3D Paving Training Start Procedure &
UTS Handover Procedure
Phil Jackson Training ManagerMarch 2010
![Page 2: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/2.jpg)
Before you Start
![Page 3: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/3.jpg)
Before You Start
Check you survey marks are present and accurate
Check your UTSs have the correct firmware and pass all calibration tests– Especially if they have travelled
Check your TDC2 has the correct SCS900 version, sites and designs– Check your Grade Check Pole Bubble
![Page 4: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/4.jpg)
Paver – UTSHandover Procedure
Before you start
![Page 5: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/5.jpg)
SCS – UTS Handover Procedure
Can be complicated & difficult Or can be simple It depends on your procedures
![Page 6: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/6.jpg)
Pitfalls If 2 or more UTS have a machine with
the same Channel and Network ID, then the radios will interfere and neither will be heard
Two UTS are trying to talk to the same machine at the same time
![Page 7: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/7.jpg)
SCS – UTS Handover Rule
Assign a Channel to each Machine or Grade Checker
Assign a Network ID to each UTS
![Page 8: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/8.jpg)
SCS – UTS Handover Procedure
First for one paver
Next for 2 pavers
![Page 9: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/9.jpg)
Channel = Machine
Assign a Channel to each Machine Paver 1 has Channel 31
![Page 10: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/10.jpg)
Channel = Grade Checker
Assign a Channel to each Grade Checker Grade Checker 1 has Channel 1
![Page 11: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/11.jpg)
Different Radio Channels
Now the 2 “Rovers on site, the Paver and the Grade Checker have DIFFERENT Radio Channels
![Page 12: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/12.jpg)
SCS – UTS Handover Procedure
Assign a Network ID to each UTS UTS 1 has Network ID 1 UTS 2 has Network ID 2 Etc,
![Page 13: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/13.jpg)
Paver – UTS Handover Procedure
Now when paving: Leave the Channel set to your Machine’s
Channel Change ONLY the Network ID to select the
UTS you want to use
![Page 14: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/14.jpg)
Minimise Machine List Only have the required machine in the
SCS900 list The UTS cycles through every machine in the
list looking for a connection A short list means fast connections
![Page 15: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/15.jpg)
Graphical UTS Handover
The next slide shows the method of transitioning down a road with multiple UTS– It is best viewed as a “Slide Show” so that you can
see the site build and transition as the paver progresses down the road
![Page 16: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/16.jpg)
Graphical UTS Handover
Channel 1Network ID 3
Channel 31Network ID 4
Channel 31Network ID 2
Channel 1Network ID 1
Channel 1Network ID 1
Channel 1Network ID 3
Channel 31Network ID 4
Channel 31Network ID 2
![Page 17: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/17.jpg)
Tip
Unlike these slides –
Do NOT use the default values– Change the Grade Checker Channel to other than 1– Change the Machine Channel to other than 31– Change the UTS Network ID to other than 1
![Page 18: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/18.jpg)
Paver – UTSHandover Procedure
While Paving
![Page 19: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/19.jpg)
UTS Handover Procedure
1. Set 2D System to Manual2. Stop3. Grade Check4. Write Down the PCS900 Elevation5. In UTS screen Change Network ID ONLY6. In UTS screen Start the UTS7. CHECK the PCS900 Elevation
![Page 20: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/20.jpg)
UTS Height Bust?
IF < 5 mm (~2/10th inch)
– carry on 5 – 15 mm
– Split the difference and bench >15 mm (5/10th inch)
– Yell at surveyor Find and use your own numbers
![Page 21: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/21.jpg)
Can You Handover On The Fly?
Maybe If your not paying for mistakes If you have a really fast car to leave in If nobody has your cell phone number...
![Page 22: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/22.jpg)
Can You Handover On The Fly?
Maybe If the design is smooth
– No transitions ahead If you have successfully Handed Over before
and are using the same procedure Have a fall-back plan
– If not 3D after 10(?) m then stop and fix
![Page 23: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/23.jpg)
Maybe??
Use next UTS as temp grade checker to check set-up
![Page 24: 3D Paving Training Start Procedure & UTS Handover Procedure Phil Jackson Training Manager March 2010.](https://reader036.fdocuments.net/reader036/viewer/2022062401/5a4d1b287f8b9ab05999832d/html5/thumbnails/24.jpg)
Paver – UTSQuick Start Procedure