3

1
7/17/2019 3 http://slidepdf.com/reader/full/3563db980550346aa9a9df152 1/1         9         5         0         0         4         0         0         0         1         5         0         0         4         0         0         0 31200 1100 1100 1100 1500 10000 16400 4000 4000 4000 4000 7000 4200 Project Manager Draughtsman Meeting Room Toilet Fire Exit Fire Exit Corridor Corridor         2         0         0         0         3         6         0         0         4         0         0         0         1         5         0         0         4         0         0         0 HSE  Engineer Toilet Toilet  Toilet Cost Cotroller Toilet Engineer 4000 3200 Engineer Surveyor Document Controller  QA/QC  Time Keeper 4200 Corridor 4000 YOU ARE HERE EMERGENCY EVACUATION LAYOUT JERRY AL SAMUR DEVELOPMENT PROJECT

description

xx

Transcript of 3

Page 1: 3

7/17/2019 3

http://slidepdf.com/reader/full/3563db980550346aa9a9df152 1/1

        9        5        0        0

        4        0        0        0

        1        5        0        0

        4        0        0        0

31200

1100 1100 1100 1500 10000 16400

4000

4000 4000 4000 7000

4200

Project Manager

Draughtsman

Meeting Room

Toilet

Fire

Exit

Fire

ExitCorridorCorridor

        2        0        0        0

        3        6        0        0

        4        0        0        0

        1        5        0        0

        4        0        0        0

HSE   Engineer

Toilet Toilet  Toilet

Cost Cotroller

Toilet

Engineer

4000 3200

Engineer Surveyor

Document Controller   QA/QC   Time Keeper

4200

Corridor

4000

YOUARE

HERE

EMERGENCY EVACUATION LAYOUTJERRY AL SAMUR DEVELOPMENT PROJECT