4 4 TH TH STREET BRIDGE STREET BRIDGE Pueblo, Colorado Pueblo, Colorado December 2006 Project Overview

description

4 TH STREET BRIDGE Pueblo, Colorado. December 2006 Project Overview. Project Team. Colorado Department of Transportation FHWA Design Consultants FIGG Project Management & Bridge Engineering PBS&J Civil, Roadway, Traffic, Utilities, Environmental - PowerPoint PPT Presentation

Transcript of 4 TH STREET BRIDGE Pueblo, Colorado

Page 1: 4 TH  STREET BRIDGE Pueblo, Colorado

44THTH STREET BRIDGE STREET BRIDGEPueblo, ColoradoPueblo, Colorado

December 2006

Project Overview

Page 2: 4 TH  STREET BRIDGE Pueblo, Colorado

Project TeamProject Team Colorado Department of TransportationColorado Department of Transportation FHWAFHWA Design ConsultantsDesign Consultants

– FIGG FIGG Project Management & Bridge EngineeringProject Management & Bridge Engineering

– PBS&J PBS&J Civil, Roadway, Traffic, Utilities, EnvironmentalCivil, Roadway, Traffic, Utilities, Environmental

– Ayres Associates Ayres Associates Hydraulics & DrainageHydraulics & Drainage

– Goodson/MWWA Goodson/MWWA Geotechnical, GeologyGeotechnical, Geology

– The Szynskie Group The Szynskie Group Lighting & Electrical DesignLighting & Electrical Design

– EDAW EDAW Urban Design & Landscape ArchitectureUrban Design & Landscape Architecture

– Abel Engineering Abel Engineering Survey & ROW SupportSurvey & ROW Support

Page 3: 4 TH  STREET BRIDGE Pueblo, Colorado

Project HistoryProject History Replacement of existing bridge K-18-ZReplacement of existing bridge K-18-Z

– Structurally Deficient, Functionally ObsoleteStructurally Deficient, Functionally Obsolete Statewide Transportation Plan – 1996Statewide Transportation Plan – 1996 Consultant Services - 2000Consultant Services - 2000 Conceptual Design – 2001/2002Conceptual Design – 2001/2002 Preliminary Design 2003Preliminary Design 2003 Environmental Clearance – 2003 thru 2005Environmental Clearance – 2003 thru 2005 Final Design – 2006Final Design – 2006

Page 4: 4 TH  STREET BRIDGE Pueblo, Colorado

Project TimelineProject Timeline

90% Plans90% Plans October 18, 2006 October 18, 2006 PS&EPS&E December 18, 2006 December 18, 2006 AdvertisementAdvertisement March 2007 March 2007 Contract AwardContract Award May- June 2007 May- June 2007 Construction (3-4 years)Construction (3-4 years) 2007-2011 2007-2011

Page 5: 4 TH  STREET BRIDGE Pueblo, Colorado

Project DescriptionProject Description

Page 6: 4 TH  STREET BRIDGE Pueblo, Colorado

Project Aerial MapProject Aerial Map

River

RR Yard

Mall

Loop Ramp Rd

Floodwall

Bluff

Bluff

To I-25

Page 7: 4 TH  STREET BRIDGE Pueblo, Colorado

Site PhotoSite Photo

Page 8: 4 TH  STREET BRIDGE Pueblo, Colorado

Project DescriptionProject Description

• Study CorridorElizabeth St. to Abriendo Ave.

• Construction LimitsMidtown Circle to Corona Ave.

Page 9: 4 TH  STREET BRIDGE Pueblo, Colorado

Bluff

Arkansas River

Trail

Fishing Pier

Kayak Course

Site Description – West EndSite Description – West End

Page 10: 4 TH  STREET BRIDGE Pueblo, Colorado

Site Description – East EndSite Description – East End

Railroad Facilities

Midtown Mall

Commercial

Downtown Pueblo

Page 11: 4 TH  STREET BRIDGE Pueblo, Colorado

Existing Bridge ConditionsExisting Bridge Conditions

Undesirable Roadway GeometryUndesirable Roadway Geometry Insufficient Safety ClearancesInsufficient Safety Clearances Substandard Load Carrying CapacitySubstandard Load Carrying Capacity Structurally DeficientStructurally Deficient Functionally ObsoleteFunctionally Obsolete Insufficient Pedestrian/Bicycle FacilitiesInsufficient Pedestrian/Bicycle Facilities

Page 12: 4 TH  STREET BRIDGE Pueblo, Colorado

Existing Bridge ConditionsExisting Bridge Conditions

Narrow Lanes, Shoulders, SidewalksNarrow Lanes, Shoulders, Sidewalks

Page 13: 4 TH  STREET BRIDGE Pueblo, Colorado

Project ConsiderationsProject Considerations

Railroad CoordinationRailroad Coordination City CoordinationCity Coordination UtilitiesUtilities Phasing / Maintenance of TrafficPhasing / Maintenance of Traffic Arkansas River & Recreation AreaArkansas River & Recreation Area Access to Midtown MallAccess to Midtown Mall Construction Access and Staging AreasConstruction Access and Staging Areas Environmental ComplianceEnvironmental Compliance

Page 14: 4 TH  STREET BRIDGE Pueblo, Colorado

Proposed Roadway SectionProposed Roadway Section

4-Lane Build / 6-Lane Future Capacity4-Lane Build / 6-Lane Future Capacity

Page 15: 4 TH  STREET BRIDGE Pueblo, Colorado

Proposed Structure & AlignmentProposed Structure & Alignment

Page 16: 4 TH  STREET BRIDGE Pueblo, Colorado

Proposed AlignmentProposed AlignmentNorth Alignment - AerialNorth Alignment - Aerial

Page 17: 4 TH  STREET BRIDGE Pueblo, Colorado

Proposed Structure InformationProposed Structure Information

Twin Structures Twin Structures 6-ft 6-ft SeparationSeparation

Average Length:Average Length: 1,137 feet 1,137 feet

5 Spans (151’, 235’, 378’, 5 Spans (151’, 235’, 378’, 228’, 145’)228’, 145’)

Clear Spans:Clear Spans:– Arkansas River & LeveeArkansas River & Levee– River TrailRiver Trail– UPRR & BNSF Yards (w/ pier between)UPRR & BNSF Yards (w/ pier between)– Loop Ramp RoadLoop Ramp Road

Page 18: 4 TH  STREET BRIDGE Pueblo, Colorado

Proposed Bridge (from Bluff)Proposed Bridge (from Bluff)