Alcatel-Lucent 1850Transport Service Switch (TSS-60) | Release 2.0User Provisioning Guide
365-372-601R2.0CC109696567
ISSUE 1JANUARY 2009
-
Legal notice
Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of theirrespective owners.
The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.Copyright 2009 Alcatel-Lucent. All rights reserved.
Notice
The information in this document is subject to change without notice. Although every effort has been made to make this document as accurate,complete, and clear as possible, Alcatel-Lucent and its predecessors assume no responsibility for any errors that may appear in this document.
Federal Communications Commission (FCC) Notification and Repair Information
This equipment is designed to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits aredesigned to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. Thisequipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions manual,may cause interference to radio communications. Operation of this equipment in a residence is likely to cause harmful interference, in whichcase, the users will be required to correct the interference at their own expense.
Security
In rare instances, unauthorized individuals make connections to the telecommunications network. In such an event, applicable tariffs requirethat the customer pay all network charges for traffic. Alcatel-Lucent and its predecessors cannot be responsible for such charges and will notmake any allowance or give any credit for charges that result from unauthorized access.
Limited Warranty
The terms and conditions of sale will include a 1-year warranty on hardware and applicable software.
Ordering information
To order Alcatel-Lucent documents, contact your local sales representative or use Online Customer Support (OLCS)(https://support.lucent.com).
Technical support telephone number
For technical assistance, call the Alcatel-Lucent Customer Support Services at 1-866-582-3688. This number is monitored 24 hours a day.
Information product support telephone number
You can also call this telephone number to provide comments on the Alcatel-Lucent 1850 Transport Service Switch 60 or to suggestenhancements. Comments or suggestions for enhancements can also be emailed to the Comments Hotline ([email protected])and/or entered online at the Online Comment Form (http://www.lucent-info.com/comments/enus/).
-
Contents
About this document
Purpose ..................................................................................................................................................................................... xxxiiixxxiii
Reason for revision ............................................................................................................................................................. xxxiiixxxiii
Safety information ............................................................................................................................................................... xxxiiixxxiii
Intended audience ................................................................................................................................................................ xxxiiixxxiii
How to use this information product ........................................................................................................................... xxxiiixxxiii
Conventions used ................................................................................................................................................................. xxxivxxxiv
User interface to system ..................................................................................................................................................... xxxvxxxv
Using procedures ................................................................................................................................................................... xxxvxxxv
Related information ............................................................................................................................................................. xxxvixxxvi
Technical support ................................................................................................................................................................ xxxviixxxvii
How to order ........................................................................................................................................................................ xxxviixxxvii
How to comment ................................................................................................................................................................ xxxviixxxvii
1 Safety
Overview ...................................................................................................................................................................................... 1-11-1
Structure of safety statements .............................................................................................................................................. 1-21-2
General notes on safety .......................................................................................................................................................... 1-41-4
Laser safety ................................................................................................................................................................................. 1-61-6
Electrostatic discharge .......................................................................................................................................................... 1-191-19
Save these safety instructions ........................................................................................................................................... 1-221-22
Eco-environmental statements ........................................................................................................................................... 1-251-25
2 Database backup and restore procedures
Overview ...................................................................................................................................................................................... 2-12-1
...................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
iii
-
Before you begin ...................................................................................................................................................................... 2-22-2
Procedure 2-1: Apply software generic ........................................................................................................................... 2-32-3
Procedure 2-2: Backup and restore NE database via FTP ...................................................................................... 2-62-6
Procedure 2-3: Backup and restore NE database via FTTD ................................................................................ 2-182-18
Procedure 2-4: Backup and restore NE database via FTAM ............................................................................... 2-332-33
3 Acceptance procedures
Overview ...................................................................................................................................................................................... 3-13-1
Before you begin ...................................................................................................................................................................... 3-23-2
Procedure 3-1: Accept Alcatel-Lucent 1850 TSS-60 shelf ...................................................................................... 3-33-3
Procedure 3-2: Accept Alcatel-Lucent 1850 TSS-60 SONET/SDH network .................................................. 3-93-9
4 Install and provision circuit packs/OLIUs procedures
Overview ...................................................................................................................................................................................... 4-14-1
Before you begin ...................................................................................................................................................................... 4-34-3
Procedure 4-1: Install SYSCTL (LNW2) in new Alcatel-Lucent 1850 TSS-60 shelf ................................. 4-44-4
Procedure 4-2: Install OLIU circuit packs in Main slots ......................................................................................... 4-74-7
Procedure 4-3: Install OLIU circuit packs in Function slots ............................................................................... 4-154-15
Procedure 4-4: Provision OLIU circuit packs/ports for service .......................................................................... 4-244-24
Procedure 4-5: Provision unprotected operation on optical ports ...................................................................... 4-294-29
Procedure 4-6: Install DS1/DS3/16/3 circuit packs ................................................................................................. 4-354-35
Procedure 4-7: Install DS3/EC1 circuit packs ........................................................................................................... 4-384-38
Procedure 4-8: Provision DS3/EC1 circuit packs/ports for service .................................................................. 4-464-46
Procedure 4-9: Install DS1/E1 circuit packs ............................................................................................................... 4-494-49
Procedure 4-10: Provision DS1/E1 circuit packs/ports for service ................................................................... 4-554-55
Procedure 4-11: Install TMUX circuit packs .............................................................................................................. 4-584-58
Procedure 4-12: Provision TMUX circuit packs/ports for service .................................................................... 4-624-62
Procedure 4-13: Install 10/100 Ethernet circuit packs ............................................................................................ 4-664-66
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
iv 365-372-601R2.0Issue 1 January 2009
-
Procedure 4-14: Install Gigabit Ethernet circuit packs ........................................................................................... 4-714-71
Procedure 4-15: Provision Ethernet circuit packs/LAN port/VCG for service ............................................ 4-774-77
Procedure 4-16: Install pluggable transmission modules ...................................................................................... 4-804-80
Procedure 4-17: Install Fibre Channel circuit packs ............................................................................................... 4-974-97
Procedure 4-18: Provision Fibre Channel circuit pack/Data port/VCG for service ................................. 4-1014-101
Procedure 4-19: Provision pluggable transmission module ............................................................................... 4-1044-104
Procedure 4-20: Provision non-volatile memory cards ........................................................................................ 4-1064-106
Procedure 4-21: Provision STS-n/VT1.5 tributary ................................................................................................. 4-1074-107
Procedure 4-22: Replace low-speed circuit pack with different type low-speed circuit pack ............. 4-1084-108
Procedure 4-23: Change slot protection state ........................................................................................................... 4-1114-111
Procedure 4-24: Install DWDM optical multiplexer/demultiplexer circuit packs ..................................... 4-1174-117
Procedure 4-25: Provision optical transport signal (OTS) port ........................................................................ 4-1214-121
Procedure 4-26: Provision optical channel (OCH) port ...................................................................................... 4-1224-122
5 Node turnup procedures
Overview ...................................................................................................................................................................................... 5-15-1
Before you begin ...................................................................................................................................................................... 5-25-2
Procedure 5-1: Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for Add/Drop Multiplexer(ADM) applications .............................................................................................................................................................. 5-35-3
Procedure 5-2: Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for Digital Cross-ConnectSystem (DCS) applications ............................................................................................................................................. 5-115-11
Procedure 5-3: Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for DWDM End Terminalapplications ............................................................................................................................................................................ 5-195-19
Procedure 5-4: Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for DWDM Add/DropRing applications ................................................................................................................................................................. 5-255-25
6 System configuration procedures
Overview ...................................................................................................................................................................................... 6-16-1
Before you begin ...................................................................................................................................................................... 6-26-2
Procedure 6-1: Provision system configuration parameters .................................................................................... 6-36-3
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
v
-
Procedure 6-2: Provision shelf/system parameters ..................................................................................................... 6-86-8
Procedure 6-3: Provision miscellaneous discrete inputs and outputs ............................................................... 6-106-10
Procedure 6-4: Provision DCC terminations .............................................................................................................. 6-126-12
Procedure 6-5: Network Element synchronization provisioning ........................................................................ 6-156-15
Procedure 6-6: Provision system alarm configuration ............................................................................................ 6-316-31
Procedure 6-7: Provision new alarm severity assignment profile ...................................................................... 6-326-32
Procedure 6-8: Change existing alarm severity assignment profile .................................................................. 6-346-34
Procedure 6-9: Delete alarm severity assignment profile ...................................................................................... 6-376-37
Procedure 6-10: Assign alarm severity assignment profile ................................................................................... 6-396-39
Procedure 6-11: Evaluate bandwidth utilization ........................................................................................................ 6-426-42
Procedure 6-12: Optimize backplane bandwidth ...................................................................................................... 6-446-44
Procedure 6-13: Provision J0 section trace ................................................................................................................. 6-476-47
7 System administration procedures
Overview ...................................................................................................................................................................................... 7-17-1
Before you begin ...................................................................................................................................................................... 7-37-3
Procedure 7-1: Provision system administration parameters .................................................................................. 7-47-4
Procedure 7-2: Change your own password ............................................................................................................... 7-107-10
Procedure 7-3: Edit, delete, or enter a users login ................................................................................................. 7-127-12
Procedure 7-4: Enable/disable lockout security state .............................................................................................. 7-167-16
Procedure 7-5: Provision system SNMP management features .......................................................................... 7-177-17
Procedure 7-6: Edit, delete, or enter SNMP users ................................................................................................... 7-207-20
Procedure 7-7: Allow/inhibit autonomous message reporting ............................................................................. 7-247-24
Procedure 7-8: Create or edit login banner ................................................................................................................. 7-267-26
Procedure 7-9: Set NE defaults alarm gateway, alarm group, remote NE status, FTP/FTTD, securityand history log thresholds ............................................................................................................................................... 7-277-27
Procedure 7-10: Set date and time .................................................................................................................................. 7-327-32
Procedure 7-11: Set/change system TID ...................................................................................................................... 7-377-37
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
vi 365-372-601R2.0Issue 1 January 2009
-
Procedure 7-12: Enable/disable OSI on an IAO LAN port .................................................................................. 7-387-38
Procedure 7-13: Provision network layer 3 parameters ......................................................................................... 7-397-39
Procedure 7-14: Set TARP parameters .......................................................................................................................... 7-417-41
Procedure 7-15: Provision TCP/IP and Proxy ARP on an IAO LAN port .................................................... 7-437-43
Procedure 7-16: Provision/enable/disable the NE as a TL1 TCP/IP GNE ..................................................... 7-467-46
Procedure 7-17: Provision static IP routes on DCC links ..................................................................................... 7-497-49
Procedure 7-18: Provision RS232 CIT (CIT-1) and/or MODEM (CIT-2) serial port parameters ........ 7-517-51
Procedure 7-19: Map TL1 message types to OS applications ............................................................................ 7-547-54
Procedure 7-20: Enable/disable user ID(s) .................................................................................................................. 7-567-56
Procedure 7-21: Provision network element security .............................................................................................. 7-587-58
Procedure 7-22: Log out user(s) ...................................................................................................................................... 7-607-60
Procedure 7-23: Allow/inhibit port/tributary maintenance .................................................................................... 7-617-61
8 System performance monitoring procedures
Overview ...................................................................................................................................................................................... 8-18-1
Before you begin ...................................................................................................................................................................... 8-28-2
Procedure 8-1: View performance monitoring (PM) thresholds ........................................................................... 8-38-3
Procedure 8-2: Provision performance monitoring (PM) thresholds ................................................................... 8-48-4
Procedure 8-3: Initialize performance monitoring (PM) registers ........................................................................ 8-58-5
Procedure 8-4: View performance monitoring (PM) settings ................................................................................. 8-78-7
Procedure 8-5: Provision performance monitoring (PM) settings ........................................................................ 8-88-8
Procedure 8-6: View performance monitoring (PM) reports ................................................................................ 8-118-11
Procedure 8-7: Schedule performance monitoring (PM) reports ........................................................................ 8-148-14
Procedure 8-8: Clear threshold crossing alert (TCA) counts ............................................................................... 8-168-16
9 Network configuration procedures
Overview ...................................................................................................................................................................................... 9-19-1
Before you begin ...................................................................................................................................................................... 9-29-2
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
vii
-
Procedure 9-1: Establish high-speed end-to-end Alcatel-Lucent 1850 TSS-60 network ............................ 9-39-3
Procedure 9-2: Add new Alcatel-Lucent 1850 TSS-60 node to UPSR ........................................................... 9-249-24
Procedure 9-3: Discontinue Alcatel-Lucent 1850 TSS-60 node from UPSR ................................................ 9-329-32
Procedure 9-4: Establish low-speed 1+1 linear optical extension ..................................................................... 9-389-38
Procedure 9-5: Establish single-homed network ....................................................................................................... 9-459-45
Procedure 9-6: Establish dual-homed network .......................................................................................................... 9-549-54
Procedure 9-7: Establish subtending low-speed UPSR .......................................................................................... 9-649-64
Procedure 9-8: Add IP route(s) through network ...................................................................................................... 9-709-70
Procedure 9-9: Establish low-speed 1+1 unprotected optical linear extension ............................................ 9-919-91
Procedure 9-10: Establish DWDM network ............................................................................................................... 9-969-96
Procedure 9-11: Establish external network-to-network interface (E-NNI) ................................................ 9-1089-108
10 TDM service provisioning procedures
Overview .................................................................................................................................................................................... 10-110-1
Before you begin .................................................................................................................................................................... 10-310-3
Procedure 10-1: Establish DS1 or E1 service ............................................................................................................ 10-410-4
Procedure 10-2: Discontinue DS1 or E1 service ...................................................................................................... 10-810-8
Procedure 10-3: Establish DS3 or EC-1 service ..................................................................................................... 10-1210-12
Procedure 10-4: Discontinue DS3 or EC-1 service ............................................................................................... 10-1610-16
Procedure 10-5: Make VT1.5 or STS-n cross-connections, single OC-3/OC-12 UPSR configuration........................................................................................................................................................................................ 10-2010-2010-20
Procedure 10-6: Make Function unit UPSR, hairpin, and Main to Function unit UPSRcross-connections .............................................................................................................................................................. 10-2610-26
Procedure 10-7: Make 1+1 (linear extension) cross-connections .................................................................... 10-3010-30
Procedure 10-8: Make single-homed cross-connections ...................................................................................... 10-3710-37
Procedure 10-9: Make dual-homed cross-connections ......................................................................................... 10-4410-44
Procedure 10-10: Bridge and roll cross-connections ............................................................................................ 10-5310-53
Procedure 10-11: Establish dual ring interworking (DRI) connections ........................................................ 10-6110-61
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
viii 365-372-601R2.0Issue 1 January 2009
-
Procedure 10-12: Provision DS1/DS3 locked cross-connections on a UPSR ............................................ 10-6810-68
Procedure 10-13: Configure LNW20 TMUX/DS3/EC1 applications ............................................................ 10-7510-75
Procedure 10-14: Add optical channel (OCH) to DWDM network ............................................................... 10-8710-87
Procedure 10-15: Delete optical channel (OCH) from DWDM network ..................................................... 10-9110-91
11 Ethernet/Data network provisioning procedures
Overview .................................................................................................................................................................................... 11-111-1
Before you begin .................................................................................................................................................................... 11-411-4
Procedure 11-1: Establishing Ethernet services ......................................................................................................... 11-511-5
Procedure 11-2: Establish point-to-point UPSR protected GbE private line service (NOTAG mode)............................................................................................................................................................................................. 11-911-911-9
Procedure 11-3: Establish point-to-point UPSR protected GbE service (802.1q mode) ........................ 11-1611-16
Procedure 11-4: Establish point-to-point UPSR protected GbE service (transparent mode) ............... 11-2611-26
Procedure 11-5: Establish Ethernet packet ring on a UPSR .............................................................................. 11-3511-35
Procedure 11-6: Establish 802.1q mode Ethernet service on established packet ring (UPSR) ........... 11-4411-44
Procedure 11-7: Establish transparent mode Ethernet service on established packet ring (UPSR) .. 11-4911-49
Procedure 11-8: Provision Ethernet LAN port parameters ................................................................................. 11-5311-53
Procedure 11-9: Provision VCG parameters ............................................................................................................. 11-6911-69
Procedure 11-10: Provision Ethernet circuit pack parameters .......................................................................... 11-8211-82
Procedure 11-11: Add bandwidth to a point-to-point UPSR protected GbE service (802.1q mode) ............11-8811-8811-88 11-88
Procedure 11-12: Establish a dedicated multiple point private line UPSR protected GbE service(transparent mode) ............................................................................................................................................................ 11-9211-92
Procedure 11-13: Add Fast Ethernet services to Ethernet packet ring FE to GbE hairpin ............ 11-10211-102
Procedure 11-14: Make cross-connections for Ethernet service .................................................................... 11-11211-112
Cross-Connections for Ethernet ................................................................................................................................... 11-12011-120
Procedure 11-15: Create preferred spanning tree configuration .................................................................... 11-12711-127
Procedure 11-16: Change an existing spanning tree configuration .............................................................. 11-13311-133
Procedure 11-17: Create/Delete/Lock MAC address on a port ...................................................................... 11-13811-138
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
ix
-
Procedure 11-18: Provision Q in Q stacked VLAN capability ...................................................................... 11-14311-143
Procedure 11-19: Perform Ethernet loopback transmission test .................................................................... 11-14711-147
Procedure 11-20: Enable/Disable LAN port transmission ................................................................................ 11-14911-149
Procedure 11-21: Establish video broadcast network on UPSR .................................................................... 11-15011-150
Procedure 11-22: Provision Ethernet quality of service (QoS) - LNW70/LNW170 ............................. 11-16711-167
Procedure 11-23: Provision Ethernet QoS parameters ....................................................................................... 11-17311-173
Procedure 11-24: Provision LCAS, add/enable/remove tributaries .............................................................. 11-17911-179
Procedure 11-25: Establish LNW74 10/100-T/F enhanced Fast Ethernet private line service on UPSR................................................................................................................................................................................... 11-18711-18711-187
Procedure 11-26: Establish LNW73/LNW73C FC-DPORT SAN transport service on UPSR ......... 11-19511-195
Procedure 11-27: Provision LNW73/LNW73C FC-DPORT circuit pack parameters .......................... 11-20111-201
Procedure 11-28: Provision FC-DPORT DATA port parameters ................................................................... 11-20311-203
Procedure 11-29: Provision FC-DPORT VCG parameters .............................................................................. 11-20711-207
Procedure 11-30: Make cross-connections for LNW73/LNW73C FC-DPORT SAN transport service................................................................................................................................................................................... 11-21011-21011-210
Procedure 11-31: Establish video multi-channel broadcast network on UPSR (NOTAG mode) .... 11-21511-215
Procedure 11-32: Provision Resilient Packet Ring (RPR)-capable VCG parameters ........................... 11-22311-223
Procedure 11-33: Provision Resilient Packet Ring (RPR)-specific VCG parameters ........................... 11-22811-228
Procedure 11-34: Bridge and roll Ethernet cross-connections ........................................................................ 11-23211-232
Procedure 11-35: Establish Resilient Packet Ring (RPR) on a UPSR ........................................................ 11-24011-240
Procedure 11-36: Provision Ethernet quality of service (QoS) - LNW78 ................................................. 11-25111-251
Procedure 11-37: Create/Modify/Delete link aggregation group (LAG) .................................................... 11-25711-257
Procedure 11-38: Enable/Disable transmission audit .......................................................................................... 11-29011-290
12 Ring and circuit pack upgrade procedures
Overview .................................................................................................................................................................................... 12-112-1
Before you begin .................................................................................................................................................................... 12-312-3
Procedure 12-1: Upgrade OC-3 UPSR to OC-12 UPSR ....................................................................................... 12-412-4
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
x 365-372-601R2.0Issue 1 January 2009
-
Procedure 12-2: Back out OC-3 UPSR to OC-12 UPSR upgrade .................................................................. 12-3612-36
Procedure 12-3: Suspend OC-3 UPSR to OC-12 UPSR upgrade ................................................................... 12-6112-61
Procedure 12-4: Upgrade OC-12 UPSR to OC-48 UPSR .................................................................................. 12-7012-70
Procedure 12-5: Back out OC-12 UPSR to OC-48 UPSR upgrade ............................................................... 12-9912-99
Procedure 12-6: Suspend OC-12 UPSR to OC-48 UPSR upgrade .............................................................. 12-11812-118
Procedure 12-7: Upgrade low-speed electrical circuit packs .......................................................................... 12-12812-128
Procedure 12-8: Upgrade or replace SYSCTL (LNW2) circuit pack ......................................................... 12-13512-135
Procedure 12-9: Upgrade LNW111 3DS3 or LNW112 16DS1PM circuit packs .................................. 12-17512-175
Procedure 12-10: Upgrade low-speed OLIU circuit packs (different slots) ............................................. 12-18012-180
Procedure 12-11: Upgrade low-speed OLIU circuit packs (same slots) .................................................... 12-18912-189
Procedure 12-12: Upgrade cross connect capacity of high-speed OLIU circuit packs at a node ... 12-19912-199
Procedure 12-13: Back out cross connect capacity upgrade of high-speed OLIU circuit packs ..... 12-21112-211
Procedure 12-14: Upgrade LNW70 100/1G FXS circuit pack ...................................................................... 12-21812-218
Procedure 12-15: Back out LNW70 100/1G FXS circuit pack upgrade ................................................... 12-22312-223
Procedure 12-16: Upgrade protected OC-192 span to DWDM OTS span ............................................... 12-22612-226
Procedure 12-17: Back out OC-192 to DWDM OTS span upgrade ........................................................... 12-23412-234
13 Routine maintenance procedures
Overview .................................................................................................................................................................................... 13-113-1
Before you begin .................................................................................................................................................................... 13-213-2
Procedure 13-1: Replace fan filter ................................................................................................................................ 13-313-3
Procedure 13-2: Enter/exit pluggable transmission module maintenance state ............................................ 13-513-5
14 Supporting procedures
Overview .................................................................................................................................................................................... 14-114-1
Before you begin .................................................................................................................................................................... 14-314-3
Procedure 14-1: Install software on the PC ................................................................................................................ 14-414-4
Procedure 14-2: Connect Personal Computer (PC) and establish WaveStar CIT session .................. 14-2714-27
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xi
-
Procedure 14-3: Clean optical fibers, dual LC adapters and LC lightguide buildouts (LBOs) .......... 14-3814-38
Procedure 14-4: Perform connection and verification of optical facility ..................................................... 14-4714-47
Procedure 14-5: Install/remove LC lightguide buildouts (LBOs) ................................................................... 14-5514-55
Procedure 14-6: Connect OLIU optical loopbacks ................................................................................................ 14-5714-57
Procedure 14-7: Perform end-to-end optical line test on Main OLIUs ........................................................ 14-6114-61
Procedure 14-8: Perform end-to-end optical line test on Function OLIUs ................................................. 14-6414-64
Procedure 14-9: Perform DS1/E1 transmission test .............................................................................................. 14-6714-67
Procedure 14-10: Perform DS3 transmission test .................................................................................................. 14-7414-74
Procedure 14-11: Perform EC-1 transmission test ................................................................................................. 14-8114-81
Procedure 14-12: Test function unit equipment protection switching ........................................................... 14-8714-87
Procedure 14-13: Perform LED test ............................................................................................................................ 14-8914-89
Procedure 14-14: Retrieve software generic release and database information ........................................ 14-9114-91
Procedure 14-15: Check 48 V DC office battery ................................................................................................ 14-9414-94
Procedure 14-16: Operate/release facility or terminal loopbacks .................................................................... 14-9714-97
Procedure 14-17: Observe FTP progress ................................................................................................................. 14-10214-102
Procedure 14-18: Disable an FTP server on your PC ....................................................................................... 14-10414-104
Procedure 14-19: Reset the system ............................................................................................................................ 14-10614-106
Procedure 14-20: Reset smart circuit pack ............................................................................................................. 14-10914-109
Procedure 14-21: Change the network card selection ........................................................................................ 14-11214-112
Procedure 14-22: Establish external test access session in the MON(E or EF) mode ......................... 14-11314-113
Procedure 14-23: Establish external test access session in the SPLT(E or EF) mode ......................... 14-12014-120
Procedure 14-24: Change test access mode of external test access session ............................................. 14-12614-126
Procedure 14-25: Delete test access session .......................................................................................................... 14-12914-129
Procedure 14-26: View test access sessions ........................................................................................................... 14-13014-130
Procedure 14-27: View reports .................................................................................................................................... 14-13114-131
Procedure 14-28: Clean optical pluggable transmission module ................................................................... 14-13514-135
Procedure 14-29: Connect modems to establish communication from remote CIT location .......... 14-13814-138
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
xii 365-372-601R2.0Issue 1 January 2009
-
Procedure 14-30: Establish internal test access session in the MONE mode .......................................... 14-14514-145
Procedure 14-31: Establish internal test access session in the SPLT(A or E) mode ............................ 14-14914-149
Procedure 14-32: Change test access mode of internal test access session .............................................. 14-15314-153
Procedure 14-33: Assign/remove test signal generator/detector to internal test access session ....... 14-15514-155
Procedure 14-34: View test measurements for internal test access session .............................................. 14-15914-159
Procedure 14-35: Initialize test measurements for internal test access session ....................................... 14-16114-161
Procedure 14-36: Perform end-to-end optical line test on DWDM line .................................................... 14-16314-163
A Provisionable parameters
Overview ..................................................................................................................................................................................... A-1A-1
Port parameters ......................................................................................................................................................................... A-2A-2
Channel parameters ................................................................................................................................................................. A-8A-8
Ethernet parameters .............................................................................................................................................................. A-10A-10
Data parameters ..................................................................................................................................................................... A-30A-30
Control plane parameters ................................................................................................................................................... A-32A-32
Cross-Connection parameters ........................................................................................................................................... A-36A-36
Synchronization parameters .............................................................................................................................................. A-38A-38
Performance monitoring parameters .............................................................................................................................. A-40A-40
Operations parameters ......................................................................................................................................................... A-41A-41
Security parameters .............................................................................................................................................................. A-49A-49
Miscellaneous parameters .................................................................................................................................................. A-53A-53
Glossary
Index
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xiii
-
List of tables
1 Alcatel-Lucent 1850 TSS-60 documentation set .................................................................................... xxxvixxxvi
1-1 Optical circuit pack laser safety specifications ............................................................................................ 1-61-6
1-2 Pluggable transmission module laser safety specifications ..................................................................... 1-71-7
9-1 ENT-CPORT-RR Edge port parameters ..................................................................................................... 9-1149-114
9-2 ENT-CPORT-RR ENNI port parameters .................................................................................................... 9-1179-117
9-3 ENT-FECOM-SCN Line DCC and LAN-3 parameters ...................................................................... 9-1219-121
9-4 ENT-ROUTE-SCN parameters ...................................................................................................................... 9-1229-122
9-5 ENT-CONN parameters .................................................................................................................................... 9-1249-124
9-6 Slot AID mapping ............................................................................................................................................... 9-1299-129
11-1 ED-EPORT command provisionable parameters .................................................................................... 11-5411-54
11-2 ED-VCG command provisionable parameters ......................................................................................... 11-7011-70
11-3 ED-EQPT command provisionable parameters ....................................................................................... 11-8211-82
11-4 ENT-MAC command provisionable parameters ................................................................................... 11-14111-141
11-5 Provisioning for example 1 ........................................................................................................................... 11-14411-144
11-6 Expected results for frame headers in example 1 ............................................................................... 11-14511-145
11-7 Provisioning for example 2 ........................................................................................................................... 11-14611-146
11-8 Expected results for frame headers in example 2 ............................................................................... 11-14611-146
11-9 ENT-ERATE command provisionable parameters ............................................................................... 11-17411-174
11-10 ED-EQPT command provisionable parameters .................................................................................... 11-20211-202
11-11 ED-DPORT command provisionable parameters ................................................................................. 11-20411-204
11-12 ED-VCG-DATA command provisionable parameters ........................................................................ 11-20811-208
11-13 ED-VCG-RPR command provisionable parameters ........................................................................... 11-22411-224
11-14 ED-RPR command provisionable parameters ....................................................................................... 11-22911-229
...................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xv
-
11-15 ENT-LAGRP command provisionable parameters .............................................................................. 11-25911-259
14-1 Modem Cable Assembly and Pin Connections ..................................................................................... 14-13914-139
A-1 Port parameters ......................................................................................................................................................... A-2A-2
A-2 Channel parameters ................................................................................................................................................ A-8A-8
A-3 Ethernet parameters .............................................................................................................................................. A-10A-10
A-4 Data parameters ..................................................................................................................................................... A-30A-30
A-5 Control plane parameters ................................................................................................................................... A-32A-32
A-6 Cross-Connection parameters ........................................................................................................................... A-36A-36
A-7 Synchronization parameters .............................................................................................................................. A-38A-38
A-8 Performance monitoring parameters ............................................................................................................. A-40A-40
A-9 Operations parameters ......................................................................................................................................... A-41A-41
A-10 Security parameters .............................................................................................................................................. A-49A-49
A-11 Miscellaneous parameters .................................................................................................................................. A-53A-53
List of tables
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
xvi 365-372-601R2.0Issue 1 January 2009
-
List of figures
1-1 Laser warning labels ............................................................................................................................................. 1-181-18
1-2 Static control wrist strap ..................................................................................................................................... 1-201-20
1-3 ESD warning label (barred-hand symbol) ................................................................................................... 1-211-21
4-1 Channel select option label on LNW447 ..................................................................................................... 4-194-19
4-2 Jumper settings for LNW425459 .................................................................................................................. 4-204-20
4-3 Jumper settings for LNW16 .............................................................................................................................. 4-404-40
4-4 Pluggable transmission module with dust cover (optical PTMs only) ............................................ 4-904-90
4-5 Examples of dust covers (optical PTMs only) .......................................................................................... 4-904-90
4-6 Latch type 3 (opened and closed) ................................................................................................................... 4-934-93
4-7 Latch type 4, 5, 6, 7 and 8 (opened and closed) ...................................................................................... 4-934-93
4-8 Insert pluggable transmission module into socket ................................................................................... 4-944-94
9-1 Adding a node example ...................................................................................................................................... 9-299-29
9-2 Discontinuing a node example ......................................................................................................................... 9-359-35
9-3 1+1 extension example 1 .................................................................................................................................... 9-439-43
9-4 1+1 extension example 2 .................................................................................................................................... 9-449-44
9-5 Single-homed configuration example ............................................................................................................ 9-539-53
9-6 Dual-Homed network configuration example 1 ........................................................................................ 9-629-62
9-7 Dual-Homed network configuration example 2 ........................................................................................ 9-639-63
9-8 Subtending UPSR configuration example ................................................................................................... 9-699-69
9-9 Local access over LAN ....................................................................................................................................... 9-709-70
9-10 Access over IP WAN ............................................................................................................................................ 9-739-73
9-11 Multi-Area operations .......................................................................................................................................... 9-769-76
9-12 IP NEs on the fringe ............................................................................................................................................. 9-809-80
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xvii
-
9-13 Multiple GNEs scenario ...................................................................................................................................... 9-859-85
9-14 DWDM point-to-point network example ..................................................................................................... 9-979-97
9-15 DWDM linear network example ..................................................................................................................... 9-979-97
9-16 DWDM ring network example ......................................................................................................................... 9-989-98
9-17 Control plane network with E-NNI connecting to an I-NNI capable core ................................. 9-1109-110
9-18 Soft permanent connection (SPC) in a control plane network ......................................................... 9-1279-127
10-1 Path protected OC-12 ring network (DS1 to DS1) with VT1.5 cross-connections ................. 10-2410-24
10-2 Path protected OC-12 ring network (DS3 to DS3) with STS-1 cross-connections ................. 10-2510-25
10-3 Cross-Connections examples .......................................................................................................................... 10-2710-27
10-4 Two Alcatel-Lucent 1850 TSS-60 UPSRs connected in a 1+1 (linear extension) ................... 10-3110-31
10-5 1+1 STS3c cross-connection examples ...................................................................................................... 10-3410-34
10-6 Single-Homed Alcatel-Lucent 1850 TSS-60 ring example ................................................................ 10-3810-38
10-7 Network with single-homed cross-connections example .................................................................... 10-4110-41
10-8 Dual-Homed Alcatel-Lucent 1850 TSS-60 ring example ................................................................... 10-4510-45
10-9 DRI configuration example ............................................................................................................................. 10-6310-63
10-10 Cross-Connection examples at node 3 ........................................................................................................ 10-6410-64
10-11 Cross-Connection examples at node 2 ........................................................................................................ 10-6510-65
10-12 Cross-Connections for DRI with UPSR protected OC-n add/drop ports example .................. 10-6610-66
10-13 Basic UPSR DRI cross-connections with UPSR protected OC-n add/drop port ...................... 10-6610-66
10-14 Basic UPSR DRI cross-connections with EC-1 add/drop port ........................................................ 10-6710-67
10-15 Basic UPSR DRI cross-connections with 1+1 protected OC-n add/drop port .......................... 10-6710-67
10-16 Basic UPSR DRI cross-connections with 0X1Sn (0x1) protected OCn add/drop port .......... 10-6710-67
10-17 DS1 locked cross-connections on a UPSR (unprotected) ................................................................... 10-7210-72
10-18 DS3 locked cross-connections on a UPSR (unprotected) ................................................................... 10-7310-73
10-19 DS3 locked cross-connections on a UPSR (protected externally) .................................................. 10-7410-74
10-20 Example of basic DS3/EC1 STS-1 add/drop (like LNW16/LNW19B) configuration ........... 10-7910-79
List of figures
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
xviii 365-372-601R2.0Issue 1 January 2009
-
10-21 Example of basic TMUX channelized DS3 STS1-xconn to VT-based STS1 (like LNW18)....................................................................................................................................................................... 10-8010-8010-80
10-22 Example of basic EC1 VT add/drop (like LNW16/LNW19B) configuration ............................ 10-8110-81
10-23 Example of basic TMUX (like LNW18) configuration ....................................................................... 10-8210-82
10-24 Example of DS1-in-DS3-in-STS1 portless TMUX to DS1 port ..................................................... 10-8310-83
10-25 Example of DS1-in-DS3-in-STS1 portless TMUX to DS1-in-DS3 port ..................................... 10-8410-84
10-26 Example of DS1-in-DS3-in-STS1 portless TMUX to VT-in-STS1 ................................................ 10-8510-85
10-27 Example of DS1-in-DS3-in-STS1 portless TMUX to DS1-in-DS3-in-STS1 (DS1 grooming)....................................................................................................................................................................... 10-8610-8610-86
11-1 Point-to-Point GbE private line example ................................................................................................... 11-1511-15
11-2 Point-to-Point GbE using 802.1q tagging mode ..................................................................................... 11-2511-25
11-3 Point-to-Point GbE using transparent tagging mode ............................................................................ 11-3411-34
11-4 Ethernet packet ring on a UPSR ................................................................................................................... 11-4311-43
11-5 Example 1 service on UPSR using 802.1q tagging mode .................................................................. 11-4711-47
11-6 Example 2 service on UPSR using 802.1q tagging mode .................................................................. 11-4811-48
11-7 Example service on UPSR using transparent tagging mode ............................................................. 11-5211-52
11-8 Example of adding bandwidth on UPSR ................................................................................................... 11-9111-91
11-9 Dedicated multiple point GbE using transparent tagging mode .................................................... 11-10011-100
11-10 Dedicated multiple point GbE private line cross-connections ...................................................... 11-10111-101
11-11 Ethernet packet ring on a UPSR ................................................................................................................. 11-11011-110
11-12 FE to GbE Ethernet hairpin cross-connections and provisioning on packet ring ................... 11-11111-111
11-13 UPSR add/drop cross-connections ............................................................................................................. 11-11511-115
11-14 Multipoint cross-connections on a UPSR ............................................................................................... 11-11611-116
11-15 Point-to-Point 10/100-PL private line service, STS1 cross-connect mode, one STS1 ......... 11-11711-117
11-16 Multipoint 10/100-PL private line service, STS1 cross-connect mode, external customerprotected ............................................................................................................................................................. 11-11811-118
11-17 Point-to-Point 10/100-T/F private line services, VT1.5 .................................................................... 11-11911-119
11-18 2-Way Point-to-Point, Through cross-connection ................................................................................ 11-12411-124
List of figures
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xix
-
11-19 UPSR add/drop cross-connection ............................................................................................................... 11-12411-124
11-20 FE to GbE 2-Way Hairpin cross-connection ......................................................................................... 11-12511-125
11-21 Multipoint cross-connection .......................................................................................................................... 11-12611-126
11-22 Spanning tree odd node example ............................................................................................................... 11-12911-129
11-23 Spanning tree even node example .............................................................................................................. 11-13011-130
11-24 Existing spanning tree configuration ......................................................................................................... 11-13611-136
11-25 New spanning tree configuration ................................................................................................................ 11-13711-137
11-26 Example 1 configuration ................................................................................................................................ 11-14411-144
11-27 Example 2 Configuration ............................................................................................................................... 11-14511-145
11-28 Provisioning Ethernet nodes for video broadcast ring ....................................................................... 11-16311-163
11-29 Provisioning cross-connections for video broadcast ring ................................................................. 11-16411-164
11-30 Provisioning Ethernet nodes for control packet ring .......................................................................... 11-16511-165
11-31 Provisioning cross-connections for control packet ring .................................................................... 11-16611-166
11-32 UPSR Ring Add/Drop cross-connections ................................................................................................ 11-18511-185
11-33 Multipoint cross-connections on a UPSR ............................................................................................... 11-18611-186
11-34 Point-to-Point 10/100-T/F private line service, three STS1s .......................................................... 11-19211-192
11-35 Point-to-Point 10/100-T/F private line service, STS1 and STS3c ................................................ 11-19311-193
11-36 Point-to-Point 10/100-T/F private line services, VT1.5 .................................................................... 11-19411-194
11-37 Point-to-point Fibre Channel service ........................................................................................................ 11-20011-200
11-38 2-Way Point-to-Point, Through cross-connection ................................................................................ 11-21311-213
11-39 UPSR Ring Add/Drop cross-connection .................................................................................................. 11-21411-214
11-40 Point-to-point Fibre Channel service ........................................................................................................ 11-21411-214
11-41 Provisioning cross-connections for video broadcast on UPSR ring ............................................ 11-22211-222
11-42 Resilient packet ring (RPR) on a UPSR ................................................................................................. 11-24711-247
11-43 Resilient packet ring (RPR) with multiple RPR circuit packs in same node .......................... 11-24811-248
11-44 Resilient packet ring (RPR) on a main and subtending UPSR ring ............................................ 11-24911-249
11-45 Resilient packet ring (RPR) host node intersection cross-connections ....................................... 11-25011-250
List of figures
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
xx 365-372-601R2.0Issue 1 January 2009
-
12-1 CIT OSI neighbor ............................................................................................................................................. 12-13712-137
13-1 Alcatel-Lucent 1850 TSS-60 fan filter .......................................................................................................... 13-413-4
14-1 WaveStar CIT welcome window ................................................................................................................ 14-2914-29
14-2 WaveStar CIT login window ....................................................................................................................... 14-3014-30
14-3 Legal notice ........................................................................................................................................................... 14-3114-31
14-4 Example of network view ................................................................................................................................ 14-3214-32
14-5 NE login .................................................................................................................................................................. 14-3414-34
14-6 NE level legal notice ......................................................................................................................................... 14-3514-35
14-7 Example of system view (graphical) ........................................................................................................... 14-3614-36
14-8 Stand-Alone shelf with OLIU loopback .................................................................................................... 14-6914-69
14-9 Stand-Alone shelf with DSX loopback ...................................................................................................... 14-6914-69
14-10 End-to-End DS1/E1 circuit with far-end loopback ............................................................................... 14-7014-70
14-11 Stand-Alone shelf with OLIU loopback .................................................................................................... 14-7614-76
14-12 End-to-End DS3 circuit with far-end loopback ...................................................................................... 14-7714-77
14-13 Stand-Alone shelf with OLIU loopback .................................................................................................... 14-8314-83
14-14 End-to-End EC-1 circuit with far-end loopback ..................................................................................... 14-8314-83
14-15 Facility loopback example ............................................................................................................................... 14-9814-98
14-16 Terminal loopback example ............................................................................................................................ 14-9914-99
14-17 Dial-Up networking to TCP/IP LAN/WAN network ......................................................................... 14-14314-143
14-18 Modem to modem connection ..................................................................................................................... 14-14414-144
List of figures
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xxi
-
List of procedures
2 Database backup and restore procedures
2-1 Apply software generic .......................................................................................................................................... 2-32-3
2-2 Backup and restore NE database via FTP ..................................................................................................... 2-62-6
2-3 Backup and restore NE database via FTTD ............................................................................................... 2-182-18
2-4 Backup and restore NE database via FTAM .............................................................................................. 2-332-33
3 Acceptance procedures
3-1 Accept Alcatel-Lucent 1850 TSS-60 shelf ..................................................................................................... 3-33-3
3-2 Accept Alcatel-Lucent 1850 TSS-60 SONET/SDH network ................................................................. 3-93-9
4 Install and provision circuit packs/OLIUs procedures
4-1 Install SYSCTL (LNW2) in new Alcatel-Lucent 1850 TSS-60 shelf ................................................ 4-44-4
4-2 Install OLIU circuit packs in Main slots ........................................................................................................ 4-74-7
4-3 Install OLIU circuit packs in Function slots .............................................................................................. 4-154-15
4-4 Provision OLIU circuit packs/ports for service ......................................................................................... 4-244-24
4-5 Provision unprotected operation on optical ports ..................................................................................... 4-294-29
4-6 Install DS1/DS3/16/3 circuit packs ................................................................................................................ 4-354-35
4-7 Install DS3/EC1 circuit packs ........................................................................................................................... 4-384-38
4-8 Provision DS3/EC1 circuit packs/ports for service ................................................................................. 4-464-46
4-9 Install DS1/E1 circuit packs .............................................................................................................................. 4-494-49
4-10 Provision DS1/E1 circuit packs/ports for service ..................................................................................... 4-554-55
4-11 Install TMUX circuit packs ............................................................................................................................... 4-584-58
4-12 Provision TMUX circuit packs/ports for service ...................................................................................... 4-624-62
4-13 Install 10/100 Ethernet circuit packs ............................................................................................................. 4-664-66
4-14 Install Gigabit Ethernet circuit packs ............................................................................................................ 4-714-71
....................................................................................................................................................................................................................................
365-372-601R2.0Issue 1 January 2009
xxiii
-
4-15 Provision Ethernet circuit packs/LAN port/VCG for service .............................................................. 4-774-77
4-16 Install pluggable transmission modules ........................................................................................................ 4-804-80
4-17 Install Fibre Channel circuit packs ................................................................................................................. 4-974-97
4-18 Provision Fibre Channel circuit pack/Data port/VCG for service .................................................. 4-1014-101
4-19 Provision pluggable transmission module ................................................................................................. 4-1044-104
4-20 Provision non-volatile memory cards ......................................................................................................... 4-1064-106
4-21 Provision STS-n/VT1.5 tributary .................................................................................................................. 4-1074-107
4-22 Replace low-speed circuit pack with different type low-speed circuit pack .............................. 4-1084-108
4-23 Change slot protection state ............................................................................................................................ 4-1114-111
4-24 Install DWDM optical multiplexer/demultiplexer circuit packs ...................................................... 4-1174-117
4-25 Provision optical transport signal (OTS) port ......................................................................................... 4-1214-121
4-26 Provision optical channel (OCH) port ........................................................................................................ 4-1224-122
5 Node turnup procedures
5-1 Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for Add/Drop Multiplexer (ADM)applications .............................................................................................................................................................. 5-35-3
5-2 Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for Digital Cross-Connect System(DCS) applications ............................................................................................................................................. 5-115-11
5-3 Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for DWDM End Terminalapplications ............................................................................................................................................................ 5-195-19
5-4 Equip new Alcatel-Lucent 1850 Transport Service Switch 60 for DWDM Add/Drop Ringapplications ............................................................................................................................................................ 5-255-25
6 System configuration procedures
6-1 Provision system configuration parameters ................................................................................................... 6-36-3
6-2 Provision shelf/system parameters .................................................................................................................... 6-86-8
6-3 Provision miscellaneous discrete inputs and outputs .............................................................................. 6-106-10
6-4 Provision DCC terminations .............................................................................................................................. 6-126-12
6-5 Network Element synchronization provisioning ....................................................................................... 6-156-15
6-6 Provision system alarm configuration ........................................................................................................... 6-316-31
List of procedures
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
xxiv 365-372-601R2.0Issue 1 January 2009
-
6-7 Provision new alarm severity assignment profile ..................................................................................... 6-326-32
6-8 Change existing alarm severity assignment profile ................................................................................. 6-346-34
6-9 Delete alarm severity assignment profile ..................................................................................................... 6-376-37
6-10 Assign alarm severity assignment profile .................................................................................................... 6-396-39
6-11 Evaluate bandwidth utilization ......................................................................................................................... 6-426-42
6-12 Optimize backplane bandwidth ........................................................................................................................ 6-446-44
6-13 Provision J0 section trace ................................................................................................................................... 6-476-47
7 System administration procedures
7-1 Provision system administration parameters ................................................................................................. 7-47-4
7-2 Change your own password .............................................................................................................................. 7-107-10
7-3 Edit, delete, or enter a users login ................................................................................................................ 7-127-12
7-4 Enable/disable lockout security state .............