REQUIREMENTS: 1 All materials needed should be available (SUBRACK, CABLES, ADDI 2 Script for 3rd Carrier Configuration 3 Proper Tools (Laptop with Cables to Connect to RBS6201, 2nd Sub 4 Softwares (Element Manager, PUTTY or HyperTerminal, Bison) PROCEDURE 1 Open MDT call Integration to perform HC and Backup CV for Site Call Integration to perform HC and Backup CV for Site 2 Install 2nd SUBRACK 3 4 5 Do the cabling as shown in the Layout 6 Note: If script loading is taking too much tim and observe if the script loading will continu 7 If already finished with script loading, check the status of th 8 9 10 11 12 Export and Delete the Configuration. 13 Load the Cabinet and Site with 3rd Carrier Configuration Insert 2nd DUW into the expansion (still powered down) Switch "ON" and Format Secondary DUW (NO CABLES CONNECTED). Run the modify script to add the 2nd DUW to the RBS (switch on “waiting for start up of board” in the Modify-Wizzard Check the status of the 2nd DUW with MOSHELL using “cab” With the command “cab” you see that the 2nd DUW is in synch sta Wait until the synch status of the 2nd DUW is “StandbyReadyVerify with Integration Team for the Status of 2nd DUW Create a CV (Ex. After_DUW_sync ) Start upgrading to R3M02 RBS6201 3RD CARRIER

description

Upgradation of 3G

Transcript of 3rd Carrier RBS6201 Procedure

Page 1: 3rd Carrier RBS6201 Procedure

REQUIREMENTS:1 All materials needed should be available (SUBRACK, CABLES, ADDITIONAL DUW) see Layout for Cable reference2 Script for 3rd Carrier Configuration3 Proper Tools (Laptop with Cables to Connect to RBS6201, 2nd Subrack Installation)4 Softwares (Element Manager, PUTTY or HyperTerminal, Bison)

PROCEDURE

1 Open MDT call Integration to perform HC and Backup CV for SiteCall Integration to perform HC and Backup CV for Site

2 Install 2nd SUBRACK34

5 Do the cabling as shown in the Layout6

Note: If script loading is taking too much time (more than 10 mins) you need to switch "OFF" and the switch "ON" again the Secondary DUWand observe if the script loading will continue

7 If already finished with script loading, check the status of the 2nd DUW with EMAS (needs to be enabled)8

910

11

12 Export and Delete the Configuration. 13 Load the Cabinet and Site with 3rd Carrier Configuration

Insert 2nd DUW into the expansion (still powered down)Switch "ON" and Format Secondary DUW (NO CABLES CONNECTED). After Format Switch"OFF" again

Run the modify script to add the 2nd DUW to the RBS (switch on 2nd DUW if you see“waiting for start up of board” in the Modify-Wizzard

Check the status of the 2nd DUW with MOSHELL using “cab”With the command “cab” you see that the 2nd DUW is in synch status. (Need to restart cabinet if 2nd DUW is not showing on moshell)

Wait until the synch status of the 2nd DUW is “StandbyReady”Verify with Integration Team for the Status of 2nd DUWCreate a CV (Ex. After_DUW_sync )Start upgrading to R3M02

RBS6201 3RD CARRIER IMPLEMENTATION

Page 2: 3rd Carrier RBS6201 Procedure

All materials needed should be available (SUBRACK, CABLES, ADDITIONAL DUW) see Layout for Cable referenceScript for 3rd Carrier ConfigurationProper Tools (Laptop with Cables to Connect to RBS6201, 2nd Subrack Installation)Softwares (Element Manager, PUTTY or HyperTerminal, Bison)

Open MDT call Integration to perform HC and Backup CV for SiteCall Integration to perform HC and Backup CV for SiteInstall 2nd SUBRACK

Do the cabling as shown in the Layout

Note: If script loading is taking too much time (more than 10 mins) you need to switch "OFF" and the switch "ON" again the Secondary DUWand observe if the script loading will continue

If already finished with script loading, check the status of the 2nd DUW with EMAS (needs to be enabled)

Export and Delete the Configuration. Load the Cabinet and Site with 3rd Carrier Configuration

(NO CABLES CONNECTED). After Format Switch"OFF" again

Run the modify script to add the 2nd DUW to the RBS (switch on 2nd DUW if you see

With the command “cab” you see that the 2nd DUW is in synch status. (Need to restart cabinet if 2nd DUW is not showing on moshell) INTEGRATIONTEAM

RBS6201 3RD CARRIER IMPLEMENTATION

Page 3: 3rd Carrier RBS6201 Procedure

INTEGRATIONTEAM

Page 4: 3rd Carrier RBS6201 Procedure

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Need additional 3 pcs for 3rd Carrier(Connection from RUW to Secondary DUW)

RPM 777 263 / 00650 - R1BSIGNAL CABLE(IDL to IDL Connection from Primary to Secondary DUW)

RPM 777 279 / 00650 R1BSIGNAL CABLE( F to F Connection from Primary to Secondary DUW)

RPM 777 193 / 01000R1CDC POWER CABLE WCDMA

Need Additional 1 pc(Power Cable for Secondary DUW)

Connected to PDU

IMPORTANT

IDL Cable labeled with "PRIMARY" should be connected to the primary DUW and "SECONDARY" to secondary DUW and do not be mistaken to interchange, otherwise primary DUW will be corrupted

Page 5: 3rd Carrier RBS6201 Procedure

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Need additional 3 pcs for 3rd Carrier(Connection from RUW to Secondary DUW)

RPM 777 279 / 00650 R1BSIGNAL CABLE( F to F Connection from Primary to Secondary DUW)

Page 6: 3rd Carrier RBS6201 Procedure

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Need additional 3 pcs for 3rd Carrier(Connection from RUW to Secondary DUW)

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Existing from Cabinet Delivery (3pcs Only)(Connection from RUW to Primary DUW)

CABLES NEEDED FOR 3rd CARRIER

RPM 777 277 / 00900 R3A - 3pcs

RPM 777 263 / 00650 - R1B - 1pc

RPM 777 279 / 00650 R1B - 1pc

RPM 777 193 / 01000 R1C - 1pc

Page 7: 3rd Carrier RBS6201 Procedure

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Need additional 3 pcs for 3rd Carrier(Connection from RUW to Secondary DUW)

Page 8: 3rd Carrier RBS6201 Procedure

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Existing from Cabinet Delivery (3pcs Only)(Connection from RUW to Primary DUW)

CABLES NEEDED FOR 3rd CARRIER

RPM 777 277 / 00900 R3A - 3pcs

RPM 777 263 / 00650 - R1B - 1pc

RPM 777 279 / 00650 R1B - 1pc

RPM 777 193 / 01000 R1C - 1pc

Page 9: 3rd Carrier RBS6201 Procedure
Page 10: 3rd Carrier RBS6201 Procedure
Page 11: 3rd Carrier RBS6201 Procedure

RPM 777 263 / 00650 - R1BSIGNAL CABLE(IDL to IDL Connection from Primary to Secondary DUW)

RPM 777 279 / 00650 R1BSIGNAL CABLE( F to F Connection from Primary to Secondary DUW)

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Need additional 3 pcs for 3rd Carrier(Connection from RUW to Secondary DUW)

Page 12: 3rd Carrier RBS6201 Procedure

RPM 777 193 / 01000R1CDC POWER CABLE WCDMA

Need additional 1 pc(Power Cable for Secondary DUW)

RPM 777 277 / 00900 R3ASIGNAL CABLE(approximate length 1m)Need additional 3 pcs for 3rd Carrier(Connection from RUW to Secondary DUW)

Page 13: 3rd Carrier RBS6201 Procedure

Welcome to OSE Shell ose5.3.

OSE Delta PowerPC/BL250206Welcome to OSE Shell ose5.3.$ Start of @(#)CXC1725340 R3A03 2010-02-26 07:56:41 GMTPlug-in Unit Product Name: DUW3001Plug-in Unit Product No: KDU127161/3Plug-in Unit Product rev: R3CPlug-in Unit Product Date: 20110120Plug-in Unit Product Serial: CB4G222342Ethernet MAC_address 0: 0xC835B842FAA2RAM size: 1024 Mbytes

Stop due to remain in basic/backup setformathd /d

Formatting Hard Disk...

OSE Delta PowerPC/BL250206Welcome to OSE Shell ose5.3.$ Start of @(#)CXC1725340 R3A03 2010-02-26 07:56:41 GMTPlug-in Unit Product Name: DUW3001Plug-in Unit Product No: KDU127161/3Plug-in Unit Product rev: R3CPlug-in Unit Product Date: 20110120Plug-in Unit Product Serial: CB4G222342Ethernet MAC_address 0: 0xC835B842FAA2RAM size: 1024 Mbytes

Stop due to remain in basic/backup setformathd /c2

username: rbspassword:rbs

$ reload --

All data on volume will be destroyed. Continue? y/n (n):y

$ reload --

HOW TO FORMAT DUW(Connect to RBS6201 LMT A port using Serial Connection)

Page 14: 3rd Carrier RBS6201 Procedure

Formatting Hard Disk...

OSE Delta PowerPC/BL250206Welcome to OSE Shell ose5.3.$ Start of @(#)CXC1725340 R3A03 2010-02-26 07:56:41 GMTPlug-in Unit Product Name: DUW3001Plug-in Unit Product No: KDU127161/3Plug-in Unit Product rev: R3CPlug-in Unit Product Date: 20110120Plug-in Unit Product Serial: CB4G222342Ethernet MAC_address 0: 0xC835B842FAA2RAM size: 1024 Mbytes

Stop due to remain in basic/backup setifconfig le0 169.254.1.1 netmask 255.255.0.0$

All data on volume will be destroyed. Continue? y/n (n):y

$ reload --

Page 15: 3rd Carrier RBS6201 Procedure

HOW TO FORMAT DUW(Connect to RBS6201 LMT A port using Serial Connection)

Page 16: 3rd Carrier RBS6201 Procedure

2 from serial to 3 on RJ453 from serial to 2 on RJ455 from serial to 1 on RJ45

The connection between a DUW and a PC for serial connection (RS232) should look like this. Please note that this is applicable for DUW/DUL/DUG.

1.1 Serial Connection Pin outs

Page 17: 3rd Carrier RBS6201 Procedure

The connection between a DUW and a PC for serial connection (RS232) should look like this. Please note that this is applicable for DUW/DUL/DUG.

useFEMALE serial

connector

Page 18: 3rd Carrier RBS6201 Procedure

output power 3-7-11 / 60st plugintxdev 0-3/1-3hscode 1-1/2-2/3-3/1/2/3get . Pool2 25/25