3.2.6 Combined Footing

download 3.2.6 Combined Footing

of 9

Transcript of 3.2.6 Combined Footing

  • 8/19/2019 3.2.6 Combined Footing

    1/20

    Combined Footing Analysis and DesignP1 P2

    Dimensions: M1 M2

    Col 1 Col 2 fy

    Length, x (m) 0.40 0.45

    Width, y (m) 0.40 0.45 d

    Distane, x! (m) 5.5

    Distane, x" (m) 0.4 Col. 1 Col. 2

    Distane, xa (m) 0.# " a

    Material Properties:

    Con$ete st$ength, f% (M!a) 20.0 &" &! &a

     'ensile st$ength, fy (M!a) 2

    *llo+ soil !$ess$e, -a (Pa) 240.0 L

    Loads

    /e$ie Loads

    Col Loads DL LL Wind - *ssme +eight of footing as 10 of olmn loads

    P1(3) 5.0 25.0 0.0 0.0P2(3) 100.0 15.0 0.0 0.0

    M1(36m) 0.0 0.0 0.0 0.0

    M2(36m) 0.0 0.0 0.0 0.0

    7ato$ed Loads

    Load Case 1 2 4

    P1(3) 21.50 #41.50 1#. 1#. Case 18 1.4DL 9 :.LL

    P2(3) 21.50 .00 205.1 205.1 Case 28 0.DL 9 1.WL

    M1(36m) 0.00 0.00 0.00 0.00 Case 8 0.5(1.4DL 9 1.LL 9 1.WL)

    M2(36m) 0.00 0.00 0.00 0.00 Case 48 0.5(1.4DL 9 1.LL 9 1.#;)

    Suggested Footing Dimensions

    Width Left," (m) 2.0 Distane, &" (m) 0.4 Length, L (m) .0

    Width + (3) 144.45 ? Wide "eam shea$ st$ength, >1 (3) 101.1 @.A.

    Max. !nhing shea$, >! (3) 225.5 ? Pnhing shea$ st$ength, >2 (3) 151.5 @.A.

    *$ea (m2)

    *$ea (m2)

  • 8/19/2019 3.2.6 Combined Footing

    2/20

    Area o Steel

    /teel Diamete$ (mm)   fo$ to! $einfo$ement, 101.##

    /teel Diamete$ (mm)   fo$ "ot $einfo$ement, 101.##

    Details

    x > (3) M (36m)

  • 8/19/2019 3.2.6 Combined Footing

    3/20

    3/20

     DESIGN of COMBINED FOOTING (Axially Loaded)  Date: 3/11/2016 9:20

     Projet: CAMP JOHN HAY MANOR 2E  Mar!: CF-1

    INPUT

     MATE"IALS:

    f'c = 20.7 MPa

    Steel: fy = 414 MPa

    Concrete Unit Weight: = 23.5Concrete Co!er : = 75 ""

    Soil Unit Weight. : = 1

    Soil #rg. Ca$ : = 47% &Pa

    Main #ar: = 20 ""

    (e"$. #ar : = 1 ""

    FOOTING LOADS:

    =

    Col 1 : = 317.4 )n

    = 74.57 )n

    Pu = 571 )nCol 2 : = %4.%4 )n

    = 23.1* )n

    Pu = 1406 )n

     DIMENSIONS:

    = 1406.199

    thic&ne++ ( = 0.7 "

    length , = 4.4 "

    -ith # = 1.8 "

    e$th / = 1.2 "

    col"n 1 col th& t = 0.3 "

    col -ith = 0.5 "

    col"n 2 col th& t = 0.3 "

    col -ith = 0.5 "

    1 = 0.01 "

    2 = 2.%

    3 = 1.13

    reire = 2.95

    $ro!ie = 7.92

    SCHEMATIC DIAGRAMS :

    N.G.L.

    in order that the load resultant coincides w/ the

    center of gravit of the footing.

    If x1 or x3 is ero! in"ut must #e 0.01.

    Concrete:

    &6"3

    &6"3

    P!

    P!!

    P!

    P!!

    ""2

    ""2

    note$ "ro"er com"utations must #e done for x1 to x3

    col  1

    col  2

  • 8/19/2019 3.2.6 Combined Footing

    4/20

  • 8/19/2019 3.2.6 Combined Footing

    5/20

    &/20

    OUTPUT:

     SOIL P"ESS#"ES:

    net = 453.886 &Pa

    lt = 249.66 &Pa

    W+hort = 781.22 &6"

    Wlong = 449.39 &6" "u

    = 565.00 ""

    = 555.00 ""ff. With8 = 1147.50 ""

     MOMENTS:

    A#$%& #$%& '()*+,($%:

    9center of col. 1 : = 0.03 &"

     et-een col"n+: = -271.54 &"

    9center of col. 2 : = 458.66 &"

    A#$%& $), '()*+,($%:

    9 face of col"n: = 165.03 &"

     S$EA"S:A#$%& #$%& '()*+,($%:

    9 left ;ace of col1 = 4.49 &

    9 right ;ace of col1 = -431.82 &

    9 left ;ace of col2 = 770.31 &

    9 right ;ace of col2 = -501.07 &

     ACT#AL ST"ESSES %&' ALLOABLE :

    = 0.63 MPa

    = 1.52 MPa &afe aai*&t +,*-i* &-ear.

    = 0.60 MPa

    = 0.76 MPa &afe aai*&t /ea0 &-ear.

    =

    actal ftg.-t. 188.34 &

    (otal Weight 1528.3 &

    ctal Soil Pre++re 192.97 &Pa

    ll. Soil Pre++re 478.00 &Pa

     At,al &oil +re&&,re i& le&& t-a* allo1a/le2 Safe.

    AOPT: 1.8 4.4 0.7 o0/i*ed footi*

    ! T

     "EINFO"CEMENTS:

    A#$%& !$%& ()*+,($%:

     A&3 4 5657'3586 P)$('* 11 + -- 20 - $,,$ )

     A&9 4 5657'3586 P)$('* 11 + -- 20 - ,$ )

    T**),u)* ): P)$('* 16 150 $% +*%,*)

    A#$%& $), ()*+,($%:

     A&5 4 935';635 P)$('* 7 + -- 20 - $,,$ )

    T**),u)* ): P)$('* 16 150 $% +*%,*)

      Pu Pu

    ff. Pa?ial

    P,$,#

    +,u#

    ##$;

    ""2

    ""2

    ""2

  • 8/19/2019 3.2.6 Combined Footing

    6/20

  • 8/19/2019 3.2.6 Combined Footing

    7/20

    (/20

     

    +$#u%

    /% +$#u%.

    ;(,(% *

  • 8/19/2019 3.2.6 Combined Footing

    8/20

  • 8/19/2019 3.2.6 Combined Footing

    9/20

    C@M3D 7@@'3E

    I%PU+ DA+A: , -&.

    Con$ete /t$ength, f% B 2. MPa

    /teel Field /t$ength, fy B 414 MPa

  • 8/19/2019 3.2.6 Combined Footing

    10/20

    +7IC8%(SS:

     '! B III 3

    2240.# 3

    III 3

    9

      t sae or punching shear

      check or beam shear:

    B 1215.0 mm.

    P+/+AL

    6

    "o B 4( 9d) B

    -*>

     B ! B

    φ>! B

    up   cp

    dL B d

    *> 9 φK2

  • 8/19/2019 3.2.6 Combined Footing

    11/20

    1# 224

    1.00 .225 1.0

    54. 3Km

    0. 0.

    ;-5

  • 8/19/2019 3.2.6 Combined Footing

    12/20

  • 8/19/2019 3.2.6 Combined Footing

    13/20

    C@M3D 7@@'3E

    I%PU+ DA+A: , -&.

    Con$ete /t$ength, f% B 2. MPa

    /teel Field /t$ength, fy B 414 MPa

  • 8/19/2019 3.2.6 Combined Footing

    14/20

    +7IC8%(SS:

     '! B III 3

    2240.# 3

    III 3

    9

      t sae or punching shear

      check or beam shear:

    B 1215.0 mm.

    P+/+AL

    6

    "o B 4( 9d) B

    -*>

     B ! B

    φ>! B

    up   cp

    dL B d

    *> 9 φK2

  • 8/19/2019 3.2.6 Combined Footing

    15/20

    1# 224

    1.00 .225 1.0

    54. 3Km

    0. 0.

    ;-5

  • 8/19/2019 3.2.6 Combined Footing

    16/20

  • 8/19/2019 3.2.6 Combined Footing

    17/20

    12

    C/M.I%(D F//+I%0

    $ete /t$ength, f% B 2# MPa

    l Field /t$ength, fy B 414 MPa

    edtion fato$, φ BIII (fo$ Gex$e) 2.50

    φ BIII(fo$ shea$)

    Colmn siHe, " B 00 mm

    h B 00 mm

    e /oil P$ess$e, Ps BIIIsf 

    B 12 Pa

    t Weight of /oil, B 1 I

     2<

    III 3 III 3

    III 3 III 3 <

    ;- k% ;- k%

    h B II m. 551

    t B II m.

    BIIIPa

    II

    * B length x +idth

    L B II m

    W B II m

    say W B 1.5 m

    ω/@L 3Km

    mm2

    PDL

    B PDL

    B

    PLL

    B PLL

    B

    PJB P

    JB

    P+/+AL

    6 P+/+AL

    6

    llo+a"le -3'

     B Ps 6 (ωsoil

    x h) 6 (ω

    on$etex t)

    *

  • 8/19/2019 3.2.6 Combined Footing

    18/20

    +7IC8%(SS:

     '! B 5.01 3

    111.2 3

    11.2 3

    9

      t ae or punching she

      check or beam shear:

    B 12.5 mm.

    P+/+AL

    6

    "o B 4( 9d) B

    -*>

     B ! B

    φ>! B

    up   cp

    dL B d

    *> 9 φK2

  • 8/19/2019 3.2.6 Combined Footing

    19/20

    3 12 3

    5.00 2.50

    220.#4 3Km

    I

    ==;>2<

    <

    @==;>2<

    BBB

  • 8/19/2019 3.2.6 Combined Footing

    20/20