4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to...
-
Upload
wyatt-kestel -
Category
Documents
-
view
215 -
download
0
Transcript of 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to...
![Page 1: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551b4ab3550346ae7a8b4f41/html5/thumbnails/1.jpg)
• 4” Diameter tube inserted into 21” riser at the seafloor (5000’)• New riser allowing flow to the drillship Enterprise • Oil separated & shipped ashore• System designed to minimize the formation of hydrates• Riser tube will also be equipped with methanol injection system to control hydrates• Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls• Support barge is capable of storing 137,000 bbls
Riser Insertion Tube
![Page 2: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551b4ab3550346ae7a8b4f41/html5/thumbnails/2.jpg)
Blowout Preventer - Top Kill
![Page 3: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551b4ab3550346ae7a8b4f41/html5/thumbnails/3.jpg)
![Page 4: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551b4ab3550346ae7a8b4f41/html5/thumbnails/4.jpg)
The Incident Command PostsUnified Source Control – Houston Tx.
• Stack Intervention
− Top Kill
− Swing Valve
− Split Stack
• Containment
− Top hat
− Hot tap
• Relief Wells
− DD II
− DD III
• Longer Term Options
![Page 5: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551b4ab3550346ae7a8b4f41/html5/thumbnails/5.jpg)
The On-Site Command PostTactical Response Team (TRT) – MC 252