Activity ID Activity Name Original Dur. Start Finish Replacement of 16" Condensate Pipeline Rev01 25Mar14 560 17-Jun-13 A 16-Aug-15 PROJECT MILESTONES 429 17-Jun-13 A 16-Feb-15 GENERAL 250 17-Jun-13 A 16-Jun-14 A.00 Award of Contract 0 17-Jun-13 A A.02 Issue Project Control Procedures, Progress Measurement/ Progress Rep 0 10-Oct-13 A A.01 Issue Overall Project Execution Plan; Coordination, E&P, Project HSE/ Qu 0 26-Dec-13 A A.03 Issue Construction Execution Plan/ Procedures/ Method Statements along 0 16-Jun-14 A.04 Issue Hydrotesting, Drying, Purging, Pre-commissioning, Commissioning a 0 16-Jun-14 DETAIL ENGINEERING 176 19-Sep-13 A 12-Jun-14 B.22 Award subcontract for topographic / Soil Investigation studies 0 19-Sep-13 A B.23 Issue MTO & MRs for linepipes 0 01-Oct-13 A B.14 Obtain final route approval from authorities 0 23-Oct-13 A B.11 Issue MRs for mechanical equipments & packages - final 0 06-Nov-13 A B.04 Issue final MTO & MRs for line pipes 0 12-Nov-13 A B.25 Issue pfd's,p & id's,plot plans,equipment layout & list for all facilities for haz 0 24-Dec-13 A B.15 Issue MTO & MRs for all balance pipeline materials 0 25-Dec-13 A B.21 Prepare design basis for all eng. disciplines and issue for company - final i 0 16-Jan-14 A B.07 Issue MTO & MRs for piping bulk materials 0 30-Jan-14 A B.16 Issue final MTO & MRs for all balance pipeline materials 0 23-Feb-14 A B.30 Issue IFC - tie in philosophy for all new facilities 0 08-Mar-14 A B.18 Issue plot plans,equipment layout & piping layout for all stations- IFC 0 16-Mar-14 A B.27 Issue PFDs, PI&Ds, data sheets & equipment list for all facilities after incor 0 27-Mar-14 B.08 Issue final MTO & MRs for piping bulk materials 0 06-Apr-14 B.09 Issue MTO & MRs for E&I bulk materials 0 08-Apr-14 B.03 Issue piping gad's,isometrics & tie-in details for all areas - IFC 0 09-Apr-14 B.12 Issue MRs for E&I equipments & packages - final 0 13-Apr-14 B.13 Complete topographic / soil survey & submit final reports along with alignm 0 17-Apr-14 B.24 Issue sld,hazardous area classification details for all areas - IFC 0 29-Apr-14 B.26 Complete HAZOP/SIL/LOPA review as applicable & submit final report aft 0 30-Apr-14 B.29 Issue drawings for all road crossings - IFC 0 05-May-14 B.05 Issue E&I cable schedule,cable layout,earthing layout,trench details for all 0 08-May-14 B.06 Complete smc/telecom system design & issue drawings for all facilities - IF 0 08-May-14 B.28 Issue civil/structural drawings for all facilities at sectionalizing valve station - 0 08-May-14 B.01 Issue MTO & MRs for structural steel bulk materials for all areas 0 12-May-14 B.10 Issue final MTO & MRs for E&I bulk materials 0 18-May-14 B.20 Issue drawings for all approach roads & other finishing works including pa 0 19-May-14 B.17 Issue civil / structural drawings for launcher and receiver at habshan and r 0 28-May-14 B.02 Issue final MTO & MRs for structural steel bulk materials for all areas 0 09-Jun-14 B.19 Complete HSEIA, QRA &submit reports to company / adnoc for review / a 0 12-Jun-14 PROCUREMENT 181 31-Oct-13 A 02-Sep-14 C.01 Issue Purchase Orders for Line Pipes 0 31-Oct-13 A C.02 Issue Purchase Orders for Launcher and Receiver 0 17-Dec-13 A C.05 Issue Purchase Orders for all Balance Pipeline Materials (Barred Tee, Iso 0 04-Feb-14 A C.08 Issue Purchase Order for HIPPS 0 05-Mar-14 A C.09 Issue Purchase Order for Fibre Optic System Materials 0 06-Mar-14 A n Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct 2013 2014 2015 REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS DETAILED CONSTRUCTION SCHEDULE Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 1 of 50 Date Revision Checked Approved 30-Mar-14 Detailed Construction Plan Rev-1 MK AM 16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

description

REPRESENTS HOW IS A BASELINE IS DONE AND CREATED.

Transcript of 4. Baseline Schedule Rev-1

  • Activity ID Activity Name OriginalDur.

    Start Finish

    ReplacementofReplacementof16"CondensatePipelineRev0125Mar14 560 17-Jun-13 A 16-Aug-15

    PROJECTMILESTOPROJECTMILESTONES 429 17-Jun-13 A 16-Feb-15GENERALGENERAL 250 17-Jun-13 A 16-Jun-14A.00 Award of Contract 0 17-Jun-13 AA.02 Issue Project Control Procedures, Progress Measurement/ Progress Rep 0 10-Oct-13 AA.01 Issue Overall Project Execution Plan; Coordination, E&P, Project HSE/ Qu 0 26-Dec-13 AA.03 Issue Construction Execution Plan/ Procedures/ Method Statements along 0 16-Jun-14A.04 Issue Hydrotesting, Drying, Purging, Pre-commissioning, Commissioning a 0 16-Jun-14

    DETAIL ENGINEERDETAIL ENGINEERING 176 19-Sep-13 A 12-Jun-14B.22 Award subcontract for topographic / Soil Investigation studies 0 19-Sep-13 A

    B.23 Issue MTO & MRs for linepipes 0 01-Oct-13 AB.14 Obtain final route approval from authorities 0 23-Oct-13 A

    B.11 Issue MRs for mechanical equipments & packages - final 0 06-Nov-13 AB.04 Issue final MTO & MRs for line pipes 0 12-Nov-13 AB.25 Issue pfd's,p & id's,plot plans,equipment layout & list for all facilities for haz 0 24-Dec-13 AB.15 Issue MTO & MRs for all balance pipeline materials 0 25-Dec-13 AB.21 Prepare design basis for all eng. disciplines and issue for company - final i 0 16-Jan-14 AB.07 Issue MTO & MRs for piping bulk materials 0 30-Jan-14 AB.16 Issue final MTO & MRs for all balance pipeline materials 0 23-Feb-14 AB.30 Issue IFC - tie in philosophy for all new facilities 0 08-Mar-14 AB.18 Issue plot plans,equipment layout & piping layout for all stations- IFC 0 16-Mar-14 AB.27 Issue PFDs, PI&Ds, data sheets & equipment list for all facilities after incor 0 27-Mar-14B.08 Issue final MTO & MRs for piping bulk materials 0 06-Apr-14B.09 Issue MTO & MRs for E&I bulk materials 0 08-Apr-14B.03 Issue piping gad's,isometrics & tie-in details for all areas - IFC 0 09-Apr-14B.12 Issue MRs for E&I equipments & packages - final 0 13-Apr-14B.13 Complete topographic / soil survey & submit final reports along with alignm 0 17-Apr-14B.24 Issue sld,hazardous area classification details for all areas - IFC 0 29-Apr-14B.26 Complete HAZOP/SIL/LOPA review as applicable & submit final report aft 0 30-Apr-14B.29 Issue drawings for all road crossings - IFC 0 05-May-14B.05 Issue E&I cable schedule,cable layout,earthing layout,trench details for all 0 08-May-14B.06 Complete smc/telecom system design & issue drawings for all facilities - IF 0 08-May-14B.28 Issue civil/structural drawings for all facilities at sectionalizing valve station - 0 08-May-14B.01 Issue MTO & MRs for structural steel bulk materials for all areas 0 12-May-14B.10 Issue final MTO & MRs for E&I bulk materials 0 18-May-14B.20 Issue drawings for all approach roads & other finishing works including pa 0 19-May-14B.17 Issue civil / structural drawings for launcher and receiver at habshan and r 0 28-May-14B.02 Issue final MTO & MRs for structural steel bulk materials for all areas 0 09-Jun-14B.19 Complete HSEIA, QRA &submit reports to company / adnoc for review / a 0 12-Jun-14

    PROCUREMENTPROCUREMENT 181 31-Oct-13 A 02-Sep-14C.01 Issue Purchase Orders for Line Pipes 0 31-Oct-13 AC.02 Issue Purchase Orders for Launcher and Receiver 0 17-Dec-13 AC.05 Issue Purchase Orders for all Balance Pipeline Materials (Barred Tee, Iso 0 04-Feb-14 AC.08 Issue Purchase Order for HIPPS 0 05-Mar-14 AC.09 Issue Purchase Order for Fibre Optic System Materials 0 06-Mar-14 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 1 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    C.03 Issue Purchase Order for Mainline Valves 0 10-Mar-14 AC.06 Issue Purchase Order for Leak Detection System 0 18-Mar-14 AC.04 Issue Purchase Order for Hot Bends 0 10-Apr-14C.07 Issue Purchase Orders for E & I Equipments (Solar Panels, UPS, Passive 0 21-Apr-14C.10 Issue Purchase Orders for all Piping Bulk Materials - I MTO 0 08-Jun-14C.13 Issue Purchase Orders for all E&I Bulk Materials & Tagged Instruments - 0 09-Jun-14C.14 Issue Purchase Orders for all Major Civil/ Structural Bulk Materials - I MTO 0 10-Jun-14C.11 Issue Purchase Orders for all Piping Bulk Materials - Final MTO 0 24-Jun-14C.12 Issue Purchase Orders for all E&I Bulk Materials & Tagged Instruments - 0 24-Jun-14C.15 Submit G-SPIRs to COMPANY and Place Orders for Operational Spares 0 02-Sep-14

    MANUFACTURINGMANUFACTURING & DELIVERY 250 01-May-14 15-Jan-15D.01 Receive Coated Line Pipes for Habshan to Ruwais Pipeline System 0 01-May-14D.09 Receive all Fibre Optic System Materials 0 01-Jul-14D.14 Receive all Major Civil/ Structural Bulk Materials - I MTO 0 15-Jul-14D.15 Receive all Major Civil/ Structural Bulk Materials - Final MTO 0 16-Jul-14D.04 Receive Pipeline Hot Bends for Habshan to Ruwais Pipeline System 0 03-Aug-14D.02 Receive Launcher & Receiver from Habshan to Ruwais Pipeline System 0 15-Sep-14D.10 Receive all Piping Bulk Materials at Site- I MTO. 0 08-Oct-14D.11 Receive all Piping Bulk Materials at Site - Final MTO. 0 10-Oct-14D.05 Receive all Balance Pipeline Materials (Barred Tee,Isolation Joints,Anchor 0 15-Oct-14D.07 Receive Leak Detection System 0 15-Oct-14D.13 Receive all E&I Bulk Materials at Site & Tagged Instruments - Final MTO. 0 17-Oct-14D.12 Receive all E&I Bulk Materials at Site & Tagged Instruments - I MTO. 0 29-Oct-14D.06 Receive E & I Equipments (Solar Panels, UPS, Passive Cooling Shelteres 0 08-Nov-14D.03 Receive Mainline Valves for Habshan to Ruwais Pipeline System 0 14-Nov-14D.08 Receive HIPPS 0 27-Nov-14D.16 Receive Insurance Spares for all Equipment & Pacakges at Site and hand 0 15-Jan-15D.17 Receive all Operating Spares at Site and Hand-Over to COMPANY 0 15-Jan-15

    CONSTRUCTIONCONSTRUCTION 121 20-Aug-14 15-Jan-15E.02 Complete foundations for Launchers and Receivers at Habshan and Ruw 0 20-Aug-14E.01 Complete Site Grading & ROW along the Pipeline - Habshan to Ruwais 0 25-Aug-14E.04 Complete construction of NDRC Road crossings - Habshan to Ruwais 0 21-Oct-14E.03 Complete Pipeline welding between Habshan to Ruwais 0 20-Nov-14E.08 Complete all Piping and E&I Installation Works at Block Valve Stations (SV 0 08-Dec-14E.05 Complete Hydrotesting of Pipeline between Habshan to Ruwais 0 10-Dec-14E.06 Complete all Piping and E&I Installation Works at Habshan station 0 16-Dec-14E.07 Complete all Piping and E&I Installation Works at Ruwais station 0 21-Dec-14E.10 Complete All Piping, Pipeline and E&I Tie-Ins to the Existing Facilities at all 0 24-Dec-14E.11 Complete Installation, Testing and Commissioning of SMC, Telecom and L 0 24-Dec-14E.09 Complete Drying & Purging for Pipeline and Block Valve Stations 0 12-Jan-15E.12 Achieve Mechanical Completion (MC) of pipeline facilities from Habshan to 0 15-Jan-15

    COMMISSIONING &COMMISSIONING & PAC 18 29-Jan-15 16-Feb-15F.01 Commission New pipeline system from Habshan to Ruwais 0 29-Jan-15F.02 Complete Test Run and Achieve Provisional Acceptance Certificate (PAC- 0 16-Feb-15

    PROJECTMANAGEPROJECTMANAGEMENT 378 17-Jun-13 A 21-Dec-14A1020 Mobilisation Home Office Abu Dhabi 55 17-Jun-13 A 28-Dec-13 AA1040 Project Kick-off Meeting 1 26-Jun-13 A 27-Jun-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 2 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    A1180 Prepare and Issue Project HSE Procedures IFA 20 26-Jun-13 A 21-Oct-13 AA1090 Prepare and Issue Engineering Execution Plan IFA 15 26-Jun-13 A 15-Dec-13 AA1110 Prepare and Issue Subcontracting Execution Plan IFA 56 26-Jun-13 A 19-Nov-13 AA1030 Mobilization of Engineering Team 15 27-Jun-13 A 25-Oct-13 AA1140 Prepare and Issue Project Numbering Procedure IFA 26 09-Jul-13 A 21-Aug-13 AA1210 Prepare and Issue Project Controls Procedure IFA 26 16-Jul-13 A 10-Oct-13 AA1130 Prepare and Issue Project Communication & Coordination Procedure IFA 38 21-Jul-13 A 20-Oct-13 AA1170 Prepare and Issue Project Quality Plan & QA/QC-Procedures IFA 38 06-Aug-13 A 10-Oct-13 AA1080 Prepare and Issue Project Execution Plan IFA 26 13-Aug-13 A 07-Oct-13 AA1120 Prepare and Issue Progress Measurement & Project Reporting Procedure 41 19-Aug-13 A 26-Sep-13 AA1050 Prepare and issue Project Calendar IFA 13 19-Aug-13 A 26-Sep-13 AA1060 Prepare & Issue Project Contract Schedule, Histograms, S-curves IFR 33 19-Aug-13 A 26-Sep-13 AA1150 Prepare and Issue Site Mobilisation Plan Personnel IFA 8 19-Aug-13 A 26-Sep-13 AA1190 Prepare and Issue Site Mobilisation Plan Equipment IFA 56 19-Aug-13 A 26-Sep-13 AA1070 Prepare and Issue Project Schedule 90-Days Lookahead IFA 56 19-Aug-13 A 27-Aug-13 AA1810 Mobilization of Manpower Other Than Engineering 90 04-Sep-13 A 18-May-14A1100 Prepare and Issue Procurement Execution Plan IFA 60 02-Oct-13 A 24-Dec-13 AA1160 Prepare and Issue Procedure for Authority Engineering IFA 1 25-Oct-13 A 25-Oct-13 AA1520 Camp and Other Temporary Works Establishments 60 07-Nov-13 A 30-Jan-14 AA1220 Agreement Signing With Company 0 24-Dec-13 AA1200 Prepare and Issue Construction Execution Plan IFA 75 01-Jan-14 A 14-Apr-14A1780 Mobilization of Construction Equipment 45 07-Jan-14 A 29-May-14A1230 Prepare and Issue Project Method Statement IFA 56 02-Feb-14 A 16-Jun-14A1900 Complete Site Mobilization 0 02-Feb-14 AA1010 Development, Implement & Maintain Quality Management / HSE Manage 0 27-Mar-14A1840 Prepare and Issue to COMPANY Commissioning Plan IFA 56 27-Mar-14 16-Jun-14E.26 Completion of All SV-4 Works 0 01-Dec-14E.24 Completion of All SV-2 Works 0 01-Dec-14E.27 Completetion of Habshan Launcher 0 07-Dec-14E.23 Completion of All SV-1 Works 0 08-Dec-14E.25 Completion of All SV-3 Works 0 15-Dec-14E.28 Completion of Ruwais Receiver 0 21-Dec-14

    HOMEOFFICEHOMEOFFICE 304 17-Jun-13 A 02-Sep-14DETAIL ENGINEERDETAIL ENGINEERING 292 05-Jul-13 A 26-Aug-14PRELIMINARY ACTPRELIMINARY ACTIVITIES 15 12-Aug-13 A 24-Sep-13 ASITE SURVEY REPSITE SURVEY REPORT 15 12-Aug-13 A 24-Sep-13 AHE-SS-0090 ENTRY PERMITS AND PASSES 15 12-Aug-13 A 22-Aug-13 AHE-SS-0010 DATA GATHERING/DOCUMENT RETRIEVAL 10 26-Aug-13 A 24-Sep-13 A

    DESIGN BASIS (CODESIGN BASIS (COMMON FOR ALL DISCIPLINES) 105 22-Jul-13 A 16-Jan-14 AHE-SS-DB-0040 ISSUANCE OF DESIGN BASIS MEMORANDUM 13 22-Jul-13 A 02-Sep-13 AHE-SS-DB-0050 RECEIVE COMPANY COMMENTS/APPROVAL - DESIGN BASIS MEMO 13 03-Sep-13 A 23-Sep-13 AHE-SS-DB-0060 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 25-Oct-13 AHE-SS-DB-0070 RECEIVE COMPANY APPROVAL - DESIGN BASIS 6 25-Oct-13 A 06-Jan-14 AHE-SS-DB-0080 ISSUE FOR DESIGN/CONSTRUCTION - DESIGN BASIS 4 07-Jan-14 A 16-Jan-14 A

    DETAIL ENGINEERDETAIL ENGINEERING DESIGN INPUTS 142 25-Aug-13 A 21-Apr-14INFO0070 RECEIPT OF VENDOR DETAILS FOR EXISTING DCS, ESD, F & G AN 25 25-Aug-13 A 30-Mar-14INFO0040 RECEIPT OF VENDOR DETAILS FOR INSTRUMENTATION ITEMS 26 25-Aug-13 A 08-Mar-14 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 3 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    INFO0010 RECEIPT OF TOPOGRAPHIC SURVEY REPORT AND ALIGNMENT S 0 25-Nov-13 AINFO0030 RECEIPT OF CP DETAILS 26 30-Jan-14 A 08-Mar-14 AINFO0060 RECEIPT OF VENDOR DETAILS FOR ACTIVE COOLING SHELTER 26 04-Feb-14 A 21-Apr-14INFO0020 RECEIPT OF GEOTECHNICAL SURVEY REPORT FROM GEO- SUBC 0 25-Feb-14 AINFO0050 RECEIPT OF VENDOR DETAILS FOR PASSIVE COOLING SHELTER 26 14-Apr-14 A 02-Apr-14

    PROCESSPROCESS 243 15-Jul-13 A 22-Apr-14SITE VISIT REPORSITE VISIT REPORT 48 16-Sep-13 A 21-Jan-14 AHE-PR-VR-0100 PREPARE & ISSUE SITE VISITS REPORT-PROCESS 5 16-Sep-13 A 06-Oct-13 AHE-PR-VR-0105 RECEIVE COMPANY COMMENTS/APPROVAL - PROCESS SITE VISIT 13 06-Oct-13 A 21-Oct-13 AHE-PR-VR-0200 ISSUE FOR DESIGN/CONSTRUCTION - PROCESS SITE VISIT 3 21-Oct-13 A 21-Jan-14 A

    HYDRAULIC ANALHYDRAULIC ANALYSIS STUDY & REPORT 127 15-Jul-13 A 19-Dec-13 AHE-PR-HS-0010 PREPARE & ISSUE FOR COMPANY REVIEW - HYDRAULIC ANALYSIS 8 15-Jul-13 A 22-Aug-13 AHE-PR-HS-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 24-Aug-13 A 03-Sep-13 AHE-PR-HS-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 03-Sep-13 A 24-Oct-13 AHE-PR-HS-0040 RECEIVE COMPANY APPROVAL 13 25-Oct-13 A 10-Nov-13 AHE-PR-HS-0050 ISSUE FOR CONSTRUCTION - Hydraulic Analysis 6 10-Nov-13 A 19-Dec-13 A

    PROCESS FLOW DPROCESS FLOW DIAGRAMS 192 15-Jul-13 A 17-Mar-14 AHE-PR-PR-0010 PREPARE & ISSUE FOR COMPANY PFD 9 15-Jul-13 A 25-Aug-13 AHE-PR-PR-0020 RECEIVE COMPANY COMMENTS/APPROVAL 19 26-Aug-13 A 01-Sep-13 AHE-PR-PR-0030 INCORPORATE COMMENTS AND ISSUE FOR P & ID REVIEW SESSI 4 02-Sep-13 A 23-Oct-13 AHE-PR-PR-0031 P & ID REVIEW SESSION 5 10-Dec-13 A 16-Dec-13 AHE-PR-PR-0032 INCORPORATE P & ID REVIEW SESSION COMMENTS & ISSUE FOR 4 16-Dec-13 A 24-Dec-13 AHE-PR-PR-0035 INCORPORATE HAZOP COMMENTS AND ISSUE FOR APPROVAL 4 24-Dec-13 A 13-Feb-14 AHE-PR-PR-0040 RECEIVE COMPANY APPROVAL 13 13-Feb-14 A 05-Mar-14 AHE-PR-PR-0050 ISSUE FOR CONSTRUCTION PFD 6 15-Mar-14 A 17-Mar-14 A

    CONSTRUCTION CONSTRUCTION P & IDs 189 15-Jul-13 A 17-Mar-14 AHE-PR-PC-0010 PREPARE & ISSUE P & IDs FOR COMPANY REVIEW 6 15-Jul-13 A 28-Aug-13 AHE-PR-PC-0020 RECEIVE COMPANY COMMENTS/APPROVAL 19 29-Aug-13 A 11-Sep-13 AHE-PR-PC-0030 INCORPORATE COMMENTS AND ISSUE FOR P & ID REVIEW SESSI 4 12-Sep-13 A 23-Oct-13 AHE-PR-PC-0031 P & ID REVIEW SESSION 5 10-Dec-13 A 16-Dec-13 AHE-PR-PC-0032 INCORPORATE P & ID REVIEW SESSION COMMENTS AND ISSUE F 4 16-Dec-13 A 24-Dec-13 AHE-PR-PC-0035 INCORPORATE HAZOP COMMENTS AND ISSUE FOR APPROVAL 4 24-Dec-13 A 13-Feb-14 AHE-PR-PC-0040 RECEIVE COMPANY APPROVAL 13 02-Feb-14 A 09-Mar-14 AHE-PR-PC-0050 ISSUE FOR CONSTRUCTION - P&ID 6 13-Mar-14 A 17-Mar-14 A

    DEMOLITION P & DEMOLITION P & IDs 172 15-Jul-13 A 22-Apr-14HE-PR-PC-0060 PREPARE & ISSUE FOR COMPANY REVIEW 5 15-Jul-13 A 28-Aug-13 AHE-PR-PC-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Aug-13 A 11-Sep-13 AHE-PR-PR-0130 INCORPORATE HAZOP COMMENTS AND ISSUE FOR APPROVAL 4 24-Dec-13 A 05-Mar-14 A

    HE-PR-PR-0140 RECEIVE COMPANY APPROVAL 13 26-Mar-14 A 14-Apr-14HE-PR-PR-0150 ISSUE FOR CONSTRUCTION P &ID Demolition 6 14-Apr-14 22-Apr-14

    SURGE ANALYSISSURGE ANALYSIS REPORT 190 25-Aug-13 A 20-Feb-14 AHE-PR-SC-0010 PREPARE & ISSUE FOR COMPANY REVIEW 9 25-Aug-13 A 23-Dec-13 AHE-PR-SC-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 24-Dec-13 A 08-Jan-14 AHE-PR-SC-0030 INCORPORATE COMMENTS & ISSUED FOR APPROVAL 4 08-Jan-14 A 26-Jan-14 AHE-PR-SC-0040 RECEIVE COMPANY APPROVAL 17 26-Jan-14 A 12-Feb-14 AHE-PR-SC-0050 ISSUE FOR CONSTRUCTION - Surge Analysis 6 19-Feb-14 A 20-Feb-14 A

    PROCESS CALCUPROCESS CALCULATION REPORT 215 25-Aug-13 A 18-Mar-14 AHE-PR-SF-0010 PREPARE & ISSUE FOR COMPANY REVIEW 9 25-Aug-13 A 18-Dec-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 4 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-PR-SF-0020 RECEIVE COMPANY COMMENTS/APPROVAL 7 19-Dec-13 A 07-Jan-14 AHE-PR-SF-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 07-Jan-14 A 12-Feb-14 AHE-PR-SF-0040 RECEIVE COMPANY APPROVAL 8 12-Feb-14 A 20-Feb-14 AHE-PR-SF-0050 ISSUE FOR CONSTRUCTION - Process Calculation 3 16-Mar-14 A 18-Mar-14 A

    EQUIPMENT LISTEQUIPMENT LIST 105 04-Aug-13 A 27-Jan-14 AHE-PR-EQ-0010 PREPARE & ISSUE FOR COMPANY REVIEW 9 04-Aug-13 A 01-Sep-13 AHE-PR-EQ-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 02-Sep-13 A 05-Sep-13 AHE-PR-EQ-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 08-Sep-13 A 24-Nov-13 AHE-PR-EQ-0040 RECEIVE COMPANY APPROVAL 13 10-Dec-13 A 30-Dec-13 AHE-PR-EQ-0050 ISSUE FOR CONSTRUCTION - Equipment List 6 31-Dec-13 A 27-Jan-14 A

    OPERATING & COOPERATING & CONTROL PHILOSOPHY 153 04-Aug-13 A 20-Apr-14 AHE-PR-OC-0010 PREPARE & ISSUE FOR COMPANY REVIEW 5 04-Aug-13 A 22-Aug-13 AHE-PR-OC-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 23-Aug-13 A 29-Aug-13 AHE-PR-OC-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 01-Sep-13 A 23-Dec-13 AHE-PR-OC-0040 RECEIVE COMPANY APPROVAL 13 24-Dec-13 A 17-Mar-14 AHE-PR-OC-0050 ISSUE FOR CONSTRUCTION - Operating & Control Philosophy 6 18-Mar-14 A 20-Apr-14 A

    TIE-IN PHILOSOPHTIE-IN PHILOSOPHY 82 25-Aug-13 A 25-Dec-13 AHE-PR-PP-0090 PREPARE & ISSUE FOR COMPANY REVIEW 5 25-Aug-13 A 06-Oct-13 AHE-PR-PP-0100 RECEIVE COMPANY COMMENTS/APPROVAL 13 07-Oct-13 A 22-Oct-13 AHE-PR-PP-0105 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 23-Oct-13 A 05-Dec-13 AHE-PR-PP-0110 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-PR-PP-0130 ISSUE FOR CONSTRUCTION - Tie-in Philosophy 6 19-Dec-13 A 25-Dec-13 A

    PRECOMMISSIONPRECOMMISSIONING & COMMISSIONING PHILOSOPHY 137 25-Aug-13 A 05-Mar-14 AHE-PR-PP-0010 PREPARE & ISSUE FOR COMPANY REVIEW 5 25-Aug-13 A 27-Oct-13 AHE-PR-PP-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Oct-13 A 10-Nov-13 AHE-PR-PP-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 11-Nov-13 A 16-Jan-14 AHE-PR-PP-0040 RECEIVE COMPANY APPROVAL 13 16-Jan-14 A 30-Jan-14 AHE-PR-PP-0050 ISSUE FOR CONSTRUCTION - Precom. & Com. Philosophy 6 04-Mar-14 A 05-Mar-14 A

    VENT AND DRAIN VENT AND DRAIN PHILOSOPHY 76 25-Aug-13 A 16-Jan-14 AHE-PR-PP-0140 PREPARE & ISSUE FOR COMPANY REVIEW 5 25-Aug-13 A 22-Oct-13 AHE-PR-PP-0150 RECEIVE COMPANY COMMENTS/APPROVAL 13 23-Oct-13 A 10-Nov-13 AHE-PR-PP-0160 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 11-Nov-13 A 05-Dec-13 AHE-PR-PP-0170 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-PR-PP-0180 ISSUE FOR CONSTRUCTION - Vent & Drain Philosophy 6 19-Dec-13 A 16-Jan-14 A

    UTILITY SUMMARYUTILITY SUMMARY 83 25-Aug-13 A 10-Feb-14 AHE-PR-PP-0190 PREPARE & ISSUE FOR COMPANY REVIEW 5 25-Aug-13 A 14-Nov-13 AHE-PR-PP-0200 RECEIVE COMPANY COMMENTS/APPROVAL 13 17-Nov-13 A 03-Dec-13 AHE-PR-PP-0210 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 03-Dec-13 A 19-Dec-13 AHE-PR-PP-0220 RECEIVE COMPANY APPROVAL 13 19-Dec-13 A 06-Jan-14 AHE-PR-PP-0230 ISSUE FOR CONSTRUCTION - Utility Summary 6 06-Jan-14 A 10-Feb-14 A

    CAUSE AND EFFECAUSE AND EFFECT DIAGRAM 96 25-Aug-13 A 11-Feb-14 AHE-PR-PP-0065 PREPARE & ISSUE FOR COMPANY REVIEW 5 25-Aug-13 A 14-Nov-13 AHE-PR-PP-0240 RECEIVE COMPANY COMMENTS/APPROVAL 19 17-Nov-13 A 03-Dec-13 AHE-PR-PP-0250 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 03-Dec-13 A 25-Dec-13 AHE-PR-PP-0260 RECEIVE COMPANY APPROVAL 13 25-Dec-13 A 13-Jan-14 AHE-PR-PP-0270 ISSUE FOR CONSTRUCTION - Cause & Effect Diagram 6 13-Jan-14 A 11-Feb-14 A

    CIVILCIVIL 242 18-Jul-13 A 15-Jun-14ADDENDUM TO DADDENDUM TO DGS 51 29-Jul-13 A 21-Oct-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 5 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-CS-AD-0260 PREPARE & ISSUE FOR COMPANY REVIEW 13 29-Jul-13 A 05-Sep-13 AHE-CS-AD-0270 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Sep-13 A 23-Sep-13 AHE-CS-AD-0290 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 03-Oct-13 AHE-CS-AD-0280 RECEIVE COMPANY APPROVAL 13 03-Oct-13 A 03-Oct-13 AHE-CS-AD-0300 ISSUE FOR CONSTRUCTION Addendum to DGS (Civil) 6 06-Oct-13 A 21-Oct-13 A

    SITE VISIT - CIVILSITE VISIT - CIVIL 190 01-Sep-13 A 01-Apr-14HE-CS-VR-0130 SITE VISITS-Civil 3 01-Sep-13 A 15-Sep-13 AHE-CS-VR-0135 PREPARE & ISSUE SITE VISITS REPORT-CIVIL 5 16-Sep-13 A 29-Oct-13 AHE-CS-VR-0140 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Oct-13 A 29-Oct-13 AHE-CS-VR-0150 RECEIVE COMPANY APPROVAL 13 29-Oct-13 A 19-Nov-13 AHE-CS-VR-0145 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 29-Oct-13 A 29-Oct-13 AHE-CS-VR-0158 ISSUE FINAL Site Visit - Civil 4 27-Mar-14 01-Apr-14

    SOW FOR GEOTESOW FOR GEOTECHNICAL SURVEY 79 18-Jul-13 A 20-Oct-13 AHE-CS-SG-0010 PREPARE & ISSUE FOR COMPANY REVIEW 5 18-Jul-13 A 24-Jul-13 AHE-CS-SG-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Jul-13 A 11-Aug-13 AHE-CS-SG-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Aug-13 A 03-Sep-13 AHE-CS-SG-0040 RECEIVE COMPANY APPROVAL 13 03-Sep-13 A 30-Sep-13 AHE-CS-SG-0045 ISSUE FOR CONSTRUCTION - SOW For Geotechnical Survey 6 01-Oct-13 A 20-Oct-13 A

    SOW FOR NDRC WSOW FOR NDRC WORKS 30 31-Oct-13 A 26-Jan-14 AHE-CS-NR-0210 PREPARE & ISSUE FOR COMPANY REVIEW 10 31-Oct-13 A 18-Nov-13 AHE-CS-NR-0220 RECEIVE COMPANY COMMENTS/APPROVAL 13 18-Nov-13 A 05-Dec-13 AHE-CS-NR-0230 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 05-Dec-13 A 15-Dec-13 AHE-CS-NR-0240 RECEIVE COMPANY APPROVAL 13 15-Dec-13 A 16-Jan-14 AHE-CS-NR-0250 ISSUE FOR CONSTRUCTION - SOW for NDRC work 6 16-Jan-14 A 26-Jan-14 A

    GENERAL NOTESGENERAL NOTES FOR CIVIL AND STRUCTURAL WORKS 127 25-Jul-13 A 05-Nov-13 AHE-CS-TD-0260 PREPARE & ISSUE FOR COMPANY REVIEW 3 25-Jul-13 A 29-Sep-13 AHE-CS-TD-0270 RECEIVE COMPANY COMMENTS/APPROVAL 13 30-Sep-13 A 06-Oct-13 AHE-CS-TD-0280 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Oct-13 A 27-Oct-13 AHE-CS-TD-0290 RECEIVE COMPANY APPROVAL 13 27-Oct-13 A 27-Oct-13 AHE-CS-TD-0300 ISSUE FOR CONSTRUCTION - General Civil 6 27-Oct-13 A 05-Nov-13 A

    TYPICAL DETAILSTYPICAL DETAILS 120 25-Jul-13 A 06-Nov-13 AHE-CS-TP-0010 PREPARE & ISSUE TYPICAL DETAILS FOR COMPANY REVIEW 19 25-Jul-13 A 29-Sep-13 AHE-CS-TP-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 30-Sep-13 A 10-Oct-13 AHE-CS-TP-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 13-Oct-13 A 27-Oct-13 AHE-CS-TP-0040 RECEIVE COMPANY APPROVAL 13 27-Oct-13 A 27-Oct-13 AHE-CS-TP-0050 ISSUE FOR CONSTRUCTION Typical Details Civil 6 27-Oct-13 A 06-Nov-13 A

    CALCULATIONSCALCULATIONS 93 18-Dec-13 A 08-May-14IMPACT WALLSIMPACT WALLS 68 24-Dec-13 A 22-Apr-14HE-CS-CL-0210 PREPARE & ISSUE FOR COMPANY REVIEW 3 24-Dec-13 A 09-Mar-14 AHE-CS-CL-0215 RECEIVE COMPANY COMMENTS/APPROVAL 9 09-Mar-14 A 11-Mar-14 AHE-CS-CL-0220 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 11-Mar-14 A 31-Mar-14HE-CS-CL-0225 RECEIVE COMPANY APPROVAL 13 01-Apr-14 17-Apr-14HE-CS-CL-0230 ISSUE FOR CONSTRUCTION - Impact Wall Calculation 3 17-Apr-14 22-Apr-14

    ANCHOR BLOCKSANCHOR BLOCKS 90 18-Dec-13 A 08-May-14HE-CS-CL-0160 PREPARE & ISSUE FOR COMPANY REVIEW 3 18-Dec-13 A 30-Dec-13 AHE-CS-CL-0165 RECEIVE COMPANY COMMENTS/APPROVAL 13 30-Dec-13 A 15-Jan-14 AHE-CS-CL-0170 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 15-Jan-14 A 16-Apr-14HE-CS-CL-0180 RECEIVE COMPANY APPROVAL 13 17-Apr-14 05-May-14

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 6 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-CS-CL-0185 ISSUE FOR CONSTRUCTION Anchor block Calculation 3 05-May-14 08-May-14

    CULVERT DETAILCULVERT DETAILS 84 12-Jan-14 A 08-May-14HE-CS-CL-0250 PREPARE & ISSUE FOR COMPANY REVIEW 3 12-Jan-14 A 03-Mar-14 AHE-CS-CL-0255 RECEIVE COMPANY COMMENTS/APPROVAL 13 27-Mar-14 14-Apr-14HE-CS-CL-0260 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 14-Apr-14 17-Apr-14HE-CS-CL-0270 RECEIVE COMPANY APPROVAL 13 17-Apr-14 05-May-14HE-CS-CL-0280 ISSUE FOR CONSTRUCTION Culvert Details Calculation 3 06-May-14 08-May-14

    MISCELLANEOUSMISCELLANEOUS STRUCTURES 93 12-Jan-14 A 08-May-14HE-CS-CL-0290 PREPARE & ISSUE FOR COMPANY REVIEW 3 12-Jan-14 A 04-Mar-14 AHE-CS-CL-0300 RECEIVE COMPANY COMMENTS/APPROVAL 13 27-Mar-14 14-Apr-14HE-CS-CL-0305 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 14-Apr-14 17-Apr-14HE-CS-CL-0310 RECEIVE COMPANY APPROVAL 13 17-Apr-14 05-May-14HE-CS-CL-0320 ISSUE FOR CONSTRUCTION Misc Structure Calculations 3 06-May-14 08-May-14

    PASSIVE COOLERPASSIVE COOLER SHLETER, SP & JIB CRANE FOUNDATION DETAILS 38 22-Apr-14 15-Jun-14HE-CS-TD-0160 PREPARE & ISSUE FOR COMPANY REVIEW 5 22-Apr-14 28-Apr-14HE-CS-TD-0170 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Apr-14 15-May-14HE-CS-TD-0180 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 4 15-May-14 21-May-14HE-CS-TD-0190 RECEIVE COMPANY APPROVAL 13 21-May-14 09-Jun-14HE-CS-TD-0200 ISSUE FOR CONSTRUCTION PCS 4 09-Jun-14 15-Jun-14

    DETAILS - IMPACTDETAILS - IMPACT WALLS, ANCHOR BLOCKS AND CULVERT 100 03-Oct-13 A 27-May-14DETAILS FOR IMPDETAILS FOR IMPACT WALLS 74 03-Oct-13 A 05-May-14HE-CS-CT-0110 PREPARE & ISSUE FOR COMPANY REVIEW 5 03-Oct-13 A 01-Apr-14HE-CS-CT-0120 RECEIVE COMPANY COMMENTS/APPROVAL 9 01-Apr-14 14-Apr-14HE-CS-CT-0140 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 14-Apr-14 17-Apr-14HE-CS-CT-0145 RECEIVE COMPANY APPROVAL 9 17-Apr-14 30-Apr-14HE-CS-CT-0150 ISSUE FOR CONSTRUCTION - Details Imapct Walls 3 30-Apr-14 05-May-14

    DETAILS FOR ANDETAILS FOR ANCHOR BLOCKS, BOLTS 88 24-Dec-13 A 08-May-14HE-CS-DT-0130 PREPARE & ISSUE FOR COMPANY REVIEW 5 24-Dec-13 A 02-Jan-14 AHE-CS-DT-0135 RECEIVE COMPANY COMMENTS/APPROVAL 13 02-Jan-14 A 16-Jan-14 AHE-CS-DT-0150 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 16-Jan-14 A 06-Apr-14HE-CS-DT-0155 RECEIVE COMPANY APPROVAL 13 06-Apr-14 22-Apr-14HE-CS-DT-0160 ISSUE FOR CONSTRUCTION - Details Anchor Block Bolts 6 30-Apr-14 08-May-14

    DETAILS FOR CUDETAILS FOR CULVERT DETAILS 43 27-Mar-14 27-May-14HE-CS-DT-0170 PREPARE & ISSUE FOR COMPANY REVIEW 5 27-Mar-14 02-Apr-14HE-CS-DT-0175 RECEIVE COMPANY COMMENTS/APPROVAL 13 03-Apr-14 21-Apr-14HE-CS-DT-0180 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 21-Apr-14 29-Apr-14HE-CS-DT-0185 RECEIVE COMPANY APPROVAL 13 29-Apr-14 18-May-14HE-CS-DT-0190 ISSUE FOR CONSTRUCTION - Details Culvert Details 6 18-May-14 27-May-14

    LAUNCHER AREA LAUNCHER AREA - HABSHAN 118 03-Oct-13 A 15-May-14CIVIL SITE LAYOUCIVIL SITE LAYOUT 84 07-Jan-14 A 04-May-14HE-CS-LO-0010 PREPARE & ISSUE FOR COMPANY REVIEW 5 07-Jan-14 A 30-Jan-14 AHE-CS-LO-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 30-Jan-14 A 30-Mar-14HE-CS-LO-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 30-Mar-14 07-Apr-14HE-CS-LO-0040 RECEIVE COMPANY APPROVAL 13 07-Apr-14 23-Apr-14HE-CS-LO-0045 ISSUE FOR CONSTRUCTION - Launcher - Civil Site Layout 6 24-Apr-14 04-May-14

    GRADING PLANGRADING PLAN 104 03-Oct-13 A 30-Apr-14HE-CS-GR-0010 PREPARE & ISSUE GRADING PLANS FOR COMPANY REVIEW 5 03-Oct-13 A 28-Oct-13 AHE-CS-GR-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 28-Oct-13 A 06-Nov-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 7 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-CS-GR-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Nov-13 A 06-Apr-14HE-CS-GR-0040 RECEIVE COMPANY APPROVAL 13 06-Apr-14 22-Apr-14HE-CS-GR-0045 ISSUE FOR CONSTRUCTION - Launcher Grading Plan 6 22-Apr-14 30-Apr-14

    CALCULATION FCALCULATION FOR PIPE SUPPORT FOUNDATION 90 12-Jan-14 A 15-May-14HE-CS-PR-0010 PREPARE & ISSUE FOR COMPANY REVIEW 5 12-Jan-14 A 02-Apr-14HE-CS-PR-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 03-Apr-14 21-Apr-14HE-CS-PR-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 21-Apr-14 24-Apr-14HE-CS-PR-0040 RECEIVE COMPANY APPROVAL 13 24-Apr-14 12-May-14HE-CS-PR-0045 ISSUE FOR CONSTRUCTION - Launcher Calculation for Pipe Support F 3 13-May-14 15-May-14

    PIPE SUPPORT& PIPE SUPPORT& FOUNDATION DETAILS 95 07-Jan-14 A 27-Mar-14 AHE-CS-DT-0010 PREPARE & ISSUE FOR COMPANY REVIEW 5 07-Jan-14 A 02-Feb-14 AHE-CS-DT-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 09-Feb-14 A 21-Feb-14 AHE-CS-DT-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 26-Feb-14 A 06-Mar-14 AHE-CS-DT-0040 RECEIVE COMPANY APPROVAL 13 23-Mar-14 A 25-Mar-14 AHE-CS-DT-0045 ISSUE FOR CONSTRUCTION - Pipe Support & Fdns 3 26-Mar-14 A 27-Mar-14 A

    SV STATIONSSV STATIONS 110 03-Oct-13 A 08-May-14CIVIL SITE LAYOUCIVIL SITE LAYOUT 89 09-Jan-14 A 05-May-14HE-CS-LO-0050 PREPARE & ISSUE FOR COMPANY REVIEW 5 09-Jan-14 A 02-Apr-14HE-CS-LO-0065 RECEIVE COMPANY COMMENTS/APPROVAL 9 01-Mar-14 A 05-Mar-14 AHE-CS-LO-0072 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 16-Mar-14 A 21-Mar-14 AHE-CS-LO-0081 RECEIVE COMPANY APPROVAL 13 03-Apr-14 21-Apr-14HE-CS-LO-0086 ISSUE FOR CONSTRUCTION Civil Site layout (SV) 6 27-Apr-14 05-May-14

    GRADING PLANGRADING PLAN 104 03-Oct-13 A 18-Mar-14 AHE-CS-GR-0050 PREPARE & ISSUE GRADING PLANS FOR COMPANY REVIEW 5 03-Oct-13 A 28-Oct-13 AHE-CS-GR-0060 RECEIVE COMPANY COMMENTS/APPROVAL 13 28-Oct-13 A 06-Nov-13 AHE-CS-GR-0070 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Nov-13 A 01-Mar-14 AHE-CS-GR-0080 RECEIVE COMPANY APPROVAL 13 06-Mar-14 A 11-Mar-14 AHE-CS-GR-0085 ISSUE FOR CONSTRUCTION - Grading Plan 6 16-Mar-14 A 18-Mar-14 A

    CALCULATION FCALCULATION FOR PIPE SUPPORT FOUNDATION 71 12-Jan-14 A 20-Apr-14HE-CS-PR-0050 PREPARE & ISSUE FOR COMPANY REVIEW 5 12-Jan-14 A 27-Jan-14 AHE-CS-PR-0060 RECEIVE COMPANY COMMENTS/APPROVAL 13 27-Jan-14 A 06-Mar-14 AHE-CS-PR-0070 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 4 16-Mar-14 A 19-Mar-14 AHE-CS-PR-0080 RECEIVE COMPANY APPROVAL 13 27-Mar-14 14-Apr-14HE-CS-PR-0085 ISSUE FOR CONSTRUCTION - Calculation for pipe Support Fdns 4 14-Apr-14 20-Apr-14

    PIPE SUPPORT& PIPE SUPPORT& FOUNDATION DETAILS 78 07-Jan-14 A 08-May-14HE-CS-DT-0050 PREPARE & ISSUE FOR COMPANY REVIEW 3 07-Jan-14 A 27-Jan-14 AHE-CS-DT-0060 RECEIVE COMPANY COMMENTS/APPROVAL 13 27-Jan-14 A 14-Apr-14HE-CS-DT-0070 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 14-Apr-14 17-Apr-14HE-CS-DT-0080 RECEIVE COMPANY APPROVAL 13 17-Apr-14 05-May-14HE-CS-DT-0085 ISSUE FOR CONSTRUCTION - Pipe Support & Fdns 3 06-May-14 08-May-14

    RECEIVER AREA - RECEIVER AREA - RUWAIS 120 03-Oct-13 A 28-May-14CIVIL SITE LAYOUCIVIL SITE LAYOUT 94 09-Jan-14 A 19-May-14HE-CS-LO-0090 PREPARE & ISSUE FOR COMPANY REVIEW 6 09-Jan-14 A 16-Mar-14 AHE-CS-LO-0110 RECEIVE COMPANY COMMENTS/APPROVAL 13 16-Mar-14 A 14-Apr-14HE-CS-LO-0120 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 14-Apr-14 22-Apr-14HE-CS-LO-0125 RECEIVE COMPANY APPROVAL 13 22-Apr-14 11-May-14HE-CS-LO-0130 ISSUE FOR CONSTRUCTION - Civil Site Layout 6 11-May-14 19-May-14

    GRADING PLANGRADING PLAN 82 03-Oct-13 A 06-Apr-14

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 8 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-CS-GR-0090 PREPARE & ISSUE GRADING PLANS FOR COMPANY REVIEW 6 03-Oct-13 A 28-Dec-13 AHE-CS-GR-0100 RECEIVE COMPANY COMMENTS/APPROVAL 13 28-Oct-13 A 06-Nov-13 AHE-CS-GR-0120 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Nov-13 A 10-Feb-14 AHE-CS-GR-0125 RECEIVE COMPANY APPROVAL 13 10-Feb-14 A 26-Feb-14 AHE-CS-GR-0130 ISSUE FOR CONSTRUCTION - Grading Plan 6 27-Mar-14 06-Apr-14

    CALCULATION FCALCULATION FOR PIPE SUPPORT FOUNDATION 93 12-Jan-14 A 28-May-14HE-CS-PR-0090 PREPARE & ISSUE FOR COMPANY REVIEW 6 12-Jan-14 A 06-Apr-14HE-CS-PR-0100 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Apr-14 22-Apr-14HE-CS-PR-0120 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 22-Apr-14 30-Apr-14HE-CS-PR-0125 RECEIVE COMPANY APPROVAL 13 01-May-14 19-May-14HE-CS-PR-0142 ISSUE FOR CONSTRUCTION - Calculation for Pipe Support Fdns 6 19-May-14 28-May-14

    PIPE SUPPORT& PIPE SUPPORT& FOUNDATION DETAILS 78 09-Jan-14 A 08-May-14HE-CS-DT-0052 PREPARE & ISSUE FOR COMPANY REVIEW 6 09-Jan-14 A 08-Mar-14 AHE-CS-DT-0058 RECEIVE COMPANY COMMENTS/APPROVAL 9 27-Mar-14 08-Apr-14HE-CS-DT-0062 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 09-Apr-14 17-Apr-14HE-CS-DT-0068 RECEIVE COMPANY APPROVAL 9 17-Apr-14 30-Apr-14HE-CS-DT-0072 ISSUE FOR CONSTRUCTION - Pipe Support & Foundation Details 6 30-Apr-14 08-May-14

    CABLE TRENCH LCABLE TRENCH LAYOUT & DETAILS 160 03-Oct-13 A 27-May-14HE-CS-LO-0060 PREPARE & ISSUE FOR COMPANY REVIEW 4 03-Oct-13 A 26-Dec-13 AHE-CS-LO-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 26-Dec-13 A 14-Apr-14HE-CS-LO-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 4 14-Apr-14 20-Apr-14HE-CS-LO-0092 RECEIVE COMPANY APPROVAL 13 20-Apr-14 06-May-14HE-CS-LO-0105 ISSUE FOR CONSTRUCTION - Cable Trench Layout details 4 20-May-14 27-May-14

    BULK MTOBULK MTO 25 04-May-14 09-Jun-14HE-CS-MT-0050 PREPARE & ISSUE FOR COMPANY REVIEW 6 04-May-14 12-May-14HE-CS-MT-0060 RECEIVE COMPANY COMMENTS/APPROVAL 13 12-May-14 29-May-14HE-CS-MT-0090 ISSUE FOR CONSTRUCTION - Bulk MTO 6 01-Jun-14 09-Jun-14

    PIPELINEPIPELINE 221 05-Jul-13 A 14-May-14SITE VISIT REPORSITE VISIT REPORT- PIPELINE AND PIPING 53 27-Aug-13 A 10-Feb-14 AHE-PL-VR-0005 PREPARE & ISSUE SITE VISITS REPORT- PIPELINE AND PIPING 10 27-Aug-13 A 04-Sep-13 A

    HE-PL-VR-0010 RECEIVE COMPANY COMMENTS/APPROVAL - PIPELINE AND PIPING 6 05-Sep-13 A 23-Sep-13 A

    HE-PL-VR-0360 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 20-Oct-13 AHE-PL-VR-0370 RECEIVE COMPANY APPROVAL - PIPELINE AND PIPING 13 20-Oct-13 A 21-Oct-13 AHE-PL-VR-0380 ISSUE FOR DESIGN/CONSTRUCTION - PIPELINE AND PIPING 4 22-Oct-13 A 10-Feb-14 A

    ADDENDUM TO DADDENDUM TO DGS 61 07-Aug-13 A 05-Nov-13 AHE-PL-AD-0060 PREPARE & ISSUE FOR COMPANY REVIEW 13 07-Aug-13 A 08-Sep-13 AHE-PL-AD-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 09-Sep-13 A 23-Sep-13 AHE-PL-AD-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 26-Sep-13 AHE-PL-AD-0090 RECEIVE COMPANY APPROVAL 13 29-Sep-13 A 23-Oct-13 AHE-PL-AD-0100 ISSUE FOR CONSTRUCTION - Addendum to DGS 6 24-Oct-13 A 05-Nov-13 A

    SOW FOR TOPOGSOW FOR TOPOGRAPHICAL SURVEY 45 05-Jul-13 A 16-Sep-13 AHE-PL-ST-0010 PREPARE & ISSUE FOR COMPANY REVIEW 3 05-Jul-13 A 24-Jul-13 AHE-PL-ST-0020 RECEIVE COMPANY COMMENTS/APPROVAL 19 25-Jul-13 A 11-Aug-13 AHE-PL-ST-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Aug-13 A 22-Aug-13 AHE-PL-ST-0040 RECEIVE COMPANY APPROVAL 13 23-Aug-13 A 02-Sep-13 AHE-PL-ST-0050 ISSUE FOR CONSTRUCTION - SOW for Topographical Survey 6 03-Sep-13 A 16-Sep-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 9 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    SOW- CATHODIC SOW- CATHODIC PROTECTION AND AC MITIGATION STUDY 65 15-Aug-13 A 30-Dec-13 AHE-PL-CP-0010 PREPARE & ISSUE FOR COMPANY REVIEW -CP WORKs 6 15-Aug-13 A 06-Oct-13 AHE-PL-CP-0020 RECEIVE COMPANY COMMENTS/APPROVAL - SOW CATHODIC PRO 13 07-Oct-13 A 21-Oct-13 AHE-PL-CP-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 22-Oct-13 A 12-Nov-13 AHE-PL-CP-0040 RECEIVE COMPANY APPROVAL -SOW CATHODIC PROTECTION 13 12-Nov-13 A 18-Dec-13 AHE-PL-ST-0048 ISSUE FOR CONSTRUCTION - SOW CATHODIC PROTECTION 6 20-Nov-13 A 30-Dec-13 A

    CALCULATION & RCALCULATION & REPORTS 76 21-Jul-13 A 19-Feb-14 AWALL THICKNESWALL THICKNESS CALCULATION REPORTS 76 21-Jul-13 A 02-Jan-14 AHE-PL-WT-0050 PREPARE & ISSUE FOR COMPANY REVIEW 9 21-Jul-13 A 05-Aug-13 AHE-PL-WT-0060 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Aug-13 A 03-Sep-13 AHE-PL-WT-0070 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 18-Sep-13 AHE-PL-WT-0080 RECEIVE COMPANY APPROVAL 13 19-Sep-13 A 01-Oct-13 AHE-PL-WT-0090 ISSUE FOR CONSTRUCTION - Calcualations & Reports 6 02-Oct-13 A 02-Jan-14 A

    PIPELINE ENGINEPIPELINE ENGINEERING CALCULATION REPORT 68 22-Jul-13 A 19-Feb-14 AHE-PL-HY-0130 PREPARE & ISSUE FOR COMPANY REVIEW 6 22-Jul-13 A 01-Aug-13 AHE-PL-HY-0140 RECEIVE COMPANY COMMENTS/APPROVAL 13 04-Aug-13 A 25-Aug-13 AHE-PL-HY-0150 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Aug-13 A 16-Sep-13 AHE-PL-HY-0160 RECEIVE COMPANY APPROVAL 13 17-Sep-13 A 01-Oct-13 AHE-PL-HY-0170 ISSUE FOR CONSTRUCTION - Pipeling Engg Calculation Report 6 02-Oct-13 A 19-Feb-14 A

    PIGGING PHILOSOPIGGING PHILOSOPHY 42 19-Sep-13 A 27-Nov-13 AHE-PL-PIG-0200 PREPARE & ISSUE FOR COMPANY REVIEW 5 19-Sep-13 A 26-Sep-13 AHE-PL-PIG-0210 RECEIVE COMPANY COMMENTS/APPROVAL 13 26-Sep-13 A 14-Oct-13 AHE-PL-PIG-0220 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 14-Oct-13 A 27-Oct-13 AHE-PL-PIG-0230 RECEIVE COMPANY APPROVAL 13 27-Oct-13 A 14-Nov-13 AHE-PL-PIG-0240 ISSUE FOR CONSTRUCTION - Pigging Philosophy 6 14-Nov-13 A 27-Nov-13 A

    SPECIFICATIONS ASPECIFICATIONS AND DATA SHEETS & MR FOR PIPELINE ITEMS 129 20-Jul-13 A 17-Feb-14 ADATA SHEETS- LIDATA SHEETS- LINE PIPE 76 20-Jul-13 A 22-Oct-13 AHE-PL-DS-0010 PREPARE & ISSUE FOR COMPANY REVIEW 3 20-Jul-13 A 04-Aug-13 AHE-PL-DS-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Aug-13 A 03-Sep-13 AHE-PL-DS-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 18-Sep-13 AHE-PL-DS-0040 RECEIVE COMPANY APPROVAL 13 19-Sep-13 A 30-Sep-13 AHE-PL-DS-0050 ISSUE FOR CONSTRUCTION - Data Sheers of Line Pipes 6 01-Oct-13 A 22-Oct-13 A

    DATA SHEETS- HDATA SHEETS- HOT INDUCTION BENDS 90 20-Jul-13 A 04-Nov-13 AHE-PL-DS-0060 PREPARE & ISSUE FOR COMPANY REVIEW 3 20-Jul-13 A 04-Aug-13 AHE-PL-DS-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Aug-13 A 03-Sep-13 AHE-PL-DS-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 20-Oct-13 AHE-PL-DS-0090 RECEIVE COMPANY APPROVAL 13 21-Oct-13 A 24-Oct-13 AHE-PL-DS-0100 ISSUE FOR CONSTRUCTION - Data Sheets Hot Induction Bends 6 24-Oct-13 A 04-Nov-13 A

    DATA SHEETS-MEDATA SHEETS-MECHNICAL MOV 86 05-Sep-13 A 25-Nov-13 AHE-PL-DS-0110 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 20-Oct-13 AHE-PL-DS-0120 RECEIVE COMPANY COMMENTS/APPROVAL 13 21-Oct-13 A 25-Oct-13 AHE-PL-DS-0130 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 25-Oct-13 A 11-Nov-13 AHE-PL-DS-0140 RECEIVE COMPANY APPROVAL 13 11-Nov-13 A 11-Nov-13 AHE-PL-DS-0150 ISSUE FOR CONSTRUCTION - Data Sheets Mechanical MOV 6 11-Nov-13 A 25-Nov-13 A

    DATA SHEETS- PIDATA SHEETS- PIGGING TEES 79 20-Jul-13 A 17-Nov-13 AHE-PL-DS-0160 PREPARE & ISSUE FOR COMPANY REVIEW 5 20-Jul-13 A 04-Aug-13 AHE-PL-DS-0170 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Aug-13 A 03-Sep-13 AHE-PL-DS-0180 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 20-Oct-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 10 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-PL-DS-0190 RECEIVE COMPANY APPROVAL 13 20-Oct-13 A 10-Nov-13 AHE-PL-DS-0200 ISSUE FOR CONSTRUCTION - Data Sheets Pigging Tee 6 20-Oct-13 A 17-Nov-13 A

    DATA SHEETS-MEDATA SHEETS-MECHANICAL ELECTRO HYDRAULIC VALVES 108 05-Sep-13 A 17-Feb-14 AHE-PL-DS-0351 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 12-Nov-13 AHE-PL-DS-0360 RECEIVE COMPANY COMMENTS/APPROVAL 13 12-Nov-13 A 26-Nov-13 AHE-PL-DS-0365 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Nov-13 A 23-Dec-13 AHE-PL-DS-0370 RECEIVE COMPANY APPROVAL 13 23-Dec-13 A 06-Jan-14 AHE-PL-DS-0390 ISSUE FOR CONSTRUCTION - Data sheet Mechanical Electro Hydrauli 6 06-Jan-14 A 17-Feb-14 A

    SPECIFICATION 3SPECIFICATION 3LPE 68 20-Jul-13 A 22-Oct-13 AHE-PL-DS-0450 PREPARE & ISSUE FOR COMPANY REVIEW 6 20-Jul-13 A 04-Aug-13 AHE-PL-DS-0455 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Aug-13 A 03-Sep-13 AHE-PL-DS-0460 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 18-Sep-13 AHE-PL-DS-0465 RECEIVE COMPANY APPROVAL 13 19-Sep-13 A 30-Sep-13 AHE-PL-DS-0470 ISSUE FOR CONSTRUCTION - Specification 3LPE 6 01-Oct-13 A 22-Oct-13 A

    DATA SHEETS- PIDATA SHEETS- PIG LAUNCHER & RECEIVER 89 20-Jul-13 A 20-Nov-13 AHE-PL-DS-0210 PREPARE & ISSUE FOR COMPANY REVIEW 3 20-Jul-13 A 04-Aug-13 AHE-PL-DS-0220 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Aug-13 A 03-Sep-13 AHE-PL-DS-0230 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 22-Oct-13 AHE-PL-DS-0240 RECEIVE COMPANY APPROVAL 13 23-Oct-13 A 10-Nov-13 AHE-PL-DS-0250 ISSUE FOR CONSTRUCTION Data Sheet Pig Lanucher & Receiver 6 10-Nov-13 A 20-Nov-13 A

    DATA SHEETS- ISDATA SHEETS- ISOLATION JOINTS & ANCHOR FLANGES 80 20-Jul-13 A 25-Nov-13 AHE-PL-DS-0260 PREPARE & ISSUE FOR COMPANY REVIEW 5 20-Jul-13 A 04-Aug-13 AHE-PL-DS-0270 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Aug-13 A 02-Sep-13 AHE-PL-DS-0280 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 03-Sep-13 A 20-Oct-13 AHE-PL-DS-0290 RECEIVE COMPANY APPROVAL 13 21-Oct-13 A 05-Nov-13 AHE-PL-DS-0300 ISSUE FOR CONSTRUCTION Data Sheet Isolation & Anchor Flanges 6 24-Oct-13 A 25-Nov-13 A

    SPECIFICATION -SPECIFICATION -SPLIT TEE 97 05-Sep-13 A 11-Nov-13 AHE-PL-SP-0060 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 22-Oct-13 AHE-PL-SP-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 23-Oct-13 A 04-Nov-13 AHE-PL-SP-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Nov-13 A 07-Nov-13 AHE-PL-SP-0090 RECEIVE COMPANY APPROVAL 13 07-Nov-13 A 07-Nov-13 AHE-PL-SP-0100 ISSUE FOR CONSTRUCTION - Specification Split Tee 6 07-Nov-13 A 11-Nov-13 A

    DATA SHEETS- SPDATA SHEETS- SPLIT TEES 105 05-Sep-13 A 27-Oct-13 AHE-PL-DS-0310 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 03-Oct-13 AHE-PL-DS-0320 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Oct-13 A 09-Oct-13 AHE-PL-DS-0330 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 10-Oct-13 A 22-Oct-13 AHE-PL-DS-0340 RECEIVE COMPANY APPROVAL 13 20-Oct-13 A 20-Oct-13 AHE-PL-DS-0350 ISSUE FOR CONSTRUCTION Data Sheets Split Tees 6 20-Oct-13 A 27-Oct-13 A

    DATA SHEETS- HDATA SHEETS- HEAT SHRINK SLEEVE 109 02-Sep-13 A 05-Nov-13 AHE-PL-DS-0400 PREPARE & ISSUE FOR COMPANY REVIEW 6 02-Sep-13 A 10-Sep-13 AHE-PL-DS-0410 RECEIVE COMPANY COMMENTS/APPROVAL 13 10-Sep-13 A 26-Sep-13 AHE-PL-DS-0420 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Sep-13 A 06-Oct-13 AHE-PL-DS-0430 RECEIVE COMPANY APPROVAL 13 06-Oct-13 A 27-Oct-13 AHE-PL-DS-0440 ISSUE FOR CONSTRUCTION Data Sheets Heat Shrink Sleeve 6 27-Oct-13 A 05-Nov-13 A

    MATERIAL REQUMATERIAL REQUISITION- LINE PIPE 80 15-Aug-13 A 06-Nov-13 AHE-PL-MR-0360 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Aug-13 A 19-Sep-13 AHE-PL-MR-0370 RECEIVE COMPANY COMMENTS/APPROVAL 13 21-Sep-13 A 03-Oct-13 AHE-PL-MR-0380 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Oct-13 A 23-Oct-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 11 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-PL-MR-0390 RECEIVE COMPANY APPROVAL 13 24-Oct-13 A 29-Oct-13 AHE-PL-MR-0400 ISSUE FOR CONSTRUCTION MR Line Pipe 6 30-Oct-13 A 06-Nov-13 A

    MATERIAL REQUMATERIAL REQUISITION- HOT INDUCTION BENDS 87 15-Aug-13 A 12-Nov-13 AHE-PL-MR-0410 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Aug-13 A 25-Sep-13 AHE-PL-MR-0420 RECEIVE COMPANY COMMENTS/APPROVAL 13 26-Sep-13 A 06-Oct-13 AHE-PL-MR-0430 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Oct-13 A 29-Oct-13 AHE-PL-MR-0450 ISSUE FOR CONSTRUCTION MR Hot Induction Bends 6 29-Oct-13 A 12-Nov-13 AHE-PL-MR-0440 RECEIVE COMPANY APPROVAL 13 29-Oct-13 A 30-Oct-13 A

    MATERIAL REQUMATERIAL REQUISITION-MECHNICAL MOV 108 15-Sep-13 A 15-Jan-14 AHE-PL-MR-0810 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Sep-13 A 25-Oct-13 AHE-PL-MR-0820 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Oct-13 A 17-Nov-13 AHE-PL-MR-0830 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 17-Nov-13 A 05-Dec-13 AHE-PL-MR-0840 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 23-Dec-13 AHE-PL-MR-0850 ISSUE FOR CONSTRUCTION MR MOV 6 23-Dec-13 A 15-Jan-14 A

    MATERIAL REQUMATERIAL REQUISITION- ELECTRO HYDRAULIC VALVES 109 18-Sep-13 A 15-Jan-14 AHE-PL-MR-0701 PREPARE & ISSUE FOR COMPANY REVIEW 6 18-Sep-13 A 25-Oct-13 AHE-PL-MR-0711 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Oct-13 A 14-Nov-13 AHE-PL-MR-0716 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 14-Nov-13 A 15-Dec-13 AHE-PL-MR-0721 RECEIVE COMPANY APPROVAL 13 15-Dec-13 A 25-Dec-13 AHE-PL-MR-0741 ISSUE FOR CONSTRUCTION MR ROV 6 25-Dec-13 A 15-Jan-14 A

    MATERIAL REQUMATERIAL REQUISITION- 3LPE 76 05-Sep-13 A 06-Nov-13 AHE-PL-MR-0760 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 19-Sep-13 AHE-PL-MR-0770 RECEIVE COMPANY COMMENTS/APPROVAL 13 21-Sep-13 A 03-Oct-13 AHE-PL-MR-0780 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Oct-13 A 23-Oct-13 AHE-PL-MR-0790 RECEIVE COMPANY APPROVAL 13 24-Oct-13 A 29-Oct-13 AHE-PL-MR-0800 ISSUE FOR CONSTRUCTION MR 3LPE 6 30-Oct-13 A 06-Nov-13 A

    MATERIAL REQUMATERIAL REQUISITION- PIGGING TEES 80 15-Aug-13 A 24-Oct-13 AHE-PL-MR-0510 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Aug-13 A 24-Sep-13 AHE-PL-MR-0520 RECEIVE COMPANY COMMENTS/APPROVAL 13 24-Sep-13 A 06-Oct-13 AHE-PL-MR-0530 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Oct-13 A 22-Oct-13 AHE-PL-MR-0540 RECEIVE COMPANY APPROVAL 13 22-Oct-13 A 23-Oct-13 AHE-PL-MR-0550 ISSUE FOR CONSTRUCTION MR Pigging Tees 6 24-Oct-13 A 24-Oct-13 A

    MATERIAL REQUMATERIAL REQUISITION- PIG LAUNCHER & RECEIVER 91 15-Aug-13 A 06-Nov-13 AHE-PL-MR-0560 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Aug-13 A 24-Sep-13 AHE-PL-MR-0570 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Sep-13 A 06-Oct-13 AHE-PL-MR-0580 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Oct-13 A 22-Oct-13 AHE-PL-MR-0590 RECEIVE COMPANY APPROVAL 13 23-Oct-13 A 29-Oct-13 AHE-PL-MR-0600 ISSUE FOR CONSTRUCTION MR Pig Laucher & Receiver 6 30-Oct-13 A 06-Nov-13 A

    MATERIAL REQUMATERIAL REQUISITION- ISOLATION JOINTS & ANCHOR FLANGES 83 12-Aug-13 A 24-Oct-13 AHE-PL-MR-0610 PREPARE & ISSUE FOR COMPANY REVIEW 6 12-Aug-13 A 24-Sep-13 AHE-PL-MR-0620 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Sep-13 A 06-Oct-13 AHE-PL-MR-0630 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Oct-13 A 22-Oct-13 AHE-PL-MR-0640 RECEIVE COMPANY APPROVAL 13 22-Oct-13 A 23-Oct-13 AHE-PL-MR-0650 ISSUE FOR CONSTRUCTION MR Isolation Joints & Anchor Flanges 6 23-Oct-13 A 24-Oct-13 A

    MATERIAL REQUMATERIAL REQUISITION- SPLIT TEES 107 05-Sep-13 A 28-Dec-13 AHE-PL-MR-0660 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 25-Oct-13 AHE-PL-MR-0670 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Oct-13 A 12-Nov-13 AHE-PL-MR-0680 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Nov-13 A 25-Nov-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 12 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-PL-MR-0690 RECEIVE COMPANY APPROVAL 13 25-Nov-13 A 28-Dec-13 AHE-PL-MR-0700 ISSUE FOR CONSTRUCTION MR Split Tees 6 28-Nov-13 A 12-Dec-13 A

    MATERIAL REQUMATERIAL REQUISITION- HEAT SHRINK SLEEVES 104 05-Sep-13 A 17-Feb-14 AHE-PL-MR-0710 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 25-Oct-13 AHE-PL-MR-0720 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Oct-13 A 10-Nov-13 AHE-PL-MR-0730 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 10-Nov-13 A 05-Dec-13 AHE-PL-MR-0740 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-PL-MR-0750 ISSUE FOR CONSTRUCTION MR Heat Srinks Sleeves 6 19-Dec-13 A 17-Feb-14 A

    ROUTE FINALISATROUTE FINALISATION REPORT 89 26-Nov-13 A 04-May-14HE-PL-RF-0250 PREPARE & ISSUE FOR COMPANY REVIEW 6 26-Nov-13 A 11-Mar-14 AHE-PL-RF-0260 RECEIVE COMPANY COMMENTS/APPROVAL 8 11-Mar-14 A 14-Apr-14HE-PL-RF-0270 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 4 14-Apr-14 20-Apr-14HE-PL-RF-0280 RECEIVE COMPANY APPROVAL 8 20-Apr-14 30-Apr-14HE-PL-RF-0290 ISSUE FOR CONSTRUCTION Route Finalization 2 30-Apr-14 04-May-14

    OVERALL ROUTEOVERALL ROUTE MAP 77 30-Nov-13 A 13-Mar-14 AHE-PL-PR-0010 PREPARE & ISSUE FOR COMPANY REVIEW 6 30-Nov-13 A 05-Dec-13 AHE-PL-PR-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-PL-PR-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 19-Dec-13 A 19-Feb-14 AHE-PL-PR-0040 RECEIVE COMPANY APPROVAL 13 19-Feb-14 A 02-Mar-14 AHE-PL-PR-0050 ISSUE FOR CONSTRUCTION Overall Route Map 6 02-Mar-14 A 13-Mar-14 A

    KEY PLAN & ALIGKEY PLAN & ALIGNMENT SHEETS 85 30-Nov-13 A 17-Apr-14HE-PL-AL-0010 PREPARE & ISSUE FOR COMPANY REVIEW 12 30-Nov-13 A 05-Dec-13 AHE-PL-AL-0020 RECEIVE COMPANY COMMENTS/APPROVAL 10 05-Dec-13 A 06-Jan-14 AHE-PL-AL-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 7 06-Jan-14 A 02-Feb-14 AHE-PL-AL-0040 RECEIVE COMPANY APPROVAL 2 12-Mar-14 A 08-Apr-14HE-PL-AL-0050 ISSUE FOR CONSTRUCTION Key Plan & Alignemnet Sheets 7 09-Apr-14 17-Apr-14

    STATION APPROASTATION APPROACH DRAWINGS 50 05-Sep-13 A 20-Feb-14 AHE-PL-SA-0010 PREPARE & ISSUE FOR COMPANY REVIEW 13 05-Sep-13 A 20-Oct-13 AHE-PL-SA-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 21-Oct-13 A 28-Oct-13 AHE-PL-SA-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 28-Oct-13 A 05-Dec-13 AHE-PL-SA-0040 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 17-Dec-13 AHE-PL-SA-0050 ISSUE FOR CONSTRUCTION Station Approach Drwgs 6 17-Dec-13 A 20-Feb-14 A

    ROAD CROSSINGROAD CROSSING DETAILS 85 22-Dec-13 A 05-May-14HE-PL-RC-0060 PREPARE & ISSUE FOR COMPANY REVIEW 13 22-Dec-13 A 05-Mar-14 AHE-PL-RC-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Mar-14 A 14-Apr-14HE-PL-RC-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 14-Apr-14 22-Apr-14HE-PL-RC-0090 RECEIVE COMPANY APPROVAL 6 22-Apr-14 30-Apr-14HE-PL-RC-0100 ISSUE FOR CONSTRUCTION Road Crossing Details 3 01-May-14 05-May-14

    DEMOLITION DRADEMOLITION DRAWINGS 35 27-Mar-14 14-May-14HE-PL-SA-0110 PREPARE & ISSUE FOR COMPANY REVIEW 13 27-Mar-14 14-Apr-14HE-PL-SA-0120 RECEIVE COMPANY COMMENTS/APPROVAL 9 14-Apr-14 27-Apr-14HE-PL-SA-0130 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 4 27-Apr-14 30-Apr-14HE-PL-SA-0140 RECEIVE COMPANY APPROVAL 6 01-May-14 11-May-14HE-PL-SA-0150 ISSUE FOR CONSTRUCTION Demolition Dwgs 4 11-May-14 14-May-14

    TYPICAL DETAILSTYPICAL DETAILS 64 07-Aug-13 A 05-Nov-13 AHE-PL-TP-0060 PREPARE & ISSUE FOR COMPANY REVIEW 6 07-Aug-13 A 15-Sep-13 AHE-PL-TP-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 16-Sep-13 A 30-Sep-13 AHE-PL-TP-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 01-Oct-13 A 20-Oct-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 13 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-PL-TP-0090 RECEIVE COMPANY APPROVAL 13 20-Oct-13 A 20-Oct-13 AHE-PL-TP-0100 ISSUE FOR CONSTRUCTION Typical Details 6 20-Oct-13 A 05-Nov-13 A

    STRESS ANALYSISSTRESS ANALYSIS REPORT 73 26-Nov-13 A 17-Apr-14HE-PL-SR-0050 PREPARE & ISSUE FOR COMPANY REVIEW 8 26-Nov-13 A 07-Jan-14 AHE-PL-SR-0060 RECEIVE COMPANY COMMENTS/APPROVAL 19 07-Jan-14 A 26-Jan-14 AHE-PL-SR-0070 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 26-Jan-14 A 17-Feb-14 AHE-PL-SR-0080 RECEIVE COMPANY APPROVAL 13 27-Mar-14 14-Apr-14HE-PL-SR-0090 ISSUE FOR CONSTRUCTION Stress Analysis Report 3 14-Apr-14 17-Apr-14

    CROSSING SCHEDCROSSING SCHEDULE MATRIX 35 27-Mar-14 14-May-14HE-PL-CM-0050 PREPARE & ISSUE FOR COMPANY REVIEW 6 27-Mar-14 06-Apr-14HE-PL-CM-0060 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Apr-14 22-Apr-14HE-PL-CM-0070 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 22-Apr-14 30-Apr-14HE-PL-CM-0080 RECEIVE COMPANY APPROVAL 6 01-May-14 11-May-14HE-PL-CM-0090 ISSUE FOR CONSTRUCTION - Crossing Schedule Matrix 4 11-May-14 14-May-14

    PIPELINE MTOPIPELINE MTO 77 26-Nov-13 A 23-Feb-14 AHE-PL-MT-0010 PREPARE & ISSUE FOR COMPANY REVIEW 10 26-Nov-13 A 03-Feb-14 AHE-PL-MT-0020 RECEIVE COMPANY COMMENTS/APPROVAL 9 03-Feb-14 A 13-Feb-14 AHE-PL-MT-0050 ISSUE FOR CONSTRUCTION - Pipeline MTO 6 13-Feb-14 A 23-Feb-14 A

    MECHANICAL/PIPINMECHANICAL/PIPING 189 05-Aug-13 A 09-Apr-14ADDENDUM TO DADDENDUM TO DGS 72 15-Aug-13 A 25-Nov-13 AHE-ME-AD-0110 PREPARE & ISSUE FOR COMPANY REVIEW 15 15-Aug-13 A 02-Sep-13 AHE-ME-AD-0120 RECEIVE COMPANY COMMENTS/APPROVAL 13 03-Sep-13 A 18-Sep-13 AHE-ME-AD-0140 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 19-Sep-13 A 20-Oct-13 AHE-ME-AD-0130 RECEIVE COMPANY APPROVAL 13 20-Oct-13 A 24-Oct-13 AHE-ME-AD-0150 ISSUE FOR CONSTRUCTION - Addendum to DGS 6 24-Oct-13 A 25-Nov-13 A

    DATA SHEETS- PIPDATA SHEETS- PIPING BALL VALVES 115 05-Aug-13 A 06-Jan-14 AHE-ME-DS-0060 PREPARE & ISSUE FOR COMPANY REVIEW 5 05-Aug-13 A 20-Oct-13 AHE-ME-DS-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 21-Oct-13 A 05-Nov-13 AHE-ME-DS-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 05-Nov-13 A 05-Dec-13 AHE-ME-DS-0090 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 15-Dec-13 AHE-ME-DS-0100 ISSUE FOR CONSTRUCTION - Data Sheet Pigging Ball Valves 6 15-Dec-13 A 06-Jan-14 A

    DATA SHEETS- PLDATA SHEETS- PLUG VALVES 107 05-Aug-13 A 05-Nov-13 AHE-ME-DS-0160 PREPARE & ISSUE FOR COMPANY REVIEW 5 05-Aug-13 A 28-Aug-13 AHE-ME-DS-0170 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Aug-13 A 02-Oct-13 AHE-ME-DS-0180 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 02-Oct-13 A 20-Oct-13 AHE-ME-DS-0190 RECEIVE COMPANY APPROVAL 13 20-Oct-13 A 20-Oct-13 AHE-ME-DS-0200 ISSUE FOR CONSTRUCTION Data Sheets Plug Valves 6 20-Oct-13 A 05-Nov-13 A

    MATERIAL REQUISMATERIAL REQUISITION - PIPING BALL VALVES 116 05-Sep-13 A 30-Dec-13 AHE-ME-MR-0610 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Sep-13 A 29-Oct-13 AHE-ME-MR-0620 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Oct-13 A 12-Nov-13 AHE-ME-MR-0625 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Nov-13 A 05-Dec-13 AHE-ME-MR-0630 RECEIVE COMPANY APPROVAL 13 05-Dec-13 A 15-Dec-13 AHE-ME-MR-0650 ISSUE FOR CONSTRUCTION MR Pigging Ball Valves 6 15-Dec-13 A 30-Dec-13 A

    MATERIAL REQUISMATERIAL REQUISITION - PLUG VALVES 98 05-Aug-13 A 12-Nov-13 AHE-ME-MR-0710 PREPARE & ISSUE FOR COMPANY REVIEW 6 05-Aug-13 A 01-Oct-13 AHE-ME-MR-0720 RECEIVE COMPANY COMMENTS/APPROVAL 13 02-Oct-13 A 06-Oct-13 AHE-ME-MR-0725 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Oct-13 A 29-Oct-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 14 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-ME-MR-0730 RECEIVE COMPANY APPROVAL 13 29-Oct-13 A 29-Oct-13 AHE-ME-MR-0750 ISSUE FOR CONSTRUCTION MR Plug Valves 6 30-Oct-13 A 12-Nov-13 A

    PLOT PLANPLOT PLAN 148 29-Aug-13 A 13-Mar-14 ALAUNCHER AREALAUNCHER AREA - HABSHAN 148 29-Aug-13 A 20-Feb-14 AHE-ME-PE-0010 PREPARE & ISSUE FOR COMPANY REVIEW 13 29-Aug-13 A 10-Sep-13 AHE-ME-PE-0020 RECEIVE COMPANY COMMENTS/APPROVAL 19 11-Sep-13 A 23-Sep-13 AHE-ME-PE-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 09-Oct-13 AHE-ME-PE-0040 RECEIVE COMPANY APPROVAL 13 10-Oct-13 A 24-Oct-13 AHE-ME-PE-0045 ISSUE FOR CONSTRUCTION Launcher Habshan 6 24-Oct-13 A 20-Feb-14 A

    SV STATIONSSV STATIONS 142 29-Aug-13 A 13-Mar-14 AHE-ME-PE-0050 PREPARE & ISSUE FOR COMPANY REVIEW 6 29-Aug-13 A 10-Sep-13 AHE-ME-PE-0060 RECEIVE COMPANY COMMENTS/APPROVAL 19 11-Sep-13 A 23-Sep-13 AHE-ME-PE-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 09-Oct-13 AHE-ME-PE-0085 RECEIVE COMPANY APPROVAL 13 10-Oct-13 A 24-Oct-13 AHE-ME-PE-0090 ISSUE FOR CONSTRUCTION SV Stations 6 24-Oct-13 A 13-Mar-14 A

    RECEIVER AREA RECEIVER AREA - RUWAIS 136 29-Aug-13 A 08-Mar-14 AHE-ME-PE-0100 PREPARE & ISSUE FOR COMPANY REVIEW 6 29-Aug-13 A 10-Sep-13 AHE-ME-PE-0110 RECEIVE COMPANY COMMENTS/APPROVAL 19 11-Sep-13 A 23-Sep-13 AHE-ME-PE-0115 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 24-Sep-13 A 09-Oct-13 AHE-ME-PE-0120 RECEIVE COMPANY APPROVAL 13 10-Oct-13 A 24-Oct-13 AHE-ME-PE-0140 ISSUE FOR CONSTRUCTION - Receiver Ruwais 6 24-Oct-13 A 08-Mar-14 A

    PIPING GA DRAWIPIPING GA DRAWINGS/LAYOUTS 123 19-Sep-13 A 16-Mar-14 ALAUNCHER AREALAUNCHER AREA - HABSHAN 117 19-Sep-13 A 15-Mar-14 AHE-ME-GA-0310 PREPARE & ISSUE FOR COMPANY REVIEW 5 19-Sep-13 A 04-Dec-13 AHE-ME-GA-0320 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-ME-GA-0340 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 19-Dec-13 A 29-Jan-14 AHE-ME-GA-0345 RECEIVE COMPANY APPROVAL 13 29-Jan-14 A 13-Feb-14 AHE-ME-GA-0350 ISSUE FOR CONSTRUCTION - Launcher Habshan 6 12-Mar-14 A 15-Mar-14 A

    SV STATIONSSV STATIONS 65 03-Oct-13 A 16-Mar-14 AHE-ME-GA-0360 PREPARE & ISSUE FOR COMPANY REVIEW 5 03-Oct-13 A 04-Dec-13 AHE-ME-GA-0370 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-ME-GA-0380 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 19-Dec-13 A 14-Jan-14 AHE-ME-GA-0385 RECEIVE COMPANY APPROVAL 13 14-Jan-14 A 30-Jan-14 AHE-ME-GA-0400 ISSUE FOR CONSTRUCTION - SV Stations 6 12-Mar-14 A 16-Mar-14 A

    RECEIVER AREA RECEIVER AREA - RUWAIS 113 19-Sep-13 A 15-Mar-14 AHE-ME-GA-0410 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Sep-13 A 04-Dec-13 AHE-ME-GA-0420 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Dec-13 A 19-Dec-13 AHE-ME-GA-0440 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 19-Dec-13 A 29-Jan-14 AHE-ME-GA-0445 RECEIVE COMPANY APPROVAL 13 29-Jan-14 A 13-Feb-14 AHE-ME-GA-0450 ISSUE FOR CONSTRUCTION - Receiver Ruwais 6 12-Mar-14 A 15-Mar-14 A

    ISOMETRIC DRAWISOMETRIC DRAWINGS 83 05-Dec-13 A 13-Mar-14 AHE-ME-IS-0010 PREPARE & ISSUE FOR COMPANY REVIEW 15 05-Dec-13 A 14-Jan-14 AHE-ME-IS-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 14-Jan-14 A 26-Jan-14 AHE-ME-IS-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Jan-14 A 11-Mar-14 AHE-ME-IS-0040 RECEIVE COMPANY APPROVAL 13 11-Mar-14 A 11-Mar-14 AHE-ME-IS-0050 ISSUE FOR CONSTRUCTION - Isomentric Dwgs 6 11-Mar-14 A 13-Mar-14 A

    TIE-IN DETAILS/SCTIE-IN DETAILS/SCHEDULES 90 19-Sep-13 A 09-Apr-14HE-ME-TD-0010 PREPARE & ISSUE FOR COMPANY REVIEW 13 19-Sep-13 A 22-Oct-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 15 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-ME-TD-0020 RECEIVE COMPANY COMMENTS/APPROVAL 19 23-Oct-13 A 10-Nov-13 AHE-ME-TD-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 10-Nov-13 A 10-Dec-13 AHE-ME-TD-0040 RECEIVE COMPANY APPROVAL 13 11-Dec-13 A 17-Dec-13 AHE-ME-TD-0050 ISSUE FOR CONSTRUCTION Tie-In details /Schedule 6 17-Dec-13 A 09-Apr-14

    LINE LISTLINE LIST 165 10-Sep-13 A 19-Feb-14 AHE-ME-TD-0060 PREPARE & ISSUE FOR COMPANY REVIEW 6 10-Sep-13 A 18-Dec-13 AHE-ME-TD-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 18-Dec-13 A 26-Dec-13 AHE-ME-TD-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Dec-13 A 29-Jan-14 AHE-ME-TD-0090 RECEIVE COMPANY APPROVAL 13 29-Jan-14 A 19-Feb-14 AHE-ME-TD-0100 ISSUE FOR CONSTRUCTION 6 19-Feb-14 A 19-Feb-14 A

    MATERIAL TAKE OMATERIAL TAKE OFF 62 27-Nov-13 A 06-Apr-14HE-ME-MT-0010 PREPARE & ISSUE FOR COMPANY REVIEW 6 27-Nov-13 A 30-Jan-14 AHE-ME-MT-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 30-Jan-14 A 12-Feb-14 AHE-ME-MT-0050 ISSUE FOR CONSTRUCTION 6 27-Mar-14 06-Apr-14

    ELECTRICALELECTRICAL 200 04-Aug-13 A 11-May-14ADDENDUM TO DADDENDUM TO DGS 61 04-Aug-13 A 23-Oct-13 AHE-EL-AD-0210 PREPARE & ISSUE FOR COMPANY REVIEW 13 04-Aug-13 A 01-Sep-13 AHE-EL-AD-0220 RECEIVE COMPANY COMMENTS/APPROVAL 13 02-Sep-13 A 12-Sep-13 AHE-EL-AD-0240 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 13-Sep-13 A 25-Sep-13 AHE-EL-AD-0230 RECEIVE COMPANY APPROVAL 13 26-Sep-13 A 02-Oct-13 AHE-EL-AD-0250 ISSUE FOR CONSTRUCTION - Addendum to DGS 6 03-Oct-13 A 23-Oct-13 A

    SITE VISIT REPORSITE VISIT REPORT-HABSHAN AND RUWAIS 37 18-Sep-13 A 09-Apr-14HE-EL-VR-0145 PREPARE & ISSUE SITE VISITS REPORT-ELECTRICAL 3 18-Sep-13 A 06-Oct-13 AHE-EL-VR-0130 RECEIPT OF PRELIM LOADS 0 29-Sep-13 AHE-EL-VR-0150 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Oct-13 A 21-Oct-13 AHE-EL-VR-0165 ISSUE FOR CONSTRUCTION - Site visit Report Habshan & Ruwais 3 22-Oct-13 A 09-Apr-14

    LAUNCHER AREA LAUNCHER AREA - HABSHAN 173 19-Sep-13 A 08-May-14LOAD LISTLOAD LIST 162 19-Sep-13 A 27-Apr-14HE-EL-PA-0310 PREPARE & ISSUE FOR COMPANY REVIEW 13 19-Sep-13 A 18-Dec-13 AHE-EL-PA-0320 RECEIVE COMPANY COMMENTS/APPROVAL 13 18-Dec-13 A 08-Jan-14 AHE-EL-PA-0330 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 08-Jan-14 A 13-Apr-14HE-EL-PA-0410 RECEIVE COMPANY APPROVAL 6 14-Apr-14 22-Apr-14HE-EL-PA-0440 ISSUE FOR CONSTRUCTION - Load List 4 22-Apr-14 27-Apr-14

    POWER ADEQUAPOWER ADEQUACY REPORT 158 19-Sep-13 A 01-May-14HE-EL-LL-0290 PREPARE & ISSUE FOR COMPANY REVIEW 5 19-Sep-13 A 06-Jan-14 AHE-EL-LL-0300 RECEIVE COMPANY COMMENTS/APPROVAL 13 06-Jan-14 A 21-Jan-14 AHE-EL-LL-0305 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 21-Jan-14 A 13-Apr-14HE-EL-LL-0310 RECEIVE COMPANY APPROVAL 6 14-Apr-14 22-Apr-14HE-EL-LL-0330 ISSUE FOR CONSTRUCTION - Power Adequacy Report 4 28-Apr-14 01-May-14

    DATA SHEETSDATA SHEETS 79 19-Sep-13 A 15-Dec-13 AHE-EL-DS-0740 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Sep-13 A 14-Nov-13 AHE-EL-DS-0750 RECEIVE COMPANY COMMENTS/APPROVAL 13 14-Nov-13 A 18-Nov-13 AHE-EL-DS-0755 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 18-Nov-13 A 04-Dec-13 AHE-EL-DS-0760 RECEIVE COMPANY APPROVAL 6 04-Dec-13 A 15-Dec-13 AHE-EL-DS-0770 ISSUE FOR CONSTRUCTION - Data Sheets 3 15-Dec-13 A 15-Dec-13 A

    SLDsSLDs 79 20-Oct-13 A 26-Dec-13 AHE-EL-SL-0340 PREPARE & ISSUE FOR COMPANY REVIEW 6 20-Oct-13 A 14-Nov-13 AHE-EL-SL-0350 RECEIVE COMPANY COMMENTS/APPROVAL 19 14-Nov-13 A 21-Nov-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 16 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-EL-SL-0355 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 21-Nov-13 A 12-Dec-13 AHE-EL-SL-0360 RECEIVE COMPANY APPROVAL 6 12-Dec-13 A 26-Dec-13 AHE-EL-SL-0380 ISSUE FOR CONSTRUCTION - SLDs 3 26-Dec-13 A 26-Dec-13 A

    MATERIAL REQUMATERIAL REQUISITIONS 49 19-Sep-13 A 13-Feb-14 AHE-EL-MR-0780 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Sep-13 A 28-Nov-13 AHE-EL-MR-0790 RECEIVE COMPANY COMMENTS/APPROVAL 13 28-Nov-13 A 15-Dec-13 AHE-EL-MR-0795 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 15-Dec-13 A 25-Dec-13 AHE-EL-MR-0800 RECEIVE COMPANY APPROVAL 6 25-Dec-13 A 26-Jan-14 AHE-EL-MR-0810 ISSUE FOR CONSTRUCTION MR 3 26-Jan-14 A 13-Feb-14 A

    CALCULATIONS-CALCULATIONS- CABLE SIZING, EARTHING, LIGHTING 107 09-Dec-13 A 08-May-14HE-EL-CL-0540 PREPARE & ISSUE FOR COMPANY REVIEW 6 09-Dec-13 A 19-Dec-13 AHE-EL-CL-0550 RECEIVE COMPANY COMMENTS/APPROVAL 13 19-Dec-13 A 06-Jan-14 AHE-EL-CL-0555 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Jan-14 A 13-Apr-14HE-EL-CL-0560 RECEIVE COMPANY APPROVAL 13 14-Apr-14 30-Apr-14HE-EL-CL-0570 ISSUE FOR CONSTRUCTION Calucation Cable Sizing Earthing Lighting 6 30-Apr-14 08-May-14

    CABLE SCHEDULCABLE SCHEDULE 125 19-Oct-13 A 08-May-14HE-EL-CS-0660 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Oct-13 A 23-Dec-13 AHE-EL-CS-0670 RECEIVE COMPANY COMMENTS/APPROVAL 13 23-Dec-13 A 07-Jan-14 AHE-EL-CS-0675 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 07-Jan-14 A 10-Feb-14 AHE-EL-CS-0680 RECEIVE COMPANY APPROVAL 13 10-Feb-14 A 18-Feb-14 AHE-EL-CS-0690 ISSUE FOR CONSTRUCTION Cable Schedule 3 05-May-14 08-May-14

    LAYOUTS-CABLELAYOUTS-CABLE ROUTING AND LIGHTING & SMALL POWER 96 09-Dec-13 A 15-Mar-14 AHE-EL-LO-0390 PREPARE & ISSUE FOR COMPANY REVIEW 6 09-Dec-13 A 25-Dec-13 AHE-EL-LO-0400 RECEIVE COMPANY COMMENTS/APPROVAL 13 25-Dec-13 A 13-Jan-14 AHE-EL-LO-0420 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR

    APPROVAL6 13-Jan-14 A 11-Feb-14 A

    HE-EL-LO-0425 RECEIVE COMPANY APPROVAL 6 11-Feb-14 A 18-Feb-14 AHE-EL-LO-0430 ISSUE FOR CONSTRUCTION Layout Cable routing & Lighting & Small P 3 24-Feb-14 A 15-Mar-14 A

    EARTHING LAYOEARTHING LAYOUT 132 19-Oct-13 A 27-Apr-14HE-EL-LO-0700 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Oct-13 A 29-Dec-13 AHE-EL-LO-0710 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Dec-13 A 14-Jan-14 A

    HE-EL-LO-0715 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROVAL

    6 14-Jan-14 A 13-Apr-14

    HE-EL-LO-0720 RECEIVE COMPANY APPROVAL 6 14-Apr-14 22-Apr-14HE-EL-LO-0730 ISSUE FOR CONSTRUCTION Earthing Layout 4 22-Apr-14 27-Apr-14

    LAUNCHER AREA LAUNCHER AREA - RUWAIS 143 19-Sep-13 A 05-May-14LOAD LISTLOAD LIST 119 19-Sep-13 A 13-Apr-14HE-EL-PA-0940 PREPARE & ISSUE FOR COMPANY REVIEW 13 19-Sep-13 A 14-Nov-13 AHE-EL-PA-0950 RECEIVE COMPANY COMMENTS/APPROVAL 13 14-Nov-13 A 28-Nov-13 AHE-EL-PA-0955 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 28-Nov-13 A 11-Dec-13 AHE-EL-PA-0960 RECEIVE COMPANY APPROVAL 6 11-Dec-13 A 23-Dec-13 AHE-EL-PA-0970 ISSUE FOR CONSTRUCTION Launcher Area Ruwais 12 27-Mar-14 13-Apr-14

    POWER ADEQUAPOWER ADEQUACY 128 19-Sep-13 A 05-May-14HE-EL-LL-0820 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Sep-13 A 17-Feb-14 AHE-EL-LL-0830 RECEIVE COMPANY COMMENTS/APPROVAL 13 27-Mar-14 14-Apr-14HE-EL-LL-0835 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 14-Apr-14 22-Apr-14HE-EL-LL-0840 RECEIVE COMPANY APPROVAL 6 22-Apr-14 30-Apr-14HE-EL-LL-0850 ISSUE FOR CONSTRUCTION - Power Adequacy 3 01-May-14 05-May-14

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 17 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    DATA SHEETSDATA SHEETS 46 13-Oct-13 A 12-Dec-13 AHE-EL-DS-1100 PREPARE & ISSUE FOR COMPANY REVIEW 6 13-Oct-13 A 31-Oct-13 AHE-EL-DS-1110 RECEIVE COMPANY COMMENTS/APPROVAL 13 31-Oct-13 A 20-Nov-13 AHE-EL-DS-1115 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 20-Nov-13 A 28-Nov-13 AHE-EL-DS-1120 RECEIVE COMPANY APPROVAL 6 28-Nov-13 A 28-Nov-13 AHE-EL-DS-1130 ISSUE FOR CONSTRUCTION Data Sheets 4 29-Nov-13 A 12-Dec-13 A

    SLDsSLDs 100 20-Oct-13 A 29-Apr-14HE-EL-SL-0900 PREPARE & ISSUE FOR COMPANY REVIEW 6 20-Oct-13 A 14-Nov-13 AHE-EL-SL-0910 RECEIVE COMPANY COMMENTS/APPROVAL 19 14-Nov-13 A 21-Nov-13 AHE-EL-SL-0915 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 21-Nov-13 A 12-Dec-13 AHE-EL-SL-0920 RECEIVE COMPANY APPROVAL 6 12-Dec-13 A 31-Dec-13 AHE-EL-SL-0930 ISSUE FOR CONSTRUCTION SLDs 12 14-Apr-14 29-Apr-14

    MATERIAL REQUMATERIAL REQUISITIONS 30 22-Oct-13 A 17-Feb-14 AHE-EL-MR-1140 PREPARE & ISSUE FOR COMPANY REVIEW 6 22-Oct-13 A 28-Nov-13 AHE-EL-MR-1150 RECEIVE COMPANY COMMENTS/APPROVAL 13 28-Nov-13 A 09-Dec-13 AHE-EL-MR-1155 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 09-Dec-13 A 25-Dec-13 AHE-EL-MR-1160 RECEIVE COMPANY APPROVAL 6 25-Dec-13 A 13-Jan-14 AHE-EL-MR-1170 ISSUE FOR CONSTRUCTION MR 4 13-Jan-14 A 17-Feb-14 A

    CALCULATIONS-CALCULATIONS- CABLE SIZING, EARTHING, LIGHTING 97 20-Oct-13 A 24-Apr-14HE-EL-CL-0980 PREPARE & ISSUE FOR COMPANY REVIEW 6 20-Oct-13 A 08-Dec-13 AHE-EL-CL-0990 RECEIVE COMPANY COMMENTS/APPROVAL 13 08-Dec-13 A 23-Dec-13 AHE-EL-CL-0995 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 23-Dec-13 A 13-Apr-14HE-EL-CL-1000 RECEIVE COMPANY APPROVAL 6 14-Apr-14 22-Apr-14HE-EL-CL-1010 ISSUE FOR CONSTRUCTION Calculations Cable Sizing Eathing Lightin 3 22-Apr-14 24-Apr-14

    CABLE SCHEDULCABLE SCHEDULE 101 19-Oct-13 A 30-Apr-14HE-EL-CS-1020 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Oct-13 A 18-Dec-13 AHE-EL-CS-1030 RECEIVE COMPANY COMMENTS/APPROVAL 13 18-Dec-13 A 06-Jan-14 AHE-EL-CS-1035 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Jan-14 A 13-Apr-14HE-EL-CS-1040 RECEIVE COMPANY APPROVAL 6 14-Apr-14 22-Apr-14HE-EL-CS-1050 ISSUE FOR CONSTRUCTION Cable Schedule 4 24-Apr-14 30-Apr-14

    LAYOUTS-CABLELAYOUTS-CABLE ROUTING AND LIGHTING & SMALL POWER 99 01-Dec-13 A 27-Feb-14 AHE-EL-LA-0860 PREPARE & ISSUE FOR COMPANY REVIEW 13 01-Dec-13 A 12-Dec-13 AHE-EL-LA-0870 RECEIVE COMPANY COMMENTS/APPROVAL 13 12-Dec-13 A 26-Dec-13 AHE-EL-LA-0880 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Dec-13 A 29-Jan-14 AHE-EL-LA-0885 RECEIVE COMPANY APPROVAL 6 29-Jan-14 A 12-Feb-14 AHE-EL-LA-0890 ISSUE FOR CONSTRUCTION Layouts Cable routing & Lihgting & Small 5 24-Feb-14 A 27-Feb-14 A

    EARTHING LAYOEARTHING LAYOUT 79 19-Oct-13 A 27-Apr-14HE-EL-LO-1060 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Oct-13 A 29-Dec-13 AHE-EL-LO-1070 RECEIVE COMPANY COMMENTS/APPROVAL 13 29-Dec-13 A 13-Jan-14 AHE-EL-LO-1075 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 13-Jan-14 A 13-Apr-14HE-EL-LO-1080 RECEIVE COMPANY APPROVAL 6 14-Apr-14 22-Apr-14HE-EL-LO-1090 ISSUE FOR CONSTRUCTION Eathing Layout 4 22-Apr-14 27-Apr-14

    SV STATIONSSV STATIONS 132 19-Sep-13 A 28-Apr-14LOAD LISTLOAD LIST 39 19-Sep-13 A 13-Apr-14HE-EL-LL-0140 PREPARE & ISSUE FOR COMPANY REVIEW 6 19-Sep-13 A 31-Oct-13 AHE-EL-LL-0150 RECEIVE COMPANY COMMENTS/APPROVAL 13 31-Oct-13 A 14-Nov-13 AHE-EL-LL-0170 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 14-Nov-13 A 04-Dec-13 AHE-EL-LL-0175 RECEIVE COMPANY APPROVAL 6 04-Dec-13 A 19-Dec-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 18 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-EL-LL-0180 ISSUE FOR CONSTRUCTION Load List 4 19-Dec-13 A 13-Apr-14

    DATA SHEETSDATA SHEETS 35 13-Oct-13 A 15-Dec-13 AHE-EL-DS-0010 PREPARE & ISSUE FOR COMPANY REVIEW 2 13-Oct-13 A 31-Oct-13 AHE-EL-DS-0020 RECEIVE COMPANY COMMENTS/APPROVAL 7 31-Oct-13 A 20-Nov-13 AHE-EL-DS-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 2 20-Nov-13 A 28-Nov-13 AHE-EL-DS-0040 RECEIVE COMPANY APPROVAL 6 28-Nov-13 A 28-Nov-13 AHE-EL-DS-0050 ISSUE FOR CONSTRUCTION Data Sheets 2 28-Nov-13 A 15-Dec-13 A

    SLDsSLDs 72 17-Oct-13 A 12-Dec-13 AHE-EL-SL-0190 PREPARE & ISSUE FOR COMPANY REVIEW 6 17-Oct-13 A 31-Oct-13 AHE-EL-SL-0200 RECEIVE COMPANY COMMENTS/APPROVAL 19 31-Oct-13 A 12-Nov-13 AHE-EL-SL-0205 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Nov-13 A 28-Nov-13 AHE-EL-SL-0210 RECEIVE COMPANY APPROVAL 6 28-Nov-13 A 28-Nov-13 AHE-EL-SL-0230 ISSUE FOR CONSTRUCTION SLDs 4 28-Nov-13 A 12-Dec-13 A

    MATERIAL REQUMATERIAL REQUISITIONS 34 23-Oct-13 A 16-Jan-14 AHE-EL-MR-0060 PREPARE & ISSUE FOR COMPANY REVIEW 2 23-Oct-13 A 25-Nov-13 AHE-EL-MR-0070 RECEIVE COMPANY COMMENTS/APPROVAL 7 25-Nov-13 A 09-Dec-13 AHE-EL-MR-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 2 09-Dec-13 A 18-Dec-13 AHE-EL-MR-0090 RECEIVE COMPANY APPROVAL 6 18-Dec-13 A 08-Jan-14 AHE-EL-MR-0100 ISSUE FOR CONSTRUCTION 2 08-Jan-14 A 16-Jan-14 A

    CABLE SIZING CACABLE SIZING CALCULATIONS 94 21-Oct-13 A 28-Apr-14HE-EL-CS-0620 PREPARE & ISSUE FOR COMPANY REVIEW 6 21-Oct-13 A 16-Dec-13 AHE-EL-CS-0630 RECEIVE COMPANY COMMENTS/APPROVAL 13 16-Dec-13 A 31-Dec-13 AHE-EL-CS-0640 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 31-Dec-13 A 14-Apr-14HE-EL-CS-0645 RECEIVE COMPANY APPROVAL 6 15-Apr-14 23-Apr-14HE-EL-CS-0650 ISSUE FOR CONSTRUCTION Cable Sizing (SV) 4 23-Apr-14 28-Apr-14

    CABLE SCHEDULCABLE SCHEDULE 94 27-Nov-13 A 28-Apr-14HE-EL-SL-0240 PREPARE & ISSUE FOR COMPANY REVIEW 5 27-Nov-13 A 17-Dec-13 AHE-EL-SL-0250 RECEIVE COMPANY COMMENTS/APPROVAL 13 17-Dec-13 A 31-Dec-13 AHE-EL-SL-0270 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 31-Dec-13 A 14-Apr-14HE-EL-SL-0275 RECEIVE COMPANY APPROVAL 6 15-Apr-14 23-Apr-14HE-EL-SL-0280 ISSUE FOR CONSTRUCTION Cable Schedule (SV) 4 23-Apr-14 28-Apr-14

    LAYOUT-CABLE RLAYOUT-CABLE ROUTING AND EARTHING 89 27-Nov-13 A 28-Apr-14HE-EL-LO-0580 PREPARE & ISSUE FOR COMPANY REVIEW 13 27-Nov-13 A 17-Dec-13 AHE-EL-LO-0590 RECEIVE COMPANY COMMENTS/APPROVAL 13 17-Dec-13 A 31-Dec-13 AHE-EL-LO-0600 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 31-Dec-13 A 23-Jan-14 AHE-EL-LO-0605 RECEIVE COMPANY APPROVAL 6 23-Jan-14 A 13-Apr-14HE-EL-LO-0610 ISSUE FOR CONSTRUCTION Layout Cable Routing (SV) 4 23-Apr-14 28-Apr-14

    ACTIVE COOLINGACTIVE COOLING SHELTER 67 04-Aug-13 A 16-Jan-14 AADDENDUM TO DADDENDUM TO DGS 57 04-Aug-13 A 18-Nov-13 AHE-EL-SP-0110 PREPARE & ISSUE FOR COMPANY REVIEW - ACTIVE COOLING SH 11 04-Aug-13 A 09-Oct-13 AHE-EL-SP-0120 RECEIVE COMPANY COMMENTS/APPROVAL - ACTIVE COOLING SH 13 10-Oct-13 A 04-Nov-13 AHE-EL-SP-0130 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 04-Nov-13 A 12-Nov-13 AHE-EL-SP-0140 RECEIVE COMPANY APPROVAL - ACTIVE COOLING SHELTER 6 12-Nov-13 A 12-Nov-13 AHE-EL-SP-0150 ISSUE FOR CONSTRUCTION - ACTIVE COOLING SHELTER 2 13-Nov-13 A 18-Nov-13 A

    MATERIAL REQUMATERIAL REQUISITIONS 49 19-Sep-13 A 16-Jan-14 AHE-EL-MR-0110 PREPARE & ISSUE FOR COMPANY REVIEW - MR ACTIVE COOLING 3 19-Sep-13 A 25-Nov-13 AHE-EL-MR-0120 RECEIVE COMPANY COMMENTS/APPROVAL - MR FOR ACTIVE COO 8 25-Nov-13 A 03-Dec-13 AHE-EL-MR-0130 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 03-Dec-13 A 19-Dec-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 19 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-EL-MR-0140 RECEIVE COMPANY APPROVAL - ACTIVE COOLING SHELTER 6 19-Dec-13 A 08-Jan-14 AHE-EL-MR-0150 ISSUE FOR CONSTRUCTION - MR ACTIVE COOLING SHELTER 2 08-Jan-14 A 16-Jan-14 A

    TYPICAL INSTALLTYPICAL INSTALLATION DETAILS 28 16-Nov-13 A 11-Dec-13 AHE-EL-TI-0160 PREPARE & ISSUE FOR COMPANY REVIEW 13 16-Nov-13 A 19-Nov-13 AHE-EL-TI-0180 RECEIVE COMPANY COMMENTS/APPROVAL 13 19-Nov-13 A 04-Dec-13 AHE-EL-TI-0200 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Dec-13 A 11-Dec-13 AHE-EL-TI-0225 RECEIVE COMPANY APPROVAL 6 11-Dec-13 A 11-Dec-13 AHE-EL-TI-0250 ISSUE FOR CONSTRUCTION - Typical Installation (ACS) 4 11-Dec-13 A 11-Dec-13 A

    ELECTRICAL EQUELECTRICAL EQUIPMENT LIST 81 20-Oct-13 A 29-Apr-14HE-EL-EQ-0460 PREPARE & ISSUE FOR COMPANY REVIEW 13 20-Oct-13 A 19-Jan-14 AHE-EL-EQ-0470 RECEIVE COMPANY COMMENTS/APPROVAL 13 19-Jan-14 A 26-Jan-14 AHE-EL-EQ-0480 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 26-Jan-14 A 15-Apr-14HE-EL-EQ-0485 RECEIVE COMPANY APPROVAL 6 16-Apr-14 24-Apr-14HE-EL-EQ-0490 ISSUE FOR CONSTRUCTION Electrical Eqpt List (ACS) 4 24-Apr-14 29-Apr-14

    ELECTRICAL TIE-ELECTRICAL TIE-IN LIST 68 09-Jan-14 A 20-Apr-14HE-EL-TE-0500 PREPARE & ISSUE FOR COMPANY REVIEW 6 09-Jan-14 A 04-Feb-14 AHE-EL-TE-0510 RECEIVE COMPANY COMMENTS/APPROVAL 13 04-Feb-14 A 17-Feb-14 AHE-EL-TE-0520 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 17-Feb-14 A 06-Apr-14HE-EL-TE-0525 RECEIVE COMPANY APPROVAL 6 06-Apr-14 14-Apr-14HE-EL-TE-0530 ISSUE FOR CONSTRUCTION Electrical Tie-In List (ACS) 4 14-Apr-14 20-Apr-14

    MATERIAL TAKE OMATERIAL TAKE OFF (MTO) 72 16-Jan-14 A 11-May-14HE-EL-MT-0010 PREPARE & ISSUE FOR COMPANY REVIEW 6 16-Jan-14 A 18-Mar-14 AHE-EL-MT-0020 RECEIVE COMPANY COMMENTS/APPROVAL 13 18-Mar-14 A 14-Apr-14HE-EL-MT-0050 ISSUE FOR CONSTRUCTION MTO (ACS) 4 05-May-14 11-May-14

    INSTRUMENTATIONINSTRUMENTATION & CONTROL 228 10-Jul-13 A 18-May-14ADDENDUM TO DADDENDUM TO DGS 68 01-Aug-13 A 06-Mar-14 AHE-IC-AD-0160 PREPARE & ISSUE FOR COMPANY REVIEW 19 01-Aug-13 A 10-Sep-13 AHE-IC-AD-0170 RECEIVE COMPANY COMMENTS/APPROVAL 13 11-Sep-13 A 01-Oct-13 AHE-IC-AD-0190 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 02-Oct-13 A 20-Oct-13 AHE-IC-AD-0180 RECEIVE COMPANY APPROVAL 13 20-Oct-13 A 20-Oct-13 AHE-IC-AD-0200 ISSUE FOR CONSTRUCTION 6 20-Oct-13 A 06-Mar-14 A

    SITE VISIT - REPOSITE VISIT - REPORT 68 27-Aug-13 A 06-Apr-14HE-IC-VR-0115 SITE VISITS-Instrumentation 3 27-Aug-13 A 01-Sep-13 AHE-IC-VR-0118 PREPARE & ISSUE SITE VISITS REPORT-I & C 5 02-Sep-13 A 04-Sep-13 AHE-IC-VR-0180 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 04-Sep-13 A 25-Sep-13 AHE-IC-VR-0121 RECEIVE COMPANY COMMENTS/APPROVAL 13 05-Sep-13 A 27-Sep-13 AHE-IC-VR-0190 RECEIVE COMPANY APPROVAL 13 25-Sep-13 A 25-Nov-13 AHE-IC-VR-0200 ISSUE FOR CONSTRUCTION 6 25-Sep-13 A 06-Apr-14

    SOW- DCS MODIFSOW- DCS MODIFICATIONS -HABSHAN-IES 9 48 21-Nov-13 A 27-Mar-14HE-IC-TB-0310 PREPARE & ISSUE FOR COMPANY REVIEW - DCS MODIFICATION I 30 21-Nov-13 A 27-Nov-13 AHE-IC-TB-0320 RECEIVE COMPANY COMMENTS/APPROVAL DCS MODIFICATION IE 13 27-Nov-13 A 12-Dec-13 AHE-IC-TB-0330 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Dec-13 A 23-Dec-13 AHE-IC-TB-0340 RECEIVE COMPANY APPROVAL - DCS MODIFICATION IES 9 13 23-Dec-13 A 13-Jan-14 AHE-IC-TB-0350 ISSUE FOR CONSTRUCTION - DCS MODIFICATION IES 9 6 13-Jan-14 A 27-Mar-14

    SOW- ESD MODIFSOW- ESD MODIFICATIONS -HABSHAN-IES 5 42 21-Nov-13 A 13-Apr-14HE-IC-TB-0360 PREPARE & ISSUE FOR COMPANY REVIEW - ESD MODIFICATION IE 24 21-Nov-13 A 27-Nov-13 AHE-IC-TB-0370 RECEIVE COMPANY COMMENTS/APPROVAL - ESD MODIFICATION 13 27-Nov-13 A 12-Dec-13 AHE-IC-TB-0380 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 12-Dec-13 A 23-Dec-13 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 20 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-IC-TB-0390 RECEIVE COMPANY APPROVAL - ESD MODIFICATION IES 5 13 23-Dec-13 A 13-Jan-14 AHE-IC-TB-0400 ISSUE FOR CONSTRUCTION - ESD MODIFICATION IES 5 6 13-Jan-14 A 13-Apr-14

    SOW-DCS MODIFISOW-DCS MODIFICATIONS - RUWAIS, TAKREER REFINARY 99 07-Aug-13 A 13-Apr-14HE-IC-TB-0410 PREPARE & ISSUE FOR COMPANY REVIEW - DCS TAKREER REFINA 13 07-Aug-13 A 10-Dec-13 AHE-IC-TB-0420 RECEIVE COMPANY COMMENTS/APPROVAL - DCS TAKREER REFIN 13 10-Dec-13 A 25-Dec-13 AHE-IC-TB-0430 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 25-Dec-13 A 08-Jan-14 AHE-IC-TB-0440 RECEIVE COMPANY APPROVAL - DCS TAKREER REFINARY 13 08-Jan-14 A 26-Jan-14 AHE-IC-TB-0450 ISSUE FOR CONSTRUCTION - DCS TAKREER REFINARY 6 26-Jan-14 A 13-Apr-14

    SMC & CONTROLSMC & CONTROL SYSTEM ARCHITECTURE DRAWING 127 21-Oct-13 A 06-Apr-14HE-IC-SM-0060 PREPARE & ISSUE FOR COMPANY REVIEW 28 21-Oct-13 A 07-Nov-13 AHE-IC-SM-0070 RECEIVE COMPANY COMMENTS/APPROVAL 13 07-Nov-13 A 20-Nov-13 AHE-IC-SM-0080 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 20-Nov-13 A 05-Mar-14 AHE-IC-SM-0090 RECEIVE COMPANY APPROVAL 13 05-Mar-14 A 11-Mar-14 AHE-IC-SM-0100 ISSUE FOR CONSTRUCTION SMC & Constrol System Architecture Dw 6 27-Mar-14 06-Apr-14

    HIPPS PACKAGEHIPPS PACKAGE 111 10-Jul-13 A 29-Jan-14 ASPECIFICATIONSPECIFICATION 102 10-Jul-13 A 03-Dec-13 AHE-IC-HP-0260 PREPARE & ISSUE FOR COMPANY REVIEW 6 10-Jul-13 A 09-Sep-13 AHE-IC-HP-0270 RECEIVE COMPANY COMMENTS/APPROVAL 13 10-Sep-13 A 03-Oct-13 AHE-IC-HP-0275 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 06-Oct-13 A 06-Nov-13 AHE-IC-HP-0280 RECEIVE COMPANY APPROVAL HIPPS Pkgs 13 06-Nov-13 A 20-Nov-13 AHE-IC-HP-0300 ISSUE FOR CONSTRUCTION HIPPS Pkgs 6 03-Dec-13 A 03-Dec-13 A

    MATERIAL REQUMATERIAL REQUISITION 105 15-Sep-13 A 29-Jan-14 AHE-IC-MR-0310 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Sep-13 A 20-Nov-13 AHE-IC-MR-0320 RECEIVE COMPANY COMMENTS/APPROVAL 7 20-Nov-13 A 05-Dec-13 AHE-IC-MR-0325 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 05-Dec-13 A 18-Dec-13 AHE-IC-MR-0330 RECEIVE COMPANY APPROVAL 7 18-Dec-13 A 31-Dec-13 AHE-IC-MR-0350 ISSUE FOR CONSTRUCTION - MR 6 31-Dec-13 A 29-Jan-14 A

    LEAK DETECTIONLEAK DETECTION SYSTEM 122 01-Aug-13 A 08-Jan-14 ASPECIFICATIONSPECIFICATION 115 01-Aug-13 A 07-Jan-14 AHE-IC-LD-0160 PREPARE & ISSUE FOR COMPANY REVIEW 3 01-Aug-13 A 09-Sep-13 AHE-IC-LD-0170 RECEIVE COMPANY COMMENTS/APPROVAL 13 10-Sep-13 A 30-Sep-13 AHE-IC-LD-0180 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 01-Oct-13 A 04-Dec-13 AHE-IC-LD-0190 RECEIVE COMPANY APPROVAL 13 04-Dec-13 A 15-Dec-13 AHE-IC-LD-0200 ISSUE FOR CONSTRUCTION - Sepcification LDS 6 15-Dec-13 A 07-Jan-14 A

    MATERIAL REQUMATERIAL REQUISITION 119 15-Sep-13 A 08-Jan-14 AHE-IC-MR-0210 PREPARE & ISSUE FOR COMPANY REVIEW 6 15-Sep-13 A 10-Dec-13 AHE-IC-MR-0220 RECEIVE COMPANY COMMENTS/APPROVAL 7 10-Dec-13 A 17-Dec-13 AHE-IC-MR-0230 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 3 17-Dec-13 A 23-Dec-13 AHE-IC-MR-0240 RECEIVE COMPANY APPROVAL 7 23-Dec-13 A 08-Jan-14 AHE-IC-MR-0250 ISSUE FOR CONSTRUCTION MR 3 08-Jan-14 A 08-Jan-14 A

    INSTRUMENTATIOINSTRUMENTATION INDEX 146 20-Oct-13 A 16-Mar-14 AHE-IC-ID-0110 PREPARE & ISSUE FOR COMPANY REVIEW 6 20-Oct-13 A 31-Dec-13 AHE-IC-ID-0120 RECEIVE COMPANY COMMENTS/APPROVAL 13 31-Dec-13 A 16-Jan-14 AHE-IC-ID-0130 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 16-Jan-14 A 09-Mar-14 AHE-IC-ID-0140 RECEIVE COMPANY APPROVAL 13 09-Mar-14 A 09-Mar-14 AHE-IC-ID-0150 ISSUE FOR CONSTRUCTION Instrument Index 6 09-Mar-14 A 16-Mar-14 A

    I/O - RTU LISTI/O - RTU LIST 99 18-Dec-13 A 17-Apr-14HE-IC-IL-0010 PREPARE & ISSUE FOR COMPANY REVIEW 6 18-Dec-13 A 13-Jan-14 A

    un Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ct2013 2014 2015

    REPLACEMENT OF 16" CONDENSATE PIPELINE FROM HABSHAN TO RUWAIS

    DETAILED CONSTRUCTION SCHEDULE

    Primary BaselineActual WorkRemaining Work

    Critical Remaining WorkBaseline MilestoneMilestone

    Summary Page 21 of 50 Date Revision Checked Approved30-Mar-14 Detailed Construction Plan Rev-1 MK AM16-Sep-13 Project Baseline Schedule Rev-0 HP SKS

  • Activity ID Activity Name OriginalDur.

    Start Finish

    HE-IC-IL-0020 RECEIVE COMPANY COMMENTS/APPROVAL 9 13-Jan-14 A 27-Jan-14 AHE-IC-IL-0030 COMMENTS INCORPORATE & ISSUED TO COMPANY FOR APPROV 6 27-Jan-14 A 11-Mar-14 AHE-IC-IL-0040 RECEIVE COMPANY APPROVAL 9 11-Mar-14 A 08-Apr-14HE-IC-IL-0050 ISSUE FOR CONSTRUCTION I/O - RTU List 6 09-Apr-14 17-Apr-14

    FIRE & GAS-INDEXFIRE & GAS-INDEX 123 20-Oct-13 A 27-Apr-14HE-IC-ID-0160 PREPARE & ISSUE FOR COMPANY REVIEW 6 20-Oct-13 A 31-Dec-13 A