40 KNOXVILLE 180 miles 40 Speedway Industrial Park - formerly … · 2019-08-21 · International...
Transcript of 40 KNOXVILLE 180 miles 40 Speedway Industrial Park - formerly … · 2019-08-21 · International...
Murfreesboro
SpringHill
Brentwood
FranklinSmyrna
La Vergne
Mt. Juliet Lebanon
Hendersonville
Gallatin
NASHVILLE
386
155
396
24
24
24
65
65
40
4040
440
840
840
LOUISVILLE
KNOXVILLE
ATLANTABIRMINGHAM
MEMPHIS
193 miles 249 miles
180 miles
176 miles
212 miles
NashvilleInternationalAirport
SmyrnaRutherfordAirport
W I L S O N C O U N T Y
T E N N E S S E E
I N D U S T R I A L P A R K
Exit 65
Speedway Industrial Park presents an unmatched opportunity for users seeking a scalable, flexible and accessible site for bulk distribution, warehouse and light manufacturing facilities. The existing infrastructure, utilities and zoning supports accelerated construction schedules and speed-to-market potential.
• Building 1 is complete with Buildings 3-5 under construction
• Direct access to I-840 (13 miles to I-40 and I-24)
• Located in the rapidly growing communities of both Wilson and Rutherford counties
• Proven area for E-Commerce
• Dedicated and controlled interchange at I-840 and Bill France Boulevard
• Blank canvas for large corporate users with attractive incentive opportunities
• 14 million SF development potential; buildings ranging from 200,000 SF to 2,000,000 SF
• Excellent opportunity to draw labor from multiple surrounding counties
HIGHLIGHTS
W I L S O N C O U N T Y
T E N N E S S E E
I N D U S T R I A L P A R K
D E V E L O P M E N T B Y :
Speedway Industrial Park - formerly the site of
the Nashville Superspeedway in Wilson County, Tennessee
- is a 1,400-acre logistics and bulk distribution park
developed by Panattoni Development Company.
Building 1 - completed and leased. Photo: June 2019
PROPOSEDBUILDING 6
± 1,514,032 SF
PROPOSEDBUILDING 7± 108,108 SF
LEASEDBUILDING 1
± 1,015,040 SF
FUTUREEXPANSION± 805,735 SF
to total1,514,032 SF
UNDER CONSTRUCTION
BUILDING 4± 443,968 SF
UNDER CONSTRUCTION
BUILDING 5± 250,208 SF
UNDER CONSTRUCTION
BUILDING 3± 600,184 SF
PROPOSEDBUILDING 2± 311,360 SF
PROPOSEDBUILDING 8± 123,552 SF
TN452 / BILL FRANCE BLVD
840
840
EXIT 65
PA R K A E R I A LI N D U S T R I A L P A R K
D E V E L O P M E N T B Y :
Mike [email protected]
Brian [email protected]
PROPO
SEDBU
ILDIN
G 7
± 108,108 SF
PROPOSEDBUILDING 8
± 123,552 SF
LEASEDBUILDING 1
1,015,040 SF
PROPOSEDBUILDING 6
± 1,514,032 SF PROPOSEDBUILDING 2± 311,360 SF
UNDER CONSTRUCTION
BUILDING 4± 443,968 SF
UNDERCONSTRUCTION
BUILDING 5± 250,208 SF
UNDER CONSTRUCTION
BUILDING 3
± 805,736 SFTOTAL = 1,405,920 SF
± 600,184 SF
TN452 / BILL FRANCE BLVD
DA
RR
ELL WA
LTRIP
DR
McC
RA
RY R
D
VICTORY LANE DR
STERLING MARLIN DR
FUTURE DRIVE
RICHARD PETTY WAY
GWYNN RD
840
EXIT 65
DA
LE EARNHARDT DR
UNCLE BOB HARMON DR
NAS
HVI
LLE S
UPERSPEEDWAY BLVD
SPEEDWAY INDUSTRIAL PARK1,400 acres / 14M SF potential
BUILDING 1BUILDING 2BUILDING 3BUILDING 4
± 1,015,040 SF± 311,360 SF± 1,405,920 SF± 443,568 SF
± 250,208 SF± 1,514,032 SF± 108,108 SF± 123,552 SF
BUILDING 5BUILDING 6BUILDING 7BUILDING 8
FUTUREEXPANSION
MARTY R
OBBIN
S DR
I N D U S T R I A L P A R KD E V E LO P M E N T B Y :
O V E R A L L P L A NI N D U S T R I A L P A R K
D E V E L O P M E N T B Y :
Mike [email protected]
Brian [email protected]
231
840
84040
24
Smyrna / RutherfordCounty Airport
Nashville InternationalAirport
W I L S O N C O U N T Y
T E N N E S S E E
I N D U S T R I A L P A R K
PHASE 1
DAVIDSONCOUNTY
WILLIAMSONCOUNTY
WILSONCOUNTY
LEBANON
MT. JULIET
NASHVILLE
SMYRNA
LAVERGNE
RUTHERFORDCOUNTY
452
231
L O C AT I O N A E R I A LW I T H P O P U L AT I O N G R O W T HI N D U S T R I A L P A R K
D E V E L O P M E N T B Y :
Mike [email protected]
Brian [email protected]
2012: 1,824,0122017: 1,971,542
+10.2%
NASHVILLE ECONOMIC
MARKET
2012: 281,0622017: 324,890
+15.7%
RUTHERFORDCOUNTY
2012: 121,9692017: 140,625
+14.7%
WILSONCOUNTY
The information contained herein is believed to be reliable but is not warranted as to the accuracy and may change or be updated without notice. ProVenture, LLC makes no representation as to said information and recommends you complete independent research.