICT-1

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3 (CONTD.)

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3

CONTROL & INTERLOCK LOGIC FOR OPERATION OFEARTH SWITCHES IN TIE-3

INDEX

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-4

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-4

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-2

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-2

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-1 (CONTD.)

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-2

EMI-7604PG754-4-028

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-3

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN ICT-1

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN ICT-1

SHEET REVISION DESCRIPTION

FRONT SHEET

INDEX

SHEET REVISION DESCRIPTION

SHEET NEXT SH.AREVA

CLIENT : ADANI POWER LTD.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM SCADA (LDC) *

B

AREVA T&D India LimitedREV.

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-4CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-1

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4 (CONTD.)

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-4

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-4

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-4

CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM HMI *

CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM HMI *

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE1CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM SCADA (LDC) *

INTERLOCK LOGIC FOR OPERATION OF400kV ISOLATORS IN ICT-1

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN ICT-1

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-3

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-3

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-3

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-3

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-3

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-3

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2 (CONTD.)

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G ICT-2

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-4

CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-4

CONTROL & INTERLOCK LOGIC FOR OPERATION OFEARTH SWITCHES IN TIE-4

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4 (CONTD.)

IMPLEMENTATION OF AUTORECLOSE FUNCTION IN BCU

CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-4

INTERLOCK LOGIC FOR OPERATION OF BUS-1 CVT ISOLATOR & EARTH SWITCH

IMPLEMENTATION OF SYNCHROCHECK IN BCU

IMPLEMENTATION OF SYNCHROCHECK IN BCU

IMPLEMENTATION OF SYNCHROCHECK IN BCU

Page 3: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR LOCAL OPERATION OF ISOLATORS FROM EQUIPMENT MARSHALLING BOX*

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY BCU / HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT EQP MARSHALLING BOX IS IN LOCAL MODE.

** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED.THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY.

*** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.

CLIENT :

INTLK PERMISSIVE FROM RESPECTIVE BCU **

TO CLOSING CIRCUIT

INTLK PERMISSIVE FROM RESPECTIVE BCU **

CLOSE

TO OPEN CIRCUIT

OPEN

REMOTE = BCU/HMI/SCADA

SHEETCONTROL LOGIC FOR LOCAL OPERATION OF 400kV ISOLATORS

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ PROJECT :

NEXT SH.

004003

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 A

ADANI POWER LTD.

LOCAL = EQP M.BOX

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

&

&

Page 4: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM BCU*

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE.

** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED.THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY.

*** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.

CLIENT :

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

OPEN/CLOSE PUSH BUTTON CONTROL

FROM BCU

OPEN

BAY LOCAL/REMOTE PUSH BUTTON ON BCU

TO CLOSING CIRCUIT

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CLOSE

TO OPEN CIRCUIT

INTLK PERMISSIVE FROM RESPECTIVE BCU **

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

LOCAL = BCU

REMOTE = HMI / SCADA

005004

AREVA T&D India Limited

INTLK PERMISSIVE FROM RESPECTIVE BCU **

ADANI POWER LTD.

CONTROL LOGIC FOR REMOTE OPERATION OF 400kV ISOLATORS FROM BCU

REV.

EMI-7604PG754-4-028 A

AREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

&

&

Page 5: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM HMI*

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER SCADA LEVEL ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTION AT HMI IS IN LOCAL MODE.

** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED.THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY.

*** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.

CLIENT :

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

006005

AREVA T&D India LimitedSHEET NEXT SH.CONTROL LOGIC FOR REMOTE OPERATION OF

400kV ISOLATORS FROM HMIREV.

EMI-7604PG754-4-028 A

AREVA

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

REMOTE = HMI / SCADA

TO OPEN CIRCUIT

INTLK PERMISSIVE FROM RESPECTIVE BCU **

INTLK PERMISSIVE FROM RESPECTIVE BCU **

ADANI POWER LTD.

TO CLOSING CIRCUIT

OPEN

CLOSE

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

REMOTE = SCADA

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SUBTATION LOCAL/REMOTE SELECTION

FROM HMI

LOCAL = HMI

OPEN/CLOSE CONTROL FROM HMI

&

&

Page 6: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM SCADA(LDC)

** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED.THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY.

*** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.

CLIENT :

OPEN/CLOSE CONTROL FROM HMI

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

REMOTE = SCADA

REMOTE = HMI / SCADA

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SUBTATION LOCAL/REMOTE SELECTION

FROM HMI

LOCAL = HMI

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

TO CLOSING CIRCUIT

OPEN

CLOSE

TO OPEN CIRCUIT

AREVA SHEET

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA INTLK PERMISSIVE FROM RESPECTIVE BCU **

INTLK PERMISSIVE FROM RESPECTIVE BCU **

ADANI POWER LTD.

CONTROL LOGIC FOR REMOTE OPERATION OF 400kV ISOLATORS FROM SCADA

REV. NEXT SH.

007006

AREVA T&D India LimitedEMI-7604PG754-4-028 A

&

&

Page 7: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR LOCAL OPERATION OF CIRCUIT BREAKERS FROM EQUIPMENT MARSHALLING BOX*

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY BCU / HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT EQP MARSHALLING BOX IS IN LOCAL MODE.

** THESE INTERLOCKS ARE HARDWIRED AT BMK LEVEL AND OPERATION FROM EQP. MARSHALLING BOX IS POSSIBLE ONLY WHEN THESE INTERLOCKS ARE SATISFIED.FOR DETAILS REFER THE RESPECTIVE BREAKER INTERLOCK LOGICS

CLIENT :

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

A

ADANI POWER LTD.

008007

AREVAEMI-7604PG754-4-028

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

LOCAL = EQP M.BOX

NEXT SH.CONTROL LOGIC FOR LOCAL OPERATION OF 400kV CIRCUIT BREAKERS

TO TRIP COIL - 1

TO CLOSING CIRCUIT

SHEET

OPEN

CLOSE

AREVA T&D India LimitedREV.

TO TRIP COIL - 2

REMOTE = BCU/HMI/SCADA

HARDWIRED INTERLOCKS AT BMK LEVEL **

&

&

Page 8: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM BCU/BAY CONTROL & PROTECTION PANEL *

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE.

** EMERGENCY TRIPPING CAN BE GIVEN THROUGH THE TNC SWITCH PROVIDED ON THE BAY PROTECTION & CONTROL PANEL. CONTROLS GIVEN THROUGH TNC SWITCH ARE ROUTED INDEPENDENT OF THE BCU AND HENCE ARE INDEPENDENT OF THE LOCAL/REMOTE SELECTION AT BCU/HMI.

*** PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.

CLIENT :

008A008

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 A

SHEET NEXT SH.

OPEN/CLOSE PUSH BUTTON CONTROL

FROM BCU

CONTROL LOGIC FOR REMOTE OPENING OF 400kV LINE-TIE- ICT CIRCUIT BREAKERS FROM

BCU

ADANI POWER LTD.

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADATO TRIP COIL - 1

TO TRIP COIL - 2

OPEN

CLOSE

REMOTE = HMI / SCADA

PROJECT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CNTL SWTCH FROM C&R PANEL FOR EMERGENCY

CONTROL **

OPEN

CLOSE

OR&

&

&

Page 9: 400 KV-Interlock Logic Diagram_RevB

DF003

PROTECTION TRIP LOGIC FOR LINE PROTECTIONS(TYPICAL)

CLIENT :

009008A

AREVAB

REV.

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

PROTECTION TRIP LOGIC FOR LINE PROTECTION

EMI-7604PG754-4-028

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

PROJECT :

SHEET NEXT SH.AREVA T&D India Limited

Page 10: 400 KV-Interlock Logic Diagram_RevB

DF003

PROTECTION TRIP LOGIC FOR TIE PROTECTIONS(TYPICAL)

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

PROTECTION TRIP LOGIC FOR TIE PROTECTION

EMI-7604PG754-4-028

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

PROJECT :

SHEET NEXT SH.AREVA T&D India Limited

008C008B

AREVAB

REV.

Page 11: 400 KV-Interlock Logic Diagram_RevB

DF003

PROTECTION TRIP LOGIC FOR GT PROTECTIONS(TYPICAL)

NOTE :

* ONLY HV O/C & E/F PROTECTION, LBB & BUSBAR PROTECTION ARE LOCATED IN THE SWITCHYARD RELAY PANEL. ALL THE OTHER PROTECTIONS ARE NOT IN PRESENT SCOPE.

CLIENT :

008D008C

AREVAB

REV.

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

PROTECTION TRIP LOGIC FOR GT PROTECTION

EMI-7604PG754-4-028

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

PROJECT :

SHEET NEXT SH.AREVA T&D India Limited

Page 12: 400 KV-Interlock Logic Diagram_RevB

DF003

PROTECTION TRIP LOGIC FOR ICT PROTECTIONS(TYPICAL)

NOTE :

* 220kV PROTECTIONS ARE NOT IN PRESENT SCOPE.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

PROTECTION TRIP LOGIC FOR ICT PROTECTION

EMI-7604PG754-4-028

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

PROJECT :

SHEET NEXT SH.AREVA T&D India Limited

009008D

AREVAB

REV.

Page 13: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM BCU/ BAY CONTROL & PROTECTION PANEL *

##PERMISSIVE FOR TNC MAINTENANCE CLOSING FROM BCU

(APPLIES TO ALL BAYS EXCEPT GT & GT TIE BAYS)

##

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE.

** CHECK SYNCHRONISATION CONDITIONS ARE VALIDATED IN THE RESPECTIVE BAY CONTROL UNIT, BASED UPON THE SELECTED INCOMING & RUNNING VOLTAGES.

*** FOR DETAILED INTERLOCKING LOGICS REFER THE INTERLOCKS OF THE RESPECTIVE CIRCUIT BREAKER.

## PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.

1 CLOSE COMMAND GIVEN BY THE OPERATOR FROM BCU WILL BE EXECUTED ONLY IF THE CHECK-SYNC CONDITIONS ARE SATISFIED.

2 CLOSE COMMAND FROM TNC SWITCH IS MEANT FOR CLOSING WITHOUT ANY SYNCHRONISATION & HENCE TO BE USED FOR MAINTENANCE/TESTING CONDITIONS.

3 INCOMING & RUNNING VOLTS ARE SELECTED BASED UPON THE ISOLATOR & CB POSITIONS IN THE RESPECTIVE DIA.CLIENT :

4 FOR GT-3 & GT-4 (BAYS-3, 12) REMOTE OPERATION IS NOT PROVIDED FROM SWITCHYARD.

5 FOR TIE-1 & TIE-4 (BAYS-2, 11) REMOTE OPERATION IS POSSIBLE FROM BCU/HMI/SCADA ONLY AS LONG AS THE TIE/GT SELECTOR SWITCH IS IN TIE MODE.

PERMISSIVE

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

ADANI POWER LTD.

LOCAL = EQP M.BOX

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

INTLKS IMPLEMENTED THROUGH SOFT LOGIC IN RESPECTIVE BCU ***

TO CLOSING CIRCUIT

REMOTE = BCU/HMI/SCADA

OPEN/CLOSE PUSH BUTTON CONTROL

FROM BCU

OPEN

CLOSE

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL***

LOCAL = BCU

CONTROL LOGIC FOR REMOTE CLOSING OF 400kV LINE-TIE-ICT CIRCUIT BREAKERS

FROM BCU

REMOTE = HMI / SCADA

SELECTED INCOMING VOLTS

SELECTED RUNNING VOLTS

PERMISSIVE FOR MAINTENANCE CLOSING

CNTL SWTCH FROM C&R PANEL FOR EMERGENCY

CONTROL

OPEN

CLOSE

ISO 89-B OPEN

ISO 89-A OPEN

010009

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B

SHEET NEXT SH.

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

OR

&

&

&

&

Page 14: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM HMI *

NOTE :

* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE.

** EMERGENCY TRIPPING CAN BE GIVEN THROUGH THE TNC SWITCH PROVIDED ON THE BAY PROTECTION & CONTROL PANEL. CONTROLS GIVEN THROUGH TNC SWITCH ARE ROUTED INDEPENDENT OF THE BCU.

CLIENT :

OPEN/CLOSE CONTROL FROM HMI

OPEN

CLOSE

SUBTATION LOCAL/REMOTE SELECTION

FROM HMI

LOCAL = HMI

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CNTL SWTCH FROM C&R PANEL FOR EMERGENCY

CONTROL **

OPEN

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

NEXT SH.CONTROL LOGIC FOR REMOTE OPENING OF 400kV LINE-TIE- ICT CIRCUIT BREAKERS FROM

HMI

ADANI POWER LTD.

CLOSE

TO TRIP COIL - 1

TRIP COIL - 2

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

REMOTE = SCADA

REMOTE = HMI / SCADA

011010

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 A

SHEET

OR

&

&

&

Page 15: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM HMI *

##PERMISSIVE FOR TNC MAINTENANCE CLOSING FROM BCU

(APPLIES TO ALL BAYS EXCEPT GT & GT TIE BAYS)

##

NOTE :

* IN THIS MODE, CONTROL FROM SCADA ARE DEFEATED AS LONG AS THE SUBSTATION LOCAL/REMOTE SELECTION IS IN LOCAL MODE.

** CHECK SYNCHRONISATION CONDITIONS ARE VALIDATED IN THE RESPECTIVE BAY CONTROL UNIT, BASED UPON THE SELECTED INCOMING & RUNNING VOLTAGES.

*** FOR DETAILED INTERLOCKING LOGICS REFER THE INTERLOCKS OF THE RESPECTIVE CIRCUIT BREAKER.

## PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.

1 CLOSE COMMAND GIVEN BY THE OPERATOR FROM HMI WILL BE EXECUTED ONLY IF THE CHECK-SYNC CONDITIONS ARE SATISFIED.

2 CLOSE COMMAND FROM TNC SWITCH IS MEANT FOR CLOSING WITHOUT ANY SYNCHRONISATION & HENCE TO BE USED FOR MAINTENANCE/TESTING CONDITIONS.CLIENT :

3 INCOMING & RUNNING VOLTS ARE SELECTED BASED UPON THE ISOLATOR & CB POSITIONS IN THE RESPECTIVE DIA.

ISO 89-B OPEN

012011

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B

NEXT SH.SHEET

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CNTL SWTCH FROM C&R PANEL FOR EMERGENCY

CONTROL

OPEN

CLOSE

ADANI POWER LTD.

LOCAL = EQP M.BOX

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL***

TO CLOSING CIRCUIT

REMOTE = BCU/HMI/SCADA

OPEN/CLOSE CONTROL FROM HMI

OPEN

CLOSE

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

PERMISSIVE FOR MAINTENANCE CLOSINGPERMISSIVE

REMOTE = HMI / SCADA

SUBTATION LOCAL/REMOTE SELECTION

FROM HMI

LOCAL = HMI

REMOTE = SCADA

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

PROJECT :

SELECTED INCOMING VOLTS

SELECTED RUNNING VOLTS

CONTROL LOGIC FOR REMOTE CLOSING OF 400kV LINE-TIE- ICT CIRCUIT BREAKERS

FROM HMI

ISO 89-A OPEN

INTLKS IMPLEMENTED THROUGH SOFT LOGIC IN RESPECTIVE BCU ***

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

OR

&

&

&

&

Page 16: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM SCADA (LDC) *

NOTE :

** EMERGENCY TRIPPING CAN BE GIVEN THROUGH THE TNC SWITCH PROVIDED ON THE BAY PROTECTION & CONTROL PANEL. CONTROLS GIVEN THROUGH TNC SWITCH ARE ROUTED INDEPENDENT OF THE BCU.

CLIENT :

TRIP COIL - 2

TO TRIP COIL - 1

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

013012

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 A

SHEET

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

REMOTE = SCADA

REMOTE = HMI / SCADA

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

NEXT SH.CONTROL LOGIC FOR REMOTE OPENING OF 400kV LINE-TIE- ICT CIRCUIT BREAKERS FROM

SCADA

ADANI POWER LTD.

SUBTATION LOCAL/REMOTE SELECTION

FROM HMI

LOCAL = HMI

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE CONTROL FROM SCADA

OPEN

CLOSE

CNTL SWTCH FROM C&R PANEL FOR EMERGENCY

CONTROL **

OPEN

CLOSE

OR

&

&

&

Page 17: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM SCADA (LDC) *

##PERMISSIVE FOR TNC MAINTENANCE CLOSING FROM BCU

(APPLIES TO ALL BAYS EXCEPT GT & GT TIE BAYS)

##

NOTE :

** CHECK SYNCHRONISATION CONDITIONS ARE VALIDATED IN THE RESPECTIVE BAY CONTROL UNIT, BASED UPON THE SELECTED INCOMING & RUNNING VOLTAGES.

*** FOR DETAILS INTERLOCKING LOGICS REFER THE INTERLOCKS OF THE RESPECTIVE CIRCUIT BREAKER.

## PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.

1 CLOSE COMMAND GIVEN BY THE OPERATOR FROM SCADA WILL BE EXECUTED ONLY IF THE CHECK-SYNC CONDITIONS ARE SATISFIED.

2 CLOSE COMMAND FROM TNC SWITCH IS MEANT FOR CLOSING WITHOUT ANY SYNCHRONISATION & HENCE TO BE USED FOR MAINTENANCE/TESTING CONDITIONS.CLIENT :

3 INCOMING & RUNNING VOLTS ARE SELECTED BASED UPON THE ISOLATOR & CB POSITIONS IN THE RESPECTIVE DIA.

ISO 89-B OPENPERMISSIVE FOR MAINTENANCE CLOSING

CLOSE

INTLKS IMPLEMENTED THROUGH SOFT LOGIC IN RESPECTIVE BCU ***

ISO 89-A OPEN

OPEN/CLOSE CONTROL FROM HMI

OPEN

PERMISSIVE

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

BAY LOCAL/REMOTE PUSH BUTTON ON

BAY CONTROL UNIT

LOCAL = BCU

TO CLOSING CIRCUIT

REMOTE = BCU/HMI/SCADA

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SHEET

REMOTE = HMI / SCADA

SELECTED INCOMING VOLTS

SELECTED RUNNING VOLTS

ADANI POWER LTD.

LOCAL = EQP M.BOX

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL***

CONTROL LOGIC FOR REMOTE CLOSING OF 400kV LINE-TIE- ICT CIRCUIT BREAKERS

FROM SCADA

SUBTATION LOCAL/REMOTE SELECTION

FROM HMI

LOCAL = HMI

REMOTE = SCADA

CNTL SWTCH FROM C&R PANEL FOR EMERGENCY

CONTROL

OPEN

CLOSE

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

013

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 A 014

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

OR

&

&

&

&

Page 18: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1

A) ISOLATOR 1-89A

B) ISOLATOR 1-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

015014

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR OPERATION OF 400kV

ISOLATORS IN O/G LINE-1REV.

EMI-7604PG754-4-028 B

AREVA

ADANI POWER LTD.

ISO 1-89B INTLK PERMISSIVE*

ISO 1-89B OPEN REQUEST**

ISO 1-89B CLOSE ORDER

ISO 1-89B OPEN ORDER

ISO 1-89B CLOSE REQUEST**

1-52CB OPEN***

ISO 1-89A CLOSE REQUEST**

ISO 1-89A OPEN REQUEST**

ISO 1-89A INTLK PERMISSIVE*

ISO 1-89A CLOSE ORDER

ISO 1-89A OPEN ORDER

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-2 CVT ISO CLOSED

BUS-2 CVT ES OPEN

1-89AE OPEN

1-52CB OPEN***

1-89BE OPEN

&

&

&

&

&

&

Page 19: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1 (CONTD)

C) ISOLATOR 1-89C

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

ISO 1-89L OPEN ORDERISO 1-89L OPEN REQUEST **

2-52CB OPEN***

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-1 (CONTD)

016015

REV.

EMI-7604PG754-4-028 B

AREVA T&D India LimitedAREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

1-89LE OPEN

1-52CB OPEN***

ADANI POWER LTD.

ISO 1-89L INTLK PERMISSIVE *

ISO 1-89L CLOSE ORDER

ISO 1-89L CLOSE REQUEST **

&

&

&

Page 20: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-1

A) EARTH SWITCH 1-89AE*

B) EARTH SWITCH 1-89BE*

C) EARTH SWITCH 1-89LE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

*** LINE U/V PERMISSIVE IS TAKEN THROUGH SOFT FROM LINE DISTANCE PROTECTION RELAY.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 1-89A OPEN

ISO 1-89B OPEN

ISO 1-89L OPEN

DEAD LINE O/G LINE-1 (UNDER VOLTAGE

OPERATED) ***

ISO 1-89A OPEN

ISO 1-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

ES 1-89BE INTLK PERMISSIVE **

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN O/G LINE-1

ADANI POWER LTD.

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

017016

AREVA T&D India LimitedSHEET NEXT SH.REV.

EMI-7604PG754-4-028 B

AREVA

OPEN

CLOSE

ES 1-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

OPEN

CLOSE

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ES 1-89LE INTLK PERMISSIVE **

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

&

&

&

&

&

&

&

&

&

Page 21: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-1

A) RUNNING VOLTS *

B) INCOMING VOLTS **

CASE - I

CASE - 2

NOTE:

* FOR LINE FEEDERS, BUS-2 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

THE SYNCHRONISATION OF LINE WITH GT IS NOT CONSIDERED IN THE CVT SELECTION & THE CB CLOSING SCHEME.

CLIENT :

RUNNING VOLTS

CB 3-52 CLOSE

SHEETCVT SELECTION LOGIC FOR CHECK-SYNC OF CB IN O/G LINE-1 (BAY-1)

ADANI POWER LTD.

AREVA T&D India Limited

PROJECT :

017

BUS-1 CVT SELECTEDISO 3-89G OPEN

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ISO 1-89L CLOSE LINE - 1 CVT (1 - CVTB) SELECTED

CB 1-89L OPEN

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS - 2 CVT

NEXT SH.REV.

EMI-7604PG754-4-028 B

AREVA018

CB 2-52 CLOSE

&

Page 22: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-1

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.CLIENT :

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU.

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSCLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

CB 1-52 LOCAL CLOSING CIRCUIT *

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

BBP RELAYRESET

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 1-89 AE CLOSE

ES 1-89 BE CLOSE

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

BBP RELAYRESET

ISO 1-89A CLOSE

ISO 1-89B CLOSE

L/R SS AT CB 1-52 M.BOX IN REMOTE MODE

ADANI POWER LTD.

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN O/G LINE-1

REV.

EMI-7604PG754-4-028 B

AREVA

CB 1-52 CLOSING CIRCUIT **

019018

AREVA T&D India LimitedSHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

RUNNING (BUS-2 CVT) VOLTS

CB 1-52 CLOSE ORDER

SELECTED INCOMING VOLTS (REFER SH: 017)

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 23: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-1

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR OPENING FROM REMOTE **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.CLIENT :

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN O/G LINE-1

REV.

EMI-7604PG754-4-028 B

AREVA020019

AREVA T&D India LimitedSHEET NEXT SH.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST *

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

TO TRIP COIL - 2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

ADANI POWER LTD.

&

&

Page 24: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-1

A) ISOLATOR 2-89A

A) ISOLATOR 2-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :

File

: PG

7250

00-0

03.x

ls

2-89BE OPEN

2-52CB OPEN***

ISO 2-89B CLOSE REQUEST**

ISO 2-89B OPEN REQUEST**

2-89AE OPEN

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS FOR TIE-1

REV.

ISO 2-89A OPEN ORDER

ISO 2-89B INTLK PERMISSIVE *

ISO 2-89B CLOSE ORDER

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

ADANI POWER LTD.

ISO 2-89A INTLK PERMISSIVE *

ISO 2-89A OPEN REQUEST**

ISO 2-89A CLOSE ORDER

ISO 2-89B OPEN ORDER

2-52CB OPEN***

ISO 2-89A CLOSE REQUEST**

021020

AREVA T&D India LimitedSHEET NEXT SH.

&

&

&

&

&

&

Page 25: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-1

A) EARTH SWITCH 2-89AE*

B) EARTH SWITCH 2-89BE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN TIE-

1 (BAY-2)

REV.

EMI-7604PG754-4-028 B

AREVA022021

ADANI POWER LTD.

AREVA T&D India LimitedSHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

File

: PG

7250

00-0

03.x

ls

ISO 2-89B OPEN

ISO 2-89A OPEN

ISO 2-89A OPEN

ES 2-89AE INTLK PERMISSIVE **

ISO 2-89B OPEN

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

ES 2-89BE INTLK PERMISSIVE **

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

&

&

&

&

&

&

Page 26: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-1

A) RUNNING VOLTS *

CASE-1 (TIE/GT SELECTOR SWITCH IN TIE MODE. SYNCHRONISATION IS DONE FROM SWITCHYARD BCU)

CASE-2 (TIE/GT SELECTOR SWITCH IN GT MODE. SYNCHRONISATION IS DONE FROM GCP)

B) INCOMING VOLTS *

CASE - I (APPLICABLE TO BOTH TIE & GCP MODE.)

CASE - 2 (APPLICABLE TO BOTH TIE & GCP MODE.)

CASE - 3 (APPLICABLE FOR GT SYNCHRONISATION ONLY .TIE/GT SELECTOR SWITCH IN GT MODE. SYNCHRONISATION IS DONE FROM GCP)

##

NOTE:

* SINCE THE SYNCHRONISATION OF GT IS DONE FROM GCP, GT CVT IS NOT CONSIDERED IN THE CVT SELECTION LOGIC FOR BCU. FOR BCU IN THE SWITCHYARD RUNNING VOLTS BY DEFAULT IS TAKEN AS BUS-1 VOLTS

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

## GT-3 CVT WILL BE SELECTED ONLY FOR SYNCHRONISATION OF GT THROUGH THE TIE. CLIENT :

TIE/GCP SELECTOR SWITCH AT SWYD BAY

CONTROL & PROT PANEL

TIE = FEEDER

GCP = GT

BUS-2 CVT SELECTED **CB 1-89L OPEN

TIE/GCP SELECTOR SWITCH AT SWYD BAY

CONTROL & PROT PANEL

TIE = FEEDER

GCP = GT

CB 3-52 OPEN

TIE/GCP SELECTOR SWITCH AT SWYD BAY

CONTROL & PROT PANEL

TIE = FEEDER

GCP = GT

CB 1-52 CLOSE

BUS - 1 CVT RUNNING VOLTS TO BCU

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

GT - 3 CVT RUNNING VOLTS

ISO 1-89L CLOSE

GT-3 CVT SELECTED **CB 3-89G CLOSED

LINE - 1 CVT (1 - CVTB) SELECTED **

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN TIE-1 (BAY-2)

ADANI POWER LTD.

EMI-7604PG754-4-028 B 023022

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

AREVA T&D India LimitedNEXT SH.REV.AREVA SHEET

&

&

OR

OR

&

Page 27: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1(REMOTE CLOSING POSSIBLE FROM SWITCHYARD ONLY AS LONG AS ISOLATOR 3-89G IS OPEN)

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

GT3INTLKS FROM GCP

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

023A023

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR CLOSING OF 400kV

CIRCUIT BREAKER IN TIE-1REV.

EMI-7604PG754-4-028 B

AREVA

CB 2-52 LOCAL CLOSING CIRCUIT *

ADANI POWER LTD.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 2-89 AE CLOSE

ES 2-89 BE CLOSE

GT-386 TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

O/G LINE-186-A TRIP RELAY RESET86-B TRIP RELAY RESET

TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &

PROT PANEL

CB 2-52 CLOSING CIRCUIT**

TIE = FEEDER

GCP = GT

&

&

OR

Page 28: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1 (CONTD.)

(REMOTE CLOSING POSSIBLE FROM SWITCHYARD ONLY AS LONG AS TIE/GCP SELECTOR SWITCH IS IN TIE MODE)

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 2-89B CLOSE

L/R SS AT CB 2-52 M.BOX IN REMOTE MODE

ISO 3-89G OPEN

O/G LINE-186-A TRIP RELAY RESET86-B TRIP RELAY RESET

TIE-1 A/R LK-OUT TRIP RELAY (86-LO) RESET

TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &

PROT PANEL

TIE = FEEDER

GCP = GT

ADANI POWER LTD.

RUNNING (BUS-1 CVT) VOLTS

CB 2-52 CLOSE ORDER

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

SELECTED INCOMING VOLTS (REFER SH: 022)

ISO 2-89A CLOSE

GT-386 TRIP RELAY RESET

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN TIE-1(CONTD.)

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

024023A

AREVA T&D India LimitedSHEET NEXT SH.

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 29: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-1(REMOTE OPENING POSSIBLE FROM SWITCHYARD ONLY IF TIE/GCP SELECTOR SWITCH IS IN TIE MODE)

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

TIE = FEEDER

GCP = GT

TO TRIP COIL - 2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST

3-89G OPEN

TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &

PROT PANEL

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN TIE-1

REV.

EMI-7604PG754-4-028 B

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

AREVA025024

AREVA T&D India LimitedSHEET NEXT SH.

&

&

Page 30: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3

A) ISOLATOR 3-89B

B) ISOLATOR 3-89A

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIEDCLIENT :

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

ISO 3-89B INTLK PERMISSIVE *

ISO 3-89B CLOSE ORDER

ISO 3-89B OPEN ORDER

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-1 CVT ISO CLOSED

BUS-1 CVT ES OPEN

3-89BE OPEN

3-52CB OPEN***

3-89AE OPEN

ISO 3-89B CLOSE REQUEST**

ISO 3-89B OPEN REQUEST**

ISO 3-89A INTLK PERMISSIVE *

ISO 3-89A OPEN REQUEST**

ISO 3-89A CLOSE ORDER

ISO 3-89A OPEN ORDER

3-52CB OPEN***

ISO 3-89A CLOSE REQUEST**

026025

AREVA T&D India Limited

ADANI POWER LTD.

SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-3 (BAY-3)

REV.

EMI-7604PG754-4-028 B

AREVA

&

&

&

&

&

&

Page 31: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3 (CONTD.)

C) ISOLATOR 3-89G

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

AREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

3-89GE OPEN

3-52CB OPEN***

ADANI POWER LTD.

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-3 (BAY-3)

027026

REV.

EMI-7604PG754-4-028 B

AREVA T&D India Limited

ISO 3-89G INTLK PERMISSIVE*

ISO 3-89G CLOSE ORDER

ISO 3-89G CLOSE REQUEST **

ISO 3-89G OPEN ORDERISO 3-89G OPEN REQUEST **

2-52CB OPEN***

&

&

&

Page 32: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN GT-3

A) EARTH SWITCH 3-89AE*

B) EARTH SWITCH 3-89BE*

C) EARTH SWITCH 3-89GE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

TO CLOSING CIRCUIT

OPENTO OPEN CIRCUIT

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

GENERATOR EXCITATION OFF

EMI-7604PG754-4-028 B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

ES 3-89GE INTLK PERMISSIVE **

AREVA T&D India Limited

PROJECT :

REV.

ISO 3-89A OPEN

ISO 3-89B OPEN

ISO 3-89G OPEN

ISO 3-89A OPEN

ISO 3-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

ES 3-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 3-89BE INTLK PERMISSIVE **

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN GT-3

ADANI POWER LTD.

028027

SHEET NEXT SH.

&

&

&

&

&

&

&

&

&

Page 33: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-3

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL FOR CLOSE OPERATION*

B) INTERLOCKS FOR CLOSING FROM REMOTE (GCP)

C) INTERLOCKS FOR OPENING FROM BMK LEVEL *

D) INTERLOCKS FOR OPENING FROM REMOTE (GCP)

NOTE:CLIENT :

* THESE INTERLOCKS APPLY TO OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.OPERATION OF THE CIRCUIT BREAKERS IN GT BAYS IS NOT ALLOWED FROM THE BAY CONTROL & PROTECTION PANEL, BCU/HMI/SCADA.

** CLOSE POSITION OF THE CIRCUIT BREAKER IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN.

CLOSE

REMOTE = GCP

GT3INTLKS FROM GCP

CB 3-52 REMOTE CLOSING CIRCUIT *

AREVA T&D India Limited

TO TRIP COIL - 1

OPEN/CLOSE PUSH BUTTON CONTROLS AT GCP

OPEN

CLOSE

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

LOCAL = EQP M.BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

SHEET NEXT SH.

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 2OPEN

CLOSE

TO TRIP COIL - 2

REMOTE = GCP

ADANI POWER LTD.

CONTROL & INTERLOCK LOGIC FOR 400kV CIRCUIT BREAKER IN GT-3 (BAY-3)

REV.

EMI-7604PG754-4-028 B

AREVA029028

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

ES 3-89 AE CLOSE

ES 3-89 BE CLOSE

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT GCP

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

GT3INTLKS FROM GCP

CB 3-52 LOCAL CLOSING CIRCUIT *

CB CLOSE **

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

LOCAL = EQP M.BOX

REMOTE = GCP

OPEN

CLOSE

LOCAL = EQP M.BOX

LOCAL = EQP M.BOX

&

&

&

&

Page 34: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-2

A) ISOLATOR 4-89A

B) ISOLATOR 4-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :

ISO 4-89A INTLK PERMISSIVE *

ISO 4-89A CLOSE ORDER

ISO 4-89A OPEN ORDER

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-2 CVT ISO CLOSED

BUS-2 CVT ES OPEN

4-89AE OPEN

4-52CB OPEN***

4-89BE OPEN

4-52CB OPEN***

ISO 4-89A CLOSE REQUEST**

ISO 4-89A OPEN REQUEST**

ISO 4-89B INTLK PERMISSIVE *

ISO 4-89B OPEN REQUEST**

ISO 4-89B CLOSE ORDER

ISO 4-89B OPEN ORDER

ISO 4-89B CLOSE REQUEST**

030029

AREVA T&D India Limited

ADANI POWER LTD.

SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-2

REV.

EMI-7604PG754-4-028 B

AREVA

&

&

&

&

&

&

Page 35: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-2 (CONTD.)

C) ISOLATOR 4-89L

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

AREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

4-89LE OPEN

4-52CB OPEN***

ADANI POWER LTD.

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

itho

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-2(CONTD.)

031030

REV.

EMI-7604PG754-4-028 B

AREVA T&D India Limited

ISO 4-89L INTLK PERMISSIVE *

ISO 4-89L CLOSE ORDER

ISO 4-89L CLOSE REQUEST **

ISO 4-89L OPEN ORDERISO 4-89L OPEN REQUEST **

5-52CB OPEN***

&

&

&

Page 36: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-2

A) EARTH SWITCH 4-89AE*

B) EARTH SWITCH 4-89BE*

C) EARTH SWITCH 4-89LE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

*** LINE U/V PERMISSIVE IS TAKEN THROUGH SOFT FROM LINE DISTANCE PROTECTION RELAY.

CLIENT :

ES 4-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

OPENTO OPEN CIRCUIT

B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

ES 4-89LE INTLK PERMISSIVE **

AREVA T&D India Limited

OPEN

CLOSE

ISO 4-89A OPEN

ISO 4-89B OPEN

ISO 4-89L OPEN

DEAD LINE O/G LINE-2 (UNDER VOLTAGE

OPERATED) ***

ISO 4-89A OPEN

ISO 4-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 4-89BE INTLK PERMISSIVE **

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN O/G LINE-2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

031

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

032

SHEET NEXT SH.REV.

EMI-7604PG754-4-028

&

&

&

&

&

&

&

&

&

Page 37: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-2

A) RUNNING VOLTS *

B) INCOMING VOLTS **

CASE - I

CASE - 2

CASE - 3

NOTE:

* FOR LINE FEEDERS, BUS-2 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS - 2 CVT

ISO 4-89L CLOSE

ISO 4-89L OPEN

033032

SHEET

ISO 4-89L OPEN

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB IN O/G LINE-2 (BAY-4)

ADANI POWER LTD.

AREVA T&D India Limited

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

LINE - 2 CVT (4 - CVTB) SELECTED

RUNNING VOLTS

ISO 6-89G CLOSE

CB 5-52 CLOSE

CB 6-52 CLOSE

BUS-1 CVT SELECTEDISO 6-89G OPEN

CB 5-52 CLOSE ICT-1 CVT (6-CVT)SELECTED

REV.

EMI-7604PG754-4-028 B

AREVA

&

&

Page 38: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-2

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU.

CLIENT : *** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSE

CLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

AREVA T&D India LimitedSHEET NEXT SH.

RUNNING (BUS-2 CVT) VOLTS

CB 4-52 CLOSE ORDER

SELECTED INCOMING VOLTS (REFER SH: 032)

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN O/G LINE-2

REV.

EMI-7604PG754-4-028 B

AREVA034033

CB 4-52 LOCAL CLOSING CIRCUIT *

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

BBP RELAYRESET

CB 4-52 CLOSING CIRCUIT **

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 4-89 AE CLOSE

ES 4-89 BE CLOSE

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

BBP RELAYRESET

ISO 4-89A CLOSE

ISO 4-89B CLOSE

L/R SS AT CB 4-52 M.BOX IN REMOTE MODE

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 39: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-2

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR OPENING FROM REMOTE **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADATO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

OPEN

CLOSE

TO TRIP COIL - 2

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST *

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN O/G LINE-2

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

035034

AREVA T&D India LimitedSHEET NEXT SH.

&

&

Page 40: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-2

A) ISOLATOR 5-89A

A) ISOLATOR 5-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT : ADANI POWER LTD.

ISO 5-89A OPEN REQUEST**

ISO 5-89A CLOSE ORDER

ISO 5-89B OPEN ORDER

ISO 5-89A OPEN ORDER

ISO 5-89A INTLK PERMISSIVE*

5-52CB OPEN***

File

: PG

7250

00-0

03.x

ls

5-89BE OPEN

5-52CB OPEN***

ISO 5-89B CLOSE REQUEST**

ISO 5-89B OPEN REQUEST**

5-89AE OPEN

ISO 5-89A CLOSE REQUEST**

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-2

ISO 5-89B CLOSE ORDER

PROJECT :

ISO 5-89B INTLK PERMISSIVE*

EMI-7604PG754-4-028

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

AREVA REV.

036035

AREVA T&D India LimitedSHEET NEXT SH.

B

&

&

&

&

&

&

Page 41: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-2

A) EARTH SWITCH 5-89AE*

B) EARTH SWITCH 5-89BE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

ES 5-89BE INTLK PERMISSIVE **

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

ES 5-89AE INTLK PERMISSIVE **

ISO 5-89B OPEN

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

File

: PG

7250

00-0

03.x

ls

ISO 5-89B OPEN

ISO 5-89A OPEN

ISO 5-89A OPEN

037036

ADANI POWER LTD.

AREVA T&D India LimitedSHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES

IN TIE-2 (BAY-5)

REV.

EMI-7604PG754-4-028 B

AREVA

&

&

&

&

&

&

Page 42: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-2

A) RUNNING VOLTS *

CASE - I

CASE - 2

B) INCOMING VOLTS *

CASE - I

CASE - 2

NOTE:

* AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING /RUNNING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING/RUNNING VOLTS TO BCU.

CLIENT :

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN TIE-2 (BAY-5)

ADANI POWER LTD.

EMI-7604PG754-4-028 B 038037

AREVA T&D India LimitedNEXT SH.REV.AREVA

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 4-89L CLOSE

CB 6-89G OPEN

CB 4-52 CLOSE

SHEET

ISO 6-89G CLOSE

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CB 6-52 CLOSE

CB 4-89L OPEN

LINE - 2 CVT (4 - CVTB) SELECTED

BUS-2 CVT SELECTED

ICT CVT (6 - CVT) SELECTED

BUS-1 CVT SELECTED

&

&

Page 43: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-2

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.CLIENT :

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU.

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSCLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

ICT-186-A TRIP RELAY RESET86-B TRIP RELAY RESET

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 5-89 AE CLOSE

ES 5-89 BE CLOSE

ISO 5-89B CLOSE

L/R SS AT CB 5-52 M.BOX IN REMOTE MODE

TIE-2 A/R LK-OUT TRIP RELAY (86-LO) RESET

O/G LINE-286-A TRIP RELAY RESET86-B TRIP RELAY RESET

O/G LINE-286-A TRIP RELAY RESET86-B TRIP RELAY RESET

TIE-2 A/R LK-OUT TRIP RELAY (86-LO) RESET

ADANI POWER LTD.

SELECTED RUNNING VOLTS (REFER SH:037)

CB 5-52 CLOSE ORDER

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

SELECTED INCOMING VOLTS (REFER SH: 037)

ISO 5-89A CLOSE

ICT-186-A TRIP RELAY RESET86-B TRIP RELAY RESET

039038

AREVA T&D India LimitedSHEET NEXT SH.

CB 5-52 LOCAL CLOSING CIRCUIT *

CB 5-52 CLOSING CIRCUIT**

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN TIE-2

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 44: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-2

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

039

AREVA T&D India LimitedSHEET NEXT SH.

File

: PG

7250

00-0

03.x

ls PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN TIE-2

REV.

EMI-7604PG754-4-028 B

AREVA040

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

REMOTE = BCU/HMI/SCADATO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

&

&

Page 45: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF400kV ISOLATORS IN ICT-1

A) ISOLATOR 6-89B

B) ISOLATOR 6-89A

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :

EMI-7604PG754-4-028 B

AREVA

ISO 6-89B INTLK PERMISSIVE *

ISO 6-89B CLOSE ORDER

ISO 6-89B OPEN ORDER

ADANI POWER LTD.

ISO 6-89A INTLK PERMISSIVE *

ISO 6-89A OPEN ORDER

ISO 6-89A CLOSE ORDER

6-52CB OPEN***

ISO 6-89B CLOSE REQUEST**

ISO 6-89B OPEN REQUEST**

6-89AE OPEN

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

BUS-1 CVT ISO CLOSED

BUS-1 CVT ES OPEN

6-89BE OPEN

6-52CB OPEN***

ISO 6-89A OPEN REQUEST**

ISO 6-89A CLOSE REQUEST**

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-1

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

File

: PG

7250

00-0

03.x

ls

041040

AREVA T&D India LimitedSHEET NEXT SH.REV.

&

&

&

&

&

&

Page 46: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-1 (CONTD.)

C) ISOLATOR 6-89G

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

ISO 6-89G OPEN ORDERISO 6-89G OPEN REQUEST**

5-52CB OPEN***

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

o

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-1 (CONTD.)

042041

REV.

EMI-7604PG754-4-028 B

AREVA T&D India LimitedAREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

6-89GE OPEN

6-52CB OPEN***

ADANI POWER LTD.

ISO 6-89G INTLK PERMISSIVE *

ISO 6-89G CLOSE ORDERISO 6-89G CLOSE REQUEST**

&

&

&

Page 47: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN ICT-1

A) EARTH SWITCH 6-89AE*

B) EARTH SWITCH 6-89BE*

C) EARTH SWITCH 6-89GE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 6-89A OPEN

ISO 6-89B OPEN

ISO 6-89G OPEN

ISO 6-89A OPEN

ISO 6-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

ICT LV CB OPEN

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN ICT-1

ADANI POWER LTD.

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

043042

AREVA T&D India LimitedSHEET NEXT SH.REV.

EMI-7604PG754-4-028 B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ES 6-89GE INTLK PERMISSIVE **

OPEN

CLOSE

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

ES 6-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

OPENTO OPEN CIRCUIT

ES 6-89BE INTLK PERMISSIVE **

&

&

&

&

&

&

&

&

&

Page 48: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN ICT-1

A) RUNNING VOLTS *

B) INCOMING VOLTS **

CASE - I

CASE - 2

CASE - 3

NOTE:

* FOR ICT BAYS, BUS-1 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN ICT-1 (BAY-6)

LINE - 2 CVT (4 - CVTB) SELECTED

BUS - 1 CVT

CB 4-52 CLOSE

CB 5-52 CLOSE

ISO 4-89L CLOSE

RUNNING VOLTS

BUS-2 CVT SELECTED

ADANI POWER LTD.

NEXT SH.REV.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

SHEETAREVAAREVA T&D India Limited

044

ICT -1 CVT (6 - CVT) SELECTED

ISO 6-89G OPEN

CB 4-52 OPEN

CB 5-52 CLOSE

ISO 6-89G CLOSE

043EMI-7604PG754-4-028 B

&

&

Page 49: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN ICT-1

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

045044

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR CLOSING OF 400kV

CIRCUIT BREAKER IN ICT-1REV.

EMI-7604PG754-4-028 B

AREVA

CB 6-52 LOCAL CLOSING CIRCUIT *

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

RUNNING (BUS-1 CVT) VOLTS

CB 6-52 CLOSING CIRCUIT **

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 6-89 AE CLOSE

ES 6-89 BE CLOSE

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

BBP RELAYRESET

ISO 6-89A CLOSE

ISO 6-89B CLOSE

L/R SS AT CB 6-52 M.BOX IN REMOTE MODE

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

BBP RELAYRESET

ADANI POWER LTD.

CB 6-52 CLOSE ORDER

SELECTED INCOMING VOLTS (REFER SH: 043)

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 50: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN ICT-1

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR OPENING FROM REMOTE **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.CLIENT :

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

TO TRIP COIL - 2

REMOTE = BCU/HMI/SCADA

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1LOCAL = EQP M.BOX

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST *

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN ICT-1

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

046045

AREVA T&D India LimitedSHEET NEXT SH.

&

&

Page 51: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3

A) ISOLATOR 7-89A

B) ISOLATOR 7-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPENCLIENT :

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

047046

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR OPERATION OF 400kV

ISOLATORS IN O/G LINE-3REV.

EMI-7604PG754-4-028 B

AREVA

ADANI POWER LTD.

ISO 7-89B INTLK PERMISSIVE *

ISO 7-89B OPEN REQUEST**

ISO 7-89B CLOSE ORDER

ISO 7-89B OPEN ORDER

ISO 7-89B CLOSE REQUEST**

7-52CB OPEN***

ISO 7-89A CLOSE REQUEST**

ISO 7-89A OPEN REQUEST**

ISO 7-89A INTLK PERMISSIVE *

ISO 7-89A CLOSE ORDER

ISO 7-89A OPEN ORDER

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-2 CVT ISO CLOSED

BUS-2 CVT ES OPEN

7-89AE OPEN

7-52CB OPEN***

7-89BE OPEN

&

&

&

&

&

&

Page 52: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3 (CONTD.)

C) ISOLATOR 7-89L

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPENCLIENT :

ISO 7-89L OPEN ORDERISO 7-89L OPEN REQUEST **

8-52CB OPEN***

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t p

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3 (CONTD.)

048047

REV.

EMI-7604PG754-4-028 B

AREVA T&D India LimitedAREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

7-89LE OPEN

7-52CB OPEN***

ADANI POWER LTD.

ISO 7-89L INTLK PERMISSIVE*

ISO 7-89L CLOSE ORDER

ISO 7-89L CLOSE REQUEST **

&

&

&

Page 53: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-3

A) EARTH SWITCH 7-89AE*

B) EARTH SWITCH 7-89BE*

C) EARTH SWITCH 7-89LE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

*** LINE U/V PERMISSIVE IS TAKEN THROUGH SOFT FROM LINE DISTANCE PROTECTION RELAY.

CLIENT :

048

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

049

SHEET NEXT SH.REV.

EMI-7604PG754-4-028

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 7-89BE INTLK PERMISSIVE **

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN O/G LINE-3

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

ISO 7-89A OPEN

ISO 7-89B OPEN

ISO 7-89L OPEN

DEAD LINE O/G LINE-3 (UNDER VOLTAGE

OPERATED) ***

ISO 7-89A OPEN

ISO 7-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

ES 7-89LE INTLK PERMISSIVE **

AREVA T&D India Limited

OPEN

CLOSE

ES 7-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

OPENTO OPEN CIRCUIT

&

&

&

&

&

&

&

&

&

Page 54: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-3

A) RUNNING VOLTS *

B) INCOMING VOLTS **

CASE - I

CASE - 2

CASE - 3

NOTE:

* FOR LINE FEEDERS, BUS-2 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

CLIENT :

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB IN O/G LINE-3 (BAY-7)

ADANI POWER LTD.

AREVA T&D India Limited

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.REV.

EMI-7604PG754-4-028

RUNNING VOLTS

ISO 9-89G CLOSE

CB 8-52 CLOSE

CB 9-52 CLOSE

BUS-1 CVT SELECTEDISO 9-89G OPEN

CB 8-52 CLOSE

ICT-2 CVT (9-CVT)SELECTED

BUS - 2 CVT

ISO 7-89L CLOSE

B

AREVA050049

SHEET

LINE - 3 CVT (7 - CVTB) SELECTED

ISO 7-89L OPEN

ISO 7-89L OPEN

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

&

&

Page 55: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-3

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.CLIENT :

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU.

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSCLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 7-89 AE CLOSE

ES 7-89 BE CLOSE

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

BBP RELAYRESET

ISO 7-89A CLOSE

ISO 7-89B CLOSE

L/R SS AT CB 7-52 M.BOX IN REMOTE MODE

CB 7-52 LOCAL CLOSING CIRCUIT *

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

BBP RELAYRESET

CB 7-52 CLOSING CIRCUIT **

ADANI POWER LTD.

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN O/G LINE-3

REV.

EMI-7604PG754-4-028 B

AREVA051050

AREVA T&D India LimitedSHEET NEXT SH.

RUNNING (BUS-2 CVT) VOLTS

CB 7-52 CLOSE ORDER

SELECTED INCOMING VOLTS (REFER SH: 049)

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 56: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-3

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.CLIENT :

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

051

AREVA T&D India LimitedSHEET NEXT SH.

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN O/G LINE-3

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

052

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST *

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

REMOTE = BCU/HMI/SCADA

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

&

&

Page 57: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-3

A) ISOLATOR 8-89A

A) ISOLATOR 8-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

File

: PG

7250

00-0

03.x

ls

8-89BE OPEN

8-52CB OPEN***

ISO 8-89B CLOSE REQUEST**

ISO 8-89B OPEN REQUEST**

8-89AE OPEN

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-3

REV.

ISO 8-89A OPEN ORDER

ISO 8-89B INTLK PERMISSIVE *

ISO 8-89B CLOSE ORDER

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

ADANI POWER LTD.

ISO 8-89A INTLK PERMISSIVE *

ISO 8-89A OPEN REQUEST**

ISO 8-89A CLOSE ORDER

ISO 8-89B OPEN ORDER

8-52CB OPEN***

ISO 8-89A CLOSE REQUEST**

053052

AREVA T&D India LimitedSHEET NEXT SH.

&

&

&

&

&

&

Page 58: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OFEARTH SWITCHES IN TIE-3

A) EARTH SWITCH 8-89AE*

B) EARTH SWITCH 8-89BE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES

IN TIE-3 (BAY-8)

REV.

EMI-7604PG754-4-028 B

AREVA054053

ADANI POWER LTD.

AREVA T&D India LimitedSHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

File

: PG

7250

00-0

03.x

ls

ISO 8-89B OPEN

ISO 8-89A OPEN

ISO 8-89A OPEN

ES 8-89AE INTLK PERMISSIVE **

ISO 8-89B OPEN

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

ES 8-89BE INTLK PERMISSIVE **

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

&

&

&

&

&

&

Page 59: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-3

A) RUNNING VOLTS *

CASE - I

CASE - 2

B) INCOMING VOLTS *

CASE - I

CASE - 2

NOTE:

* AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING/RUNNING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING/RUNNING VOLTS TO BCU.

CLIENT :

055054

AREVA T&D India LimitedNEXT SH.REV.AREVA SHEET

ISO 9-89G CLOSE

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CB 9-52 CLOSE

CB 7-89L OPEN

LINE - 3 CVT (7 - CVTB) SELECTED

BUS-2 CVT SELECTED

ICT -2 CVT (9 - CVT) SELECTED

BUS-1 CVT SELECTED

ADANI POWER LTD.

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 7-89L CLOSE

CB 9-89G OPEN

CB 7-52 CLOSE

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN TIE-3 (BAY-8) EMI-7604PG754-4-028 B

&

&

Page 60: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-3

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

CB 8-52 LOCAL CLOSING CIRCUIT *

CB 8-52 CLOSING CIRCUIT**

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN TIE-3

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

ICT-286-A TRIP RELAY RESET86-B TRIP RELAY RESET

056055

AREVA T&D India LimitedSHEET NEXT SH.

TIE-3 A/R LK-OUT TRIP RELAY (86-LO) RESET

ADANI POWER LTD.

SELECTED RUNNING VOLTS (REFER SH:054)

CB 8-52 CLOSE ORDER

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

SELECTED INCOMING VOLTS (REFER SH: 054)

ISO 8-89A CLOSE

ICT-286-A TRIP RELAY RESET86-B TRIP RELAY RESET

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 8-89 AE CLOSE

ES 8-89 BE CLOSE

ISO 8-89B CLOSE

L/R SS AT CB 8-52 M.BOX IN REMOTE MODE

TIE-3 A/R LK-OUT TRIP RELAY (86-LO) RESET

O/G LINE-386-A TRIP RELAY RESET86-B TRIP RELAY RESET

O/G LINE-386-A TRIP RELAY RESET86-B TRIP RELAY RESET

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 61: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-3

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

TO TRIP COIL - 2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST

File

: PG

7250

00-0

03.x

ls PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN TIE-3

REV.

EMI-7604PG754-4-028 B

AREVA057056

AREVA T&D India LimitedSHEET NEXT SH.

&

&

Page 62: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2

A) ISOLATOR 9-89B

B) ISOLATOR 9-89A

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-1 CVT ISO CLOSED

BUS-1 CVT ES OPEN

9-89BE OPEN

9-52CB OPEN***

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

9-52CB OPEN***

ISO 9-89B CLOSE REQUEST**

ISO 9-89B OPEN REQUEST**

ISO 9-89B INTLK PERMISSIVE *

ISO 9-89B CLOSE ORDER

ISO 9-89B OPEN ORDER

ADANI POWER LTD.

ISO 9-89A INTLK PERMISSIVE *

ISO 9-89A OPEN REQUEST**ISO 9-89A OPEN ORDER

ISO 9-89A CLOSE ORDER

9-89AE OPEN

ISO 9-89A CLOSE REQUEST**

058057

AREVA T&D India LimitedSHEET NEXT SH.REV.

EMI-7604PG754-4-028 B

AREVA

&

&

&

&

&

&

Page 63: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2 (CONTD.)

C) ISOLATOR 9-89G

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

AREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

9-89GE OPEN

8-52CB OPEN***

ADANI POWER LTD.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t wi

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2 (CONTD.)

059058

REV.

EMI-7604PG754-4-028 B

AREVA T&D India Limited

ISO 9-89G INTLK PERMISSIVE *

ISO 9-89G CLOSE ORDER

ISO 9-89G CLOSE REQUEST**

ISO 9-89G OPEN ORDERISO 9-89G OPEN REQUEST**

9-52CB OPEN***

&

&

&

Page 64: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN ICT-2

A) EARTH SWITCH 9-89AE*

B) EARTH SWITCH 9-89BE*

C) EARTH SWITCH 9-89GE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

CLOSE

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

ES 9-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

OPENTO OPEN CIRCUIT

ES 9-89BE INTLK PERMISSIVE **

B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ES 9-89GE INTLK PERMISSIVE **

OPEN

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN ICT-2

ADANI POWER LTD.

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

060059

AREVA T&D India LimitedSHEET NEXT SH.REV.

EMI-7604PG754-4-028

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 9-89A OPEN

ISO 9-89B OPEN

ISO 9-89G OPEN

ISO 9-89A OPEN

ISO 9-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

&

&

&

&

&

&

&

&

Page 65: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN ICT-2

A) RUNNING VOLTS *

B) INCOMING VOLTS **

CASE - I

CASE - 2

CASE - 3

NOTE:

* FOR ICT BAYS, BUS-1 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING/ RUNNING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING/ RUNNING VOLTS TO BCU.

CLIENT :

CB 7-52 OPEN

CB 8-52 CLOSE

ISO 9-89G CLOSE

SHEET

BUS-2 CVT SELECTED

ICT-2 CVT (9 - CVT) SELECTED

ISO 9-89G OPEN

B

AREVA061

BUS - 1 CVT

CB 7-52 CLOSE

CB 8-52 CLOSE

CVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN ICT-2 (BAY-9)

ISO 7-89L CLOSE

LINE - 3 CVT (7 - CVTB) SELECTED

RUNNING VOLTS

060

AREVA T&D India Limited

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ADANI POWER LTD.

NEXT SH.REV.

EMI-7604PG754-4-028

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

&

&

Page 66: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN ICT-2

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

BBP RELAYRESET

ADANI POWER LTD.

CB 9-52 CLOSE ORDER

SELECTED INCOMING VOLTS (REFER SH: 060)

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 9-89 AE CLOSE

ES 9-89 BE CLOSE

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

BBP RELAYRESET

ISO 9-89A CLOSE

ISO 9-89B CLOSE

L/R SS AT CB 9-52 M.BOX IN REMOTE MODE

CB 9-52 LOCAL CLOSING CIRCUIT *

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

RUNNING (BUS-1 CVT) VOLTS

CB 9-52 CLOSING CIRCUIT **

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN ICT-2

REV.

EMI-7604PG754-4-028 B

AREVA062061

AREVA T&D India LimitedSHEET NEXT SH.

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 67: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G ICT-2

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

062

AREVA T&D India LimitedSHEET NEXT SH.

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN ICT-2

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

063

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST *

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

TO TRIP COIL - 2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

&

&

Page 68: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4

A) ISOLATOR 10-89A

B) ISOLATOR 10-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIEDCLIENT :

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

ISO 10-89A INTLK PERMISSIVE *

ISO 10-89A CLOSE ORDER

ISO 10-89A OPEN ORDER

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-2 CVT ISO CLOSED

BUS-2 CVT ES OPEN

10-89AE OPEN

10-52CB OPEN***

10-89BE OPEN

10-52CB OPEN***

ISO 10-89A CLOSE REQUEST**

ISO 10-89A OPEN REQUEST**

ISO 10-89B INTLK PERMISSIVE *

ISO 10-89B OPEN REQUEST**

ISO 10-89B CLOSE ORDER

ISO 10-89B OPEN ORDER

ISO 10-89B CLOSE REQUEST**

064063

AREVA T&D India Limited

ADANI POWER LTD.

SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4

REV.

EMI-7604PG754-4-028 B

AREVA

&

&

&

&

&

&

Page 69: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4 (CONTD.)

C) ISOLATOR 10-89L

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

AREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

10-89LE OPEN

10-52CB OPEN***

ADANI POWER LTD.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ith

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4 (CONTD.)

065064

REV.

EMI-7604PG754-4-028 B

AREVA T&D India Limited

ISO 10-89L INTLK PERMISSIVE *

ISO 10-89L CLOSE ORDER

ISO 10-89L CLOSE REQUEST **

ISO 10-89L OPEN ORDERISO 10-89L OPEN REQUEST **

11-52CB OPEN***

&

&

&

Page 70: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-4

A) EARTH SWITCH 10-89AE*

B) EARTH SWITCH 10-89BE*

C) EARTH SWITCH 10-89LE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

*** LINE U/V PERMISSIVE IS TAKEN THROUGH SOFT FROM LINE DISTANCE PROTECTION RELAY.

CLIENT :

ES 10-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

OPENTO OPEN CIRCUIT

B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

ES 10-89LE INTLK PERMISSIVE **

AREVA T&D India Limited

OPEN

CLOSE

ISO 10-89A OPEN

ISO 10-89B OPEN

ISO 10-89L OPEN

DEAD LINE O/G LINE-4 (UNDER VOLTAGE

OPERATED) ***

ISO 10-89A OPEN

ISO 10-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 10-89BE INTLK PERMISSIVE **

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN O/G LINE-4

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

065

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

066

SHEET NEXT SH.REV.

EMI-7604PG754-4-028

&

&

&

&

&

&

&

&

&

Page 71: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-4

A) RUNNING VOLTS *

B) INCOMING VOLTS **

CASE - I

CASE - 2

NOTE:

* FOR LINE FEEDERS, BUS-2 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

THE SYNCHRONISATION OF LINE WITH GT IS NOT CONSIDERED IN THE CVT SELECTION & THE CB CLOSING SCHEME.

CLIENT :

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS - 2 CVT

NEXT SH.REV.

EMI-7604PG754-4-028 B

AREVA067066

ISO 10-89L CLOSE LINE - 4 CVT (10 - CVTB) SELECTED

RUNNING VOLTS

CB 10-52 CLOSE

SHEETCVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN O/G LINE-4 (BAY-10)

ADANI POWER LTD.

AREVA T&D India Limited

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ISO 10-89L OPEN

CB 11-52 CLOSE

BUS-1 CVT SELECTEDISO 12-89G OPEN

&

Page 72: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-4

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU.

CLIENT : *** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSE

CLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

AREVA T&D India LimitedSHEET NEXT SH.

RUNNING (BUS-2 CVT) VOLTS

CB 10-52 CLOSE ORDER

SELECTED INCOMING VOLTS (REFER SH: 066)

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ADANI POWER LTD.

INTERLOCK LOGIC FOR CLOSING OF 400kV CIRCUIT BREAKER IN O/G LINE-4

REV.

EMI-7604PG754-4-028 B

AREVA068067

CB 10-52 LOCAL CLOSING CIRCUIT *

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

86-A TRIP RELAY RESET

86-B TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

BBP RELAYRESET

CB 10-52 CLOSING CIRCUIT **

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 10-89 AE CLOSE

ES 10-89 BE CLOSE

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

BBP RELAYRESET

ISO 10-89A CLOSE

ISO 10-89B CLOSE

L/R SS AT CB 10-52 M.BOX IN REMOTE MODE

&

&

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 73: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-4

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

TO TRIP COIL - 2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST *

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN O/G LINE-4

REV.

EMI-7604PG754-4-028 B

AREVAPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT

MUNDRA SEZ

069068

AREVA T&D India LimitedSHEET NEXT SH.

&

&

Page 74: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-4

A) ISOLATOR 11-89A

A) ISOLATOR 11-89B

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT : ADANI POWER LTD.

ISO 11-89A INTLK PERMISSIVE *

ISO 11-89A OPEN REQUEST**

ISO 11-89A CLOSE ORDER

ISO 11-89B OPEN ORDER

11-52CB OPEN***

ISO 11-89A CLOSE REQUEST**

ISO 11-89A OPEN ORDER

ISO 11-89B INTLK PERMISSIVE *

ISO 11-89B CLOSE ORDER

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-4

070069

AREVA T&D India LimitedSHEET NEXT SH.

EMI-7604PG754-4-028 B

AREVA REV.

File

: PG

7250

00-0

03.x

ls

11-89BE OPEN

11-52CB OPEN***

ISO 11-89B CLOSE REQUEST**

ISO 11-89B OPEN REQUEST**

11-89AE OPEN

&

&

&

&

&

&

Page 75: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OFEARTH SWITCHES IN TIE-4

A) EARTH SWITCH 11-89AE*

B) EARTH SWITCH 11-89BE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

ES 11-89BE INTLK PERMISSIVE **

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

ES 11-89AE INTLK PERMISSIVE **

ISO 11-89B OPEN

TO OPEN CIRCUITOPEN/CLOSE PUSH BUTTON

CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSETO CLOSING CIRCUIT

File

: PG

7250

00-0

03.x

ls

ISO 11-89B OPEN

ISO 11-89A OPEN

ISO 11-89A OPEN

071070

ADANI POWER LTD.

AREVA T&D India LimitedSHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN

TIE-4 (BAY-11)

REV.

EMI-7604PG754-4-028 B

AREVA

&

&

&

&

&

&

Page 76: 400 KV-Interlock Logic Diagram_RevB

DF003

CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-4

A) RUNNING VOLTS *

CASE-1 (TIE/GT SELECTOR SWITCH IN TIE MODE. SYNCHRONISATION IS DONE FROM SWITCHYARD BCU)

CASE-2 (TIE/GT SELECTOR SWITCH IN GT MODE. SYNCHRONISATION IS DONE FROM GCP)

B) INCOMING VOLTS *

CASE - I (APPLICABLE TO BOTH TIE & GCP MODE.)

CASE - 2 (APPLICABLE TO BOTH TIE & GCP MODE.)

CASE - 3 (APPLICABLE FOR GT SYNCHRONISATION ONLY .TIE/GT SELECTOR SWITCH IN GT MODE. SYNCHRONISATION IS DONE FROM GCP)

##

NOTE:

* SINCE THE SYNCHRONISATION OF GT IS DONE FROM GCP, GT CVT IS NOT CONSIDERED IN THE CVT SELECTION LOGIC FOR BCU. FOR BCU IN THE SWITCHYARD RUNNING VOLTS BY DEFAULT IS TAKEN AS BUS-1 VOLTS

** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.

## GT-3 CVT WILL BE SELECTED ONLY FOR SYNCHRONISATION OF GT THROUGH THE TIE. CLIENT :

NEXT SH.REV.AREVA SHEETCVT SELECTION LOGIC FOR CHECK-SYNC OF CB

IN TIE-4 (BAY-11)

ADANI POWER LTD.

EMI-7604PG754-4-028 B 072071

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

AREVA T&D India Limited

BUS - 1 CVT RUNNING VOLTS TO BCU

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f A

RE

VA

T&

D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

GT - 4 CVT RUNNING VOLTS

ISO 10-89L CLOSE

GT-4 CVT SELECTED **CB 12-89G CLOSED

LINE - 4 CVT (10 - CVTB) SELECTED **

TIE/GCP SELECTOR SWITCH AT SWYD BAY

CONTROL & PROT PANEL

TIE = FEEDER

GCP = GT

CB 10-52 CLOSE

TIE/GCP SELECTOR SWITCH AT SWYD BAY

CONTROL & PROT PANEL

TIE = FEEDER

GCP = GT

BUS-2 CVT SELECTED **CB 10-89L OPEN

TIE/GCP SELECTOR SWITCH AT SWYD BAY

CONTROL & PROT PANEL

TIE = FEEDER

GCP = GT

CB 12-52 OPEN

&

&

OR

OR

&

Page 77: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-4(REMOTE CLOSING POSSIBLE FROM SWITCHYARD ONLY AS LONG AS TIE/GCP SELECTOR SWITCH IS IN TIE MODE)

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *

B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &

PROT PANEL

CB 11-52 CLOSING CIRCUIT**

TIE = FEEDER

GCP = GT

ADANI POWER LTD.

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ES 11-89 AE CLOSE

ES 11-89 BE CLOSE

GT-486 TRIP RELAY RESET

A/R LK-OUT TRIP RELAY (86-LO) RESET

O/G LINE-486-A TRIP RELAY RESET86-B TRIP RELAY RESET

EMI-7604PG754-4-028 B

AREVA

CB 11-52 LOCAL CLOSING CIRCUIT *

GT4INTLKS FROM GCP

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

072A072

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR CLOSING OF 400kV

CIRCUIT BREAKER IN TIE-4REV.

&

&

OR

Page 78: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-4

(REMOTE CLOSING POSSIBLE FROM SWITCHYARD ONLY AS LONG AS TIE/GCP SELECTOR SWITCH IS IN TIE MODE)

C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***

NOTE:

* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.

** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :

*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSECLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

073072A

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR CLOSING OF 400kV

CIRCUIT BREAKER IN TIE-4REV.

EMI-7604PG754-4-028 B

AREVA

ADANI POWER LTD.

RUNNING (BUS-1 CVT) VOLTS

CB 11-52 CLOSE ORDER

TRIP CIRCUIT - 1 & 2 HEALTHY

CLOSE REQUEST FROM BCU/SCADA/HMI

SELECTED INCOMING VOLTS (REFER SH: 070)

ISO 11-89A CLOSE

GT-486 TRIP RELAY RESET

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

ISO 11-89B CLOSE

L/R SS AT CB 11-52 M.BOX IN REMOTE MODE

ISO 12-89G OPEN

O/G LINE-486-A TRIP RELAY RESET86-B TRIP RELAY RESET

TIE-4 A/R LK-OUT TRIP RELAY (86-LO) RESET

TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &

PROT PANEL

TIE = FEEDER

GCP = GT

&

VALIDATION OF CHECK-SYNC CONDITIONS

IN BCU**

Page 79: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-4(REMOTE OPENING POSSIBLE FROM SWITCHYARD ONLY IF TIE/GCP SELECTOR SWITCH IS IN TIE MODE)

A) INTERLOCKS FOR OPENING FROM BMK LEVEL *

B) INTERLOCKS FOR REMOTE OPENING **

NOTE:

* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.

** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.

*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.

CLIENT :

073

AREVA T&D India LimitedSHEET NEXT SH.

File

: PG

7250

00-0

03.x

ls

ADANI POWER LTD.

INTERLOCK LOGIC FOR OPENING OF 400kV CIRCUIT BREAKER IN TIE-4

REV.

EMI-7604PG754-4-028 B

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

AREVA074

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

CB CLOSE ***

CB CLOSE ***

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

CB OPEN REQUEST

12-89G OPEN

TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &

PROT PANEL

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 1

TIE = FEEDER

GCP = GT

TO TRIP COIL - 2

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO TRIP COIL - 2

LOCAL = EQP M.BOX

REMOTE = BCU/HMI/SCADA

&

&

Page 80: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4

A) ISOLATOR 12-89B

B) ISOLATOR 12-89A

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :

ISO 12-89A INTLK PERMISSIVE *

075074

AREVA T&D India LimitedSHEET NEXT SH.INTERLOCK LOGIC FOR OPERATION OF 400kV

ISOLATORS IN GT-4REV.

EMI-7604PG754-4-028 A

AREVA

ADANI POWER LTD.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

ISO 12-89A OPEN REQUEST**

ISO 12-89A CLOSE ORDER

ISO 12-89A OPEN ORDER

12-52CB OPEN***

ISO 12-89A CLOSE REQUEST**

ISO 12-89B CLOSE REQUEST**

ISO 12-89B OPEN REQUEST**

ISO 12-89B INTLK PERMISSIVE *

ISO 12-89B CLOSE ORDER

ISO 12-89B OPEN ORDER

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e co

pied

or l

ent w

ithou

t prio

r per

mis

sion

in w

ritin

g

BUS-1 CVT ISO CLOSED

BUS-1 CVT ES OPEN

12-89BE OPEN

12-52CB OPEN***

12-89AE OPEN

&

&

&

&

&

&

Page 81: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4 (CONTD.)

C) ISOLATOR 12-89G

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN

CLIENT :

ISO 12-89G OPEN ORDERISO 12-89G OPEN REQUEST**

11-52CB OPEN***

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t wi

INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4 (CONTD.)

076075

REV.

EMI-7604PG754-4-028 A

AREVA T&D India LimitedAREVA SHEET NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

12-89GE OPEN

12-52CB OPEN***

ADANI POWER LTD.

ISO 12-89G INTLK PERMISSIVE*

ISO 12-89G CLOSE ORDER

ISO 12-89G CLOSE REQUEST**

&

&

&

Page 82: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN GT-4

A) EARTH SWITCH 12-89AE*

B) EARTH SWITCH 12-89BE*

C) EARTH SWITCH 12-89GE*

NOTE:

* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

ISO 12-89G OPEN

GENERATOR EXCITATION OFF

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

ES 12-89BE INTLK PERMISSIVE **

CONTROL & INTERLOCK LOGIC FOR OPERATION OF 400kV EARTH SWITCHES IN GT-4

ADANI POWER LTD.

077076

SHEET NEXT SH.REV.

ISO 12-89A OPEN

ISO 12-89B OPEN

ISO 12-89A OPEN

ISO 12-89B OPEN

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

ES 12-89AE INTLK PERMISSIVE **

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

EMI-7604PG754-4-028 B

AREVA

OPEN

CLOSE

CLOSETO CLOSING CIRCUIT

ES 12-89GE INTLK PERMISSIVE **

AREVA T&D India Limited

PROJECT :

OPENTO OPEN CIRCUIT

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE

TO OPEN CIRCUIT

TO CLOSING CIRCUIT

&

&

&

&

&

&

&

&

&

Page 83: 400 KV-Interlock Logic Diagram_RevB

DF003

CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-4

A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL FOR CLOSE OPERATION*

B) INTERLOCKS FOR CLOSING FROM REMOTE (GCP)

C) INTERLOCKS FOR OPENING FROM BMK LEVEL *

D) INTERLOCKS FOR OPENING FROM REMOTE (GCP)

NOTE: CLIENT :

* OPERATION OF THE CIRCUIT BREAKERS IN GT BAYS IS NOT ALLOWED FROM THE BAY CONTROL & PROTECTION PANEL, BCU/HMI/SCADA.

** CLOSE POSITION OF THE CIRCUIT BREAKER IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN.

CB 12-52 LOCAL CLOSING CIRCUIT *

CB CLOSE **

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

LOCAL = EQP M.BOX

REMOTE = GCP

OPEN

CLOSE

LOCAL = EQP M.BOX

LOCAL = EQP M.BOX

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AR

EV

A T

&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

ES 12-89 AE CLOSE

ES 12-89 BE CLOSE

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT GCP

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

GT4INTLKS FROM GCP

ADANI POWER LTD.

CONTROL & INTERLOCK LOGIC FOR 400kV CIRCUIT BREAKER IN GT-4 (BAY-12)

REV.

EMI-7604PG754-4-028 B

AREVA078077

SHEET NEXT SH.

REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1

TO TRIP COIL - 2OPEN

CLOSE

TO TRIP COIL - 2

CLOSE

AREVA T&D India Limited

OPEN/CLOSE PUSH BUTTON CONTROLS AT GCP

TO TRIP COIL - 1

OPEN

EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP

MARSHALLING BOX

LOCAL = EQP M.BOX

REMOTE = GCP

CLOSE

REMOTE = GCP

GT4INTLKS FROM GCP

CB 12-52 REMOTE CLOSING CIRCUIT *

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

&

&

&

&

Page 84: 400 KV-Interlock Logic Diagram_RevB

DF003

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

in

BLANK SHEET

NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

AREVA

ADANI POWER LTD.

File

: PG

7250

00-0

03.x

ls

079078

REV.

EMI-7604PG754-4-028 A

AREVA T&D India LimitedSHEET

BLANK SHEET

Page 85: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF BUS-1 CVT ISOLATOR & EARTH SWITCH (MANAGED BY TIE-1 BCU)

A) BUS - 1 CVT ISOLATOR

#B) BUS-1 CVT EARTH SWITCH

##

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

# FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

## THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e

INTERLOCK LOGIC FOR REMOTE OPERATION OF 400kV BUS-1 CVT ISOLATOR & EARTH

SWITCH

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE TO CLOSING CIRCUIT

BUS-1 CVT ISO INTLK PERMISSIVE *

BUS-1 CVT ISO CLOSE ORDER

BUS-1 CVT ISO OPEN ORDER

080079

REV.

EMI-7604PG754-4-028 A

AREVA T&D India LimitedSHEET

BUS-1 CVT ISO OPEN REQUEST **

BUS-1 CVT EARTH SWITCH OPEN

BUS-1 CVT ISO CLOSE REQUEST **

NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

BUS-1 CVT ISO OPEN BUS-1 CVT E/S INTLK PERMISSIVE

TO OPEN CIRCUIT

AREVA

ADANI POWER LTD.

&

&

&

&

Page 86: 400 KV-Interlock Logic Diagram_RevB

DF003

INTERLOCK LOGIC FOR OPERATION OF BUS-2 CVT ISOLATOR & EARTH SWITCH(MANAGED BY TIE-1 BCU)

A) BUS - 2 CVT ISOLATOR

#B) BUS-2 CVT EARTH SWITCH

##

NOTE:

* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORSTO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED.

# FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX.ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED.

## THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH. COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.

CLIENT :

NEXT SH.

PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

BUS-2 CVT ISO OPEN BUS-2 CVT E/S INTLK PERMISSIVE

TO OPEN CIRCUIT

AREVA

ADANI POWER LTD.

BUS-2 CVT ISO OPEN REQUEST **

BUS-2 CVT EARTH SWITCH OPEN

BUS-2 CVT ISO CLOSE REQUEST **

BUS-2 CVT ISO INTLK PERMISSIVE *

BUS-2 CVT ISO CLOSE ORDER

BUS-2 CVT ISO OPEN ORDER

081080

REV.

EMI-7604PG754-4-028 A

AREVA T&D India LimitedSHEET

File

: PG

7250

00-0

03.x

lsTh

is d

raw

ing

and

desi

gn is

the

prop

erty

of

AREV

A T

&D a

nd m

ust n

ot b

e

INTERLOCK LOGIC FOR REMOTE OPERATION OF 400kV BUS-2 CVT ISOLATOR & EARTH

SWITCH

OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX

OPEN

CLOSE TO CLOSING CIRCUIT

&

&

&

&

Page 87: 400 KV-Interlock Logic Diagram_RevB

DF003

IMPLEMENATION OF SYNCHROCHECK FUNCTION IN BCU (TYPICAL FOR ALL BAYS EXCEPT GT BAYS)

CASE -1 DEAD INCOMING VOLTS - DEAD RUNNING VOLTS

NOTE :

* VOLTAGE SELECTION FOR INCOMING AND RUNNING VOLTS SHALL BE AS PER THE SELECTION LOGIC INDICATED IN THE RESPECTIVE BAY INTERLOCK LOGICS.

** SOFTWARE INTERLOCKS BUILT IN THE BCU ARE VERIFIED BEFORE CHECKING THE SYNCHRONISATION CONDITIONS. FOR DETAILED INTERLOCKS REFER THE RESPECTIVE BAY INTERLOCK LOGIC DIAGRAMS

*** WHEN BOTH VOLTAGES ARE BELOW THE SET THRESHOLD FOR DEAD VOLTS, A TIMER IS STARTED BEFORE GIVING THE CLOSE SIGNAL TO THE CB. THIS TIMER IS CONFIGURABLE IN THE RANGE 0.2 TO 10 Sec.

1 COMMAND TO THE BREAKER WILL BE SUCCESFUL ONLY IF EXTERNAL HARDWIRED INTERLOCKS IN THE CB CLOSING CIRCUIT ARE SATISFIED.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SHEET

ADANI POWER LTD.

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL

TO CLOSING CIRCUIT

CLOSE REQUEST FROM BCU/HMI/SCADA

SELECTED RUNNING VOLTS *

SELECTED INCOMING VOLTS *

IMPLEMENTATION OF SYNCHROCHECK IN BCU

SOFTWARE INTERLOCKS BUILT IN RESPECTIVE BCU VERIFIED SUCCESFULLY **

RUNNING VOLTS < SELECTED DEAD VOLTS THRESHOLD

TIMER FOR CONFIRMATION (SETTABLE) ***

INCOMING VOLTS < SELECTED DEAD VOLTS THRESHOLD

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

081

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B 082

PROJECT :

&

DEAD INCOMING VOLTS & DEAD RUNNING VOLTS CONDITIONS SATISFIED?

YES

IMPLEMENTED IN BCU

Page 88: 400 KV-Interlock Logic Diagram_RevB

DF003

IMPLEMENATION OF SYNCHROCHECK FUNCTION IN BCU (TYPICAL FOR ALL BAYS EXCEPT GT BAYS)

CASE -2 DEAD INCOMING VOLTS - LIVE RUNNING VOLTS

NOTE :

* VOLTAGE SELECTION FOR INCOMING AND RUNNING VOLTS SHALL BE AS PER THE SELECTION LOGIC INDICATED IN THE RESPECTIVE BAY INTERLOCK LOGICS.

** SOFTWARE INTERLOCKS BUILT IN THE BCU ARE VERIFIED BEFORE CHECKING THE SYNCHRONISATION CONDITIONS. FOR DETAILED INTERLOCKS REFER THE RESPECTIVE BAY INTERLOCK LOGIC DIAGRAMS

*** WHEN BOTH VOLTAGES ARE BELOW THE SET THRESHOLD FOR DEAD & LIVE VOLTS, A TIMER IS STARTED BEFORE GIVING THE CLOSE SIGNAL TO THE CB. THIS TIMER IS CONFIGURABLE IN THE RANGE 0.2 TO 10 Sec.

1 COMMAND TO THE BREAKER WILL BE SUCCESFUL ONLY IF EXTERNAL HARDWIRED INTERLOCKS IN THE CB CLOSING CIRCUIT ARE SATISFIED.

CLIENT :

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

082

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B 083

PROJECT :

IMPLEMENTATION OF SYNCHROCHECK IN BCU

SOFTWARE INTERLOCKS BUILT IN RESPECTIVE BCU VERIFIED SUCCESFULLY **

RUNNING VOLTS > SELECTED LIVE VOLTS THRESHOLD

TIMER FOR CONFIRMATION (SETTABLE) ***

INCOMING VOLTS < SELECTED DEAD VOLTS THRESHOLD

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SHEET

ADANI POWER LTD.

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL

TO CLOSING CIRCUIT

CLOSE REQUEST FROM BCU/HMI/SCADA

SELECTED RUNNING VOLTS *

SELECTED INCOMING VOLTS *

&

DEAD INCOMING VOLTS & LIVE RUNNING VOLTS CONDITIONS SATISFIED?

YES

IMPLEMENTED IN BCU

Page 89: 400 KV-Interlock Logic Diagram_RevB

DF003

IMPLEMENATION OF SYNCHROCHECK FUNCTION IN BCU (TYPICAL FOR ALL BAYS EXCEPT GT BAYS)

CASE -3 LIVE INCOMING VOLTS - DEAD RUNNING VOLTS

NOTE :

* VOLTAGE SELECTION FOR INCOMING AND RUNNING VOLTS SHALL BE AS PER THE SELECTION LOGIC INDICATED IN THE RESPECTIVE BAY INTERLOCK LOGICS.

** SOFTWARE INTERLOCKS BUILT IN THE BCU ARE VERIFIED BEFORE CHECKING THE SYNCHRONISATION CONDITIONS. FOR DETAILED INTERLOCKS REFER THE RESPECTIVE BAY INTERLOCK LOGIC DIAGRAMS

*** WHEN BOTH VOLTAGES ARE BELOW THE SET THRESHOLD FOR DEAD & LIVE VOLTS, A TIMER IS STARTED BEFORE GIVING THE CLOSE SIGNAL TO THE CB. THIS TIMER IS CONFIGURABLE IN THE RANGE 0.2 TO 10 Sec.

1 COMMAND TO THE BREAKER WILL BE SUCCESFUL ONLY IF EXTERNAL HARDWIRED INTERLOCKS IN THE CB CLOSING CIRCUIT ARE SATISFIED.

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SHEET

ADANI POWER LTD.

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL

TO CLOSING CIRCUIT

CLOSE REQUEST FROM BCU/HMI/SCADA

SELECTED RUNNING VOLTS *

SELECTED INCOMING VOLTS *

IMPLEMENTATION OF SYNCHROCHECK IN BCU

SOFTWARE INTERLOCKS BUILT IN RESPECTIVE BCU VERIFIED SUCCESFULLY **

RUNNING VOLTS < SELECTED DEAD VOLTS THRESHOLD

TIMER FOR CONFIRMATION (SETTABLE) ***

INCOMING VOLTS > SELECTED LIVE VOLTS THRESHOLD

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

083

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B 084

PROJECT :

&

LIVE INCOMING VOLTS & DEAD RUNNING VOLTS CONDITIONS SATISFIED?

YES

IMPLEMENTED IN BCU

Page 90: 400 KV-Interlock Logic Diagram_RevB

DF003

IMPLEMENATION OF SYNCHROCHECK FUNCTION IN BCU (TYPICAL FOR ALL BAYS EXCEPT GT BAYS)

CASE -4 LIVE INCOMING VOLTS - LIVE RUNNING VOLTS

NOTE :

* VOLTAGE SELECTION FOR INCOMING AND RUNNING VOLTS SHALL BE AS PER THE SELECTION LOGIC INDICATED IN THE RESPECTIVE BAY INTERLOCK LOGICS.

** SOFTWARE INTERLOCKS BUILT IN THE BCU ARE VERIFIED BEFORE CHECKING THE SYNCHRONISATION CONDITIONS. FOR DETAILED INTERLOCKS REFER THE RESPECTIVE BAY INTERLOCK LOGIC DIAGRAMS

*** WHEN BOTH VOLTAGES ARE BELOW THE SET THRESHOLD FOR DEAD & LIVE VOLTS, A TIMER IS STARTED BEFORE GIVING THE CLOSE SIGNAL TO THE CB. THIS TIMER IS CONFIGURABLE IN THE RANGE 0.2 TO 10 Sec.

1 COMMAND TO THE BREAKER WILL BE SUCCESFUL ONLY IF EXTERNAL HARDWIRED INTERLOCKS IN THE CB CLOSING CIRCUIT ARE SATISFIED.

2 FOR LIVE CONDITIONS OF BOTH THE INCOMING & RUNNING VOLTS, THE FOLLOWING CONDITIONS(CONFIGURED THROUGH SOFTWARE) ARE CHECKED:

A. DIFFERENCE IN VOLTAGE MAGNITUDESB. DIFFERENCE IN PHASE ANGLESC. DIFFERENCE IN FREQUENCIES

CLIENT :

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

084

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B 085

PROJECT :

IMPLEMENTATION OF SYNCHROCHECK IN BCU

SOFTWARE INTERLOCKS BUILT IN RESPECTIVE BCU VERIFIED SUCCESFULLY **

RUNNING VOLTS > SELECTED LIVE VOLTS THRESHOLD

TIMER FOR CONFIRMATION (SETTABLE) ***

INCOMING VOLTS > SELECTED LIVE VOLTS THRESHOLD

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

SHEET

ADANI POWER LTD.

INTLKS IMPLEMENTED THROUGH HARDWIRINGIN BAY CNTL & PROT PANEL

TO CLOSING CIRCUIT

CLOSE REQUEST FROM BCU/HMI/SCADA

SELECTED RUNNING VOLTS *

SELECTED INCOMING VOLTS *

&

LIVE INCOMING VOLTS & LIVE RUNNING VOLTS CONDITIONS SATISFIED?

YES

IMPLEMENTED IN BCU

Page 91: 400 KV-Interlock Logic Diagram_RevB

DF003

IMPLEMENATION OF AUTO RECLOSE FUNCTION IN BCU (TYPICAL FOR ALL LINE BAYS)

CLIENT :

SHEET

ADANI POWER LTD.

IMPLEMENTATION OF AUTORECLOSE FUNCTION IN BCU

086

PROJECT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

085

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B

Page 92: 400 KV-Interlock Logic Diagram_RevB

DF003

IMPLEMENATION OF AUTO RECLOSE FUNCTION IN BCU (TYPICAL FOR ALL TIE BAYS)

CLIENT :

This

dra

win

g an

d de

sign

is th

e pr

oper

ty o

f AR

EVA

T&D

and

mus

t not

be

copi

ed o

r len

t with

out p

rior p

erm

issi

on in

writ

ing

400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ

NEXT SH.

086

AREVAAREVA T&D India Limited

REV.

EMI-7604PG754-4-028 B

SHEET

ADANI POWER LTD.

IMPLEMENTATION OF AUTORECLOSE FUNCTION IN BCU

/

PROJECT :