    Appendix U12

    UMTS Network KPI

    NOTES:

    This document can be used as an example of defining KPs in a cont!act" t is inE!icsson#s inte!est that KPs a!e $ell defined% including:

    a KP ta!get &alues '(eep as fe$ $ith ta!gets as possible)

    b *o!mula and measu!ement definitions 'fo! d!i&es and stats)

    c +he!e and ho$ KP $ill be measu!ed 'locations% setup% tools% d!i&e% statistics)

    d ,onditions - p!e!e.uisites% exclusions

    e Statistical conside!ations

    As much of this as p!actical should be defined in the cont!act% pa!ticula!l/ an/thingthat $ill limit E!icsson#s !is(s and costs"

    Some of the mate!ial in this document ma/ best be included in othe! pa!ts of thecont!act% including the Acceptance P!ocedu!e and associated documents"

    KP ta!get &alues ha&e &e!/ little meaning until the conditions of measu!ement a!edefined as abo&e" ,ommitting to a ta!get $ithout defining ho$% $hen and $he!e it $illbe measu!ed lea&es E!icsson at g!eat !is("

    N"0" The KPs and thei! ta!gets included in this document ma/ not be the ones

    !ecommended b/ E!icsson" efe! to the KP Technical uidelines and KP data basefo! cu!!ent !ecommendations"

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    2/40

    Table of Contents

    UMTS NETWORK KPI..........................................................................................................................................................1

    1 INTRODUCTION..........................................................................................................................................................3

    1.1 SUMMARYOFLEVEL-1 KPI ANDTARGETS.............................................................................................................3

    2 PERFORMANCE COMMITMENTS AND REQUIREMENTS...............................................................................6

    2.1 MILESTONEDEFINITION..........................................................................................................................................62.2 SCOPE......................................................................................................................................................................6

    2.3 GENERALREQUIREMENTS.......................................................................................................................................62.4 CONTRACTUALKPI COMMITMENTS.......................................................................................................................7

    3 UTRAN LEVEL-1 KEY PERFORMANCE INDICATORS......................................................................................7

    3.1 CIRCUITSWITCHEDLEVEL-1 KEYPERFORMANCEINDICATORS.............................................................................7

    3.1.1 Circuit Switched Call Setup...............................................................................................................................7

    3.1.2 RRC Establishment Causes............................................................................................................................ ....93.1.3 CSV Access Failure............................................................................................................................................9

    3.1.4 CSV Drop..........................................................................................................................................................11

    3.1.5 CSV Qualit......................................................................................................................................................1!

    3.1.6 CSV Cell Capacit............................................................................................................................................1"

    3.1.7 CSV So#t$So#ter %ando&er '&erhead...............................................................................................................1(3.1.8 CSV )nter*Radio Access +echnolo, %ando&er Failure..................................................................................1-

    3.1.9 CSV Call Setup +ime........................................................................................................................................1

    3.1.10 CSD Access Failure.....................................................................................................................................193.1.11 CSD Drop....................................................................................................................................................!/

    3.1.12 CSD Qualit................................................................................................................................................!1

    3.1.13 CSD Call Setup time....................................................................................................................................!!

    3.2 PACKETSWITCHEDLEVEL-1 KEYPERFORMANCEINDICATORS............................................................................233.2.1 0acet Switched Call Setup..............................................................................................................................!2

    3.2.2 0SD Access Failure..........................................................................................................................................!"

    3.2.3 0SD Drop.........................................................................................................................................................!(

    3.2.4 0SD 3atenc.....................................................................................................................................................!-3.2.5 0SD +hrou,hput...............................................................................................................................................!-

    3.2.6 0SD Call Setup +ime........................................................................................................................................!3.2.7 0SD )nter*Radio Access +echnolo, %ando&er Failure..................................................................................!9

    3.2.8 0SD )RA+ )nterruption time.............................................................................................................................2/3.2.9 %SD0A Access Failure.....................................................................................................................................21

    3.2.10 %SD0A Drop................................................................................................................................ ............ ...2!

    3.2.11 %SD0A 3atenc............................................................................................................................... ............2"

    3.2.12 %SD0A +hrou,hput.....................................................................................................................................2"3.2.13 %S40A +hrou,hput.....................................................................................................................................2-

    3.2.14 %SD0A Data Session Setup +ime.................................................................................................... ............27

    3.3 SYSTEMAVAILAILITY..........................................................................................................................................37

    3.3.1 A&era,e Cell A&ailabilit..................................................................................................................................23.3.2 A&era,e Cell 5on*6aintenance A&ailabilit....................................................................................................2

    3.4 COMPARISONOFUMTS ANDGSM NETWORKPERFORMANCE............................................................................3!

    3." IMPACTOFUMTS ONGSM NETWORKPERFORMANCE........................................................................................3!4 UTRAN LEVEL-2 KEY PERFORMANCE INDICATORS....................................................................................40

    2 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    3/40

    1 Introduction

    The pu!pose of this Appendix U12 is to define Net$o!( Ke/ Pe!fo!mance ndicato!s 'KP) fo! the U5TS

    d!i&e test% UTAN counte! based measu!ements and pe!fo!mance ta!gets and fo!mulas fo! each of the

    KP" All capitali6ed te!ms% ac!on/ms% and definitions used in this Appendix U12 a!e listed in eithe! the

    U5TS Ac!on/ms and 7efinitions 'Appendix U18)% o! in the O!iginal Ag!eement"

    The UTAN KP definition and de&elopment effo!t is pe!fo!med at the t$o le&els as defined belo$:

    9e&el1 KP: a!e the highle&el met!ics used fo! o&e!all se!&ice .ualit/ measu!ement and monito!ing

    the health of Pu!chase!#s UTAN Net$o!(" These met!ic definitions shall be ag!eed to b/ Selle!%

    and Selle!;s implementation of the 9e&el1 met!ics shall be in compliance $ith Pu!chase!;s

    definitions defined in this Appendix U12"

    9e&el2 KP: a!e the detailed enginee!ing le&el met!ics that shall be used fo! enginee!ing%

    dimensioning the Net$o!(% the in&estigation and t!oubleshooting of p!oblem a!eas in the U5TS

    Net$o!("

    Summary of Level1 KPI and Tar!ets

    N"T#$ T%e selection of KPI and t%e tar!et values s%ould use t%eKPI Tec%nical &uidelines and KPI 'atabase( T%e followin! is ane)am*le from a real contract and s%ould N"T be seen as#ricsson recommendation and must not be used in any contractin t%is form(

    KPI Parameter Table

    +eference

    PreLaunc%

    ,Milestone 1-

    Launc%

    ,Milestone .-

    Post Launc%

    ,Milestone /-

    ,S< Access *ailu!e ate Table = > 2"4 ? > 2"4 ? > 2"4 ?

    ,S< 7!op ate Table @ > 2"4 ? > 2"4 ? > 2"4 ?

    ,S< ualit/ '79) Table 8 B@thpe!centile

    of samples >

    2"4 ? 09E

    B@thpe!centile of

    samples > 2"4 ?

    09E

    B@thpe!centile

    of samples >

    2"4 ? 09E

    ,S< ualit/ 'U9) Table 8 B@thpe!centile

    of samples >

    2"4 ? 09E

    B@thpe!centile of

    samples > 2"4 ?

    09E

    B@thpe!centile

    of samples >

    2"4 ? 09E

    ,ell ,apacit/ Table 14 C 34 U# 0M+1.(.k

    'p!o&ided it is

    achie&ed in *

    design)

    C 34 U# 0M+1.(.k 'p!o&ided it

    is achie&ed in *

    design)

    5easu!e and!epo!t

    SoftDSofte! ando&e!

    O&e!head

    Table 12 > 1"F > 1"F > 1"G

    ,S< AT *ailu!e ate Table 13 NDA > @"4 ? > @"4 ?

    = of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    4/40

    H B seconds

    B@thpe!centile >

    B seconds

    B@thpe!centile

    > B seconds

    ,S7 Access *ailu!e ate Table 1G > ="4 ? > 2"4 ? > 2"4 ?

    ,S7 7!op ate Table 1B > 2"@ ? > 2"@ ? > ="4 ?

    ',ounte!)

    > 2"@ ? '7!i&e

    Test)

    ,S7 ualit/ '79) Table 21 B@thpe!centile

    of samples >

    1"4 ? 09E

    B@thpe!centile of

    samples > 1"4 ?

    09E

    B@thpe!centile

    of samples >

    1"4 ? 09E

    ,S7 ualit/ 'U9) Table 21 B@thpe!centileof samples >

    1"4 ? 09E

    B@thpe!centile ofsamples > 1"4 ?

    09E

    B@thpe!centileof samples >

    1"4 ?09E

    H,S7 ,all Setup time Table 22 N"A B@thpe!centile > B

    seconds

    N"A

    PS7 Access *ailu!e ate Table 23 > 2"4 ? > 2"4 ? > 2"4 ?

    PS7 7!op ate Table 2F > 2"@ ? > 2"4 ? > 2"4 ?

    HPS7 9atenc/ 'an/ BBA0)

    Table 28 N"A B@thpe!centile

    > 244ms

    N"A

    PS7 BB A&e!age 79

    th!oughput '(bps)

    'Unloaded)

    Table =1 C 234 C 234 C 1@4 ',ounte!)

    C 234 '7!i&e

    Test)

    PS7 BB A&e!age 79

    th!oughput '(bps)

    '9oaded)

    Table =1 C 214 C 214 C 1@4 ',ounte!)

    C 214 '7!i&e

    Test)

    PS7 BB A&e!age U9

    th!oughput '(bps)

    'Unloaded)

    Table =2 C 244 C 244 C 1@4 ',ounte!)

    C 244 '7!i&e

    Test)

    PS7 BB A&e!age U9

    th!oughput '(bps)

    '9oaded)

    Table =2 C 184 C 184 C 1@4 ',ounte!)

    C 184 '7!i&e

    Test)

    3 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    5/40

    HPS7 ,all Setup time Table =3 N"A B@thpe!centile

    sessions > @

    seconds

    N"A

    PS7 AT *ailu!e ate Table =F NDA > @"4 ? > @"4 ?

    PS7 AT nte!!uption time Table =B N"A B@th pe!centile> 12 seconds

    N"A

    PS7 AT Use! 7ata

    nte!!uption time

    Table =B N"A 5easu!e andepo!t

    N"A

    S7PA Access *ailu!e

    ate

    Table 31 > 2"4 ? > 2"4 ? > 2"4 ?

    S7PA 7!op ate Table 3= > ="4 ? > 2"4 ? > 2"4 ?

    HS7PA 9atenc/ Table 3@ N"A B@th

    pe!centilesessions > 144

    ms

    N"A

    Stationa!/ 5aximum 79

    S7PA 0it ate '(bps)

    unde! no load 'UE

    ,atego!/ 12)

    Table 3G C 1=44 C 1=44 C1=44

    'at 9, 9a/e!

    using counte!)

    Stationa!/ 5aximum 79

    S7PA 0it ate '(bps) $ith

    @4? 79 loading 'UE

    ,atego!/ 12)

    Table 3G C 1144 C 1144 N"A

    S7PA A&e!age 79

    Th!oughput '(bps) fo! UE

    catego!/ 12 unde! no load

    Table 38 C G44 C G44 C G44

    'at off pea()

    S7PA A&e!age 79

    Th!oughput '(bps) fo! UE

    catego!/ 12 unde! @4? 79

    loading

    Table 38 C F44 C F44 N"A

    SUPA Stationa!/ Pea(

    th!oughput '(bps) fo! UE

    ,atego!/ = '1"3@ 5bps)

    Table @4 C 1144 C 1144 5easu!e and

    epo!t

    SUPA Stationa!/ A&e!age

    th!oughput '(bps) fo! UE

    ,atego!/ = '1"3@ 5bps)

    Table @4 C @44 C @44 5easu!e and

    epo!t

    HS7PA Session Acti&ation

    time

    Table @1 N"A B@thpe!centile

    sessions > @

    seconds

    N"A

    @ of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    6/40

    HA&e!age ,ell A&ailabilit/

    KP

    Table @= N"A N"A N"AHH

    HA&e!age ,ell Non

    5aintenance A&ailabilit/

    KP

    Table @@ N"A N"A N"AHH

    S5 Pe!fo!mance

    7eg!adation due to

    nt!oduction of U5TS

    Page No:

    34

    ,ell > 14 ?

    ,luste! > G"@?

    5a!(et > @?

    ,ell> 14 ?

    ,luste! > G"@?

    5a!(et > @?

    ,ell> 14 ?

    ,luste! > G"@?

    5a!(et > @?

    H Selle! shall commit to these KP du!ing the life of the Net$o!( as desc!ibed in Section of this document

    HH KP Applicable one '1) /ea! afte! U5TS Net$o!( comme!cial 9aunch"

    2 Performance Commitments and +euirements

    Milestone 'efinition

    5ilestone desc!iption is p!o&ided in the U5TS S/stem Acceptance 'Appendix U1F)"

    Th!ee milestones a!e defined in this Appendix U12 as follo$s:

    1" 5ilestone1 '5S1): Prelaunc%" P!elaunch is defined as the completion of ,luste! Acceptancetesting" The KP ta!get le&els $ill be based on d!i&e tests and not OSS statistics"

    2" 5ilestone2 '5S2): Launc%" 9aunch is defined as the completion of 5a!(et Acceptance testing of the

    initial Net$o!( configu!ation" The KP ta!get le&els shall be based on d!i&e tests and not OSS

    statistics"

    =" 5ilestone= '5S=): PostLaunc%" Post9aunch is defined as six 'F) months afte! 9aunch" The KP

    ta!get le&els shall be based on OSS statistics at 5a!(et 9e&el o! 7!i&e Test data if the!e is not

    sufficient t!affic% as defined in U5TS S/stem Acceptance 'Appendix U1F) in the U5TS Net$o!("

    Sco*e

    The scope in this Appendix U12 is to define applicable U5TS Net$o!( KPs fo! S/stems and E.uipmentsupplied b/ Selle!"

    &eneral +euirements

    Pe!fo!mance 5anagement 5easu!ement Entit/ shall be a&ailable at ,ell% Node0% ,luste!% N,% 5a!(et%

    egion and Net$o!( le&el fo! e&e!/ KP unless othe!$ise stated in this Appendix U12" N, 5easu!ement

    !anula!it/ shall be a minimum pe!iod of fifteen '1@) minutes unless othe!$ise stated in this Appendix U12"

    All tests fo! KP pu!poses shall be pe!fo!med in 5obile '&ehicle d!i&e) en&i!onment unless othe!$ise specified"

    AT a!d ando&e! *eatu!e shall be s$itched off du!ing KP &e!ification $ithin the U5TS Se!&ice A!ea at

    P!e9aunch" At 9aunch milestone AT O failu!e !ate in =2 * Se!&ice bounda!/ shall be &e!ified $ith

    one dedicated d!i&e pe! 5a!(et unit"

    The tests shall be pe!fo!med unde! a multisupplie! en&i!onment% in $hich nodes f!om diffe!ent supplie!sma/ be used 'e"g" SSN% SN% 5S,% 5+ etc)" n the e&ent that a pa!ticula! test is not passed andSelle! claims the p!oblem is $ith the othe! supplie!% Selle! shall clea!l/ demonst!ate that the element in.uestion is the sou!ce of the p!oblem" f the p!oblem is confi!med to be in a thi!dpa!t/ supplie!#sE.uipment then Selle! shall !eschedule the indi&idual test cases onl/ afte! the p!oblem has been!esol&ed b/ the thi!dpa!t/ supplie!"

    The initial UTAN pa!amete! set shall be mutuall/ ag!eed" No UTAN pa!amete! shall be changeddu!ing ,luste!D5a!(et Acceptance tests $ithout p!io! app!o&al of Pu!chase! as defined in the U5TSS/stem Acceptance 'Appendix U1F)" As te!minal pe!fo!mance ma/ also ha&e an impact on the

    F of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    7/40

    pe!fo!mance% the b!and and model of te!minal to be used fo! the tests shall be mutuall/ ag!eed to b/Selle! and Pu!chase!"

    ,ounte! based statistics fo! 9e&el1 KP shall co&e! all t!affic classes and include all causes of

    failu!esDsuccesses to indicate end to end pe!fo!mance as &ie$ed b/ UTAN"

    Contractual KPI Commitments

    The follo$ing KPs and ta!gets shall be &alid fo! the lifetime of the Net$o!(% p!o&ided that the!e is a Suppo!tAg!eement in place fo! the Selle! p!o&ided S/stems"

    Table .$ KPI Parameter Commitment for t%e lifetime of t%e UMTS Network

    SN KPI Parameter Tar!et

    1 ,S< ,all Setup Time '5obile to PSTN) > F seconds

    2 ,S< ,all Setup Time '5obile to 5obile) > B seconds

    = ,S7 ,all Setup time '5obile to 5obile) > B seconds

    3 PS7 9atenc/ an/ BB A0 > 244 ms

    @ PS7 ,all Setup Time > @ seconds

    F S7PA 9atenc/ > 144ms

    G S7PA 7ata Session Setup Time > @ seconds

    8 ,ell A&ailabilit/ As pe! Table @=

    B ,ell A&ailabilit/ 'Non5aintenance) As pe! Table @@

    The U5TS Net$o!( is expected to meet o! exceed the KP ta!gets specified in this Appendix U12 $ithin the

    U5TS Se!&ice A!ea $ith o! $ithout loading the U5TS Net$o!("

    Selle! commitment applies to 9e&el1 KP fo! achie&ing ta!get &alues at the milestone applicable to KP"

    KP counte! met!ics shall be based on UTAN &ie$ of Net$o!( Pe!fo!mance" Selle! shall p!o&ide all9e&el1 KP counte!s used in the fo!mulas defined in this Appendix U12 at 5ilestone2 $ith theexception of S0 counte!s fo! Access *ailu!e" Selle! shall p!o&ide all 9e&el1 KP !epo!ts fo! KP

    Acceptance"

    Pu!chase! shall define KP 9e&el2 !e.ui!ements as outlined in Section 3"

    3 UT+0N Level1 Key Performance IndicatorsThis Section desc!ibes the UTAN 9e&el1 KP% o! high le&el se!&ice met!ics" 9e&el1 KP is subdi&ided into t$o basic se!&ice domains: the ,i!cuit S$itched ',S) domain that includes

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    8/40

    /(1(1 ,i!cuit S$itched ,all Setup

    The setup of a ,S se!&ice is comp!ised of th!ee basic steps 'see *igu!e 1)" *i!st% UE must accessthe UTAN and establish an , connection" Once this connection is completed the Non AccessSt!atum 'NAS) messages a!e exchanged bet$een the UE and the ,o!e Net$o!( ',N) e"g" ,5Se!&ice e.uest% Authentication% Secu!it/% etc" The last step of the call setup is the establishment ofa adio Access 0ea!e! 'A0) bet$een the ,N and the UE"

    2i!ure 1$ Call Setu* 3lock 'ia!ram

    *igu!e 2 illust!ates a call setup flo$ diag!am fo! a ,S mobile o!iginated call" f a p!oblem occu!sbet$een , ,onnection e.uest 'step 1)% and ANAP: A0 Assignment esponse 'step 2G)%

    Ale!tingD,onnect 'step 2B) in case of d!i&e test% it is conside!ed an Access *ailu!e" An/ A0abno!mal !elease afte! A0 Assignment esponse 'in case of ,ounte! *o!mula)% Ale!tingD,onnect

    message 'in case of 7!i&e Test *o!mula) is conside!ed a d!opped call"

    8 of 34

    Establish,

    ,onnection

    Non AccessSt!atum

    5essaging

    adioAccess0ea!e!'A0)Setup

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    9/40

    2i!ure .$ Circuit Switc%ed Call Setu* 2low 'ia!ram

    /(1(. , Establishment ,auses

    Table 1 p!o&ides a list of , establishment causes" +hen the UE attempts to setup a ,,onnection $ith the UTAN% the UE sends a , ,onnection e.uest message" Embedded $ithin

    this message is an info!mation element that communicates the establishment cause fo! theconnection !e.uest" This establishment cause shall be utili6ed to diffe!entiate ,S and PS call KP!elated to Access *ailu!e" Sepa!ate counte!s fo! each t!affic classes fo! e&e!/ , ,onnectione.uest and , ,onnection ,omplete 'as pe! =PP) shall be made a&ailable in Soft$a!e !eleaseat the time of comme!cial launch '5ilestone 2)"

    Table 1$ ++C #stablis%ment Causes

    ++C #stablis%mentCause

    'escri*tion

    4 O!iginating ,on&e!sational ,all

    1 O!iginating St!eaming ,all

    2 O!iginating nte!acti&e ,all

    = O!iginating 0ac(g!ound ,all

    3 O!iginating Subsc!ibed t!affic ,all

    @ Te!minating ,on&e!sational ,all

    F Te!minating St!eaming ,all

    G Te!minating nte!acti&e ,all

    8 Te!minating 0ac(g!ound ,all

    B Eme!genc/ ,all

    14 nte!AT ,ell !eselection

    11 nte!AT ,ell change o!de!

    12 egist!ation

    1= 7etach

    13 O!iginating igh P!io!it/ Signaling

    1@ O!iginating 9o$ P!io!it/ Signaling

    1F ,all !eestablishment

    1G Te!minating igh P!io!it/ Signaling

    18 Te!minating 9o$ P!io!it/ Signaling

    1B Te!minating - cause un(no$n

    /(1(/ ,S< Access *ailu!e

    Access failu!e is the p!oduct of the , ,onnection *ailu!e% NAS Setup *ailu!e and the A0Establishment *ailu!e" , ,onnection Success is counted $hen the N, !ecei&es a , Setup,omplete f!om the UE" NAS Setup is conside!ed successful $hen the signaling messages in thecall flo$ du!ing call setup flo$ is successfull/ completed b/ !ele&ant Net$o!( Elements" A A0 isconside!ed successfull/ established $hen the A0 Assignment esponse is sent b/ N, to the,N"

    B of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    10/40

    #uation 1$ CS4 0ccess 2ailure +ate ,Counter 2ormula-

    144H

    #$R%&

    #$R%&'

    &

    &'

    &

    &1

    CSV7uestAssi,nmentRA8

    CSVsponseAssi,nmentRA8

    SR8Attempt

    SR8Success

    AttemptConnectionRRC

    SuccessConnectionRRC

    The abo&e fo!mula definition shall be met $ith the follo$ing Selle!#s counte!s"

    144H

    -(S*,0A((%-N4R*E(

    %S*,0S5//-N4R*E('!!!3.'

    ,,#C$U()*+C%C4++%/(R%7-T4(N4R)/

    *+C%,,#CS5//$U()C4++%/(R%7-T4(N4R)/1

    Selle! shall de&elop S0 counte!s b/ AN elease P8" Selle! and Pu!chase! ag!eed to use BB"B=?S0 success !ate until S0 counte!s pe! ,S and PS domain a!e made a&ailable at P8"

    As an inte!im solution% it shall be defined as a d!op !ate of 2? o&e! an a&e!age call length of B4seconds% the p!obabilit/ of d!opping the S0 du!ing the di!ect t!ansfe! phase is =sDB4sH2?I 4"4G?"

    f du!ing the deplo/ment% fault !ates highe! than 4"1? a!e obse!&ed% selle! shall de&elop counte!s inPG"

    Measurement Condition$

    n case of multiple , connection !e.uests onl/ the fi!st , connection !e.uest shall be ta(eninto conside!ation fo! KP calculation"

    Table .$ CS4 0ccess Term 'efinition

    Key Performance Indicator Term 'efinition

    #RRC Connection Success (CSV) The numbe! of successful , ,onnection ,omplete$ith an/ establishment cause that lead to ,S< A0"

    #RRC Connection Attempt (CSV) The numbe! , ,onnection e.uest 5essages!ecei&ed $ith an/ establishment cause that leads to a,S< A0"

    #RAB Assignment Response (CSV) The numbe! of ANAP: A0 Assignment esponsemessages sent f!om the N, to the 5S, fo! a &oicecall"

    #RAB Assignment Request (CSV) The numbe! of ANAP: A0 Assignment e.uestmessages sent f!om the 5S, to the N, to establish a&oice call"

    # SRB Attempt The numbe! of , ,onnection ,ompletes that $ill

    lead to an nitial 7i!ect T!ansfe! to the ,S domain and$ill also lead to a ,S< A0 Assignment e.uest"

    # SRB Success The numbe! of ,S< A0 Assignment e.uests

    #uation .$ CS4 0ccess 2ailure +ate ,'rive Test 2ormula-

    =

    CallsCSV

    CallsCSV

    7uestConnectionRRC

    ConnectAlertin,CC

    ailureRateCSVAccessF

    8

    8

    R%8

    98

    1'166

    14 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    11/40

    Measurement Condition$

    n the e&ent that the!e a!e se&e!al consecuti&e , ,onnection e.uest onl/ the fi!st , connection

    !e.uest shall be ta(en into account fo! the KP calculation"

    ,alls a!e conside!ed as failed du!ing access $hen a connection is attempted and the UE does not !ecei&e

    Ale!tingD,onnect message in case of d!i&e test measu!ement" *o! OSS ANAP: A0 Assignment

    esponse message f!om the N, to co!e Net$o!( is conside!ed as a call successful setup"

    Table /$ CS4 0ccess 2ailure +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 .(6 7 5 .(6 7 5 .(6 7

    /(1(8 ,S< 7!op

    ,i!cuit S$itched

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    12/40

    Measurement Condition$

    An/ ,S< call successfull/ handed o&e! f!om = to 2 net$o!( $ithin the ,S< Se!&ice A!ea shall beconside!ed as d!op call fo! 5ilestone 2"

    Table 9$ CS4 'ro* +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 .(6 7 5 .(6 7 5 .(67

    /(1(9 ,S< ualit/

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    13/40

    144H#$&

    #$&

    Speechnin,A#terCombiDownlin1)n8loc1sport+otal+rans

    Speechnin,A#terCombiDownlin1)n8loc1s+ransportFault

    ,P fo! ES is found unde! AN Pe!fo!mance 5anagement !adio En&i!onment Statistics:USE 7ES,PTON 14FD1@@=S7 141 42D@ Uen 0

    Measurement Condition$79 .ualit/ shall be measu!ed in all th!ee '=) 5ilestones 'P!e9aunch% 9aunch and Post 9aunch)

    This KP shall be measu!ed at 1? 09E ope!ating point set in UTAN fo! &oice call"

    09E shall be a&ailable using counte!s $ith ,ell 9e&el g!anula!it/" KP fo! 5S= shall be calculatedat 5a!(et 9e&el" *o! 5S=% 79 09E shall be measu!ed using ES counte!s o! d!i&e test as!e.ui!ed"

    79 09E is !epo!ted b/ the mobile acco!ding to =PP specification" 5easu!ement !epo!ts a!ecollected and p!esented in the 5+ featu!e in OSS," epo!ting pe!iod can be set to bet$een2 to F3 seconds acco!ding to standa!d" ,ounte!s a!e p!esented in a P7* fo!mat in 5+" n 2seconds the!e a!e 144 bloc(s"

    esolution fo! the P7* is 4"@?" Note that using &e!/ sho!t sampling inte!&als fo! 09E

    measu!ements $ill !esult in lo$ accu!ac/ fo! each sample"

    Table 9t%*ercentile ofsam*les 5 .(6 7

    3L#+

    >9t%*ercentile ofsam*les 5 .(6 7

    3L#+

    >9t%*ercentile ofsam*les 5 .(6 7

    3L#+

    1= of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    14/40

    KPI PreLaunc% Launc% Post Launc%

    CS4 :uality ,UL- >9t%*ercentile ofsam*les 5 .(6 7

    3L#+

    >9t%*ercentile ofsam*les 5 .(6 7

    3L#+

    >9t%*ercentile ofsam*les 5 .(6 7

    3L#+

    3.1.6 ,S< ,ell ,apacit/

    #uation =$ CS4 Cell Ca*acity ,Counter 2ormula-

    llA&,R30erCarR3A&,0ower0e

    c0owerCell+ra##iacitCSVCellCap

    '=

    nel0owerCommonChanabilitDl0owerCapc0owerCell+ra##i =*?ch0owerprimarCpinel0owerCommonChan '".2

    =

    =

    +=

    74

    74

    ;$ Cell Ca*acity 'efinition

    Key Performance Indicator Term 'efinition

    CSV CellCapacity A&e!age numbe! of

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    15/40

    PreLaunc% Launc% PostLaunc% Units

    ? 86 ,*rovided it isac%ieved in +2

    desi!n-

    ? 86 ,*rovided it isac%ieved in +2

    desi!n-

    ? Measure andre*ort

    @ of 0M+1.(. U#As

    Measurement Condition$

    ,S< ,ell ,apacit/ shall be calculated based on a&e!age 79 po$e! allocated to A5 12"2 0 fo! this KP"The $hole of ,luste!D5a!(et d!i&e data shall be used to calculate this KP"

    3.1.7 ,S< SoftDSofte! ando&e! O&e!head

    SoftDSofte! ando&e! O&e!head KP p!o&ides an indication of ho$ man/ ,ells o! Secto!s $e!e in the

    acti&e set du!ing the call on an a&e!age basis"

    #uation 16$ SoftBSofter andover "ver%ead ,Counter 2ormula-

    =

    == 6

    AS

    6

    AS

    ASDuration

    ASDurationAS

    erhead%ando&er'&So#tSo#ter

    1

    1

    #$

    #$'

    .-S5-U%+A/(S%((03R,4R,I.-S5-U%W+A/(S%((03R,3R,I.-S5-U%W

    .-S5-U%+A/(S%((02R,3R,I.-S5-U%W+A/(S%((02R,2R,I.-S5-U%W

    .-S5-U%W+A/(S%((01R,2R,I.-S5-U%WI+A/(S%((01R,1R,$.-S5-U%W

    .-S5-U+A/(S%((03R,4R,I.-S5-U%WI+A/(S%((02R,4R,$.-S5-U%W'4

    .-S5-U%+A/(S%((02R,3R,I.-S5-U%WI+A/(S%((01R,3R,$.-S5-U%W'3

    .-S5-U%I+A/(S%((01R,2R,$.-S5-U%W'2I+A/(S%((01R,1R,$.-S5-U%W

    +++

    +++

    ++

    +++

    +++

    ++

    =erhead%ando&er'&So#tSo#ter

    The counte!s fo! this KP measu!es not onl/ ,S< SoftDSofte! ando&e! O&e!head fo! all ,Sconnections but also fo! PS connections"

    Measurement Condition$

    The counte!s ha&e a sampling !ate of 1 minute and the counte!s should be agg!egated o&e! a sufficientl/

    long pe!iod fo! statistical &alidit/"

    Table 11$ SoftBSofter andover "ver%ead definition

    Key Performance Indicator Term 'efinition

    5aximum Acti&e Set si6e as defined in N,

    AS Acti&e Set si6e

    uration(AS) 7u!ation of the call in Acti&e Set si6e of AS 'ASI1 to 5)

    #uation 11$ SoftBSofter andover "ver%ead ,'rive Test 2ormula-

    1@ of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    16/40

    =

    ==6

    AS

    6

    AS

    ASDuration

    ASDurationAS

    %ando&erSo#tSo#ter

    1

    1

    #$

    #$'

    Table 1.$ SoftBSofter andover "ver%ead KPI

    PreLaunc% Launc% PostLaunc%

    5 1(; 5 1(; 5 1($ CS' 'ro* +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 .(9 7 5 .(9 7 5 /(6 7 ,Usin! Counter met%od-

    5 .(9 7 ,Usin! 'rive Test met%od-

    /(1(1. ,S7 ualit/

    This e.uation is simila! to that of ,S

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    22/40

    79 09E is !epo!ted b/ the mobile acco!ding to =PP specification" 5easu!ement !epo!ts a!ecollected and p!esented in the 5+ featu!e in OSS," epo!ting pe!iod can be set to bet$een2 to F3 seconds acco!ding to standa!d" ,ounte!s a!e p!esented in a P7* fo!mat in 5+" n 2seconds the!e a!e 144 bloc(s"

    esolution fo! the P7* is 4"@?" Note that using &e!/ sho!t sampling inte!&als fo! 09Emeasu!ements $ill !esult in lo$ accu!ac/ fo! each sample"

    ,P fo! ES is found unde! AN Pe!fo!mance 5anagement !adio En&i!onment Statistics

    Measurement Condition$

    79 .ualit/ shall be measu!ed in all th!ee '=) 5ilestones 'P!e9aunch% 9aunch and Post 9aunch $ithoptional featu!e fo! UE to !epo!t 79 09E measu!ement)

    09E shall be a&ailable using counte!s $ith ,ell 9e&el g!anula!it/" KPs at 5S= shall be calculated

    at 5a!(et 9e&el"

    Table .6$ CS' :uality Terms 'efinition

    Key Performance Indicator Term 'efinition

    #FaultyTransportBlocks2nplinkA!terSelectionCombining(CS)

    Numbe! of fault/ Uplin( 7, t!anspo!t bloc(s fo! ,S7afte! selection and combining" Sampling pe!iod shall bee&e!/ ten '14) seconds

    #TotalTransportBlocks2nplinkA!terSelectionCombining(CS)

    Total numbe! of Uplin( 7, t!anspo!t bloc(s fo! ,S7afte! selection and combining" Sampling pe!iod shall bee&e!/ ten '14) seconds "

    #FaultyTransportBlocks2no$nlinkA!terCombining(CS)

    Numbe! of fault/ 7o$nlin( 7, t!anspo!t bloc(s fo!,S7 afte! combining" Sampling pe!iod shall be e&e!/ten '14) seconds

    #TotalTransportBlocks2no$nlinkA!terCombining(CS)

    Total numbe! of 7o$nlin( 7, t!anspo!t bloc(s fo!,S7 afte! combining" Sampling pe!iod shall be e&e!/ten '14) seconds

    #uation .1$ CS' :uality 'L ,'rive Test 2ormula-

    =

    CallsCSD

    CallsCSD

    plesAll83ERSam

    etow83ER+Samples8el

    D3CSDQualit

    8

    8

    *)>

    '1

    Measurement Condition$

    79 .ualit/ shall be measu!ed in all th!ee '=) 5ilestones 'P!e9aunch% 9aunch and Post 9aunch)

    Table .1$ CS' :uality KPI

    KPI PreLaunc% Launc% Post Launc%

    CS' :uality,'L-

    >9t%*ercentile ofsam*les 5 17 3L#+

    >9t%*ercentile ofsam*les 517 3L#+

    >9t%*ercentile ofsam*les 5 17 3L#+

    CS' :uality,UL-

    >9t%*ercentile ofsam*les 5 17 3L#+

    >9t%*ercentile ofsam*les 5 173L#+

    >9t%*ercentile ofsam*les 5 173L#+

    This KP $ill be measu!ed at 4"= ? 09E ope!ating point set in UTAN fo! ,S

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    23/40

    n case of multiple , connection !e.uests the fi!st , connection !e.uest $ill be ta(en intoaccount fo! KP calculation"

    #uation ..$ Mobile to Mobile 4ideo call ,'rive Test 2ormula-

    Vi-eo Call setup time . CC/Alerting (0C) 1 RRC Connection Request (0C)

    Table ..$ CS' Call Setu* time KPI

    Parameter PreLaunc% Launc%

    4ideo Call Setu* time N(0 >9t%*ercentile 5 > seconds

    Selle! ag!ees to the B@thpe!centile and B seconds p!o&ided the impact of non UTAN E.uipment is $ithin

    the indust!/ t/pical &alue !ange"

    Packet Switc%ed Level1 Key Performance Indicators

    BB 79 A0 allo$ed: =83 (bps%128 (bps% and F3 (bps% onl/BB U9 A0 allo$ed: =83 (bps% F3 (bps onl/

    S7PA 79 S7S, allo$ed: UE ,at 12 '1844 (bps)SUPA U9 allo$ed: UE ,at = '1"3@4 5bps)

    /(1(18 Pac(et S$itched ,all Setup

    *igu!e 3 is a flo$ diag!am fo! a PS call" f a p!oblem occu!s bet$een , ,onnection e.uest'step 1) and the A0 Assignment esponse 'step 2G)% the !esult is conside!ed Access *ailu!e" An/A0 abno!mal !elease afte! the A0 Assignment esponse is conside!ed a call 7!op"

    2= of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    24/40

    2i!ure 8$ Packet Switc%ed Setu* 2low 'ia!ram

    /(1(19 PS7 Access *ailu!e

    The aim is to measu!e Pac(et S$itch 7ata access failu!e f!om a use! pe!specti&e"

    #uation ./$ PS' 0ccess 2ailure +ate ,Counter 2ormula-

    144H

    #$R%&

    #$R%&'

    &

    &'

    R%&

    &1

    0SD7uestentRA8Assi,nm

    0SDsponseentRA8Assi,nm

    SR8Attempt

    SR8Success

    7uestConnectionRRC

    CompleteConnectionRRC

    The follo$ing fo!mula includes Pac(et nte!acti&e and Pac(et 0ac(g!ound" Please !efe! to Section Fof the ,P document Use! 7esc!iption ,onnection andling 3D1@@=S7 141 42D@ Uen"

    23 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    25/40

    144H

    ishSueRA8Establ)nteracti&R!!'!!!3.'

    ,,#P$U()*+C%C4++%/(R%7-T4(N4R)/

    *+C%,,#PS5//$U()C4++%/(R%7-T4(N4R)/1

    R!!I+(%)*/(B%RAE(*,0S5//%R*(% %5*,

    +C%,,#8F,4$U()*HS28H*)HO-

    .(P*/=%*,30A((%.N4R*E3(-#$U()*+C%,,+(%)*/(B%.(P*/=%(I*,30A((%.N4R*E3(

    %33P*/=%*,30S5//.N4R*E3(-#$U()*+C%,,+(%)*/(B%%33P*/=%(I*,30S5//.N4R*E3(

    *+

    HS28H*)HO8F,$U()*+C%,,# O5(>+>HH*)HA((%($U()*+C%,,#

    NHH*)HR%(5)+O,C0S5)/%$U()*+C%,,# I+/+HH*)HA((%($U()*+C%,,#

    Selle! shall de&elop S0 counte!s b/ AN elease P8" Selle! and Pu!chase! ag!eed to use BB"B=?S0 success !ate until S0 counte!s pe! ,S and PS domain a!e made a&ailable at P8"

    *o! an inte!im solution% it shall be defined as a d!op !ate of 2? o&e! an a&e!age call length of B4

    seconds% the p!obabilit/ of d!opping the S0 du!ing the di!ect t!ansfe! phase is =sDB4sH2?I 4"4G?"f du!ing the deplo/ment fault !ates highe! than 4"1? a!e obse!&ed% selle! shall de&elop counte!s inPG"

    Measurement Condition$

    0oth nte!acti&e and 0ac(g!ound t!affic a!e included in the counte! based fo!mula abo&e"

    Table ./$ PS' 0ccess 2ailure Term 'efinition

    Key Performance Indicator Term 'efinition

    #RRCConnectionComplete The numbe! of successful , ,onnectionSetups $ith PS7 Establishment ,auses 'botho!iginating and te!minating)"

    #RRCConnectionRequest The numbe! , ,onnection e.uest5essages !ecei&ed $ith PS7 Establishment,auses 'both o!iginating and te!minating)"

    #RABAssignmentResponse (%S) The numbe! of ANAP: A0 Assignmentesponse messages sent f!om the N, tothe SSN PS se!&ice"

    #RABAssignmentRequest(%S) The numbe! of ANAP: A0 Assignmente.uest messages sent f!om the SSN tothe N, to establish PS Se!&ice"

    #SRBAttempt The numbe! of , ,onnection ,ompletesthat $ill lead to an nitial 7i!ect T!ansfe! to

    the PS domain and $ill also lead to a PS'BB) A0 Assignment e.uest"

    #SRBSuccess The numbe! of PS BB A0 Assignmente.uests"

    #uation .8$ PS' 0ccess 2ailure +ate ,'rive Test 2ormula-

    2@ of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    26/40

    =

    Calls0SD

    Calls0SD

    7uestConnectionRRC

    0D0

    ateFailure R0SD Access

    8

    8

    R%

    A//%.(C+(%?(A/(B*(%

    1'1

    Measurement Condition$

    Access *ailu!e ate shall be measu!ed b/ data session acti&ation 'PS) follo$ed b/ do$nload" n case ofmultiple , connection !e.uests the fi!st , connection !e.uest $ill be conside!ed fo! KP calculation"

    Table .8$ PS' 0ccess 2ailure +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 .(6 7 5 .(6 7 5 .(6 7

    3.1.16 PS7 7!op

    Pac(et session is conside!ed as d!opped $hen associated A0 has been !eleased abno!mall/ b/eithe! UTAN o! ,N" An/ d!op afte! ANAP: A0 Assignment esponse is conside!ed as PS d!opcall"

    #uation .9$ PS' 'ro* +ate ,Counter 2ormula-

    144H#$&

    #$&

    0SDmpleteRA8SetupCo

    0SDRA8Drop

    144H

    +(%)*/(B%%P*/=%(I*,0S5//N4R*E(

    P*/=%(R*R%,%*%N4S:(%

    The fo!mula abo&e calculates d!op !ate fo! Pac(et nte!acti&e and Pac(et 0ac(g!ound 'including S7PA)"

    Measurement Condition$

    T!affic classes 0ac(g!ound% and nte!acti&e 'both o!iginating and te!minating) shall be conside!ed in

    counte!based met!ics" Table .9$ PS' 'ro* Term 'efinition

    Key Performance Indicator Term 'efinition

    #RABSetupComplete The numbe! of completed A0 setup phasefo! PS 7ata% $hen the N, sends ANAP:A0 Assignment esponses to ,o!e Net$o!(afte! a successful A0 establishment

    #RABrop The numbe! of A0 7!op fo! PS data calls

    #uation .;$ PS' 'ro* +ate ,'rive Test 2ormula-

    =

    #tpSession

    #tpSession

    uccessCallSetupS

    dSuccess#tpDownloa

    pRate0SDCallDro 1'1

    Measurement Condition$

    PS7 d!op ate shall be measu!ed afte! sta!t of ftp do$nload " PS7 call is conside!ed as d!opped$hen ftp session is manuall/Dabno!mall/ disconnected $ithout completing file t!ansfe! due to an/!eason"

    2F of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    27/40

    Table .;$ $ PS' 'ro* +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 .(9 7 5 .(67 5 .(6 7

    /(1(1< PS7 9atenc/

    The follo$ing is ext!acted f!om =PP Specification 2="14G% Section F"3"="1 fo! !efe!ence:

    Transfer delay ,ms-

    'efinition: ndicates maximum dela/ fo! B@thpe!centile of the dist!ibution of dela/ fo! all deli&e!edS7Us du!ing the lifetime of a bea!e! se!&ice% $he!e dela/ fo! an S7U is defined as the time f!om a!e.uest to t!ansfe! an S7U at one SAP to its deli&e!/ at the othe! SAP"

    N"T# /$ T!ansfe! dela/ of an a!bit!a!/ S7U is not meaningful fo! a bu!st/ sou!ce% since the lastS7Us of a bu!st ma/ ha&e long dela/ due to .ueuing% $he!eas the meaningful !esponse dela/pe!cei&ed b/ the use! is the dela/ of the fi!st S7U of the bu!st"

    Table .9t%*ercentile 5 .66 ms +>> +03 ,;8 Kb*s or 1.= Kb*s or /=8 Kb*s-

    Selle! ag!ees to the B@thpe!centile and the 244ms p!o&ided the impact of non UTAN E.uipment is $ithin

    the indust!/ t/pical &alue !ange"

    /(1(1= PS7 Th!oughput

    Total numbe! of 9, bloc(s sent o&e! the obse!&ation $indo$ including !et!ansmission pe!t!anspo!t t/pe"

    #uation .

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    28/40

    Measurement Condition$

    This met!ic shall be measu!ed onl/ fo! Pac(et S$itch T!affic ,lass 'nte!acti&e and 0ac(g!ound)"

    KP 5easu!ement shall be based on 9, 'S7U) la/e! th!oughput $ith fi&e pe!cent '@?) ta!get fo!

    79DU9 09E fo! BB A0"

    Table .>$ PS' 0vera!e T%rou!%*ut Term 'efinition

    Key Performance Indicator Term 'efinition

    A/R'C/S/ata(kb) Total A5 9, S7Us '(b) t!ansfe!!ed excluding !et!ansmission in the do$nlin( o! uplin(

    lserT"roug"put 7o$nlin( A&e!age Pac(et data th!oughput '(bps)

    A/R'C/S/uration The total 9, S7U t!ansmission du!ation in seconds" *o!79DU9% this excludes the pe!iod $hen the 79DU9t!ansmission buffe! fo! the 9, entit/ is empt/

    #uation .=$ PS' 0vera!e T%rou!%*ut ,'rive Test 2ormula-

    =

    Call0SD

    Call0SD

    ationSessionDur

    1bans#erred4serData+r

    1bpsu,hput0SDA&,+hro

    8

    8

    $%/#

    #$

    #$

    *o!mula is &alid fo! uplin( and do$nlin("

    Measurement Condition$

    KP 5easu!ement shall be fo! application la/e! th!oughput $ith fi&epe!cent '@?) ta!get 79DU9

    09E ope!ating point fo! BB A0" Th!oughput shall be calculated using data f!om the enti!e

    ,luste!D 5a!(et d!i&e test fo! 5ilestone 1 and 5ilestone 2"

    The do$nloadDupload file shall be comp!essed t/pe"

    Table /6$ PS' 0vera!e T%rou!%*ut 'efinition

    Key Performance Indicator Term 'efinition

    serataTrans!erre-(kb) *TP do$nload in (ilobit du!ing one session"

    Sessionuration(sec) Time du!ation 'seconds) to do$nloadDupload a file"

    %S/T"roug"put(kbps) Pac(et data th!oughput in (bps using BB A0measu!ed at application la/e!"

    Table /1$ PS' 0vera!e 'L T%rou!%*ut KPI

    KPI PreLaunc% Launc% Post Launc%

    0vera!e 'L t%rou!%*ut

    ,Unloaded- kb*s

    ? .86 ? .86 ? 196 ,Counter-

    ? .86 ,'rive Test-

    0vera!e 'L T%rou!%*ut

    ,Loaded- kb*s

    ? .16 ? .16 ? 196 ,Counter-

    ? .16 ,'rive Test-

    Table /.$ PS' 0vera!e UL T%rou!%*ut KPI

    28 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    29/40

    KPI PreLaunc% Launc% Post Launc%

    0vera!e UL t%rou!%*ut

    ,Unloaded- kb*s

    ? .66 ? .66 ? 196 ,Counter-

    ? .66 ,'rive Test-

    0vera!e UL T%rou!%*ut

    ,Loaded- kb*s

    ? 1=6 ? 1=6 ? 196 ,Counter-

    ? 1=6 ,'rive Test-

    Measurement Condition$

    KP 5easu!ement shall be fo! application la/e! th!oughput $ith fi&epe!cent '@?) 09E ope!ating

    point fo! both U9 and 79" Th!oughput shall be calculated using data f!om the enti!e ,luste!D 5a!(et

    d!i&e test fo! 5ilestone 1 and 5ilestone 2 using all a&ailable BB adio 0ea!e!"

    Table //$ PS' 0vera!e T%rou!%*ut 'efinition

    Key Performance Indicator Term 'efinition

    serataTrans!erre-(kb) Total ftp si6e do$nload in (ilobit in one session

    Sessionuration(sec) Total time 'seconds) du!ation to do$nload singlefileSession7u!ation'sec) I 'time stamp of Session End o!

    Session E!!o! - time stamp of Session Sta!t)%SA&gT"roug"put Pac(et S$itched 7ata a&e!age th!oughput using BB A0

    measu!ed at application la/e!

    /(1(1> PS7 ,all Setup Time

    PS7 call setup time indicates Net$o!( !esponse time to a use! !e.uest fo! a pac(et data se!&ice" ncase of multiple , connection !e.uests the fi!st , connection !e.uest $ill be conside!ed fo!KP calculation"

    #uation .>$ PS' Call Setu* Time ,'rive Test 2ormula-

    %S Call setup time . %% Conte3t Acti&ation accept (0C) 4 RRC Connection Request (0C)

    Measurement Condition$The UE is al!ead/ attached to the UTAN net$o!("

    Table /8$ PS' Call Setu* time KPI

    KPI PreLaunc% 0t Launc% Post Launc%

    PS' Session0ctivation time

    N(0 >9t%*ercentilesessions 5 9

    seconds

    N(0

    Selle! ag!ees to the B@thpe!centile and the @ seconds p!o&ided the impact of nonUTAN E.uipment is

    $ithin the indust!/ t/pical &alue !ange"

    3.1.20 PS7 nte!adio Access Technolog/ ando&e! *ailu!ente!adio Access Technolog/ 'AT) is a ha!d hando&e! bet$een U5TS and S5"

    *o! Pac(et S$itched hando&e!% the N, sends a ,ell ,hange O!de! f!om UTAN command to theUE" A successful hando&e! can be monito!ed b/ the N, u elease message f!om the ,N"

    #uation /6$ PS' I+0T 2ailure +ate ,counter formula-

    d+RA5Comman'rderFrom4CellChan,e

    e+RA5Failur'rderFrom4CellChan,eterFailureRa90S%ando&e9

    &

    &'16623 =

    2B of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    30/40

    pmNoOut!at,cetu!nOld,h is inc!eased $hen the ,E99 ,ANE O7E *O5 UTAN*A9UE ',) message is !ecei&ed f!om the UE"pmNoOut!at,cAtt is inc!eased $hen the ,E99 ,ANE O7E *O5 UTAN ',) messagehas been sent to the UE"

    R%,*(4+#(C/A(($GN4O5(I)*

    ,*(4+#,C0$GR%(C/R%(5)+ON4O5(I)*'16623 =terFailureRa90S%ando&e9

    Measurement Condition$

    PS7 AT O failu!e KP does not include O P!epa!ation failu!e"

    n o!de! to &e!if/ PS7 AT O pe!fo!mance% some p!e!e.uisites ha&e to be fulfilled such as: definition of

    AT st!ateg/% setting up se!&ices p!io!ities" 0oth = and 2 Net$o!(s shall ha&e AT neighbo!s defined"

    The S5 Net$o!( shall ha&e a&ailable !esou!ces $ithout sho$ing congestion" 5utuall/ ag!eed test UE

    '$ith the latest a&ailable Soft$a!e% *i!m$a!e and E.uipment) shall be used fo! the AT KP &e!ification"

    The 2 and = Net$o!(s shall be p!ope!l/ configu!ed in acco!dance $ith Pu!chase!#s Net$o!( design

    including the definition of the !outing tables th!ough the ,o!e Net$o!(" PU,ASE shall info!m Selle!

    about maJo! changes in the configu!ation of the S5 Net$o!( 'f!e.uenc/ !eplan% ,ell pa!amete!

    changes% etc) that $ill deg!ade the = AT pe!fo!mance . Selle! ma/ !e&ie$ Pu!chase!#s S5 Net$o!(

    changesDplanned acti&ities befo!e% du!ing o! afte! AT KP &e!ification d!i&e"

    Table /9$ PS' I+0T 2ailure Term 'efinition

    Key Performance Indicator Term 'efinition

    *+*%S,an-o&erFailureRate a!d ando&e! failu!e !ate $hen a PS 7ata call'BB) fail to hando&e! f!om U5TS net$o!( toS5 net$o!(

    #CellC"ange0r-erFromTRAN Failure(%S) ,: The numbe! of ,ell ,hange O!de! f!omUTAN *ailu!e messages f!om UE to N,

    #CellC"ange0r-erFromTRAN Comman-(%S) ,: The numbe! of ,ell ,hange O!de!5essages f!om N, to UE

    #uation /1$ PS' I+0T 2ailure +ate ,'rive Test 2ormula-

    =

    Call0SD

    Call0SD

    R5Cd+RA5Comman'rderFrom4CellChan,e

    4Ee+RA5Failur'rderFrom4CellChan,e

    90S%%'9

    8

    8

    8

    8

    '1%F*,5)%R*(23

    ,,ell,hangeO!de!*!omUTAN*ailu!eLUE message is sent b/ UE",,ell,hangeO!de!*!omUTAN,ommandLN, message is sent b/ N,"

    Measurement Condition$

    PS7 AT O failu!e KP does not include O P!epa!ation failu!e" Specific d!i&e !oute shall beidentified at the U5TS * Se!&ice A!ea bounda!/ to &e!if/ this KP"

    Table /;$ PS' I+0T 2ailure +ate KPI

    PreLaunc% Launc% PostLaunc%

    NB0 5 9(6 7 5 9(6 7

    3.1.21 PS7 AT nte!!uption time

    =4 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    31/40

    This KP is an indicato! of inte!!uption time fo! the pac(et s$itch data du!ing nte!adio Access

    Technolog/ ha!d hando&e!"

    #uation /.$ PS' I+0T Interru*tion time ,'rive Test 2ormula-

    %S/2RAT2nterruptionTime . (TimeRAp-ateComplete/5 1 TimeCellC"ange0r-er/RNC)

    #uation //$ PS' I+0T User 'ata Interru*tion time ,'rive Test 2ormula-

    %S/2RATserata2nterruptionTime . (TimeFirst%acketataRecei&e-2n+* 1Time'ast%acketataRecei&e-2n*)

    Measurement Condition$

    This KP is applicable fo! dedicated d!i&e test !oute on =2 * se!&ice bo!de! a!ea du!ing 5a!(etAcceptance"

    The inte!!uption time shall be measu!ed du!ing = to 2 PS7 O"

    Table /

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    32/40

    This test shall be done $ith a single UE doing S7PA call in the ,ell unde! test $ith =83DF3 Kbpsassociated 7, on the uplin("

    #uation /8$ S'P0 0ccess 2ailure +ate ,Counter 2ormula-

    144H

    $R%&

    $&'

    &

    &'

    R%&

    &1

    DSC%%S7uestentRA8Assi,nm

    DSC%%SSuccessentRA8Assi,nm

    SR8Attempt

    SR8Success

    7uestConnectionRRC

    CompleteConnectionRRC

    144H

    ,,#H$U()*+C%+(%)*/(2B%-(P*/=%(I*,20A((%-N4R*E(

    ,,#H$U()*+C%+(%)*/(2B%%P*/=%(I*,20S5//-N4R*E(

    '!!!3.6',,#P$U()*+C%C4++%/(R%7-T4(N4R)/

    *+C%,,#PS5//$U()C4++%/(R%7-T4(N4R)/

    1

    Selle! shall de&elop S0 counte!s b/ AN elease P8" Selle! and Pu!chase! ag!eed to use BB"B=?S0 success !ate until S0 counte!s pe! ,S and PS domain a!e made a&ailable at P8"

    As an inte!im solution% it shall be defined as a d!op !ate of 2? o&e! an a&e!age call length of B4seconds% the p!obabilit/ of d!opping the S0 du!ing the di!ect t!ansfe! phase is =sDB4sH2?I 4"4G?"f du!ing the deplo/ment% fault !ates highe! than 4"1? a!e obse!&ed% selle! shall de&elop counte!s inPG"

    Table 86$ S'P0 0ccess 2ailure Term 'efinition

    Key Performance Indicator Term 'efinition

    #RRCConnectionComplete The numbe! of successful , ,onnectionSetups $ith Pac(et Establishment ,auses'both o!iginating and te!minating)"

    #RRCConnectionRequest The numbe! , ,onnection e.uest5essages !ecei&ed $ith Pac(etEstablishment ,auses 'both o!iginating andte!minating)"

    #RABAssignmentResponse (,S4SC,)

    The numbe! of ANAP: A0 Assignmentesponse messages sent f!om the N, tothe SSN PS se!&ice"

    #RABAssignmentRequest(,S4SC,) The numbe! of ANAP: A0 Assignment

    e.uest messages sent f!om the SSN tothe N, to establish S7PA Se!&ice"

    #SRBAttempt The numbe! of , ,onnection ,ompletesthat $ill lead to an nitial 7i!ect T!ansfe! tothe PS domain and $ill also lead to a S7PAA0 Assignment e.uest"

    #SRBSuccess The numbe! of S7PA A0 Assignmente.uests

    #uation /9$ S'P0 0ccess 2ailure +ate ,'rive Test 2ormula-

    =2 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    33/40

    =

    Session%SD0A

    Session%SD0A

    7uestConnectionRRC

    0D0

    atessFailureR%SD0A Acce

    8

    8

    R%

    A//%(C4+(%?(A/(B*(%

    1'1

    Measurement Condition$

    n case of multiple , connection !e.uests the fi!st , connection !e.uest $ill be conside!ed fo!KP calculation"

    Access *ailu!e ate shall be measu!ed b/ data session acti&ation 'S7PA) follo$ed b/ do$nload"

    Table 81$ S'P0 0ccess 2ailure +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 .(6 7 5 .(6 7 5 .(6 7

    /(1(./ S7PA 7!op

    S7PA session is conside!ed as d!opped $hen associated S7S, has been !eleasedabno!mall/ b/ eithe! UTAN o! ,N" This test $ill be done $ith a single UE pe!fo!ming S7PA callin the ,ell unde! test $ith =83DF3 Kbps associated 7, on the uplin( and S7S, in the 79 $ithdo$ng!adeDupg!ade toDf!om BB A0"

    #uation /;$ S'P0 'ro* +ate ,Counter 2ormula-

    144H *(4+S5//%DSCH8A,,4/-HS&

    ,5)%%D5%T4F*DSCH8R%,%*-HS&

    144H

    ++

    +

    #

    %HI+(%)*/(B/%P*/=%((*,0S5/$.-NR*E

    RR%,%*%H.-NS:(%-

    ulchSuccessEpm4l4pswitEulnteracti&eess0ac1et)ablishSuccpm5oRabEst

    schSuccess%pmDl4pswit

    pmNoSstemR!Release"s: Numbe! of successful s/stem !eleases of pac(et A0s mapped onS7S, in the Se!&ing S7S, cell" The counte! is stepped fo! the Se!&ing S7S, cell atA0D0 combination t!ansition f!om PS nte!acti&e F3DS S7S, to S07, o! to dle modedue to the same !easons as fo! stepping the existing counte! pmNoS/stemabeleasePac(et"pmNoS/stemabeleasePac(et is onl/ inc!eased due to a ANAPu elease ,ommand o! A0

    Assignment e.uest message $ith M!elease causeM I an/thing except No!mal elease%Successful elocation% esou!ce Optimisation elocation% Use! nacti&it/ o! !eleaseduetoUEgene!ated signallingconnection!elease" This counte! is inc!emented fo! the best cell in the Acti&e

    Set in the SN, and $hen !eleasing a S A0% this counte! is stepped fo! the Se!&ing S7,cell"

    pmNoRa!#sta!lis$S%ccessPacketInteractive"s: The numbe! of successful A0 establishmentsfo! PS nte!acti&e A0 mapped on S7S," The counte! is stepped fo! the selected Se!&ing S7S, cell at A0 establishment afte! the successfull/ t!ansition S07, to PS nte!acti&e F3DS S7S,"

    pmDl&ps'itc$S%ccess"s( Numbe! of successful 79 ups$itches to an/ S state" The counte! isstepped fo! successful 79 ups$itch to a 0 combination containing S" The counte! is inc!ementedin all cells of the acti&e set"

    == of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    34/40

    pmNoRa!#sta!lis$S%ccessPacketInteractive#%l( The numbe! of successful A0establishments fo! PS nte!acti&e A0 mapped on E7,DS7PA" ,ounte! is stepped fo! theSe!&ing E7, cell at successful A0D0 combination t!ansition to PS nte!acti&e E7,DS S7S, due to A0 establishment" The counte! is t!igge!ed afte! sending of A0 Assignmentesponse 'successful)"

    pm&l&ps'itc$S%ccess#%l(Numbe! of successful ups$itches% t!igge!ed b/ U9 use! acti&it/% to a ta!get0 combination E7,DS7PA" Stepped fo! the ta!get cell" ,ounte! in ta!get cell is stepped at a

    successful ups$itch t!igge!ed b/ U9 use! acti&it/"

    Measurement Condition$

    The Selle! counte! based met!ics fo!mula shall be updated as ne$ functionalit/ is int!oduced in the

    S/stem

    Table 8.$ S'P0 'ro* Term 'efinition

    Key Performance Indicator Term 'efinition

    ,S4SC,/ReleaseueToFailure Numbe! of S7S, allocation !eleases due to !adiolin( and othe! failu!es

    ,S4SC,/AllocationSuccess Numbe! of allocations $hen the N, has !ecei&ed,: adio 0ea!e! e,onfigu!ation ,ompletemessage f!om the UE afte! successful S7S, 5A,d flo$ setup

    #uation /;$ S'P0 'ro* +ate ,'rive Test 2ormula-

    =

    Call%SD0A

    Call%SD0A

    SuccessAllocationDSC%%SDropRate%SD0A

    8

    8

    8

    DSCH8D)4.-HS

    '1668

    Measurement Condition$

    S7PA 7!op ate shall be measu!ed b/ data session acti&ation 'S7PA) follo$ed b/ ftp do$nload

    Table 8/$ S'P0 'ro* +ate KPI

    PreLaunc% Launc% PostLaunc%

    5 /(6 7 5 .(6 7 5 .(6 7

    /(1(.8 S7PA 9atenc/

    Table 88$ S'P0 Latency Term 'efinition

    Key Performance Indicator Term 'efinition

    ,S%A 'atencyound t!ip time fo! a =2 0/tes ping fo! S7PANT A0

    Measurement Condition$

    9atenc/ shall be measu!ed $ith the destination se!&e! fo! ping connected di!ectl/ to the SN 'i"e

    the se!&e! on the same nt!anet domain as SN)" TT shall be measu!ed in a stationa!/ test" This

    test shall be done $ith a single UE doing S7PA call in the ,ell unde! test"

    Table 89$ S'P0 Latency KPI

    =3 of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    35/40

    KPI Latency at Launc%

    S'P0 Latency >9t%*ercentile sessions 5 166 ms

    Selle! ag!ees to the B@thpe!centile and the 144ms p!o&ided the impact of non UTAN E.uipment is $ithin

    the indust!/ t/pical &alue !ange"

    3.1.2 S7PA Th!oughput

    Total numbe! of 9, bloc(s sent o&e! the obse!&ation $indo$ including !et!ansmission"

    #uation />$ S'P0 T%rou!%*ut ,Counter 2ormula-

    =

    Call%SD0A

    Call%SD0A

    Duration0D4R3CA6

    1bData0D4R3CA6

    +hrou,hput%SD0A

    8

    8

    888

    #$888

    8

    #R%$'2 rames7uiredSubF&epm5o)nactiSubFramespm5oActi&e

    8itspmSumAc1edhrou,hput%SD0ACell+

    +=

    Key Performance IndicatorTerm

    'efinition

    A/R'C/%/ata(kb) Total A5 9, P7Us '(ilobit) t!ansfe!!ed excluding !et!ansmission in the uplin(

    A/R'C/%/uration The total 9, P7U t!ansmission du!ation 'in seconds)

    Table 8;$ S'P0 T%rou!%*ut Term 'efinition

    Key Performance IndicatorTerm

    'efinition

    A/R'C/%/ata(kb) Total A5 9, P7Us '(ilobit) t!ansfe!!ed excluding !et!ansmission in the do$nlin( o! uplin(

    A/R'C/%/uration The total 9, P7U t!ansmission du!ation 'in seconds)"*o! do$nlin( this du!ation excludes the pe!iod $hen thedo$nlin( t!ansmission buffe! fo! the 9, entit/ is empt/

    #uation 86$ S'P0 T%rou!%*ut ,'rive Test 2ormula-

    =

    Call%SD0A

    Call%SD0A

    ationSessionDur

    1bans#erred4serData+r

    +hrou,hput%SD0A

    8

    8

    $%/#

    #$

    8

    Measurement Condition$

    5easu!ement shall be fo! Application 9a/e! bit !ate" The S7PA th!oughput is onl/ applicable $hen

    the UE is on S7S,"

    Table 8

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    36/40

    PreLaunc% Launc% PostLaunc% 1=66 kb*s

    ,usin! U# cate!ory 1.-

    ? 1/66 ? 1/66 ? 1/66

    ,at +LC Layerusin! counter-

    Under no load condition

    ? 1166 ? 1166 N(0 967 of 0vailable Power atSystem +eference Pointallocated to S'P0

    Measurement Condition$

    UE shall be in Stationa!/ location unde! excellent * condition ',P, S,P C 84 d0m and

    ,P, EcDNo C 8 d0)"

    The do$nload file shall be comp!essed t/pe"

    5easu!ement shall be based on *TP file do$nload of minimum ten '14) 50 file to !educe the

    impact of T,P slo$ sta!t"

    5easu!ement shall be at application la/e! th!oughout the S7PA Se!&ice A!ea"

    Table 8=$ 0vera!e 'L T%rou!%*ut ,kb*s- KPI

    PreLaunc% Launc% PostLaunc% Usin! U# cate!ory 1.

    1(= Mb*s

    ?

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    37/40

    =

    Session%S40A

    Session%S40A

    Duration0D4R3CA6

    1bData0D4R3CA6

    +hrou,hput%S40A

    8

    8

    888

    #$888

    8

    #16'16$ lmsFramesEupm5oActi&e

    l8itsCellEupmSumAc1edhrou,hput%S40ACell+ =

    pmSumAc(ed0its,ellEul: The numbe! of 5edia Access ,ont!ol Enhanced Uplin( 'Eul) bits!ecei&ed and ac(no$ledged b/ the 0S"

    pmNoActi&e14ms*!amesEul: The numbe! of 14ms f!ames containing enhanced uplin( datat!ansmitted b/ the UE

    Table 8>$ SUP0 T%rou!%*ut Term 'efinition

    Key Performance IndicatorTerm

    'efinition

    A/R'C/%/ata(kb) Total A5 9, P7Us '(ilobit) t!ansfe!!ed excluding !et!ansmission in the uplin(

    A/R'C/%/uration The total 9, P7U t!ansmission du!ation 'in seconds)"

    #uation 86$ SUP0 T%rou!%*ut ,'rive Test 2ormula-

    =

    Session%S40A

    Session%S40A

    ationSessionDur

    1bans#erred4serData+r

    +hrou,hput%S40A

    8

    8

    $%/#

    #$

    8

    Measurement Condition$

    5easu!ement shall be at Application 9a/e! bit !ate" The upload file shall be comp!essed t/pe"

    SUPA Se!&ice A!ea shall be same as PS7 F3( Se!&ice A!ea"

    UE shall be in Stationa!/ location unde! excellent * condition ',P, S,P C 84 d0m and

    ,P, EcDNo C 8 d0)

    Table 96$ SUP0 Stationary UL 3it +ate ,kb*s- KPI

    PreLaunc% Launc% PostLaunc% U# Cate!ory / ,1(89 Mb*s-

    ? 1166 ? 1166 Measure and+e*ort

    Stationary Peak T%rou!%*ut,kb*s- under no load

    ? 966 ? 966 Measure and

    +e*ort

    0vera!e T%rou!%*ut ,kb*s-

    under no load

    3.1.27 S7PA 7ata Session Setup Time

    S7PA 7ata Session setup time indicates Net$o!( !esponse time to a use! !e.uest fo! an S7PAdata se!&ice"

    #uation 81$ S'P0 session definition ,'rive Test 2ormula-

    ,S%A ata Session setup time . %% Conte3t Acti&ation accept (0C) 4 RRC ConnectionRequest (0C)

    Measurement Condition$

    =G of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    38/40

    This test shall be done $ith a single UE pe!fo!ming S7PA call in the cell unde! test" The UE isal!ead/ attached to the UTAN Net$o!("

    Table 91$ S'P0 'ata Session Setu* time KPI

    KPI PreLaunc% Launc%

    S'P0 Session 0ctivation time N(0 >9t%*ercentile sessions 59 seconds

    Selle! ag!ees to the B@thpe!centile and the @ seconds p!o&ided the impact of non UTAN E.uipment is

    $ithin the indust!/ t/pical &alue !ange"

    System 0vailability

    S/stem A&ailabilit/ is defined as the pe!centage of time the Net$o!( can handle one hund!ed pe!cent'144?) of the t!affic it is designed fo! as measu!ed at ,ell 9e&el"

    The pu!pose of this met!ic is to calculate the total amount of time 'in pe!centage) out of the totalope!ating time the N, and Node0 a!e a&ailable to ca!!/ comme!cial t!affic" 5inimum g!anula!it/ fo!KP pu!poses is total loss of t!affic at ,ell le&el"

    Selle! is !esponsible onl/ fo! the SubS/stem supplied to Pu!chase!: N, and Node0" This excludesAntenna S/stems% T!anspo!t S/stems% Po$e!D0atte!/ 0ac(up% nonSelle! ,o!e Net$o!("

    The loss of t!affic at ,ell 9e&el can be due to one o! mo!e !easons:

    1" E.uipment failu!es

    2" Soft$a!e failu!es

    =" Selle! o!iginated 'accidental% misuse% !eset etc")

    3" Planned e&ents autho!i6ed b/ Selle! 'Soft$a!e upg!ade% E.uipment upg!ade% Pa!amete! changeetc)

    *o! A&e!age ,ell A&ailabilit/% Selle! shall be !esponsible fo! se!&ice deg!adation due to 1% 2% = 'causedb/ Selle!#s pe!sonnel o! subcont!acto!s of Selle!) and 3"

    *o! A&e!age ,ell Non5aintenance A&ailabilit/% Selle! shall be !esponsible fo! se!&ice deg!adation dueto 1% 2 and = 'caused b/ Selle!#s pe!sonnel o! subcont!acto!s of Selle!)"

    The le&el of agg!egation fo! this met!ic is Pu!chase!#s enti!e U5TS Net$o!( fo! $hich Selle! hassupplied the E.uipment and Soft$a!e 'N, and Node0)" The ala!m agg!egation fo! this met!ics shallbe pe!fo!med on dail/ basis" S/stem A&ailabilit/ KP fo! Selle! shall be calculated on a /ea!l/ basis fo!the pu!pose of achie&ing KP ta!get sta!ting f!om the Net$o!( comme!cial 9aunch fo! N, and Node0E.uipment" Selle! shall p!o&ide all the necessa!/ ala!m details to assist Pu!chase! in !eali6ing S/stem

    A&ailabilit/ KP mat!ices fo! the subS/stems supplied b/ Selle! 'N, and Node0)" Selle! shall!ecommend to Pu!chase! $hich ala!ms to use to measu!e these KPs"

    7ail/ S/stem A&ailabilit/ shall be measu!ed as follo$s:

    3.1.28 A&e!age ,ell A&ailabilit/

    #uation /

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    39/40

    Key Performance Indicator Term 'efinition

    TotalSectorCo%nt Total numbe! of acti&e Node0 ,ells $ithin N,

    AvgCellAvaila!ilit A&e!age Node0 ,ells a&ailabilit/ to ca!!/ use! t!afficcalculated as a pe!centage of total time

    Table 9/$ 0vera!e Cell 0vailability KPI

    0vera!e Cell 0vailability KPI SubSystem +0N +elease

    ? >>(>9 ,>>(>(>9 ,>>(=- 7 +NC E Node3 P;

    ? >>(>9 ,>>(>- 7 +NCE Node3 P>(>9 ,F>>(>-7 +NCE Node3 ?P=

    3.1.2! A&e!age ,ell Non5aintenance A&ailabilit/

    #uation /=$ 0vera!e Cell NonMaintenance 0vailability 2ormula

    R5C

    R5C

    rCount+otalSecto6in%rs

    timeenanceDownon6a+otalCell5

    '$%/#6'#$6'#$1@

    $%/#+(

    1'1

    Table 98$ 0vera!e Cell NonMaintenance 0vailability Term 'efinition

    Key Performance Indicator Term 'efinition

    TotalCellNon)aintenanceDo'ntime*sec+ Total du!ation 'in seconds) of Node0 ,ells $ithina N, not able to ca!!/ an/ t!affic du!ing no!malope!ation 'excluding planned e&ents) due to N,

    and Node0 E.uipment !eason" The du!ation shallbe calculated $hen Ala!mDS/stem notificationclea!s minus $hen Ala!mDS/stem notificationt!igge!s"

    TotalSectorCo%nt Total numbe! of acti&e Node0 ,ells $ithin N,

    AvgCellNon)aintenanceAvaila!ilit A&e!age Node0 ,ells a&ailable calculated as ape!centage of a&ailable time at ,ell le&el

    Table 99$ 0vera!e Cell NonMaintenance 0vailability KPI

    0vera!e Cell NonMaintenance 0vailability KPI SubSystem +0N +elease

    ? >>(>>9 ,>>(>(>>9 ,>>(=- 7 +NC E Node3 P;

    ? >>(>>9 ,>>(>- 7 +NCE Node3 P>(>>9 ,F>>(>- 7 +NCE Node3 ?P=

    Com*arison of UMTS and &SM Network Performance

    Selle! shall collect some 2 measu!ements defined belo$ at the same time as = measu!ementsfo! all ,luste! Acceptance and all 5a!(et Acceptance d!i&es"

    =B of 34

  • 5/20/2018 3G KPI Guidelines,UMTS,WCDMA

    40/40

    The 2 measu!ements collected b/ Selle! f!om a 2 te!minal in the &ehicle executing a p!edefinedcall se.uence a!e defined belo$:

    a"