August 20, 2013 Attachment J-13 Environmental Health and Safety Requirements Page i Appendices....................................................... iii Section I: General Requirements...................................1 1.1 Regulatory Compliance..........................................1 1.2 Work Performed by Contract................................... 1 1.3 Selected Specifications, Codes, and Standards................1 1.4 Integrated Safety Management System;.........................3 1.5 Environmental Management System..............................5 1.6 Hazard Prevention and Control................................5 1.7 The Conditions/Requirements for Operations...................6 1.8 Worker Rights and Responsibilities...........................7 1.9 Training Requirements........................................ 7 1.10 Pre-Job and Post –Job Briefings..............................8 1.11 Work Clothing and Personal Protective Equipment.............9 1.12 Industrial Hygiene.........................................9 1.13 Contractor Project Safety Plan.............................10 1.14 Contractor Environmental Plan..............................10 1.15 OSHA 300-A Logs and Experience Modification Rate...........10 1.16 Environmental Compliance...................................10 1.17 Safety and Health Training.................................10 1.18 Contractor Compliance with the HSE Requirements............10 1.19 Injury/Illness and/or Off-Normal Occurrence Reporting.....11 1.20 Contractor Files...........................................11 1.21 Contractor’s HSE Representative............................11 1.22 Contractor Industrial Hygiene Representative Responsibilities and Qualifications.........................................13 1.23 Risk Based Supervision and HSE Staffing....................14 1.24 Industrial Hygiene Training...............................16 1.25 ESH&Q and Fire Protection Requirements....................16 1.26 Jobsite Inspections........................................17 1.27 Equipment Inspections......................................17

Transcript of \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store...

Page 1: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page i of iii

Appendices..............................................................................................................................................iiiSection I: General Requirements.............................................................................................................11.1 Regulatory Compliance.................................................................................................................1

1.2 Work Performed by Contract.....................................................................................................11.3 Selected Specifications, Codes, and Standards..........................................................................11.4 Integrated Safety Management System;....................................................................................31.5 Environmental Management System.........................................................................................51.6 Hazard Prevention and Control..................................................................................................51.7 The Conditions/Requirements for Operations...........................................................................61.8 Worker Rights and Responsibilities...........................................................................................71.9 Training Requirements...............................................................................................................71.10 Pre-Job and Post –Job Briefings................................................................................................81.11 Work Clothing and Personal Protective Equipment..............................................................91.12 Industrial Hygiene..................................................................................................................91.13 Contractor Project Safety Plan.............................................................................................101.14 Contractor Environmental Plan............................................................................................101.15 OSHA 300-A Logs and Experience Modification Rate.......................................................101.16 Environmental Compliance..................................................................................................101.17 Safety and Health Training..................................................................................................101.18 Contractor Compliance with the HSE Requirements...........................................................101.19 Injury/Illness and/or Off-Normal Occurrence Reporting.....................................................111.20 Contractor Files....................................................................................................................111.21 Contractor’s HSE Representative.........................................................................................111.22 Contractor Industrial Hygiene Representative Responsibilities and Qualifications............131.23 Risk Based Supervision and HSE Staffing..........................................................................141.24 Industrial Hygiene Training.................................................................................................161.25 ESH&Q and Fire Protection Requirements.........................................................................161.26 Jobsite Inspections................................................................................................................171.27 Equipment Inspections.........................................................................................................171.28 Safety Showers/Eye Washes................................................................................................171.29 Hoisting and Rigging Requirements....................................................................................171.30 Heavy Equipment Operation................................................................................................171.31 Electrical Safety/Energy Isolation........................................................................................181.32 First Aid Kits........................................................................................................................18

Page 2: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page i of iii

1.33 Lower-Tier Subcontractors..................................................................................................191.34 Severe Weather.....................................................................................................................19

1.35 Hazard Control Hierarchy....................................................................................................191.36 Overhead Power Lines.........................................................................................................191.37 Elevated Work/Fall Protection.............................................................................................201.38 Scaffold Erection..................................................................................................................211.39 Portable Ladders...................................................................................................................211.40 Excavation, Trenching and Penetrations..............................................................................211.41 Slip, Trip and Fall Hazards...................................................................................................221.42 Working on or Near Water...................................................................................................221.43 Environmental Hazards........................................................................................................221.44 Tagging of Defective Tools, Materials or Equipment..........................................................221.45 Housekeeping.......................................................................................................................221.46 Drinking Water.....................................................................................................................231.47 Illumination..........................................................................................................................231.48 Hand Tools...........................................................................................................................231.49 Bladed Tools.........................................................................................................................231.50 Signs and Barricades............................................................................................................241.51 Inspections and Hazard Abatement......................................................................................241.52 Firearms, Explosive, and Biological Safety.........................................................................241.53 Industrial Hygiene Surveys & Assessments........................................................................251.54 Hazard Communications Program.......................................................................................25

1.55 Occupational Noise Exposure and Hearing Conservation...................................................................................281.56 Temperature Extremes (Heat and Cold Stresses).................................................................................................281.57 Confined Space Entry...........................................................................................................................................291.58 Ergonomics 301.59 Indoor Air Quality 301.60 Reproductive Hazards..........................................................................................................................................301.61 Biological Monitoring for Industrial Hazards......................................................................................................301.62 Inorganic Arsenic, Lead, and Cadmium..............................................................................................................301.63 Bloodborne Pathogens..........................................................................................................................................311.64 Beryllium 311.65 Laser Safety 311.66 Occupational Medical Program............................................................................................................................31

Page 3: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page i of iii

1.67 Emergency Management......................................................................................................................................331.68 Pressure Safety and Storing of Compressed Gas Cylinders................................................................................341.69 Utility Vehicles 35

1.70 Accident Prevention/Equipment Control Tags.....................................................................................................351.71 Welding and Hot Work........................................................................................................................................35

Section II: RADIOLOGICAL REQUIREMENTS................................................................................372.1 Purpose........................................................................................................................................37

2.2 Project Radiological Requirements Plan.................................................................................372.3 General Radiological Considerations.......................................................................................382.4 Personnel Entry and Exit Protocol through Radiologically controlled areas..........................392.5 Radiological Limits and Respiratory Requirements................................................................412.6 Minimum Radiological Requirements for Personnel Access and Work within a controlled area or other Radiological Area .........................................................................................................432.7 Radiological Work Permits (RWPs)........................................................................................432.8 Break Rooms in Radiologically Controlled Areas...................................................................44

Section III Respirators............................................................................................................................453.1 Respiratory Requirements...........................................................................................................45

3.2 Respiratory Protection.............................................................................................................453.3 Respirator Reuse Criteria.........................................................................................................473.4 Technical Approach.................................................................................................................48

Section IV Asbestos and Lead................................................................................................................504.1 Asbestos and Lead in the Work Area..........................................................................................50

4.2 Asbestos Containing Material..................................................................................................504.3 Asbestos Abatement.................................................................................................................504.4 Asbestos Abatement Plan Requirements.................................................................................514.5 Lead Abatement.......................................................................................................................52

Appendices:

Appendix 1 - Special Environmental, Safety Health, Training Matrix

Exhibits:

Exhibit # 1 – You Have a Right to a Safe and Healthful WorkplaceExhibit # 2 – Fluor B&W Portsmouth LLC Environmental Health and Safety PolicyExhibit # 3 – Environmental PolicyExhibit # 4 – 10 CFR 851, Fit for Duty Evaluation (Employee/Contractor)Exhibit # 5 – Contractor OSHA Competent Person DesignationExhibit: #6 – Pre-Job Briefing and Post- Job ReviewExhibit # 7 – Safety Task Assignment (STA)

Page 4: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page i of iii

Exhibit # 8 – Physiological Monitoring for Heat Stress

Page 5: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 1 of

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Section I: General Requirements

1.0 Regulatory Compliance:

1.1 Work Performed by Contract1.1.1 All work performed by this contract shall be in accordance with the U.S. Department of

Energy Acquisition Regulation (Integrated Safety Management DEAR 970.5223-1 clause), 10 CFR 851 (h t t p :/ / ww w . hss . do e. g ov / Hea l t hS a f e t y / W S H P / r ul e 851 / 851 f in a l . h t m l .), 10 CFR 835 and all applicable federal regulations and site-specific requirements. The Company maintains a formal Worker Safety and Health Program (WSHP) acceptable to the DOE which satisfies the requirements of 10 CFR 851.

1.1.2 The Contractor shall comply with the requirements of this Document (Attachment J-13) which identifies the portions of the Company’s DOE approved WSHP (required by 10 CFR 851) which are applicable to the contract work and identified in Section C - Statement of Work (SOW).

1.1.3 Any subcontracts issued by the Contractor in support of this contract shall require all lower-tier subcontractors to comply with these requirements

1.1.4 A “Subcontractor” is any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including lower-tier subcontractors at any tier, with responsibility for performing work at the Portsmouth GDP D&D Project (PORTS) site.

1.1.5 Vendors, delivery persons, who merely provide supplies, are typically obtained through a purchase order and not under contract/subcontract, and the requirements of 10 CFR 851 are not applicable because the type of services that a supplier performs does not have requirements which apply to them (Ref. DOE G 440.1-8, Section 3.1.3.3). The Contractor or Subcontractor that issues the purchase order to a vendor or supplier remains fully responsible for the safety and health of all vendors and suppliers providing on-site services and supplies.

1.1.6 For the purpose of this Clause:

1. The Company has a zero tolerance policy for willful violation of safety or work rules.

2. Safety encompasses environment, safety, and health, including pollution prevention and waste minimization.

3. Employees include Contractors and lower-tier subcontractor employees.

1.2 Selected Specifications, Codes, and Standards1.2.1 The following safety and health standards as a minimum are applicable to

work performed at the Portsmouth GDP D&D Project (PORTS) site:

Code of Federal Regulations

10 CFR 850 Chronic Beryllium Disease Prevention Program

10 CFR 1904 Recording and Reporting Occupational Injuries and Illnesses

Page 6: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 2 of

10 CFR 835 Occupational Radiation Protection

10 CFR 851 Worker Safety and Health

Program

29 CFR 1910 Occupational Safety and Health Standards for General Industry and standards incorporated by reference

29 CFR 1926 Safety and Health Regulations for Construction and standards incorporated by reference

American National Standards Institute

American Conference of Governmental Industrial Hygienists, “Threshold Limit Values for chemical Substances and Physical Agents and Biological Exposure Indices”

ANSI Z308.1 2009, Minimum Requirements for Workplace First Aid Kits and Supplies

ANSI Z87.1 American National Standard for Occupational and Educational Eye and Face Protection Devices

ANSI Z88.2 American National Standard for Respiratory Protection

ANSI Z89.1 American National Standard Requirements for Protective Headwear for Industrial Workers

American Society for Testing and Materials

ANSI Z136.1 Safe Use of Lasers

ANSI Z49.1 Safety in Welding, Cutting and Allied

ProcessesASTM F 2412 Standard Test Methods for Foot

Protection

ASTM F 2413 Standard Specifications for Performance Requirements for Foot Protection

National Fire Protection Association

NFPA 70 National Electric Code

NFPA 70E Standard for Electrical Safety in the Workplace

1.2.2 Not listing certain requirements does not relieve the Contractor from complying with any additional specific safety and health requirement that are necessary to protect the environment, safety and health of workers or those referenced in applicable requirement documents.

Page 7: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 3 of

1.3 Integrated Safety Management System;1.3.1 Contractor shall define and coordinate health and safety for his project activities with

the Company. The Company is committed to systematically integrating environment, safety, and health management into all facets of work planning, practices, and execution at all levels, using an Integrated Safety Management System (ISMS) so that the work is accomplished while protecting the workers, the public, and the environment. For the purposes of integrated safety management, the definition of safety encompasses safety, health, and environmental protection, including pollution prevention and waste minimization.

1.3.2 Contractor personnel including lower-tier subcontractors shall perform work safely, in a manner that ensures adequate protection for employees, the public, and the environment, shall be accountable for the safe performance of work and are responsible for following work instructions and procedures, and for taking precautions to prevent injury to themselves and others.

1.3.3 The Contractor will prepare a Hazard Assessment (HA) using the ISMS’s Seven Guiding Principles and Five Core Functions identified in Section 1.3.5. Contractor personnel shall review and understand the HA prior to the start of work and add any additional identified hazards or concerns to the HA, thereby integrating safety management into the workplace.

1.3.4 Prior to commencement of affected work, the Hazards Assessment shall be approved by the FBP Project Manager in accordance with 10 CFR 851, Appendix A, Section 1 Construction Safety.

1.3.5 The Contractor shall ensure that management of environment, safety, and health functions and activities becomes an integral, but visible, part of the Contractor work planning and execution processes.

1.3.6 The Contractor shall ensure that, as a minimum, their Health, Safety & Environmental (HSE) practices are structured to address the Seven Guiding Principles and Five Core Functions contained in this Section (1.3.5) and the requirements of Section 1.6 of this clause, relative to the performance of work and follow the tenets of the Department of Energy’s Integrated Safety Management System in its entirety:

Seven Guiding Principles1. Line Management Responsibility

Line managers and supervisors are responsible for the safe and efficient conduct of work to ensure protection of the public, the employees, and the environment.

2. Clear Roles and Responsibilities

Clear and unambiguous lines of authority and responsibility for ensuring safety are established and maintained at all organizational levels of the Company and the Supplier / Contractor’s organization

3. Competence Commensurate with Responsibilities

Supplier / Contractor’s selected personnel and subontractors are provided training and possess the experience, knowledge, skills, and abilities necessary

Page 8: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 4 of

to discharge their responsibilities.

Page 9: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 5 of

4. Balanced Priorities

Resources are effectively allocated to address safety, programmatic, and operational considerations.

5. Identification of Safety Standards and Requirements

Safety requirements and applicable Standards are known, understood and implemented

6. Hazard Controls Tailored to Work Being Performed

Engineering and administrative controls to prevent and mitigate hazards are integrated and tailored to the work and associated hazards.

7. Operations Authorization

The conditions and requirements to be satisfied for operations to be initiated and conducted are clearly established and agreed-upon between the Company and the Contractor.

Core Functions1. Defining the Scope of Work

The first step in the ISMS process is defining the work scope, including translating the contract scope of work into a specific work plan, setting expectations, and prioritizing tasks and allocating resources.

2. Analyze the Hazards

The second step in the ISMS process is to identify foreseeable hazards, and identify planned protective measures. Address further hazards revealed by supplemental site information (e.g., site characterization data, as-built drawings) provided by FBP’s Project or Construction Manager.

Analyze the hazards identified, and ensure relevant and appropriate standards for mitigation of identified hazards are selected or established. As a minimum all contractual requirements through the implementation of various Company procedures and federal, state and local requirements shall be included if relevant to hazards analysis. Identify any additional commercial standards, and corporate best practices needed to analyze or mitigate hazards likely to be encountered.

3. Identify Controls to Mitigate or Prevent Hazards

The third step in the ISMS process is to mitigate hazards identified through work plans and procedures, permits, regulatory requirements, agreements, procedures, activity hazard assessments, and training. Work planning includes a step-by-step review of how the activity will be performed, which hazards are involved, and which controls are needed to eliminate or mitigate identified hazards. The types of engineered controls, administrative controls, and personal protective equipment used to mitigate or preclude all identified hazards are formally documented.

Page 10: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 6 of

4. Perform Work

To perform work safely, confirm the readiness of the team, verify that work control documents are approved, authorized by FBP facility or site management, and released for work. Monitor and oversee work during execution and ensure that effective systems for managing change are in place.

5. Feedback and Continuous Improvement

The Company Implements the requirements of DOE O 226.1, Implementation of Department of Energy Oversight Policy, Contractor Requirements Document, and utilize a variety of feedback and assessment methods to evaluate the adequacy and effectiveness of the ISMS processes and to assure continuous improvement in the application of ISMS. Examples of these methods include management self-assessments and independent assessments, employee meetings and end of task reviews to provide ongoing, formal feedback.

Upon identification of changes in scope or planned work activities, the Contractor shall pause or suspend work until hazards associated with the changes have been identified and controls put in place to mitigate the hazards.

1.4 Environmental Management System1.4.1 The Company has developed an Environmental Management System (EMS) that is

compliant with DOE O 436.1. An EMS is a systematic and structured approach for addressing the environmental consequences of activities, products and services. This includes a continual cycle of planning, implementing, reviewing, and improving operations to positively address and manage environmental resources with a mindset that is proactive rather than reactive. The Company’s EMS is integral with the ISMS program.

1.5 Hazard Prevention and Control1.5.1 Contractor shall perform a Hazard Assessment (HA) prior to work being performed,

the associated hazards including environmental hazards must be evaluated, and the Company’s JHA is attached as a Reference to aid the contractor in development of his HA. The Contractor’s HA shall provide and an agreed-upon set of HSE standards and requirements to be established which, when properly implemented, provide adequate assurance that employees, the public, and the environment are protected from adverse consequences.

1.5.2 The Contractor’s HA shall be submitted for review and approval by the Company prior to mobilization. All changes made to the “HA” post mobilization shall be submitted and approved by the Company.

1.5.3 Written, properly authorized, permits (e.g., electrical, hot work, confined space, chemical, lockout/tagout, environmental, etc.) may be required before work begins; the Company shall provide these permits (Refer to Section C Statement of Work). Permits provide details on the type of activity to be performed and specific safety requirements necessary to perform the job. Permits shall be reviewed with applicable workers to assure understanding of the hazards and mitigators, posted in a designated

Page 11: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 7 of

area of the workplace and the instructions must be followed without exception;

Page 12: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 8 of

1.5.4 Supervisory responsibilities shall include analyzing the work to identify hazards and implementing appropriate controls and assuring workers are qualified to perform their assigned tasks and follow the applicable work plan;

1.5.5 Engineering and administrative controls shall be incorporated into the design or work plan to prevent and mitigate hazards and tailored to the work being performed and the associated hazards. Emphasis should be on designing the work and/or controls to eliminate or reduce the hazards and to prevent accidents;

1.5.6 Releases and exposures (chemical & radiological) shall be eliminated, mitigated, or otherwise controlled to as low as reasonably achievable limits but not exceeding regulatory limits;

1.5.7 Contractor’s Line Management shall ensure that current and potential task hazards are analyzed, identified, corrected and/or controlled as work progresses:

1. First through elimination or substitution of the hazards where feasible and appropriate;

a) then through engineering controls where feasible and appropriate;b) next through safe work procedures and administrative controls that

are understood, followed, and reinforced where feasible and appropriate; and;

c) finally, by use of personal protective equipment (PPE).

2. Line Management shall ensure that all equipment is used and maintained per manufacturer’s instructions or per an approved established technical basis

1.6 The Conditions/Requirements for Operations:1.6.1 The conditions/requirements for operations must be established and approved by the

Company and agreed upon by the Company and the Contractor prior to an activity taking place on site. These agreed-upon contract conditions/requirements are binding upon the Contractor. The extent of documentation and level of authority shall be tailored to the complexity and hazards associated with the work.

1. The Contractor shall identify and submit a listing of all major equipment to be used in support of their work activities that reflects maintenance, operation, and inspection of such heavy equipment. Section C of this document is applicable to this section;

2. The Contractor shall manage and perform work in accordance with their approved documented work plan and hazard assessment. Documentation of the HSE portion of the work plan shall describe how the Contractor will:

a) Define the scope of work;b) Identify and analyze hazards associated with the work;c) Identify the mitigation actions for the identified hazards associated

with the scope of work;d) Perform work within controls and all applicable regulations;e) Develop/implement feedback on adequacy of controls and continue

to improve safety management;

Page 13: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 9 of

f) Provide the tools and equipment necessary for safe performance of work. Tools and equipment (i.e., PPE, hand tools, power tools, ladders, scaffolds, hoists, vehicles, and mobile equipment, etc.) brought onto the site shall meet all federal, state, and local laws, regulations, and standards (e.g. OSHA, American National Standards Institute [ANSI], NFPA, etc.) and are subject to inspection and approval by the Company personnel. Tools and equipment shall be regularly inspected, maintained and operated by the Contractor as per manufacturer’s recommendations and applicable requirements. Contractor employees shall be responsible for using the proper tool for the job being performed;

1.7 Worker Rights and Responsibilities:1.7.1 Workers are responsible for identifying safety concerns, potential hazards, or unsafe

conditions to management. Each worker has the right, responsibility, and authority to, participate in work planning and hazard analysis, report unsafe or environmentally unsound conditions or practices and stop work activities without fear of reprisal in order to prevent injuries or accidents.

1.7.2 Prior to the start of work, all Contractor and lower-tier subcontractor personnel shall read the attached Worker Safety and Health Poster Exhibit 1 and Exhibit 2 Fluor B&W Portsmouth LLC Environmental Health and Safety Policy which outlines worker rights and the Companies commitment to workers health and safety. Reading shall be documented, be maintained on site and made available upon request. The poster shall be placed in an easily accessible location within the Contractor’s work area for workers viewing.

1.8 Training Requirements1.8.1 Required site specific and identified specialty training as applicable to the task being

performed (reference Appendix 1) will be scheduled for Contractors by the Company. Upon submittal by the Contractor to the Company, training records of individual employees will be reviewed to determine what training is acceptable and transferable to the Company activities.

1.8.2 Workers are responsible for performing tasks in accordance with requirements identified in the Contractors Work Plan, and may not perform tasks for which they have not been adequately trained. Minimum training requirements include the following:

1. The Company may require the Contractor to participate in Periodic group safety meetings to discuss issues / lessons learned affecting the Contractor’s work and its employees.

Personnel Qualifications

a) Qualified OperatorProvide personnel that are trained, qualified, professional, licensed, and certified as required to operate equipment or perform their tasks as required under this contract. Operators shall be qualified and experienced operating the equipment that they are assigned to. Contractor shall submit a signed statement to document personnel

Page 14: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 10 of

proficiency to perform tasks and operate the equipment supplied under this contract prior to the start of activity.

b) Contractor shall identify the OSHA Competent Person and submit Exhibit 5 Competent Person Designation in accordance with OSHA regulations on the Contractor OSHA Competent Person Designation.

c) The identified OSHA competent person shall meet the requirements of a competent person as defined by OSHA for each appropriate component of the work (e.g., hoisting and rigging, scaffolding, electrical, excavations). The form shall be updated as the project progresses and changes in personnel occur and specialized phases of the work required are initiated.

d) First Aid/CPR:The Contractor shall designate at least one person, who is currently trained in first aid/CPR, and who will be onsite at all times while work is being performed.

e) Motor Vehicle Safety:Contractors who use motorized equipment on-site, including utility vehicles (e.g., John Deere Gator ®, Kubota RTV ®), during the course of the work shall provide documentation that personnel are trained and qualified to operate the equipment.

Note: All Terrain Vehicles (ATVs) are not permitted on-site.

Documentation shall include:· A documented review of the applicable owner’s manual.· A current and valid state driver’s license is required for the

operation of all motor vehicles on-site.f) A copy of the manufacturer’s owner’s manual shall be kept on

the vehicle or be readily available for consultation.

1.9 Pre-Job and Post –Job Briefings1.9.1 Initial Site Briefing: All Contractor field personnel shall attend an initial site briefing

on the first day of work before conducting any field activity Contractor shall utilize Exhibit 6 (Form FBP-NSE-PRO-00002-F01) Pre-Job and Post Job Briefing Pre-Job briefing and Post-Job Review to conduct the meeting. If circumstances require the use of personnel who did not attend and initial site briefing, arrange individual briefings with the Company for the replacement personnel before they begin field work.

1.9.2 Daily Briefings: At the beginning of each day’s work, and before specific tasks with significant or changed safety considerations, the Contractor foremen shall perform a Briefing utilizing Safety Task Assignment (STA) Exhibit 7 (Form FBP-NSE-PRO- 00002-F03) the scope of the upcoming day’s operations and activities will be reviewed, and hazards associated with those activities will be identified along with the safety implications and procedures to mitigate the hazards.

1. Relevant safety documentation associated with the upcoming work will be reviewed. In addition, issues or concerns noted from the previous days’

Page 15: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 11 of

activities will be discussed. This briefing will be documented to identify the topics discussed and personnel in attendance.

Page 16: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 12 of

1.10 Work Clothing and Personal Protective Equipment1.10.1 Work Clothing

1. Adequate dress for personnel on a jobsite shall consist of the following:

a. Full-length trousers, slacks, or jeans in good condition.b. Safety boots (protective toe) with sturdy soles that meet

the requirements of ASTM F 2412/F 2413.c. Shirts that cover the shoulders, with sleeves at least T-shirt length.

2. Clothing such as tank tops, shirts cut off at the midriff, cut-off pants, pants and shirts with holes or tears, shorts, sandals, sneakers, and jogging shoes are considered unacceptable dress and shall not be worn.

1.10.2 Personal Protective Equipment1. The Contractor shall be responsible for providing personal protective

equipment (PPE) to the workers. This equipment includes, but is not limited to, the following:

a. Safety glasses, with side shields or wraparounds that meet the requirements of ANSI Z87.1.

b. Hardhats that meet the requirements of ANSI Z89.1.c. Hearing protection, required when a noise level equals or exceeds

an 8-hour time-weighted average (TWA) sound level of 85 dBA.d. Full-face shields with safety glasses, goggles & face shield or safety

glasses with Bionic face shield for any equipment that produces flying particles and/or sparks.

e. High-visibility traffic shirts / vests; reflective vests for spotting and traffic control.

f. Leather, cotton, or synthetic work gloves when required to protect from abrasions, cuts, bruises, and to enhance the ability to safely grasp objects.

1.10.3 The requirement for specific PPE, including when to wear it, will be determined by Contractor in its Hazard Assessment and or Contractors Work Plan for specific tasks. All non-radiological PPE shall be provided by the Contractor.

1.10.4 Radiological PPE (anti-C’s) required by a Radiological Work Permit (RWP) shall be worn with at least modesty clothing (e.g., undershirts, scrubs, shorts, leggings) underneath. PPE furnished by the Company will include:

1. Launderable, fire retardant nomex, anti-contamination clothing2. Latex Rubber Shoe Covers at the job site; and3. Launderable or disposable anti Cs (hood, anti C coveralls, shoe covers).4. Full Face Air Purifying Respirators (excluding cartridges and Powered APRs)

1.10.5 All required respirators will be furnished by the Company.

1.11 Industrial Hygiene1.11.1 Contractors shall comply with the Industrial Hygiene requirements established by this

document (Attachment J-13).

Page 17: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 10 of 52

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

1.12 Contractor Project Safety Plan1.12.1 The Contractor shall submit their Project Safety Plan; commensurate with the size,

complexity and risk level of the construction project; to the Company for review and approval in accordance with Section “C” Statement of Work. The Safety Plan shall include Safety Performance Objectives, Measures and Commitments.

1.12.2 The Project Safety Plan shall designate the individual(s) responsible for on-site implementation of the plan, specify qualifications for those individuals, and provide a list of those project activities for which subsequent hazard analyses are to be performed.

1.12.3 Contractor shall review and update the Project Safety Plan on an annual basis, and submit to the Company for approval.

1.13 Contractor Environmental Plan1.13.1 The Contractor shall submit their Environmental Plan to the Company for review and

approval. The plan shall include a discussion of the Contractor’s environmental aspects of their activities as applicable. These activities may include recycling opportunities, and their plans for sustainable acquisitions addressing recycled content, bio-based content, energy and water efficiency, alternative fuels, and non-ozone depleting substances for products intended to be purchased and used on site.

1.14 OSHA 300-A Logs and Experience Modification Rate.1.14.1 The Contractor shall submit annual updates to its OSHA 300-A Logs and Experience

Modification Rate from their workers’ compensation insurance carrier to the Company Purchasing Representative for review. The Contractor shall maintain a current year OSHA 300 Log and Summary at the Project worksite.

1.14.2 At the direction of the Company, Contractor may be required to submit a process improvement plan if it’s Experience Modification Rate is above 1.0 and /or its OHSA Total Recordable Case rate is above 1.0.

1.15 Environmental Compliance1.15.1 The Contractor shall comply with all applicable environmental protection laws,

executive Orders, ordinances, DOE, other Federal Regulations, directives and support the Company’s Environmental Management System (DOE 436.1).

1.15.2 Prior to the start of work, all Contractor and lower-tier subcontractor personnel shall read the attached Environmental Policy Statement Poster Exhibit 3, which outlines worker rights, reading shall be documented, be maintained on site and made available upon request. The poster shall be placed in an easily accessible location within the Contractor’s work area for workers viewing

1.16 Safety and Health Training1.16.1 Contractor shall refer to Appendix 1, for required Training.

1.17 Contractor Compliance with the HSE Requirements1.17.1 The Contractor is responsible to comply with the HSE requirements applicable to this

contract. The Contractor shall promptly evaluate and resolve any noncompliance with applicable HSE requirements and the Safety plan. If the Contractor fails to provide

Page 18: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 11 of

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

resolution or, if at any time, the Contractor acts or failures to act causes substantial harm or an imminent danger to the environment or health and safety of employees or the public, the Company may issue an order stopping work in whole or in part, based on the non-compliance.

1.18 Injury/Illness and/or Off-Normal Occurrence Reporting1.18.1 In accordance with Section H Contract Clauses (Safety and Health Laws and

Regulations) all occupational injuries/illnesses of Contractor employees, off-normal occurrences including property/equipment damage, and injuries or near miss-type incidents shall be reported immediately to the Company.

1.18.2 The Contractor shall investigate and take corrective action to prevent recurrence.Copies of the written initial incident/injury/illness reports must be submitted to the Company. The Contractor shall participate in any critique and in investigation, as related to the reported event, accident, injury or illness conducted by the Company.

1.18.3 Contractor shall immediately stop work, secure the equipment and/or work site involved in an accident, event, or near miss until the Company grants permission to return to work.

1.18.4 Contractor shall cooperate fully with the Company and DOE personnel in any investigation of an accident, illness, or injury.

1.19 Contractor Files1.19.1 Contractor shall maintain files on the project to document all training, inspections,

certifications, qualifications, permits, and noncompliance notifications/responses. Such files shall be maintained on site and be readily available for the Company’s inspection and review.

1.20 Contractor’s HSE Representative1.20.1 Contractor shall provide one or more full-time onsite competent HSE Representative: when Contractor’s on site employee total is less than thirty individuals, the HSE Representative may have other responsibilities; if Contractor’s onsite total equals or exceed 30 employees, the HSE Representative shall be dedicated full time to the responsibilities of the onsite HSE Representative and must devote all of his/her time to these responsibilities. Such Representative(s) shall be fully qualified to perform the responsibilities of the position and they, or a fully qualified alternate, shall be present on the work site at all times when Contractor is on site and working. Additional full- time competent HSE Representatives shall be assigned to the Project by Contractor for each increase of 30 employees. Additional competent HSE personnel may be required due to geographic location, specific hazards, Company requirements, or local regulatory requirements, this will be determine based on the contractors work plan and/or changes in work scope.

Number ofEmployees

HSERepresentative can have other

Duties

Dedicated HSERepresentatives

Geographic location, Specific Hazards,Company requirements, or Local

Regulatory requirements

0-30 1 Determined by Company30-60 2 Determined by Company

Page 19: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 12 of

60-Plus 2 for 1st 60, 1 forevery additional 30 employees

Determined by Company

1.20.2 The HSE Representative, because of training and experience, shall be capable of identifying existing or potential hazards in the job(s) being performed, identifying working conditions that are unsanitary, hazardous, or dangerous to the safety and health of employees, and have the authority to take prompt action in assuring a safe work environment.

1.20.3 The Site HSE Representative assigned dedicated to this Contract with experience as defined below, The HSE Representative will also work closely with the Company management in hazard recognition/prevention and ensuring prompt correction of safety deficiencies, including participating in joint safety inspections at least once per week.

1.20.4 Qualification and Responsibilities

1. The Contractor's Site HSE Representative shall be a responsible member of the organization at the site whose duty shall be the prevention of injuries and/or accidents, assurance that a safe and healthy work place exists, compliance with applicable requirements contained within this document, conducting documented daily inspections of work and storage areas, reporting safety related information, and maintaining applicable job site safety records.

2. The HSE Representative must be approved by the Company before he/she is assigned to the project. The Company reserves the right to approve/disapprove any HSE Representative which the Contractor may submit either before the project begins or during project execution. During execution of the Contract, the Company reserves the right to assess the HSE representative's work performance based on the number of first-aid cases, recordable injuries, lost time injuries, contamination incidents, safety violations, occurrence reports, and understanding and commitment to safety and require replacement when performance is unsatisfactory.

3. The HSE Representative must meet the following criteria:a. Completed OSHA 30 Training.b. Ability to demonstrate adequate safety knowledge of this

Document (Attachment J-13).c. Ability to explain how to effectively implement a safety and

industrial hygiene program for this project.d. Ability to explain how to manage injuries/illnesses as well as

accident prevention.e. Ability to keep documentation accurate and up to date as required by

the terms and conditions of this Contract as well as those requirements as identified by OSHA or other regulatory agencies.

f. 5 years verifiable applied safety and health experience, with 3 years of that time in the construction industry, as a full-time safety professional.

NOTE: This is the minimum criteria for the (qualification and responsibilities) Contractor HSE Representative to meet at the time of pre-

Page 20: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 13 of

approval (pre-mobilization) by the Company. The Contractor shall

Page 21: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 14 of

comply with any other requirements either contractually or required by OSHA and other regulatory agencies.

g. A familiarity level knowledge of the major environmental laws which envelop the work activities at the site including the Clean Air Act, Clean Water Act, RCRA, and CERCLA

1.20.5 Contractor's HSE Representative shall be responsible for initiating the Contractor’s Project Safety Plan, ensuring that Work site HSE requirements are being effectively implemented, conducting and documenting weekly inspections, weekly safety meetings with craft employees and submitting a weekly report documenting HSE activities.

Note: Unsafe acts and/or conditions noted during inspections shall be corrected immediately

1.20.6 During periods of active construction the Contractor HSE Representative will be on site at all times. This individual will conduct and document daily inspections of the worksite to identify and correct hazards and instances of noncompliance with project safety and health requirements. If immediate corrective action is not possible or the hazards fall outside the project scope, the HSE Representative will suspend/stop work, notify affected employees, secure the affected area, and notify the CTR.

1.20.7 Work will remain suspended/stopped until appropriate protective measures are established and work is again re-authorized by the Company.

1.21 Contractor Industrial Hygiene Representative Responsibilities and Qualifications1.21.1 This section describes the requirements for personnel used to perform Industrial

Hygiene associated work. This person can be the Contractor’s HSE Representative if all of the following qualifications are met:

Note: This qualified person may train other personnel to perform monitoring as long as they ensure monitoring/sampling is done accurately when the task is performed.

1. Three (3) years (35% of time) verifiable experience in the field of industrial hygiene comprehensive practice, or one (1) year field experience, Note: Experience in the field of industrial hygiene shall include more than 1 year of dedicated asbestos work if applicable and minimum certification as:

a. an Industrial Hygienist in Training (IHIT) by the American Board of Industrial Hygiene (ABIH),

b. an Associate Safety Professional (ASP) by the Board of Certified Safety Professionals (BCSP),

c. a certified Occupational Health and Safety Technologist (OHST) by ABIH/BCSP,

or

d. a certified Construction Health and Safety Technologist (CHST) by ABIH/BCSP.

e. The IH representative can be an independent third party Industrial Hygiene consultant.

Page 22: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 15 of

1.21.2 The qualifications of the person(s) developing, approving and performing any industrial hygiene monitoring/sampling shall be submitted to the Company for approval prior to the person(s) performing any industrial hygiene monitoring/sampling

1.22 Risk Based Supervision and HSE Staffing1.22.1 Some activities are recognized as having higher risks than others such as working on

elevated surfaces, work involving energized systems, work in confined spaces, use of hazardous chemicals, excavations, penetrations and demolition activities. Those with higher risks require additional attention to both detail and execution methodology and must be carefully planned, managed and supervised.

The following table lists activities that may be performed as part of this contract. Each activity is sub-divided into four categories, with four (4) being the highest risk and one(1) the lowest risk. Contractor supervisory and HSE support shall be adjusted with activity risk. The risk category governs the required supervisory and safety support requirements for projects performed at PORTS.

This list is not intended to be a comprehensive list of all potential project activities. Additional activities may be added to project plans to address project specific activities. The Contractor may propose alternate risk based supervisory requirements based on a detailed evaluation of the hazards associated with specific work activities as part of the Contractor’s Work Plan.

Safety Risk Categories by Activity Type

Activity TypeSafetyRisk

Category

FBPSupervisor

ContractorSupervisor

Contractor HSE1

Fall Protection

Open edge elevated work – non roofing 4 Full-time Full-time Full-timeLeading edge roofing/protected edge non-roofing

3 Full-time Full-time Review &Observe

Aerial lift/Ladder fall with protection utilized 2 Multi-site Multi-site Multi-siteElevated ladder work greater than 6 ft. - 3 pointsof contact

1 Multi-site Multi-site Multi-site

Confined Space

Permit - confined space hazardous atmosphere 4 Full-time Full-time Full-timePermit - confined space non-hazardousatmosphere

3 Full-time Full-time Review &Observe

Non-permit requiring continual monitoring 2 Multi-site Multi-site Multi-siteNon-permit no known hazards 1 Multi-site Multi-site Multi-siteLOTO/Penetrations - Working on or near energized sourcesLOTO – High Energy/high consequence (highvoltage, high pressure - more than 50 volts or 75 psi)

4 Full-time Full-time Full-time

LOTO - Low Energy (low voltage, low pressure- less than 50 volts or 75psi)

3 Full-time Full-time Review &Observe

LOTO Single Source isolation - permit notrequired

2 Multi-site Multi-site Multi-site

Air gap no hazard 1 Multi-site Multi-site Multi-sitePPE Required

Page 23: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 16 of

Activity TypeSafetyRisk

Category

FBPSupervisor

ContractorSupervisor

Contractor HSE1

Level A 4 Full-time Full-time Full-time

Level B 3 Full-time Full-time Review &Observe

Level C 2 Multi-site Multi-site Multi-siteLevel D 1 Multi-site Multi-site Multi-siteChemical ExposureUse National Fire Protection Association(NFPA) 704 Hazard diamond for guidance

4 Full-time Full-time Full-time

Use NFPA 704 Hazard diamond for guidance 3 Full-time Full-time Review &Observe

Use NFPA 704 Hazard diamond for guidance 2 Multi-site Multi-site Multi-siteUse NFPA 704 Hazard diamond for guidance 1 Multi-site Multi-site Multi-site

ExcavationRequiring Trench boxes and checklists 4 Full-time Full-time Full-timeLess than 4 ft. near roadways, unstable soil 2 Multi-site Multi-site Multi-site

Low risk excavations 1 Multi-site Multi-site Multi-siteHoisting and Rigging

High Risk/Critical lifts 4 Full-time Full-time Full-timeComplex lifts 3 Full-time Full-time Review &

ObserveRoutine lifts 2 Multi-site Multi-site Multi-siteSimple lifts 1 Multi-site Multi-site Multi-siteDemolitionNon-routine operations (e.g., explosivedemolition, complex structural demolition, energized facilities)

4 Full-time Full-time Full-time

Complicated operations (e.g., asbestosabatement, elevated sampling,)

3 Full-time Full-time Review &Observe

Routine demolition (e.g., uncontaminated,simple single story structures, mechanized material processing)

2 Multi-site Multi-site Multi-site

Simple demolition 1 Multi-site Multi-site Multi-siteConstructionNon-routine operations (e.g., blasting, elevatedconcrete pours, deep trenching >20’)

4 Full-time Full-time Full-time

Complicated operations (e.g., active roadways,loading and unloading heavy equipment, manual tree clearing, mechanized equipment operation on steep slopes > 2:1)

3 Full-time Full-time Review &Observe

Non-elevated concrete flat work, masonrysawing, framing

2 Multi-site Multi-site Multi-site

Routine/Repetitive operations 1 Multi-site Multi-site Multi-siteDrilling/BoringAdjacent or near underground utilities oroverhead obstructions

4 Full-time Full-time Review &Observe

Near/adjacent to high value/high impact assets(e.g., fiber optic line, data), geologic investigation2

3 Full-time Multi-site Multi-site

Page 24: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 17 of

Activity TypeSafetyRisk

Category

FBPSupervisor

ContractorSupervisor

Contractor HSE1

Simple repetitive (e.g., Geoprobe or similar) 2 Multi-site Multi-site Multi-siteRoutine (e.g. , hand auger) 1 Multi-site Full-time Review &

ObserveEquipment MovementMovement of equipment in close proximity toenergized sources (e.g., non-routine near steam lines, electrical, etc.)

4 Full-time Full-time Full-time

Mobilizing and de-mobilizing equipment,equipment movement near or handling high value/high impact assets (e.g., fiber optic line, long lead procured item)

3 Full-time Full-time Review &Observe

On site transport (e.g. material haulingoperations)

2 Multi-site Multi-site Multi-site

Routine operations 1 Multi-site Multi-site Multi-siteHot WorkHot Work performed in a Confined Space whileworking in a Radiological area

4 Full Time Full Time Full Time

Hot Work in a Radiological area but not in aconfined space.

3 Multi-site Full Time Review &Observe

Hot Work performed under a Hot Work Permitbut not in a fixed Weld Shop

2 Multi Site Multi Site Multi Site

Hot Work Performed utilizing a Hot WorkPermit but performed in a Fixed Weld Shop.

1 Multi Site Multi Site Multi Site

1 Contractors should plan to staff supervisors and HSE personnel to comply with this table. FBP may elect to provide HSE personnel to support Contractor activities at its discretion.

2 Geological investigations may have either a project dedicated full-time non-working Contractor supervisor or dedicated full-time Contractor HSE.

1.23 Industrial Hygiene Training1.23.1 Employees shall be trained to recognize potential health hazards and the means

to protect themselves from such hazards

1.24 ESH&Q and Fire Protection Requirements1.24.1 The Contractor shall refer to Appendix 1 Special Environmental, Safety

Health, Training Matrix for activities associated with this work including Training requirements.

1.24.2 Contact the Company for approval prior to modifying any Fire Protection system or altering Fire Protection design features, egress, or combustibles.

1.24.3 Contractor employees shall immediately contact the Portsmouth Site Fire Station by pulling the Fire Pull Box, calling 911 on any plant telephone, or by dialing 740-897- 2444.

1.24.4 All welding, cutting and grinding operations shall be conducted under a Hot Work Permit provided by the Company. Contractor shall notify the Company when a Hot Work Permit is needed at least 48 hours in advance in order that applicable approvals can be obtained.

Page 25: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 18 of

1.25 Jobsite Inspections1.25.1 The Contractor shall conduct daily inspections of the jobsite for unsafe conditions

or practices. The inspection shall be documented and made available for review by the Company on a daily basis. Corrective action shall be taken to mitigate hazardous jobsite conditions.

1.26 Equipment Inspections1.26.1 The Contractor shall ensure that vehicles, equipment, and materials comply with and

meet the manufacturer’s safety and operating requirements and applicable regulatory standards including OSHA, State of Ohio Department of Transportation, and DOE requirements.

1.26.2 The Contractor shall make vehicles, equipment, and materials available to the Company for an initial safety and radiological inspection prior to commencement of work. The Contractor shall allow one (1) workday for the Company to conduct the initial inspection and one (1) workday for each piece of equipment delivered to the jobsite after work has begun at the site.

1. If vehicles, heavy equipment, or materials do not meet the manufacturer’s safety and operating requirements and applicable regulatory standards, the vehicles, heavy equipment, or materials shall not be used on a jobsite until approved by the Company.

1.27 Safety Showers/Eye Washes1.27.1 Contractor shall provide safety showers/eye washes when required by the product

MSDS. A safety shower/eyewash shall be located within 100 feet of the hazard. All portable safety showers/eye washes furnished by the Contractor and brought onto site must comply with ANSI Z 358.1- 2009 and ICC/ANSI A117.1 – 2003.

1.28 Hoisting and Rigging Requirements1. All hoisting and rigging operations shall comply with DOE-STD-1090-2007,

Hoisting and Rigging Standard (Formerly DOE Hoisting and Rigging Manual)2. Contractor shall submit, for Company approval, a lift plan prior to making

any lift.3. Contractor shall submit with equipment or product submittals

manufacturer’s recommended lift points for the piece of equipment or the product.

1.29 Heavy Equipment Operation1. Before an operator uses equipment on site, the Contractor shall furnish the

Company with a signed copy of the Operator Qualification for the type of equipment to be operated, at least five working days before starting work. Acceptable verifications can be from the equipment manufacturer, a certified trainer, the Operating Engineers Union or the employer.

2. Mobile Crane Operators shall be license to Operate mobile cranes the as defined in OSHA 1926 Subpart CC, Contractor shall submit the operator’s license prior to the operator operating the crane on site.

3. All material handling equipment and mobile powered personnel lifts shall have the factory approved operator/safety manual for use by the operator and personnel. This manual shall either be with the equipment at the time of use or

Page 26: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 19 of

be on file, available for reference when requested. The safety requirements within the manual shall be followed.

4. Prior to beginning work on site, the operator shall become familiar with the specific equipment to be operated by reviewing the manufacturer's operating manual and by physically operating the equipment. The Contractor shall document this familiarization and proficiency and retain a copy in the jobsite files and make them available to the Company upon request.

5. The Contractor's qualified person shall perform and document a daily inspection on each piece of motorized equipment prior to its use. The Contractor shall maintain these inspection records on site, make them available to the Company, and submit them at project completion for retention as a project record.

6. Heavy equipment shall not be loaded/unloaded until the loading/unloading portion of the JHA has been reviewed and understood by affected personnel for this activity.

7. Equipment shall only be loaded/unloaded with the Company present unless directed to do otherwise by the Company.

8. Contractor shall notify the Company 1 day prior to equipment being loaded/unloaded and shall provide the following information to:a. Type of equipment being loaded/unloaded.b. Type of equipment transport.c. Method for loading/unloading (for example, direct roll off, metal

ramps, or temporary dirt ramps).

1.30 Electrical Safety/Energy Isolation1. All electrical installations shall be performed by qualified, trained, professional

personnel and under the supervision of a licensed electrical Contractor in the State of Ohio. Electrical work shall be performed in accordance with Subpart K of 29 CFR 1926 and National Fire Protection Association (NFPA)Standard 70E.

2. All energy isolation shall be done in accordance with the Company’s Lock Out/Tag Out (LOTO) Program (FBP-OS-PRO-00068). Contractor shall request a LOTO Permit from the Company five (5) working days prior to the need of a system being locked out.

3. Contractor shall complete LOTO Authorize Person training by the Company prior to initiating LOTO Request.

1.31 First Aid Kits1. The Contractor shall provide a first aid kit that meets the requirements of

ANSI Z308.1-2009, including providing minimum supplies and supplemental supplies as necessary. The type and quantity of supplemental supplies shall be based upon consultation of a person competent in first aid and cognizant of the hazards found in the particular work environment, and upon the number of people who many need first aid at one time. Additionally, the Contractor shall inspect the first aid kits in accordance with 29 CFR 1910.151 and 1926.50. Any work place injury or illness treated with first aid shall be reported immediately to the Company.

2. Contractors may have Automatic External Defibrillators (AEDs) at their

Page 27: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 20 of

work site provided personnel are appropriately trained and qualified to use the equipment. Contractor shall notify the Company prior to bringing an AED onsite.

Page 28: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 21 of

1.32 Lower-Tier Subcontractors1.32.1 The Contractor shall notify the Company of any lower-tier subcontractors planning to

work on the site. The Contractor shall ensure that lower-tier subcontract documents contain applicable health and safety flow-down requirements and that those requirements are enforced. The applicable requirements of 10 CFR 851 and requirements as contained in this contract are applicable to all lower-tier subcontractors. Information and rates from the OSHA 300 Log, OSHA Form 300 A, and Experience Modification Rate for lower-tier subcontractors must be acceptable and approved by the Company prior to the start of work.

1.33 Severe Weather1.33.1 Work will be suspended or delayed if adverse weather conditions are determined or

as advised by the Company. The Contractor may suspend work based on emergent adverse weather conditions.

1.33.2 When lightning is present, stop all work until 30 minutes after last lightning flash.

1.33.3 Any operations utilizing drill rigs, personnel working on ladders, aerial lifts, or at unprotected heights will be suspended if sustained wind velocity reaches 25 mph or gust equal to or exceed 35 mph. The Contractor shall contact the Company prior to restarting work. Cost of work stoppage for adverse weather conditions shall be borne by the Contractor.

1.34 Hazard Control Hierarchy1.34.1 The desired ways to control a hazard in order of preference include:

1. Elimination (including substitution): remove the hazard from the workplace.2. Engineering Controls: includes designs or modifications to plants,

equipment, ventilation systems, and processes that reduce the source of exposure.

3. Administrative Controls: controls that alter the way the work is done, including timing of work, policies and other rules, and work practices such as standards and operating procedures (including training, housekeeping, and equipment maintenance, and personal hygiene practices).

4. Personal Protective Equipment: equipment worn by individuals to reduce exposure such as contact with chemicals or exposure to noise.

1.35 Overhead Power Lines1.35.1 Minimum Distance for Overhead Electrical Work

1. Only allow qualified personnel with appropriate PPE, to work close to energized overhead lines when either de-energizing introduces additional or increased hazard or de-energizing is not feasible and the line is 480-volt (or less) and usually considered insulated (e.g., double jacketed cables or quad-plex or tri-plex).

2. Unqualified workers are not to work within, or have conductive material within, the following:

Page 29: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 20 of

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

a. 10 feet, for voltage to ground 50kv or belowb. 10 feet plus 4 inches for every 10kv over 50 kv.

1.36 Elevated Work/Fall Protection1.36.1 100 Percent Fall Protection

1. Full body safety harnesses shall be worn by all employees when working six feet or more above the ground or when working in a precarious position. Lanyard shall be securely attached to the employee 100% of the time and shall be rigged such that an employee can neither free fall more than six (6) feet (1.8 m), nor contact any lower level. Safety harnesses shall also be worn and attached to the tie-off rail when working out of extendable and articulating boom platforms and to vertical drop lines when working from suspended scaffolding.

2. Any work on roofs shall be preplanned identifying tie off points, number of people and safety precautions required. This plan shall be formal and documented. Documentation shall be made available upon request. Documentation shall include as a minimum:

a. Job Descriptionb. Hazardsc. Permitsd. Protective Equipmente. Isolations Requiredf. Authorized Personsg. Acceptance Prior to starting workh. Document Job Completioni. Acceptance of work and Responsible Person or Persons Handing Back

3. Each Harness shall receive a monthly inspection by a competent person as defined by OSHA. This inspection shall be documented, signed and dated by competent person and documentation maintained by the Contractor. Contractor is to provide a list of competent persons and their qualifications to the Company prior to commencement of work. The documented inspections shall be made available upon request, it shall include as a minimum:

a. Inspection Dateb. Equipment Identificationc. Month Year Equipment introduced into Serviced. Equipment Manufacturere. Harness Webbing or Leather - P/Ff. All Stitching Sewing – P/Fg. Engineer Anchor Points – P/Fh. Rivets and Eyelets – P/Fi. Ropes Chains Lanyard Lifelines and Body Pad (If Applicable)- P/F

1.36.2 Any equipment found defective shall be removed from service and tagged until it is removed from site to prevent further use

1.36.3 Each employee required to use fall protection is to inspect harness at time of use to ensure that no tears or frays exist that would render harnesses or lanyards unsafe

Page 30: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 21 of

1.36.4 Safety nets shall be provided when work places are more than 25 feet (7.62 m) above the ground where the use of other fall protection devices is impractical.

1.36.5 Guard rails consisting of top rail (42”); mid rail (21”) and toe boards (4”), and capable of supporting 200 pounds, or secured, labeled floor hole covers capable of supporting two (2) times the weight of personnel and material, shall be erected by the Contractor, or replaced in suitable condition if displaced by the Contractor’s work, for all floor holes or leading edges six (6) feet or more above lower levels.

1.36.6 When operating a boom-type elevated work platform from inside the “basket/bucket”, and certain scissors lifts (where required by manufacturer’s operational/safety manual) ONLY a personal fall limiter/self-retracting lanyard approved by the manufacturer for use in the horizontal position shall be utilized.

1.37 Scaffold Erection1.37.1 Contractor scaffolds shall be erected in accordance with the requirements of OSHA

29 CFR 1926 Sub Part L.

1.37.2 A competent person shall inspect scaffolding daily before use, approve initial use and inspect scaffolding following any occurrence that could affect structural integrity. Inspections shall be documented with a “Checklist/Users Acknowledgment Sheet," and attached to the scaffold in an obvious location.

1.37.3 The Checklist shall be maintained on site, made available to the Company upon request and submitted at project completion for retention as a project record.

1.37.4 Manufacturer's instructions for safe scaffold erection and use must be available for employee reference.

1.37.5 Scaffolds over 50 feet high must be pre-approved by the responsible Contractor’s Qualified Scaffold Engineer.

1.37.6 The Contractor shall have a written scaffold-tagging program requiring the competent person to inspect and tag scaffolding daily prior to use. Three Scaffold Tags shall be used addressing the following scaffold configurations:

1. Incomplete Scaffold- 100% tie off required;2. Complete Scaffold-follow standard use procedures; and3. Warning Do Not Use.

1.38 Portable Ladders1.38.1 Contractor shall inspect portable ladders when they are brought on site and

perform periodic inspections by a competent person as required by OSHA. Portable ladder inspections shall be documented, be maintained on site and made available upon request. Contractor shall provide training to employees on the use and inspection of ladders as required by Appendix 1.

1.39 Excavation, Trenching and Penetrations1.39.1 Contractor shall request permits for operations involving excavation or penetration

into the earth surface, concrete or pavement, and interior penetrations into building walls, floors, and ceilings five (5) working days prior to start of work. Potential

Page 31: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 22 of

hazards (e.g., contact with hazardous or radioactive materials, electrical lines, cave-ins, etc.) exist and these operations require that an excavation/penetration permit be obtained before the work is initiated.

1.39.2 Excavations and penetration activities are performed in accordance with the Company Excavation/Penetration Permit, and 29 CFR 1926, Subpart P.

1.40 Slip, Trip and Fall Hazards1.40.1 Roadways, access ways, aisles, stairways, scaffolds, and ladders, are to be kept clean

and clear of hoses, extension cords, welding leads, and other obstructions that may cause tripping or other accident hazards. Slipping hazards, such as grease, oil, water, ice, snow or other liquids are to be cleaned up or eliminated on walkways, ladders, scaffolds, or other access ways or work areas. If slipping and/or tripping hazards cannot be completely eliminated, the area shall be barricaded and posted with applicable hazard postings.

1.41 Working on or Near Water1.41.1 Any time personnel work on or near waterways such as ponds, lakes, rivers, or near

or above liquid containing tanks and water or sewage treatment holding ponds where the potential danger of drowning exists, they shall be in compliance with OSHA 29 CFR 1926.106, Working Over or Near Water.

1.42 Environmental Hazards1.42.1 Work at the PORTS site requires working outdoors. Anyone working outdoors

might come in contact with stinging and biting insects (e.g., wasps, bees, and mosquitoes, etc.), bird droppings, poisonous plants (e.g., poison ivy, poison oak, etc.), and venomous snakes and spiders. Proper identification of these hazards and avoidance whenever possible is the best prevention.

1.42.2 Many project activities will be performed outdoors and employees will be exposed to the harmful effects of ultraviolet radiation (sunburn). HA and daily briefings will be utilized to communicate these hazards and the mitigation of such to the employees.

1.43 Tagging of Defective Tools, Materials or Equipment1.43.1 Contractor shall implement controls to assure defective tools, materials, and

equipment is not used and shall take defective tools, materials, and/or equipment out of service immediately by tagging, destroying, or removing them from the project site.

1.44 Housekeeping1.44.1 Contractor shall enforce good housekeeping in accordance with 29 CFR 1910.22 and

29 CFR 1926.25. All material, scrap, tools and toolboxes, and other equipment shall be stored in a neat and orderly fashion. Trash and scrap shall be removed from the work area on a regular basis (i.e., at least daily, before the end of each work shift, etc.) and not allowed to accumulate, especially in walkways, under stairs, at the bases and landings of stairs and ladders, and near flammable substances.

1.44.2 Walkways and aisles shall be kept clear at all times, and laydown areas are to be maintained neat and orderly. Materials shall be stored on level ground, and the boundaries of laydown areas shall be identified.

Page 32: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 23 of

1.44.3 Contractor shall perform a project walkdown to assure good housekeeping practices are maintained.

1.44.4 Eating, drinking, chewing gum, and use of tobacco products will be permitted only in designated areas of the work site. Smoking is not permitted indoors or government/Company owned vehicles; designated outdoor smoking areas will be identified. No consumption of food, liquid, or use of tobacco products is allowed in radiological or HAZWOPER designated areas.

1.45 Drinking Water1.45.1 Contractor shall provide drinking water in all active work areas in accordance with

OSHA 29 CFR 1910.141 and 29 CFR 1926.51. Drinking water in Rad areas shall be established and controlled by the Company.

1.46 Illumination1.46.1 Adequate illumination intensity shall be provided in all active work areas and

access ways in accordance with OSHA Standard 29 CFR 1926.56./1910.120(m).

1.47 Hand Tools1.47.1 All tools shall be inspected and maintained in accordance with the

manufacturer’s requirements and applicable OSHA standards (OSHA 1910 Subpart B and 1926 Subpart I). Steps shall be taken to assure the following:

1. All tools are maintained in good condition and properly stored when not in use.2. Tools are not altered, and are used only for their intended purposes and

within the manufacturer’s guidelines.3. Tool guards shall not be removed from tools or altered in any way.4. All tools are inspected by the user before each use,5. All electric power tools will be double insulated or be equipped

with appropriate grounding.6. Power tools are equipped with constant pressure switches that will shut the

tool off when the switch is released.7. All bench-mounted and floor-mounted tools are secured against movement

or displacement.8. Hand tools with cracked, splintered, or taped wooden handles are not to be used.9. Impact tools are free of mushroomed heads and cracks

1.48 Bladed Tools1.48.1 Contractor shall utilize the following criteria when using tools with knife edges

(Bladed Tools) to perform cutting, scraping, or stripping operations. Examples of these types of tools are but not limited to: razor blades, utility knives, label scrapers, box cutters, scissors, Exacto knife, etc. Personal pocket knives are not to be brought on to the PORTS site.

1. Choose the safest tool that best matches the application. If possible, instead of using an open blade, choose snips, cutters, wire strippers, etc., as applicable.

2. Utilize safety-engineering tools, wherever possible.3. Ensure employees are trained on the hazards associated with the tool and

the task.4. Ensure tool and blade is in good working condition and free of defects.

Page 33: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 24 of

5. Ensure proper storage of blade tools and the replacement blades.6. Ensure spare blades are not carried in coverall pockets, where they might

be inadvertently returned to the laundry.7. Provide sharps container for used blade disposal.8. Prohibit any non-authorized use or storage of bladed tools.9. Ensure employees understand PPE requirements for the tool and task.10. Ensure PPE is available.

1.49 Signs and Barricades1.49.1 Signs shall be properly colored and labeled in accordance with OSHA 29 CFR

1926, Subpart G and 29 CFR 1910 Subpart J. Signs shall be promptly removed when no longer needed. The types of barricades on the Company’s projects may include rope, tape, chain, or physical barricades (guardrails, jersey type barriers, etc.). If hazard information is not printed on barricades or barriers, then signs or tags are used to describe the hazard. Stepping over or ducking under any barricade is prohibited.

1.49.2 Radiological barricades will be established by the Company. The boundaries will consist of yellow and magenta or yellow and black rope, with signs of the same color. In some instances fencing will serve as the boundary with radiological signs posted at the entrance gates. The signs will include the area designation (i.e. Controlled Area, Contamination Area, Radiation Area etc.) and the requirements for entry. Boundaries can only be crossed at designated entry points, called Control Points. The worker must meet the requirements listed on the sign in order to enter the area

1.50 Inspections and Hazard Abatement1.50.1 Contractor will communicate hazards to workers prior to commencement of work.

Furthermore, all individuals involved in any aspect of the project have the authority and responsibility to suspend or stop work for any perceived threat from hazards presented to the well being of the workers, other personnel, or the environment.

1.50.2 Contractors Management Team (e.g. Project Manager, Superintendent, Safety Representative, etc.) shall perform project walkdown to ensure that project work areas are maintained and provide a safe work environment for all personnel in the area work. Contractor shall document the project walkdown and make it available to the Company upon request.

1.51 Firearms, Explosive, and Biological Safety1.51.1 The Contractor is prohibited from bringing firearms onto the Site. This includes

dangerous weapons, ammunition, incendiary devices, or similar devices which could cause damage or personal injury.

1.51.2 The Contractor is prohibited from bringing on site or utilizing biological etiologic agents to accomplish their work scope without prior approval from the Company.

1.51.3 The Company is not planning to use explosives of any type. If explosive use were to be required, the use, storage or transportation of explosive material would require coordination with Protective Services and affected safeguards and security organizations in compliance with the applicable requirements of DOE M 440.1-1, 29 CFR 1926, Subpart U, NFPA 495, and any specific state or local requirements.

Page 34: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 25 of

1.51.4 Employees using powder-actuated tools shall be trained/qualified and have on their person a card indicating such. The loads for powder-actuated tools are kept in a locked red box labeled "EXPLOSIVES," which are kept in a locked area with restricted access and shall be approved by the Company prior to use.

1.52 Industrial Hygiene Surveys & Assessments1.52.1 A health hazard assessment shall be performed to evaluate and document

employee exposures to chemical, physical and biological agents and ergonomic stressors. Samples shall be analyzed by an accredited and certified lab utilizing a recognized exposure assessment and testing methodologies. Results of the assessment shall be submitted to the Company in accordance with Attachment J-8.

1.52.2 A baseline survey of all work areas shall be conducted whenever the contractor introduces a potential chemical hazard is identified as a result of:

1. Review of Scope of Work and Work Plan2. Inspection of areas or walk downs.3. Review of procedures or operations.4. Investigation of complaints of illness or injury.5. Employee reports of potential health hazards.

1.52.3 The survey shall consist of the gathering of information such as: processes involved, chemical/material information, MSDSs, health hazards and controls, exposure routes, and exposure groups. The survey results may be rolled into the associated hazard assessment, procedure, or other Industrial Hygiene Assessment document.

1.52.4 Personnel breathing zone measurements, based on the applicable exposure limit shall be performed and documented using the sampling strategy of NIOSH and OSHA, a copy of the sampling results shall be submitted to the Company.

1.52.5 All employees monitored for exposure levels shall be informed of their legal rights to their exposure records per 29 CFR 1910.1020.

1.52.6 Follow-up monitoring/ resurveys shall be performed:

1. to assess conditions after modifications which may increase the potential for employee exposure or the implementation of hazard control measures are completed; or

2. at intervals specified in substance specific standards identified in 29 CFR 1910 and 1926.

1.52.7 Contractor shall maintain on site calibration records for all Measuring &Test Equipment (M&TE) (instruments) used for sampling purposes and make them available upon request.

1.53 Hazard Communications Program:1.53.1 The Contractor shall have a Written Hazardous Communication Program that complies

with the requirements of OSHA 29 CFR 1926, Subpart D and 29 CFR 1910, Subpart Z. This program shall be submitted to and approved by the Company prior to mobilization.

1.53.2 Chemical Approval

Page 35: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 26 of

1. The Contractor shall submit to the Company for compliance review a list of all chemicals anticipated to be used onsite by their employees and their lower-tier subcontractor's employees. The list shall include the identity of the chemical, the manufacturer, the quantity to be brought onto the site, the application (i.e. lubricant, paint etc.) and the specific location (confined spaces, pads, etc.) where it will be used and stored. A legible copy of the most current MSDS for each chemical to be used shall accompany this list.

2. The list and associated MSDSs shall be submitted to the Company at least fifteen (15) calendar days prior to mobilization for compliance review and approval by the Company.

3. The Contractor or his lower-tier subcontractor shall notify the Company at least one (1) work day in advance of the chemical arrival on site. Chemicals in excess of project requirements shall not be brought onto the site.

4. The Contractor shall update the list each time additional or new chemicals are identified. A legible copy of the most current MSDS for each chemical used shall accompany any revisions. Revisions shall be formally transmitted to the Company for compliance review by Industrial Hygiene fifteen (15) calendar days prior to the chemical arriving on site.

5. `The Contractor shall remove his surplus Chemical from the site at project completion and provide written notification to the Company that all Chemicals have been removed.

1.53.3 Hazard Communication Labeling

1. The contractor shall perform the following steps to ensure that all containers are properly labeled.a. Place National Fire Protection Association (NFPA) labels, in

accordance with NFPA-704 “Standard System for the Identification of the Hazards of Materials for Emergency Response”, on any unlabeled secondary containers of hazardous chemicals that will not be used up by the end of the current shift or that will be used by other employees. Include the identity of the hazardous chemical directly above the NFPA label.

b. Assign NFPA 0 to 4 hazard ratings for health, fire, reactivity, and special warnings for NFPA-704 labels based on one or more of the following information sources:· labels of other containers of the same product;· information provided in the hazardous chemical MSDS;

· NFPA guidelines.· Ensure that containers of hazardous chemicals entering

and leaving the area are labeled,1.54 Carcinogen Control

1.54.1 The Contractor shall submit his Carcinogen Control Program to the Company for review and approval. This program establishes requirements for the identification, evaluation and control of occupational exposure to chemical carcinogens. The major elements of the Carcinogen Control Program are summarized in this section.

1.54.2 Carcinogens

1. Occupational carcinogens regulated by this program include:

Page 36: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 27 of

a. Those substances regulated as carcinogens by OSHA in 29 CFR 1926, Subpart D and 29 CFR 1910, Subpart Z;

b. Those substances categorized as a confirmed human carcinogen or suspected human carcinogen (i.e., A1 or A2) by the ACGIH.

c. Those substances that have been evaluated by the International Agency for Research on Cancer and found to be a carcinogen or potential carcinogen (i.e., Groups 1,2A or 2B);

d. Those substances listed by the U.S. National Toxicology Program as known to be carcinogenic or reasonably anticipated to be carcinogenic.

2. The requirements of this program apply to all regulated occupational carcinogens when the carcinogen is present in its pure form or in concentrations of 0.1 percent or greater in a mixture or product AND they are listed in one or more of the four references above. The requirements of this program are not applicable to control the hazards associated with exposure to asbestos and radioactive materials (unless the radioactive material is comprised of one or more occupational carcinogens).

1.54.3 Purchase Requirements

1. Hazardous chemical approval must be obtained from the Company’s Industrial Hygiene Dept. prior to the purchase of any regulated occupational carcinogens. Also, regulated occupational carcinogens shall be brought onto site only after a technical/engineering evaluation has been performed and documented by the Contractor, when required by the Company Industrial Hygiene Dept., which justifies that a feasible substitute is not available. The Contractor shall bear the costs associated with performing and documenting a technical/engineering evaluation.

1.54.4 Use Requirements Controls

1. If a large quantity of carcinogen will be handled for an extended period of time and there is the potential for worker exposure to the carcinogen, a Carcinogens Control Plan or equivalent will be required.

2. If smaller quantities of carcinogens will be handled, the duration of use will be for a short period of time, or there is very little potential for worker exposure, then use of the carcinogen can be addressed in the Contractor’s Work Plan.

3. The Carcinogens Control Plan (or equivalent) shall be submitted to the Company at least 15 calendar days prior to use and/or potential exposure, and it shall be reviewed and approved by the Company Industrial Hygiene Dept. prior to use and/or potential exposure to the occupational carcinogen.

4. The Carcinogens Control Plan (or equivalent) will be required to address all or some of the following elements. The elements to be addressed and the level of detail will be determined by the Company Industrial Hygiene Dept. using a graded approach based on the extent of potential occupational carcinogenic hazard:

1.54.5 Regulated Areas:

1. Establish a regulated area where use of occupational carcinogens presents a potential for worker exposure. The characteristics of the regulated area

Page 37: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 28 of

should

Page 38: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 29 of

depend upon the quantity and physical characteristics of the materials to be used and the tasks to be performed.

a. Ensure that access to the regulated area is controlled.b. Maintain a record of all entries into the regulated area.

1.54.6 Engineering Controls:

1. Use engineering controls as the primary method for minimizing employee exposure.

2. Provide details on the engineering controls to be utilized.3. Provide information on the steps that will be taken to ensure the effectiveness

of the engineering controls.

1.54.7 Administrative / Personal Protective Equipment (PPE) Controls:

1. Use administrative (work practice) controls and/or PPE to supplement engineering controls to minimize employee exposure.

2. Provide details on the administrative and/or PPE controls to be utilized.3. Provide information on the steps that will be taken to ensure the effectiveness

of the administrative and/or PPE controls.

1.54.8 Warning Signs / Labels:

1. Post proper warning signs at all entrances to a regulated area which clearly indicate “Regulated Area” and the chemical hazard.

1.54.9 Training

1. Worker training/information for use of carcinogens shall be in compliance with information/training requirements established in 29 CFR 1926.59 and made available to the Company upon request.

1.55 Occupational Noise Exposure and Hearing Conservation1.55.1 Exposure to excessive noise levels may lead to temporary or permanent hearing loss.

Hearing protection shall be worn by all personnel where noise levels are suspected or shown to exceed 85 dBA. In the event that a new noise hazard, such as a new piece of equipment, is brought onsite, the Contractor will have the equipment monitored. Areas where noise levels are greater than 85 dBA will be posted as “CAUTION Noise Hazard Areas-Hearing Protection Required” in accordance with the requirements of OSHA 1910.95.

1.55.2 Contractor shall perform a base line noise survey on all equipment prior to its use and the area of use shall be posted as required by OSHA.

1.56 Temperature Extremes (Heat and Cold Stresses)1.56.1 Contractor shall submit for review and approval his Program for Physiological

Monitoring and use of wet bulb globe temperature at the work site for potential for heat stress that meet or exceeds the requirements of Exhibit 8 and ACGIH 2011 (American Congress of Government Industrial Hygienist).

1.56.2 Contractor shall implement heat stress measures when the temperature reaches dry-bulb air temperatures are ≥85°F or ≤39°F and/or when controls have not already been implemented, the Contractor shall implement physiological monitoring (heart rate or

Page 39: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 30 of

body temperature), as well as for guidance regarding engineering controls, administrative work practices and PPE. Other conditions warranting an evaluation for temperature extremes include:

1. Performing heavy, exhaustive work in areas that are above room temperature (70°F).

2. Wearing heavy attire or encapsulating, impermeable suits while working in areas that are above room temperature (55°F).

1.56.3 Initial hazard screening for temperature extremes are to be documented by means of operating procedures/instructions, permits, job hazard analyses, pre job briefings, safety and health plans, or other media.

1.56.4 Working in hot environments can result in heat illnesses including heat cramps, heat exhaustion, and heat stress.

1.56.5 Personal protective clothing can greatly increase the likelihood of heat fatigue, heat exhaustion, and heat stroke, the latter being a life-threatening condition.

1.56.6 Supervisors are responsible for briefing workers on the signs of heat stress when temperature conditions require it and implementing the appropriate measures to prevent heat stress.

1.57 Confined Space Entry1.57.1 It is the Contractor's responsibility to ensure that their employees and all lower-

tier subcontractor employees are informed of the presence of permit-required confined spaces in the project area as identified by the Company.

1.57.2 Any time Contractor personnel or lower-tier subcontractor employees are required to enter permit-required confined spaces at the PORTS site, the Contractor shall observe the requirements of the Company’s Permit Required Confined Space Program.

1.57.3 The Company's confined space program complies with the requirements of OSHA 29 CFR 1910.146. Prior to any entry into a confined space at the PORTS site, the Contractor shall ensure that the following criteria are satisfied:

1. All confined spaces at the PORTS site are classified as permit-required confined spaces until evaluated by the Company;

1. Prior to making an entry or performing any work in a confined space, the confined space shall be evaluated by the Company;

2. When no hazards are present in the confined space, a Confined Space Evaluation Form will be completed by the Company stating that the space is a non-permit confined space for the work activity and work may progress with minimal requirements;

3. If evaluation of the confined space indicates a hazard(s) is present in the space, the space will be classified as a permit-required confined space and a Confined Space Entry Permit will be issued by the Company;

4. Prior to any entry into a permit required confined space, efforts shall be made to remove the identified hazard(s) from the space. If the hazard(s) cannot be removed from the space, certain steps/criteria specified in 1910.146 are required (i.e., continuous/periodic monitoring of the atmosphere, attendant/standby

Page 40: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 30 of

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

personnel, entry supervisor, fall protection/retrieval equipment, confined space rescue plan, confined space training);

5. Confined space rescues will be conducted by the Company; and6. Contractor personnel required to enter into permit required confined spaces, to

act as standby/attendant personnel, or to act as entry supervisors shall attend Confined Space Training offered by the Company or alternate confined space training which meets the training requirements of 1910.146. Documentation of training by alternate confined space training providers shall be submitted to the Company for compliance review prior to performing work.

1.58 Ergonomics1.58.1 Contractor shall evaluate the interaction of personnel with their working environment

that may present potential musculoskeletal hazards such as incorrect lifting of heavy loads, equipment vibrations, improper body positioning, negotiation of physical obstacles, and office computer workstations. The Contractor shall eliminate or mitigate any ergonomics hazards. Documentation of this evaluation shall be available upon request by the Company.

1.59 Indoor Air Quality1.59.1 Contractor shall evaluate indoor air quality for various factors such as chemical

contaminants, carbon monoxide levels, humidity, and microbiological organisms that influence the quality of breathing air. Air quality evaluations shall be performed to ensure the indoor air quality is free of, biological organisms such as molds, mildew, and other fungi, and spores that thrive in moist and stagnant environments. Documentation of such evaluations shall be available upon request by the Company.

1.60 Reproductive Hazards1.60.1 Contractor shall make every reasonable effort to protect both male and female workers

from excessive exposure to reproductive hazards. Due to the sensitivity of the human reproductive system to the effects of chemical, biological, and physical agents, special precautions, such as engineering controls, product substitution, PPE, and administrative controls, may be necessary to reduce employee exposure.

1.61 Biological Monitoring for Industrial Hazards1.61.1 Contractor shall perform employee’s assessment for potential exposure to chemical

substances and for determining the effectiveness of PPE and controls. Early integration of initial and ongoing exposure assessments with work planning activities will identify potential exposures associated with specific chemical substances and biological monitoring during pre-task planning. The use of a multidisciplinary team including assigned workers in planning work facilitates this integration.

1.62 Inorganic Arsenic, Lead, and Cadmium1.62.1 Inorganic arsenic and lead are primarily found in painted items and in trace amounts

on uranium hexafluoride (UF6) cylinders; however, any painted surface (unless painted within the last 10 years) should be suspected of containing inorganic arsenic and lead. Each work activity that involves the potential for exposure to inorganic arsenic or lead will be evaluated on a case-by-case basis. Appropriate controls and protective

Page 41: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 31 of

measures will be specified in an HA, procedure, or other work control documentation developed for this activity

1.62.2 Occupational exposure to cadmium and cadmium compounds, in all forms, in construction work where an employee may potentially be exposed to cadmium is managed in accordance with 29 CFR 1926.1127.

1.63 Bloodborne Pathogens1.63.1 Contractor shall protect personnel who have the potential for occupational exposure to

bloodborne pathogens. Any individual, who comes in contact with blood or other potentially infectious material, either accidentally or as a result of their occupation, has the potential for exposure to bloodborne pathogens. Individuals who come in contact with blood or other potentially infectious material should report the incident to the Contractors Project HSE representative.

1.64 Beryllium1.64.1 All work activities involving beryllium are performed in compliance with DOE Order

10 CFR Part 850, Chronic Beryllium Disease Prevention Program; Final Rule. Beryllium has been identified as being responsible for the development of sensitization and chronic beryllium disease.

1.64.2 Section III of 10 CFR 850 entitled “Overview of the Final Rule” states that the concentration specified in the beryllium definition is consistent with the criterion that OSHA Hazard Communication Standard uses for a carcinogenic mixture concentration of 0.1 percent (or 1,000 ppm) or greater, by weight or volume.

1.64.3 Trace levels of beryllium may be found as mixtures in waste streams including oils, solids, liquids, and other waste stream components. Beryllium in mixtures not meeting the OSHA criterion may be excluded from some sections of the Chronic Beryllium Disease Prevention Program.

1.64.4 Laboratory operations involving beryllium that fall within the scope of 29 CFR 1910.1450, Occupational Exposure to Hazardous Chemicals in Laboratories, are excluded from the scope of the Chronic Beryllium Disease Prevention Program.

1.65 Laser Safety1.65.1 The Contractor's use of lasers shall comply with the requirements of the

American National Standards Institute (ANSI) Z136.1.

1.65.2 Contractor shall ensure that only qualified and trained employees shall be assigned to install, adjust, and operate laser equipment.

1.65.3 Contractor shall maintain a copy of proof of qualification of the laser equipment operator and make it available upon request and ensure the operator has it in his/her possession at all times.

1.65.4 Contractor shall register his Laser Equipment with the Company prior to use.

1.66 Occupational Medical Program1.66.1 Required Medical Monitoring

Page 42: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 32 of

1. The Company has an approved medical monitoring program meeting the requirements of 10 CFR 851. The Company will provide required physicals for contractors and their lower-tier subcontractors.

2. If the contractor elects to use an outside medical resource to perform physicals, the physical results must be reviewed by the Company Medical Director to assure compliance with the Company Medical Program requirements and 10 CFR 851.

3. Contractor shall complete and submit the Fit for Duty Form, Exhibit 4, four (4) working days prior to the start of the activity to allow the Company time to schedule the physical and process the associated paper work.

4. Costs for Contractor personnel and for medical services performed by an outside medical resource shall be borne by the Contractor.

5. When medical monitoring services are provided by the Company, the Company bears the cost of medical services and the Contractor bears the cost of Contractor personnel wages, etc.

6. Notify the Company of all Contractor or lower-tier subcontractor employees on the fifth consecutive day of any absence due to injury or illness, irrespective of work-relatedness. Those employees shall receive a fitness-for-duty evaluation prior to returning to work.

7. Contractor or lower-tier subcontractor employees will not be permitted to work on the site for more than 240 hours (30 days) in a rolling 12-month period without a fitness-for-duty evaluation on file with the Company. Failure to submit the completed FFD form and ensuring that each employee completes the physical evaluation process prior to reaching the 240-hour threshold will result in the employee being restricted from the job site. Any Contractor downtime that results from such restriction shall be at the Contractor’s expense.

8. Workers shall report any open wounds prior to entry into a controlled area.Workers with wounds that cannot be covered are restricted from working in radiological areas.

9. The Company’s Medical Department has the following Medical Monitoring Programs (including all of the laboratory, x-ray, and other testing ordinarily included in the Biologic Monitoring Program) in place for workers with potential exposures:a. Asbestos Worker;b. Hazardous Waste Worker (including radiation);c. Lead Worker (and other heavy metals); andd. Hearing Conservation.

10. Some workers are required by regulation to be entered into a long-term Health Surveillance Process Program; however, the Company cannot provide nor be responsible for these longer term programs for Contractor employees. Other Standards of Care/Practice in Industrial Hygiene, Occupational Medicine, or Health Physics may also dictate special testing or programs for some workers. The Contractor is responsible for these requirements. Additional surveillance or monitoring requirements may be generated from the Contractor's method of performing work or for materials used (i.e., such as indicated by hazardous components on MSDSs).

Page 43: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 33 of

11. The Company’s Medical Director will be the final authority to determine the fitness of any worker or his/her suitability to perform work and be exposed to any of the various hazards at the PORTS site.

1.66.2 Use of Prescription Medicine in Radiological Areas

1. Non-prescription medicine shall not be taken into controlled areas with the single exception of Glucose Tablets which may be taken by diabetics. Employees that need Glucose Tablets shall also register with the Company Medical Department.

2. Prescription medicine will only be recognized by the Company after the employee to whom the medicine is prescribed registers the medicine with the Company Medical Department.

3. In the event of an emergency, an employee may take prescription medicine on the spot, regardless of the area in which he or she is standing. If medicine has been taken under these conditions, the employee should contact the Company to determine what action, if any, will be required of the employee in regards to dosimetry.

4. Contractor employees receiving medical treatment with radio-pharmaceuticals will be restricted from entering controlled areas until such time as the radio- pharmaceutical has cleared sufficiently from his/her system to the point where frisking through a Personal contamination Monitor (PCM) at the control point does not trigger the alarms. Contractor employees that are to receive such treatment shall report to the Company Medical Department beforehand so appropriate precautions can be taken. Employees that have received treatment with radio-pharmaceuticals shall report to Medical immediately upon returning to work.

5. Contractor employees that are pregnant should report to the Company Medical.The employee will be informed of risks related to her pregnancy as a result of working on the Contract. The employee may "Declare Pregnancy" in accordance with 10 CFR 835. If declared, the Company will ensure that the employee's thermoluminescent dosimeter (TLD) is read monthly (as opposed to quarterly). The Companies administrative control limit is 50 mrem/month or 400 mrem/gestation period.

1.66.3 Exit Physicals

Contractor and lower-tier subcontractor personnel upon termination of employment shall have an exit physical unless they have had a Company physical as follows:

a. in the past six months for employees identified as a Hazardous Waste Worker as per 1910.120; or

b. 1 year for all other employees.

1.66.4 Contractor shall request the exit physical five (5) working days in advance of the employees exit where possible.

1.67 Emergency Management1.67.1 Contractor will participate and comply with PORTS site response measures and

actions necessary for emergency management events, including drills and exercises (i.e. severe

Page 44: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 34 of

weather, evacuations, hazardous materials, fire, criticality and other simulated emergency event exercises/drills).

1.68 Pressure Safety and Storing of Compressed Gas Cylinders1.68.1 Contractor shall ensure that all pressure vessels, boilers, air receivers, and

supporting piping systems conform to the requirements of 10 CFR 851, Appendix A, Part 4.

1.68.2 Storage of Compressed Gas Cylinders

1.68.3 Group different compressed gases stored in the same area, according to the following:

1. By types2. By compatibility

1.68.4 According to NFPA 55, flammable gases shall not be stored near oxidizing gases.

1.68.5 Do not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve acetylene supplies, or other fuel gases, except in approved welding carts and stations.

1.68.6 Store compressed gas cylinders away from exit pathways as to not interfere with normal passage.

1.68.7 Store compressed gas cylinders in the upright position.

1.68.8 Securely restrain compressed gas cylinders to a firm structure at about two-thirds their height.

1.68.9 Do not secure compressed gas cylinders by the valve.

1.68.10 Keep compressed gas cylinders far enough away from hot work so that sparks, hot slag, or flames will not reach them, according to the following:

1. At a distance of approximately 50 feet for flammable cylinders. A distance of approximately 35 feet for all other gases

1.68.11 WHEN it is not possible to keep cylinders away from the vicinity of hot work activities, THEN provide fire-resistant shields for the cylinders.

1.68.12 Take precautions against accidently grounding or allowing the compresses gas cylinders to get burned by the arc during electric welding operations.

1.68.13 Use a properly sized cylinder stand to support a cylinder where a tie-down bracket cannot be attached.

1.68.14 Secure with chains cylinders not currently in use in identified safety boxes or safety racks and segregate them, according to 49 CFR 177.848, Separation and Segregation Chart of Hazardous Materials Identified.

1.68.15 Manage Acetylene, according to the following:

1. Store acetylene cylinders valve-end-up (the container axis may be inclined as much as 45 degrees from the vertical) to minimize the possibility of solvent being discharged.

2. Maintain acetylene that is generated, piped (except in approved cylinder manifolds), or utilized at a pressure below 15 psig.

Page 45: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 35 of

1.68.16 Orient cylinders, according to the following:

1. With the exception of acetylene, store properly secured compressed gas cylinders with a water volume less than 305 in3 in a horizontal position.

2. Stored and use valve-end-up all liquefied gas cylinders, except those designed for use in a horizontal position on tow motors, etc., to ensure that the cylinder's pressure relief device will remain in contact with the gas phase, as designed.

1.69 Utility Vehicles1.69.1 When the contractor brings a utility vehicle (e.g., John Deere Gator ®, Kubota RTV

®) on site for use the following shall apply:

1. A flashing yellow caution light shall be mounted on top;2. A minimum of one head light3. A minimum of one tail/break light4. A audible back-up alarm;5. Limit passengers to the equipped seating;6. Do not lap ride or ride on side board, keep all extremities within the confines

of the vehicle cab; and7. Engage the parking brake prior to exiting the cart.

1.69.2 Contractor personnel operating Utility Vehicles shall be trained in operating the vehicle. Contractor shall maintain documentation onsite and make it available to the Company upon request.

1.69.3 Contractor shall perform inspections in accordance with 29 CFR 1926.601.

1.70 Accident Prevention/Equipment Control Tags1.70.1 Contractor shall follow the requirements of 29 CFR 1926.200 for the installation

of Accident Prevention/Equipment Control Tags.

1.70.2 Contractor shall provide training for personnel designated/authorized to install Accident Prevention/Equipment Control Tags and document the training, including position, titles and make it available to the Company upon request.

1.70.3 Contractor shall remove tags as soon as the work is complete.

1.70.4 Lockout/Tagout and Accident Prevention/Equipment Control Tags may be used together, but NOT in place of the other

1.71 Welding and Hot Work1.71.1 Contractor shall request a Hot Work Permit from the Company five (5) working

days prior to use for the following:

1. Welding and allied processes2. Heat treating3. Portable or pedestal/bench grinding4. Thawing pipe5. Powder-driven fasteners6. Hot riveting7. Torch-applied roofing, in conjunction with the requirements of NFPA 241,

Standard for Safeguarding Construction, Alteration, and Demolition

Page 46: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 36 of

Operations.8. Similar applications producing or using a spark, flame, or heat.

Page 47: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

1.71.2 Contractor shall ensure his employees are trained in accordance with Appendix 1.

Page 37 of 51

Page 48: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Section II: RADIOLOGICAL REQUIREMENTS

2.0 Purpose

Fluor B&W Portsmouth (Company) and its Contractors are required to comply with the requirements of DOE Order 458.1 Radiological Protection of the "Public and Environment," 10 CFR 835, "Occupational Radiation Protection," Fluor B&W Portsmouth's Radiological Protection Program; and Fluor B&W Portsmouth Radiological Procedures The requirements here in were derived from these requirements.

This section provides the Contractor with many of the radiological requirements by which to plan the project. Additional radiological control requirements are incorporated throughout the body of this Contract. Specific information contained in this section includes: anticipated Fluor B&W Portsmouth radiological control interface with the Contractor; general radiological considerations, personnel entry and exit protocol through radiological areas, radiological limits, access and monitoring requirements, Radiological Work Permits (RWPs), and PPE.

2.1 Project Radiological Requirements Plan

2.1.1 Radiological Control Interface with the Contractor

2.1.2 Company -Provided Radiological Control Programs

1. The Company will provide radiological control support, including providing Radiological Control Technicians (RCTs), radiological monitoring, anti-c’s clothing, respiratory protection and record keeping. The Contractor shall comply with all radiological control requirements, directions, RWPs, Work plans, training requirements, sampling, testing, oversight, etc. Additionally the Company will provide the following:a. DOELAP accredited external dosimetry program (including

record keeping and reporting);b. All radiological monitoring equipment;c. DOELAP accredited Internal Dosimetry program (including

air sampling, bioassay, and record keeping);d. Radiological Worker Training program consistent with the

requirements of 10 CFR 835; ande. Radiological Control support personnel trained to the requirements of

10 CFR 835.

2.1.3 Daily Activities List

1. The Contractor is required to provide the Company with a Daily Activities List describing projected activities (including movement of material and specific personnel activities), crew sizes, crew members, and crew locations. This information shall be provided at least 24 hours prior to commencement of work.

2. Walk Downs/Meetings:

Representatives of the Company will participate in periodic walk downs/inspections of the facility/work area, be present at pre-job meetings to address health and safety requirements of the work plans or work permits,

Page 38 of 51

Page 49: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

attend weekly meetings with the Contractor to raise issues of concern, provide

Page 39 of 51

Page 50: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

updates on the status of the quality of radiological controls for the project activities, participate in morning safety meetings with the Contractor's personnel, and discuss radiological safety requirements pertaining to work practices previously witnessed and anticipated based on upcoming work.

2.1.4 Radiological Sources

Radiological sources may only be brought onsite with prior approval of the Company. Required information from the Contractor includes the type and activity of the source, its intended purpose, how long the source is expected to remain onsite, and what controls will be placed on the source to ensure its stability while onsite. A Radioactive Materials License is required for non-exempt sources.

1. A minimum of five (5) days advance notice is required to bring such materials onsite

2.1.5 Bioassay Schedules

All personnel qualified as radiation workers are required to submit a baseline bioassay as part of their initial qualification. Radiation workers will be placed on and notified of bioassay schedules based on periodic and incident sampling protocols. Failure to submit bioassays as requested may result in the worker being disqualified as a radiation worker until the requirement is fulfilled. Radiation Workers leaving the job are required to submit a bioassay sample just prior to final departure.

2.1.6 Radiological Incidents and Reporting for All Project Work

Problem Reports are written by the Company to document radiological deficiencies. Examples include, but are not limited to, poor performance of health physics practices, violations of procedures and safety policies, personnel contamination, etc. The Contractor is responsible for correcting deficiencies and providing a written response summarizing action(s) taken and/or planned to prevent reoccurrence.

2.1.7 Stop Work Authority

All Company and Contractor personnel have the responsibility and authority to stop radiological work when radiological controls are inadequate.

In any situation in which stop work authority is used, the following requirements apply:

1. Exercise stop work authority in a justifiable and responsible manner;

2. Once work is stopped, do NOT resume until proper radiological controls have been established; and

3. Resumption of work requires approval of the Company.

2.2 General Radiological Considerations

2.2.1 Radiological Isotopes of Concern

The most limiting isotope (for radiological contamination control purposes) is determined and applied as the isotope of concern. This is determined by the Company based on a combination

Page 40 of 51

Page 51: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

of sampling data, calculation and process knowledge. Most of the radioactive contamination onsite is due primarily from uranium isotopes and their radioactive daughters

2.2.2 ALARA Considerations and Exposure Limits

ALARA is an approach to radiological control to manage and control exposures (individual and collective) to the work force and to the general public at levels As Low As Reasonably Achievable, taking into account social, technical, economic, practical and public policy considerations. ALARA is not a dose limit but a process that has the objective of attaining doses as far below the applicable controlling limits as is reasonably achievable.

1. The Contractor shall perform necessary actions to maintain occupational exposures below site administrative limits (internal and external exposures) and shall practice ALARA at all times.

2. The Contractor shall take measures to maintain radiation exposures in controlled areas As Low As Reasonably Achievable through facility and equipment design and administrative control. The primary method used shall be physical design features (e.g., confinement, ventilation, remote handling, and shielding). Administrative controls and procedural requirements shall be employed only as supplemental methods to control radiation exposure.

3. For specific activities where use of physical design features is demonstrated to be impractical, administrative controls and procedural requirements shall be used to maintain exposures ALARA.

4. ALARA practices shall be documented in the Contractor's work plans.

2.3 Personnel Entry and Exit Protocol through Radiologically controlled areas

2.3.1 Access to the Controlled Area

The workers must obtain their thermoluminescent dosimeter (TLD) or Personal Nuclear Accident Dosimeter (PNAD) PRIOR to reaching the controlled area. TLDs or PNADS must be worn while the worker is in the non-radiological areas of the controlled area. TLDs must be worn in the radiological areas of the controlled area. TLDs shall be worn on the outside of the worker's clothing (non-PPE), facing forward, between their waist and shoulders.

2.3.2 Badging-in at the access control point:

At the control point (access way from the uncontrolled area to the controlled area), workers will have their training verified to be current by security.

1. If the access control computer system is inoperable, training will be verified by visual inspection of the worker's qualification card; and

2. If a worker's training is insufficient or out of date, access to the controlled area will be denied.

2.3.3 Access to the Contamination Area

The following are standard requirements for access to the contamination area:

Page 41 of 51

Page 52: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 40 of

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

1. Workers will sign the appropriate RWP for entry into the work area, collect prescribed respiratory protection, go to the dressing area, and don the prescribed protective clothing;

2. If a worker's training or bioassay is insufficient or out of date, their access to the contamination area will be denied;

3. When wearing protective clothing such that no skin is exposed (e.g., full anti-Cs and a respirator), the worker's TLD must be worn underneath the protective clothing. When protective clothing requirements are such that skin is exposed (e.g., no respirator), the TLD must be worn on the outside of the anti-Cs;

4. Prior to entering the work area, workers must contact an RCT for assignment to a personal air sampler and testing of the airflow of powered air purifying respirators (if worn). The following conditions apply to wearers of personal air samplers:a. In areas where uranium is the isotope of concern, Rad Control may

require 20% of workers in each work group/crew (minimum of one worker) to wear a belt mounted personal air sampler. All other workers in the work crew must be signed-in on the paperwork under which their crew-partner received their personal air sampler. Workers in the work crew shall work in the general proximity of the other workers such that the assigned personal air sampler is representative of the air being breathed by all parties in the work crew;

b. When changing work areas, the workers must sign-in on the appropriate RWP and verify that their level of PPE is in compliance with the RWP. If the worker must change PPE to move to a new job area, the worker must exit the contamination area and go through the appropriate steps for re-entry, wearing the correct protective clothing. The worker will be reassigned to a different personal air sampler.

5. Personnel entry into the contamination area must be through the established control point.

2.3.4 Exiting the Contamination Area

Workers must always leave the work area and doff anti-Cs at the appropriate control point whenever their protective clothing is compromised i.e. damaged, wet, when non-water resistant anti-Cs get wet or workers sweat through their protective clothing. The Company will periodically monitor contamination levels on the outside of PPE. If contamination, as detected by an RCT, on the outside of a worker's work gloves is found to be greater than 1,000 counts per minute, the worker must change their work gloves. If this level of contamination is found on the outside of a single-layer of anti-Cs, workers must return to the control point to change their protective clothing.

1. The Contractor should estimate that a minimum of four workers per day will be sent through this routine. If 10% of the Contractor work force is greater than four workers, estimate that 10% of the workers will be sent through this routine daily.

2. The Contractor should recognize that high contamination areas and asbestos areas that are in contamination areas will require a double layer of anti-C’s. Prior to leaving any of these areas, workers will doff their outer set of anti-C's at the work area boundary and proceed directly to the appropriate change out

Page 53: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 41 of

facility/area. Doffing of the inner layer of anti-C's and personnel monitoring will be performed at the change facility.

3. The workers themselves may survey personal items out, using friskers provided at the control point.

4. Tools, lapel samplers, and equipment may only be surveyed out of a contamination area by an RCT. Workers requiring items of this nature to be removed from the contamination area must give the RCT notice of such a need at least one full work shift in advance.

5. Whole body personnel monitoring is required prior to exit from contamination areas.

6. Workers will sign out on the RWP upon exiting.

2.4 Radiological Limits and Respiratory Requirements

2.4.1 Personnel Monitoring Limits

When personnel are surveyed upon leaving a contamination or controlled area (including monitoring into the locker room or break area from the controlled area), the following limits shall be applied:

1. For leaving a uranium contamination area or a controlled area 5,000 dpm/100cm2 beta/gamma.

2. If a personnel monitoring instrument alarms, the worker must notify the Company. The Company will investigate to determine if there is long-lived contamination (e.g., uranium) on the worker's clothes or skin. If this is confirmed, the Company will begin the documentation of the incident and decontamination of the worker.

2.4.2 Airborne Radioactivity Limits

1. Airborne Radioactivity Areas will be posted around locations that exceed (or have the potential to exceed) 10% of the Derived Air Concentration (DAC) limits for the applicable isotopes. Engineering and/or administrative controls shall be implemented for these areas to control the impact on personnel and other project areas.

2. Within the work area, airborne radioactivity shall be controlled to less than 10% of the specific DAC for the isotope-of-concern, taking into account the protection factor (PF) of the respirator worn by workers in the area, plus ALARA. The PF's that apply to this project include the following:

a. PF = 1000 for powered air-purifying respirator;b. PF = 50 for full-face air-purifying respirator; andc. PF = 1 for no respirator or half-mask respirators.

Note: If the Contractor desires the use of other types of respirators on the job beyond those listed, the Contractor shall contact the Company to determine the respiratory protection factor of that respirator.

3. If general area airborne radioactivity exceeds 10% of the appropriate DAC (given the appropriate respiratory protection factor), then immediate radiological controls must be implemented at the source of generation to reduce

Page 54: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 42 of

airborne concentration. Upon written notification by the Company, the Contractor has one week to provide the Company with a written explanation of causes and corrective actions to prevent the reoccurrence of the situation.

4. In all cases, the Contractor shall control airborne emissions at the project boundaries such that 2% of the DAC for the appropriate radiological isotope-of- concern is not exceeded (based on a weekly average).

2.4.3 Contamination Limits

Equipment Release Cleaning Requirements

Requirements, including contamination limits for release of Contractor provided tools, equipment or material from containment or the building enclosure and the contamination area or for unrestricted release from the controlled area, consistent with DOE458.1 criteria.

2.4.4 Radiation Limits, Dose Limits, and Dosimetry Investigations

Radiation areas will be established for any area accessible to individuals in which radiation levels could result in an individual receiving a deep dose equivalent in excess of 5.0 mrem in one hour at 30 cm from the source or from any surface that the radiation penetrates.

1. High radiation areas will be established for any area accessible to individuals in which radiation levels could result in an individual receiving a deep dose equivalent in excess of 100 mrem in one hour at 30 cm from the source or from any surface that the radiation penetrates.

2. The Company Radiological Dosimetry performs investigations of unplanned external exposure results when the following levels are exceeded:

· 100 mrem to the whole body; and· 1,000 mrem to the skin or extremities.

NOTE: If any of these levels are exceeded, the Contractor shall be required to participate in an investigation into the cause of the exposure.

3. The Company Dosimetry performs internal dosimetry investigations with possible follow-up bioassay sampling when one of three conditions listed below occur:a. Air sampling indicates that a worker(s) may have been exposed to

levels above the action level for a particular radionuclide.

Note: Action levels are determined by internal dosimetry on a nuclide specific basis. Action levels are typically based on a worker's potential to receive ten mrem Committed Effective Dose (CED) in a one week period.

b. An incident or routine bioassay sample (urine) result is above the decision level for a particular radionuclide.

c. Worker is involved in a skin contamination event.4. When an internal dosimetry investigation is required, actions taken by

internal dosimetry are as follows:

Page 55: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 43 of

a. A preliminary internal dose estimate is performed based on air sampling and/or bioassay results.

b. An interview is performed with the worker and/or their supervisor to determine radiological working conditions and potential time of intake.

c. If preliminary dose estimates are greater than or equal to 100 mrem CED, a radiological work restriction is issued and a field investigation is initiated.

Note: A radiological work restriction may be issued by Dosimetry with approval of the Radiological Control Manager when preliminary dose estimates are less than 100 mrem to limit any further exposure that may prevent obtaining valid follow-up bioassay sampling and interfere with the dose evaluation.

d. Obtain follow-up bioassay sampling (urinalysis) to confirm initial results.

Note: The type and extent of follow-up bioassay sampling required is determined by internal dosimetry given the type of exposure, the radionuclide, the length of time since the exposure, and the preliminary dose estimate. For incident investigations involving potential exposure to uranium, a minimum of two samples is required.

e. Finalize internal dose estimates and notify worker or supervisor after follow-up sampling is completed.

2.5 Minimum Radiological Requirements for Personnel Access and Work within a controlled area or other Radiological Area.

2.5.1 Contractor personnel requiring access to the controlled areas or other radiological areas are to be trained radiological workers meeting requirements of 10 CFR 835 and DOE (approved the Company training programs are available). Workers are to participate in the Company DOELAP accredited personnel dosimetry and bioassay programs, and respiratory protection and medical requirements associated with the programs.

2.5.2 Project Personnel Radiological Monitoring and Surveillance Requirements

All project personnel who perform work in a controlled area must participate in the following personnel monitoring and surveillance programs:

1. TLD-the Contractor must provide the Company with the number of personnel in need of TLDs at least five (5) working days prior to the need for TLDs; and;

2. Urinalysis-baseline, annual, incident and at termination.

2.5.3 All project personnel who perform work in a radiological area must participate in the following the Companies personnel monitoring and surveillance programs:

1. TLD2. Baseline, periodic, incident and termination urinalysis.

2.6 Radiological Work Permits (RWPs)

Page 56: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 44 of

2.6.1 RWPs will be generated by the Company. The RWP informs workers of area radiological conditions, work controls, and entry/exit requirements. RWPs are required for activities at the site that include, but are not limited to:

1. Entry into any radiological area as defined in 10 CFR 835;2. Breaching of any process line, tank, vessel, or enclosure containing

radioactive material that may become loose or airborne during the work;3. Any work within the controlled area on contaminated or potentially

contaminated equipment where safety precautions are not adequately discussed in technical work documents approved by the Company Radiological Control;

4. Decontamination of highly contaminated equipment;5. Digging or disturbing soil in a soil contamination area; and6. Breaking the barrier of a fixed contamination area.

2.6.2 All workers must be briefed on the contents of each RWP under which that worker will perform work and the conditions of the work area.

2.6.3 Workers will sign the daily sign-in sheet on the RWP applicable to the work they are going to perform prior to entering the work areas, and will sign-out upon exiting these areas. With reference to the daily sign-in sheet, a worker may only be signed-in on one RWP at a time.

2.7 Break Rooms in Radiologically Controlled Areas

2.7.1 The following requirements apply to the establishment and use of break rooms:

1. The establishment of break rooms in radiologically controlled areas must be approved by the Company;

2. In approved break rooms, workers may drink any supplied beverages (i.e., soda, water, coffee, and drink mixes), no smoking or use of other tobacco products is allowed in the break rooms.

3. No anti-C clothing is allowed in break rooms with the exception of bagged and laundered anti-Cs that are being returned to the trailers after laundering, which must be moved immediately to the changing areas/locker rooms for storage. The respirator cabinet may be in the break room for accessibility.

Page 57: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 45 of

Section III Respirators

3.0 Respiratory Requirements

3.1 Respiratory Protection:

3.1.1 Respiratory protection is required whenever the likelihood of airborne concentrations of chemical hazards (1) exceed one half the current OSHA Permissible Exposure Limit (PEL) or ACGIH Threshold Limit Value (TLV), whichever is most restrictive; (2) exceed one half of any applicable Short Term Exposure Limit; (3) exceed other limits required by specific DOE or OSHA standards (e.g., Beryllium Action Level or Asbestos Excursion Limit), or (4) as required by MSDSs for materials used.

3.1.2 Respiratory protection is required when airborne radioactivity concentrations are likely to exceed 10% of the applicable Derived Air Concentration (DAC) or the worker’s exposure potential exceeds 4 DAC-hours per week.

3.1.3 Powered Air-Purifying Respirators (PAPRs), as a minimum, are required for all airborne generating activities in thorium contaminated areas.

3.1.4 Use of PAPRs in cold weather will be restricted in the following manner:

1. Below 32° F all personnel must attend a briefing on use of PAPR’s in cold weather; the briefing can be conducted during a regularly scheduled safety meeting.

2. When temperatures are between 15° F and 0° F, PAPR use is limited to 15 minutes.

Note: When the temperature is between 15° F and 0° F the employee can exit to a heated area without removal of the respirator.

3. When temperatures fall below 0° F, PAPR use is prohibited.

3.1.5 For the purposes of radiological control, all respirators are required to have P-100 filter cartridges.

3.1.6 The radiological Assigned Protection Factors (APF) that apply to this project include the following:

1. APF = 1000 for powered air-purifying respirator;2. APF = 50 for full-face air-purifying respirator; and3. APF = 1 for no respirator or half-mask respirators (non-FUEF only).

Note: If the Contractor desires the use of other types of respirators on the job beyond those listed, the Contractor shall contact the Company to determine the APF for that respirator. Half-mask respirators are not permitted for protection against radiological hazards unless approved in advance by the Company.

3.1.7 When respiratory equipment is provided by the Company, the Contractor shall comply with the Company Respiratory Protection Program which meets all regulatory requirements. Salient features of this program are:

Page 58: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 46 of

1. The Company shall review and accept adequate written documentation of training, medical evaluation and quantitative fit-testing from other organizations for Contractor personnel prior to issuance of respiratory equipment.

2. In the absence of acceptable written documentation of training, medical evaluation or quantitative fit-testing from another organization, the Company will provide the following:

· Respirator training;

· Required medical monitoring; and/or

· Quantitative fit-testing.

3. The Company shall supply the following types of respiratory equipment:

· Half-Face Air Purifying Respirator (APR) (Small, Medium, or Large) w/Cartridges;

· Full-Face APR (Small, Medium, or Large) w/Cartridges;

· Powered Air Purifying Respirator (PAPR) (Small, Medium, or Large Mask; Hood; or Helmet) Complete w/Cartridges and Accessories;

Note: Any Contractor-supplied breathing air equipment shall be approved by the Company prior to installation on site.

4. The Company shall determine the minimum respiratory protection requirements.

5. Cleaning and repair of respirators shall be the responsibility of the Company.

6. The Company shall supply clean, reconditioned and inspected respirators, as required at the jobsite.

7. Respirator issuance will be conducted by the Company. Contractor personnel will be required to check out each respirator individually from the Company Respirator Facility or the project respirator storage area.

8. Respirator use is limited to the Company-approved service life, as follows:

· Single use (one don-doff cycle);

· Single shift (repeated don-doff cycles until the end of the shift or the job, whichever occurs first, provided it is kept clean and radiologically uncontaminated or

· Multiple shift (repeated don-doff cycles until the end of the approved service life or the job, whichever occurs first, provided it is kept clean and radiologically uncontaminated).

9. Expired respirators shall be separated from their cartridges for recycling and the cartridges discarded.

10. Expired respirators contaminated with specially regulated chemicals (e.g., asbestos) shall be bagged and an approved warning label affixed before they are placed in the recycling receptacle

Page 59: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 47 of

11. The Company shall approve any exemptions or variances from the Company Respiratory Protection Program.

3.1.8 When respiratory equipment is provided by the Contractor, approval of the Contractor’s Respiratory Protection Program is required, including review and acceptance of written documentation of training, medical evaluation, and quantitative fit-testing as well as approval of respiratory equipment to be used for the job.

3.1.9 The Contractor is responsible for the following:

1. Properly maintain all respirator equipment.2. Complete a daily Company respirator request form specifying the names,

badge numbers (if available), and respirator quantity required for each individual. Requirements for weekends (Thursday through Monday) must be included in the request made on Wednesday.

3. Daily recycle expired respirators in Company approved receptacles and discard used cartridges.

3.2 Respirator Reuse Criteria

3.2.1 The following procedures will outline the necessary steps that must be followed to properly sanitize and survey respirators (face piece and cartridges together) so that they may be safely reused. The steps in this procedure, and all release criteria, are for work performed in uranium contamination areas.

3.2.2 Definitions and Limits

C ont a min a tion or B u f fe r Z o n e R e spi r a tor S to r a ge A r e a - Located on the buffer table, these are the shelves where empty respirator bags are placed by workers before entering the contamination area, and where sanitized and bagged respirators are placed when coming out on break. The Company RCTs remove the respirators from these shelves and perform surveys on the respirators.

C l ea n S ide R e spi ra tor A re a - This shelving unit is similar to the Buffer Zone Storage Area, but only sanitized respirators that pass a radiological survey are placed here.

Note: All of the above-mentioned areas will be demarcated with signs or labels.

R e spi ra tor - The term respirator will refer to the combination of cartridges and facepiece for APRs and the entire assembly as donned for PAPRs and ASRs.

3.2.3 Respirator Reuse

For reuse of respirators from a uranium contamination area, direct frisk contamination surveys using a beta-gamma monitoring instrument (frisker), must indicate levels less than 100 cpm above background, and removable contamination surveys measured by field counting smears using a beta-gamma monitoring instrument (frisker), must indicate less than 100 cpm above background.

3.2.4 Other Restrictions to Reuse

1. A respirator shall only be used by the same worker for the duration of its approved service life.

Page 60: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 48 of

2. The wearer shall have the right to refuse reuse of a respirator or cartridge if the wearer feels that the steps outlined in this procedure do not produce an adequately clean, sanitary respirator in good operating condition. In addition, the wearer shall have the right to refuse reuse of a cartridge if the wearer feels that the breathing resistance of that cartridge is too high.

3. The Company Radiation Protection approval is required prior to reuse of respirators by personnel performing work in thorium regulated areas.

3.3 Technical Approach

3.3.1 Doffing and Frisking Respirator

After doffing the respirator leave it in an area designated by the Company Radiation Protection personnel. The Company Radiological Control Technician will survey the respirator and release it to the user, if it is not contaminated. The user can then sanitize and store the respirator, as directed.

3.3.2 Sanitizing the Respirator

1. Don a new pair of surgical, powder-free gloves. Use paper towels to dry the respirator if necessary and use a wet wipe designed to clean/sanitize respiratory protection equipment to sanitize the respirator. – Powder-free surgical gloves should be specified – residual powder could interfere with ensuring proper seal and cause skin irritation to affected employee if mask is reused.

2. Put the sanitized respirator into the bag with your name on it and use a twist tie or tape to close the bag.

3. Place the bagged respirator on the buffer zone table (or Buffer Zone Respirator Storage Area), dispose of all wet wipes, paper towels, and surgical gloves as radiological waste, and then monitor out of the area as usual.

Note: Do not stack respirators on top of each other. If any doubt exists about who a certain respirator face piece was used by, that respirator face piece will not be re-used. Discard the cartridges and place the face piece in the respirator drum.

3.3.3 Surveying Sanitized Respirators

A Company Radiological Control Technician will don clean surgical, powder-free gloves and get a bagged respirator from the Buffer Zone Storage Area. Remove the respirator from the bag and perform a smear of the entire respirator, including the cartridges, beginning with interior surfaces and then proceeding to the exterior surfaces. Survey the smear using a portable beta-gamma frisker. – Powder-free gloves should be specified for use in surveying respirators for reuse. Residual powder on respirator could interfere with proper seal and cause skin irritation to user.

Note: Oil treated cloth (i.e. masslin cloth or equivalent) shall not be used to smear the respirator. The residual oil left on the respirator may cause deterioration of the respirator parts.

1. Perform a direct frisk for fixed contamination of all accessible surfaces of

Page 61: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 49 of

the respirator using a portable beta-gamma frisker.2. Based on the survey results, perform the following:

Page 62: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 50 of

a. If fixed or loose contamination levels are greater than or equal to 100 cpm above background, remove the cartridges and place the face piece in the radiological contaminated respirator container.

b. If fixed or loose contamination levels are less than 100 cpm above background on the respirator and cartridges, place the respirator back in the bag and put in the designated clean side storage location.

3.3.4 Reusable Respirator Donning Sequence

1. Don all anti-Cs except outer gloves and hood, proceed to the Clean Side Respirator Storage Area, and get the re-usable respirator with your name on it.

2. Perform pre-donning inspection, don respirator, and perform positive and negative pressure tests. Note: Successful completion of both the positive and negative pressure tests required for respirator usage.

3. Don outer gloves and hood for re-entry into the area.

Page 63: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Page 50 of

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Section IV Asbestos and Lead4.0 Asbestos and Lead in the Work Area4.1 Asbestos Containing Material:

4.1.1 Asbestos Containing Material (ACM) or Presumed Asbestos Containing Material (PACM) to be abated by or that will affect the Contractor is addressed in the Section “C” Statement of Work.

4.1.2 Contractor shall ensure his employees and his lower-tier subcontractor employees are informed of the presence and location of ACM or PACM in the project work area.

4.1.3 Contractor shall inform the Company if he or one of his lower-tier subcontractors discover suspected ACM or PACM in the project work area that was not originally identified by the Company. The Contractor shall ensure that the Company is notified immediately upon discovery.

4.2 Asbestos Abatement

4.2.1 Contractor shall make the required notifications and pay applicable fees to the Ohio Department of Health (ODOH) and provide a copy to the Company for the Environmental Compliance Section records.

4.2.2 At least ten working days prior to issuing notification to the ODOH and Environmental Protection Agency, the Contractor shall meet with the Company Environmental Compliance Officer to ensure that the Contractor's Ohio Department of Health Notification and the Company's Ohio EPA Notification are consistent.

4.2.3 Contractor shall provide documentation of current certification as a licensed asbestos abatement Contractor by the ODOH. This documentation shall be provided as part of the Asbestos Abatement Work Plan.

4.2.4 Contractor shall provide the names of all personnel assigned to the asbestos abatement project with the Asbestos Abatement Work Plan.

4.2.5 Contractor personnel involved (including the asbestos abatement Project Designer) in the removal of more than 50 linear or square feet of friable ACM shall be asbestos trained and have a current State of Ohio Asbestos Certification. These certifications may be submitted with the Asbestos Abatement Safe Work Plan.

Note: Removal of non-friable AMC does not require certification by the ODOH.

4.2.6 Contractor shall provide documentation that each worker performing asbestos abatement work is physically fit to perform asbestos work. This documentation shall be provided in the form of a physician's written opinion stating that each worker is medically fit to perform asbestos work. A physician's written opinion shall be included as part of the Asbestos Abatement Work Plan when an outside source is used.

4.2.7 Contractor shall provide documentation with the Asbestos Abatement Work Plan of respirator training, medical certification (physician's written opinion for respirator usage), and quantitative respirator fit-test.

4.2.8 The Company will conduct daily inspections of the asbestos work area. If leaks are present in a negative pressure enclosure or there is visual evidence of asbestos

Page 64: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 51 of

contamination outside the asbestos regulated area, the asbestos abatement Contractor shall take immediate action to abate the hazard.

4.3 Asbestos Abatement Plan Requirements

4.3.1 Contractor shall submit an Asbestos Abatement Work Plan to the Company for compliance review, for all asbestos abatement activities. The asbestos abatement work plan shall incorporate the requirements of OSHA, the U.S. EPA's National Emissions Standards for Hazardous Air Pollutants (NESHAPS) and ODOH. Refer Attachment J- 25 for Work Plan format requirements. The Contractor is responsible for submittal of a work plan for the Company compliance review for all asbestos abatement activities.

4.3.2 For asbestos abatement projects which involve more than 3 linear or square feet of friable ACM or more than 50 linear or square feet of non-friable ACM, the asbestos abatement work plan shall be prepared by an Asbestos Hazard Abatement Project Designer who is currently certified by the ODOH. The Asbestos Abatement Work Plan shall contain information listed in Appendix F of 1926.1101, under the paragraph heading "Planning the Project" as applicable for the scope of asbestos work. The following information as applicable shall also be included in the asbestos abatement work plan.

1. The method which will be used to notify building occupants of the nature of the asbestos work;

2. A description of the method(s) to be used to isolate the work area;3. Employee exposure assessments which have been completed for previous

asbestos activities closely resembling the asbestos activities to be performed, which will be used to assign protective clothing and respiratory protection for asbestos work;

4. A description of the method to be used to handle and remove waste material from the work site; and

5. A description of procedures which will be used in the event of an emergency situation (i.e., medical emergency, breach of containment).

4.3.3 The asbestos abatement Work Plan shall provide the name of the individual who will serve as the competent person during asbestos work activities and address how the Contractor will:

1. Ensure that an employee exposure assessment has been completed by the competent person prior to the start of asbestos work, or as soon as practical after the start of asbestos work. Protective clothing, respiratory protection, Industrial Hygiene requirements and work practices shall be determined based on the results of the exposure assessment.

2. Ensure that methods are used to prevent the migration of airborne asbestos from the asbestos regulated area. The requirements for air monitoring described in this paragraph apply to asbestos work where critical barriers are not used to control the migration of asbestos fibers from the work area. For all Class I jobs exceeding 25 linear or 10 square feet of ACM or PACM and for all Class I jobs or indoor Class II jobs (classes of asbestos work as defined by 29 CFR 1926.1101) where a negative exposure assessment cannot be produced, when perimeter air monitoring is used to verify that isolation methods prevent the migration of airborne asbestos, the asbestos abatement Contractor shall ensure

Page 65: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 52 of

the results of such air monitoring are provided to the Company no later than 24 hours from the end of the work shift represented by the monitoring.

3. Ensure the competent person makes routine inspections of the asbestos job site to perform duties specified by OSHA. For Class I asbestos work, the competent person shall inspect the asbestos job site at least once during each work shift. For Class II and III asbestos work, the competent person shall inspect the asbestos job site at least once during the work shift during the first three days of each phase of the asbestos work, and at least once a week after that time.

4.3.4 Contractor shall document daily asbestos inspections and shall maintain a file of the Daily Job Site inspections on site, make them available to the Company and submit them to the Company at the project completion for retention as a project record.

1. Ensure that any incidents involving potential asbestos contamination (i.e., spills of asbestos outside the asbestos regulated area, the breach of a negative pressure enclosure) shall be abated immediately by the asbestos abatement Contractor. All incidents shall be reported to the Company.

2. Ensure that the asbestos regulated area is maintained until the Company verifies that final clean-up of the work area is acceptable.

4.4 Lead Abatement

4.4.1 Contractor shall submit a Written Lead Compliance Plan to the Company 30 days prior to the start of lead abatement activities. A work plan may be used as the Written Lead Compliance Plan if all requirements for the Written Lead Compliance Plan are contained within the work plan. The plan shall contain all of the information listed in 29 CFR 1926(e)(2). Refer to Attachment J-25 for Work Plan Format Requirements. If the Contractor is using a Contractor for lead abatement, the Contractor shall submit the Contractor's work plan.

4.4.2 Contractor shall ensure that the competent person shall make frequent and regular inspections of lead work activities. Documentation of inspections by the competent person shall be in writing and be available to the Company upon request.

4.4.3 Contractor lead workers and supervisors shall be trained in accordance with the requirements of 29 CFR 1926.62, reference 8, section E.

4.4.4 Contractor shall provide the names of workers and documentation of lead worker training with the Written Lead Compliance Plan when training is provided by an outside source.

4.4.5 Contractor shall provide documentation with the Written Lead Compliance Plan of respirator training, medical certification (physician's written opinion for respirator usage), and quantitative respirator fit-test (reference section B 3.1, for requirements related to outside medical resources).

4.4.6 Contractor shall submit documentation of lead medical surveillance examination and laboratory and other biological monitoring results to the Company for approval by the Medical Department in accordance with the Submittal Register Attachment J-8.

4.4.7 Contractor shall submit the names of lead abatement workers to the Company Medical Department prior to the start of lead abatement work in order to ensure that initial baseline biological monitoring has been performed in accordance with the

Page 66: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

August 20, 2013 Attachment J-13Environmental Health and Safety Requirements for On-Site Work

Page 53 of

Submittal Register Attachment J-8.

Page 67: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13, Appendix 1August 20, 2013 Special Environmental, Safety Health,Training Matrix

For items checked the stated requirements will apply to Contractor personnel as applicable to the task being performed.

Y 1. This work is Hazardous/Complex. "Hazardous or complex" work means any on-site physical work involving construction, D&D, infrastructure improvement, sample collectionand analysis, excavation, transportation, or waste material packaging and placement.

Y

2. This work is categorized as, and is, therefore, generally governed by the following occupational safety and health standards:

Xa. CERCLA (29 CFR 1910.120, as invoked by the National Oil & Hazardous Substance Pollution Contingency Plan)

D b. Construction (29 CFR 1926)

D c. Telecommunications (29 CFR 1910.268)

D d. General industry/service (29 CFR 1910)

Y3. V i s i t o rs S a f e t y Br i e f i n g - Disposable Paper Visitor Badge, X1000 and will need entry to T152G, bring Drivers License

• Responsibility: the Company, Responsibility: Each Contractor employee must complete security training guide and be briefed to the security plan prior to access and Visitor

• Duration: 30 minute, class room session.• Anticipated Task: General site access under constant FOCI Escort.

N4. G e n eral E m p l o yee Tra i n i n g ( G ET) – Minimum Visitor Site Access – Unescorted, no LAA and less than 10 days on sight.

• Responsibility: the Company,• Duration: Training will consist of 10hr CBT (to be completed if on-site for more than 2 weeks)• Anticipated Task: General site access• Basis: General overview of site rules• Remarks: Visitor will receive a “GET” access card

N5. Ra d i o l og i cal W o r k er Tra i n i n g - allows unescorted access to Radiological areas

• Responsibility: the Company,• Duration: 24 hr. class room (2 or 3 sessions)• Required for access to areas with radiological exposure/contamination potential• Anticipated Task: Access requiring use of TLD and exit monitoring• Remarks: Employee will be able to enter Radiological areas without an escort

N

6. Re s pi ra t o ry P ro t ec t i on Tr ai n i n g • Responsibility: Company• Training verification certificate (OSHA equivalent) submittal required for each employee.• Anticipated Task: Personnel who are required to wear respiratory protection equipmentContractor employees will be using the Company respiratory equipment and require.• 2 hr. class room training• A physical and entrance into the Company Respiratory Protection Program

N

7. Re s pi ra t o r F i t Te s t • Responsibility: Company• Training verification certificate (OSHA equivalent) submittal required for each employee

If Contractor employees will be using the Company respiratory equipment and require.• 1 hr. fit test• A physical and entrance into the Company Respiratory Protection Program

Y8. S u p erv i s e d F i e l d Ex p er i e n ce f o r G e n eral Sit e W o r k er – OSHA Trained individual

• Responsibility: Contractor

• Anticipated Task:

N9. H AZW O P ER

• D 24 Hour (Occasional Site Worker) Occasional Site Worker (8 hrs.) Supervised Field Experience, must be documentedOr• X40 Hour (General Site Worker) HAZWOPER Training General Site Worker (24 hrs.) Supervised Field Experience, must be documented

Y10. L o c k o u t / Ta g o u t f o r A u t h o r i z e d E mp l oy e e – On-site LOTO Class ( 6 hrs). Contact: Billy Summers x3749, or Cindy Howard x3086 (coordinator)

• Responsibility: the Company,• Anticipated Task: Personnel to be performing work under LOTO protection• Basis: LOTO on the Company systems requires site specific knowledge and qualified program

D11. H o i s t i n g a n d R i g g i n g – If Hoisting or Rigging is used, then yes. Contractor provides.

• Responsibility: Contractor

• Anticipated Task: Personnel performing hoisting and rigging activities• Basis: No site cranes or hoists. Only equipment supplied by the Contractor. Lift Plans to be reviewed by the Company

D12. P re - W o r k r i gg i n g O r i e n t a t i on – If needed, shall be done on site as part of the Pre-job brief. Tim Williams is the contact. X3921

• Responsibility: the Company,

• Anticipated Task: Personnel doing any work involving hoisting and rigging(non-critical lifts)• Basis: General overview of site rigging requirements

Y13. T h e C o mp a n y HS E O r i e nt a t i on

• Responsibility: the Company,

• Anticipated Task: Personnel who will be on-site• Basis: Introduction in the Company site safety program

Y14. OSH A 1 0 h r C l a ss room I n s t r u c t i on f o r Co n s t r u c t i o n/G e n eral I n d u s t ry – Provided by Contractor

• Responsibility: Contractor• Class room training with verification certificate (OSHA equivalent) submittal required for each employee• Anticipated Task: Personnel who will be performing work performed on-site

Page 68: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13, Appendix 1August 20, 2013 Special Environmental, Safety Health,Training Matrix

Y15. OSH A 3 0 h r C l a ss room I n s t r u c t i on f o r Co n s t r u c t i o n/G e n eral I n d u s t ry – Provided by Contractor

• Responsibility: Contractor• Class room training with verification certificate (OSHA equivalent) submittal required for each employee serving as Supervisor and/or HSO• Anticipated Task: Supervision and HSO of personnel who will be performing work performed on-site

Y16. F a l l P r o t ec t i on : Contact FBP H&S

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity.• Anticipated Task: Personnel who are required to work at elevated heights of 6 ft or more from an unprotected work surface

Y17. Co n f i n ed S p ace: Confined Space – Authorized Attendant/Entrant - Training on-site (2 hrs), Confined Space for Supervisor (2 hrs), Rick Stragne x2451

• Responsibility: Company• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity.• Anticipated Task: Personnel who enter or attend a confined space

D18. H ear i n g C o n s erv a t i on – If above 85 dB

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who work in high noise (time-weighted average 85 db in 8 hrs)

D19. F i re Wa t ch f o r We ld i n g / B u r n i n g / H ot w o rk

• Responsibility: the Company,

• Anticipated Task: Personnel performing or acting as fire watch of any activity producing an open flame of sparks• Basis: the Company facilities are at risk

N20. A s b e s t o s A w ar e n e s s

• Responsibility: the Company.

• Anticipated Task: Personnel who may be exposed to Asbestos when working• Basis: General awareness to the hazards of Asbestos exposure

N21. Bery ll i u m Awar e n e s s

• Responsibility: the Company,

• Anticipated Task: Personnel who may be exposed to Beryllium when working• Basis: General awareness to the hazards of Beryllium exposure

N22. P CB A w ar e n e s s

• Responsibility: the Company,

• Anticipated Task: Personnel who may be exposed to PCBs when working• Basis: General awareness to the hazards of PCB exposure

N23. Lead S a f e t y

• Responsibility: the Company,

• Anticipated Task: Personnel who may be exposed to Lead when working• Basis: General awareness to the hazards of Lead exposure

N24. RCRA P art B

• Responsibility: the Company,• Duration: 1 hr CBT• Anticipated Task: Personnel generating RCRA wastes

Y24A.

Waste Generation Training Module. 1 hr Computer Based Training Class, at T152G, Tracy McKee x2297• Responsibility: the Company,• Duration: 1 hr CBT• Anticipated Task: Personnel generating RCRA wastes

N25. H AZC O M C h e mi cal Ca t e g or i es

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Hazardous Chemical Use

D26. PP E

• Responsibility: Contractor

• Anticipated Task: Personnel who wear hand, eye, face, and foot protection• Basis: General PPE use

Y27. S p o t t er a n d F l agger

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who will be performing spotter duties .

Y28. M o bil e E q ui p m e n t

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who operate mobile equipment on-site

N29. Co mp re ss ed G as Cy l i nd er S a f e t y

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel that handle, transport, and use compress gas cylinders

Page 69: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13, Appendix 1August 20, 2013 Special Environmental, Safety Health,Training Matrix

Y30. La dd er s a f e t y

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who use a ladder

D 31. S ca ff o ld i n g (includes documentation for Scaffold Competent Person)

• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who use and assemble scaffolds on-site

D32. Te mp era t u re Ex t re m es

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who will be performing work in greater than 85 degrees Fahrenheit or colder than 10 degrees Fahrenheit

D33. E l ec t r i cal H a z ard A w ar e n e s s

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who may be exposed to electrical hazards when work on or near electrical equipment

N34. E x cav a t i on C o m p e t e n t P er s on

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who are required to perform Excavation Competent Person Duties

D35. E l ec t r i cal S a f e t y

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who will be working on electrical equipment

N36. A s b e s t o s A b a t e m e n t

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel who will remove, supervise, design, or inspect asbestos

N37. F i r s t Re s p o nd er A w ar e n e s s

• Responsibility: the Company,

• Anticipated Task: Response to emergency situations on-site• Basis: What to do in emergency situations

Y38. C P R

• Responsibility: Contractor• Training with verification certificate (OSHA equivalent) submittal required for employee performing activity• Anticipated Task: Personnel protection and safety

N39. S PP C/ Spil l P rev e n t i on a n d Co nt r ol

• Responsibility: the Company,

• Anticipated Task: Use/ storage of hazardous liquids• Basis: At least one trained person shall be onsite at all times

N40. E n v i r o nm e nt al M a n a ge m e n t S y s t e m

• Responsibility: the Company• Duration: 0.5 hrs CBT• Anticipated Task: General awareness

N41. G e n eral A w ar e n e s s Tra i n i n g f o r H a z M a t W o r k ers

• Responsibility: the Company• Duration: 1 hr CBT• Anticipated Task: General awareness for personnel performing demolition

Y42. S a f T - C on

• Responsibility: the Company• Duration: 6 hrs Classroom• Anticipated Task: Safety Training for Contractor personnel

D43. P re ss u re S a f e t y

• Responsibility: Contractor• Anticipated Task: Modification or replacement of pressure vessels, modification to steam system, boilers, air receivers, and supporting piping systems.• Basis: 10 CFR 851, App A, Part 4

Page 70: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 1

Page 71: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 2

Page 72: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13 Environmental PolicyExhibit # 3

Page 73: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 4

10 CFR 851, Fit For Duty Evaluation

Fluor B&W PortsmouthEmployee/Contractor

Name: Date:

Phone: Company or Contractor: E-

Mail: Job Site Location:

Position Description: Charge No.:

Manager (M): New Hire: Yes No

M Phone: Change in Job Duties: Yes No

M E-Mail: Return to Work (RTW): Yes No

The employee will be performing the following job duties and working in the following conditions: (Please check all that apply or are anticipated)

Job Requirements Job RequirementsPrimary office duties, heavy computer use Accurate distance visionExcessive Heat Accurate near visionExcessive cold Depth perceptionUse of ladders or scaffolds or working at heights Color perceptionClimbing steps Prolonged driving of or riding in motor vehicleProlonged walking/standing Environmental samplingRepeated pushing/pulling Crane operatorsInitial site walk-downs in unknown hazard environments Working around moving equipment/machineryDuties at remote work sites or working alone Driving vehicles requiring a CDLAbility to wear safety shoes or foot protection Driving/operating heavy equipmentAbility to wear hearing protection Use of vibratory toolsExposure to moderate noise, more than 85 dBA, 8 hours per

daySqueezing hand tools (repetition)

Exposure to significant noise, more than 90 dBA, more than 8hours per day

Driving a motorized vehicle (car, golf cart, gator)

Ability to wear respiratory protection Working in confined spaces (claustrophobia)Respirable environment-exposure to chemical, dust, fumes,

mistsWorking in disposable PPE (toxic dust barrier)

Respirable environment-exposure to asbestos, silica, coal, etc. Working in impermeable PPE (heat stress factors)Working in a toxic environment-(e.g., carbon monoxide fumes)Sedentary work- mostly seated work with occasional walking, standing or lifting up to 10 lbs.Light work-significant degree of walking or standing, lifting up to 20 lbs. Occasionally and/or up to 10 lbs. of force frequentlyMedium work-frequent squatting, bending, stooping, kneeling. More than occasional work on uneven surfaces. Exerting up to 50 lbs. of force

occasionally and/or up to 20 lbs. frequently, and or up to 10 lbs. of force constantlyHeavy work-frequent squatting, bending, stooping, kneeling. More occasional work on uneven surfaces. Exerting up to 100 lbs. of force

occasionally, and/or up to 50 lbs. of force frequently, and/or more than 20 lbs. of force constantlyVery Heavy work-frequent squatting, bending, stooping, kneeling. Frequent work on uneven surfaces. Exerting more than 100 lbs. of force

occasionally, and/or more than 50 lbs. of force frequently, and/or more than 20 lbs. of force constantly

Type of Physical Required: Repeat Annual Bi-Annual Tri-Annual

Medical Records Reviewed Hazwoper Routine Respirator

Project Manager (sign & date):

Reviewing Medical Professional (sign & date):

Page 74: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 5

Subcontractor OSHA Competent Person Designation

Contractor shall complete this Form signifying that the designated Competent Person has completed the appropriate training and background to perform the duties as a competent person.

The following individual(s) representing are designated as the OSHACompany Name

Competent Person, and are capable of identifying existing and predictable hazards in the surroundings

or working conditions which are unsanitary, hazardous, or dangerous to personnel on the site or the

public, and has authorization to take prompt corrective measures including “stop work” authority to

eliminate them, while overseeing the specific work scope outline in this contract.

1. Competent Person Name Date

Descending order of Designated Competent Person in Line 1’s or 2’s

absence: 2. Name Date

3. Name Date

1. Specialized Work Competent Person:

Name Date

Type of Work

==================================================================================

Contractor Superintendent/Foreman/Lead Site Manager Acknowledgement of Understanding

I, designated as the assigned on-site ContractorName

Superintendent/Foreman/Lead Site Manager for Contract No. acknowledge

that I have read and understand the contract documents relative to the scope of work for this

project.

Superintendent/Foreman/Lead Site Manager Signature

Company

Date

Page 75: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 6

Page 76: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 6

Page 77: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 6

Page 78: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

SAFETY TASK ASSIGNMENT Attachment J-13, Exhibit 7

THE COMPANY-NSE-PRO-00002-F03, Rev. 1 (05/12)

Fluor-B&W IPortsmoulh

Safety Concerns

Check the applicable activities in your area and ensure

Post Work STA

Supervisor:

safe measures are implemented:Asbestos Exposure Lifting SafetyAsphalt Lock Out/Tag Out

Date:

Time:

Attendants Material StorageBarricades Nuclear Criticality SafetyCement Pinch PointsChemical Exposure Powder Actuated Tools Confined Space Power LinesCranes/Lifting Equip Power Tools Dismantle/Demolition Pressurized Equipment

Was anyone injured or did an unplanned incident occurtoday. Yes No

If yes, explain: Project/ Activity Name:

Location: Electrical Radiological Controls Emission Controls Respiratory ProtectionEquipment Inspection RiggingErosion Controls Safety Involvement Excavation/Trenching Tank/Pipe Testing

Was it reported to the Safety department?Yes No

Was a Problem Report submitted? Yes NoFissile Material

HandlingTraffic Management Is the work area clean and free of debris from the day’s

Flammable Material Vehicles/Mobile Equip Grinding Waste Streams Hazard Communication Weather Conditions Heavy Equipment Working at HeightHigh Pressure Cleaning Working in Cold Hot Tapping Working in HeatHousekeeping Working with Sharps

Insects Others

work? Yes No

What problems did you have with today’s work assignment?

What can we do to improve performance?Supervisor:

Ladders/Scaffolds Lead Exposure

Date:

Time:

Involved Crew Members

Signature Post STA Initial

Work area walk down completed prior to work:

Task Location:

Task Description:

Page 79: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

SAFETY TASK ASSIGNMENT Attachment J-13, Exhibit 7

THE COMPANY-NSE-PRO-00002-F03, Rev. 1 (05/12)

File completed STA Forms with technical work

documents.

Page 80: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

SAFETY TASK ASSIGNMENT Attachment J-13, Exhibit 7

THE COMPANY-NSE-PRO-00002-F03, Rev. 1 (05/12)

Safety Task AssignmentClothing

Personal Protective Equipment Permits/Tags/Signs/Documents RequiredThe Company’s Safety Task Assignment (STA) processsignificantly impacts the success of our safety culture and the reduction of incidents. The interactive processrequires that management/supervisors and employeesshall:

· Define the general task for each activity.· Identify known and potential safety hazards

associated with the task.· Determine work practices to complete the task

safely.· Address requirements for all personal

protective equipment.· Establish that all crew/department

employees understand the above information.

· Each crew member is empowered to continuously participate in this process in an effort to promote our ZERO Incidents culture.

· Safely execute the task as described—if conditions or scope change, revise accordingly.

STAs will be completed daily. Post this STA in an obvious place or with the technical work documents throughout the duration of the task. Each crew member involved with the task will sign this STA.

Know the emergency procedure for your work area!

General Task Assignment

Chemical Resistant Fire Retardant Reflective Vest or Hand-held signal Device

Ear ProtectionEar Plugs Ear Muffs

Eye/Face ProtectionSafety Glasses with Side-shields GogglesWelding Hood Face Shield

Fall Protection Head ProtectionFull-Body Harness Hard Hat

Foot ProtectionSteel Toed Boots MetatarsalRubber Boots Electrical-Rated Boots

Hand ProtectionLeather Rubber/LatexKevlar Forearm Cuffs

Chemical Resistant

Respiratory ProtectionQualified to wear?

Type:

Other

Critical StepsRadiological Quality Assurance

Technical Safety Requirements Nuclear Criticality

Other:

Potential Hazards

Hot Work Crane LiftTrenching & Excavation ScaffoldsConfined Space MSDS Line Break/Hot TappingLock-Out/Tag-Out Signs/BarricadesHazardous Material Compliance Emissions Notifications

Other

Employee Qualifications RequiredCrane Operator Forklift Operator Mobile Equipment Operator Vehicle Operator Powder-Actuated Tool User Hazardous Waste Heavy Equipment SignalmanCompetent Person (excavations, confined space, scaffolds, hazardous material, heavy equipment) Fissile Material Handler

Other

Training Verified Complete? Yes No

Safe Work Practices Pertinent to Hazards

Page 81: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 8

PHYSIOLOGICAL MONITORING FOR HEAT STRESS

1 of 2

This appendix is intended to be used to provide work conditions that allow workers to maintain body temperatures less than or equal to 100.4F. Medically approved, fully acclimatized workers can work up 101.3º F, as necessary. Not all individuals are affected by heat in the same way. An individual's response to working in a hot environment depends on a variety of factors (i.e., level of physical fitness, age, gender, level of acclimatization, use of alcohol and drugs, etc.).

Physiological monitoring measures an individual's response to heat, determining their heat load and acts as a method of preventing overexposure. Therefore, physiological monitoring may be performed on individuals in any heat-related work environment and ideally when the water vapor barrier impermeable clothing is worn. The monitoring shall be performed by the worker or other qualified individual. This will allow personnel to adjust the work/rest regimen according to their individual tolerance for heat. This may result in a work period that exceeds those specified in Appendix A.

CAUTIONAny time symptoms of sudden fatigue, nausea, dizziness, or lightheadedness manifest themselves,

theindividual should discontinue work immediately and report for medical evaluation.

Physiological monitoring may result in a more restrictive or less restrictive work period for individuals with a low tolerance to heat stress. Individuals displaying a low tolerance to heat stress may need to receive further medical evaluation for fitness to work in hot environments. Physiological monitoring may be conducted using one or more of the following methods outlined on Pages 2 and 3 of this Appendix.

1. Hear t R a te Monito r i n g (OS&H can provide or recommend heart rate monitors and assist with monitoring)

A. Sustained Heart Rate Monitoring (e.g., measured during work with attached pulse monitor)

Determine sustained heart rate (several minutes) during work by using a pulse monitor. Discontinue any environmentally-induced or activity-induced heat stress for an individual when the sustained heart rate is greater than the value representing 180 beats per minute (bpm) minus the individual’s age in years. This limit only applies to healthy adults with assessed normal cardiac performance. Workers taking prescribed medications should be provided with specific recommendations by the Occupational

NOTEIf the worker’s pre-work resting heart rate is greater than 110 bpm, he cannot continue

working in ahot environment. (Re-measurement of the resting heart rate can be made if there is

any question aboutthe representativeness of the initial measurement.)

Physician.

B. Recovery Heart Rate Monitoring (measured on rest break approx. one minute following work)

i. A pulse monitor should be used determine the recovery heart rate following work by counting the radial pulse (e.g., wrist) during a 30 second period as soon as possible after going on break (approximately 1 minute). Discontinue exposure to heat stress for a full rest period if the recovery heart rate is above 110 bpm.

Page 82: \376\377\000M\000i\000c\000r\000o\000s\000o\000f\000t\000 ... J-13... · Web viewDo not store oxygen cylinders near flammable or combustible materials, such as oil, grease, reserve

Attachment J-13Exhibit # 8

PHYSIOLOGICAL MONITORING FOR HEAT STRESS

1 of 2

ii. If the recovery heart rate exceeds 110 beats per minute, then shorten the next work cycle by 1/3 and keep the rest period the same. For example, if the initial work/rest cycle was 45/15 minutes, shorten it to 30/15 minutes.

iii. If the recovery heart rate still exceeds 110 beats per minute at the beginning of the next rest period, shorten following work cycle by 1/3 and keep the rest period the same. Continuing the previous example, shorten the next work/rest cycle to 20/15 minutes.

iv. Continue this process until the recovery heart rate is less than 110 bpm at approximately one minute into the break period. The individual should cease work and report for medical evaluation immediately upon any symptoms of heat illness.

C. Heat stress-related activities in hot environments shall be discontinued when an individual’s recovery heart rate exceeds 110 bpm or sustained heart rate is greater than Maximum Heart Rate (MHR) calculated as follows: M H R = 180 - N i (where Ni is the individual’s age in years)

D. Heart rate monitoring should be conducted after each 15- minute work period unless performed continuously using pulse monitors.

E. Length of rest periods times are not dictated by this procedure, but need to long enough to allow heart rates to return to pre-start levels.

2. B ody T e m pe r a t u r e ( W o r k / R est P e r i od) (OS&H can provide or recommend ear thermometers)

NOTEIF measuring body temperature using an ear thermometer, THEN, to ensure an accuratetemperature reading is taken, ensure the following requirements are met before taking a reading:

· Thermometer window is clean· Thermometer is aligned toward the Tympanic Membrane (TM)· Subject’s ear canal is relatively clear

A. Measure body temperature at any time during the work period or as soon as possible in the rest period. Ear temperature monitors with disposal covers are available through OS&H. The body temperature shall not be allowed to stay over 100.4º F (101.3ºF, if medically approved and fully acclimatized).i. If temperature exceeds 100.4ºF (101.3oF), shorten next work cycle by 1/3 and keep

rest period the same.

ii. If temperature exceeds 100.4ºF (101.3oF) at the beginning of the next rest period, shorten the next work cycle by 1/3 and keep rest period the same.

iii. Continue until body temperature is at or below 100.4º F (101.3oF) at the beginning of the next rest period.

B. Temperature monitoring should be conducted approximately every 15 minutes when the Action Limits of Appendix A are exceeded or when workers self-determine that monitoring is appropriate.

Length of rest periods times are not dictated by this procedure, but need to be long enough to allow body temperatures to return to pre-start levels