Start Yes §115.420(a) 60 Is the operation a surface coating process as specified in §115.420(a)? End Is the surface coating process performed by using only aerosol coating as defined in §115.420? §115.427(6) No No Yes 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating Processes does not apply. Is the operation located in Gregg, Nueces, or Victoria county? §115.427(7) No Yes No Yes Is the surface coating process in the Beaumont/Port Arthur, Dallas/Fort Worth, El Paso, or Houston/Galveston areas? Comply with the following: Standard §115.427(7) §115.427(7) §115.426 Monitoring/Testing §115.426(4) Recordkeeping §115.426(4) Do all the surface coating operations located at the property when uncontrolled emit a combined weight of VOC < 550 pounds in any continuous 24-hour period, and approved as per the criteria of §115.427(7)? End Yes No §115.420(a) 70 Below is a flowchart describing 30 TAC Chapter 115, Surface Coating Processes. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to 30 TAC Chapter 115, Surface Coating Processes (1 of 39) Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 Layered These flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

Transcript of 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating...

Page 1: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Start

Yes

§115.420(a)

60

Is the

operation a surface coating

process as specified in

§115.420(a)?

End

Is the

surface coating process

performed by using only aerosol

coating as defined in

§115.420?

§115.427(6)

No

NoYes

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes

does not apply.

Is the operation

located in Gregg, Nueces, or

Victoria county?

§115.427(7)

No

Yes

No

Yes

Is the surface

coating process in

the Beaumont/Port Arthur,

Dallas/Fort Worth, El Paso, or

Houston/Galveston

areas?

Comply with the following:

Standard§115.427(7)

§115.427(7)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping

§115.426(4)

Do all the surface

coating operations located at

the property when uncontrolled emit

a combined weight of VOC < 550 pounds in

any continuous 24-hour period, and

approved as per the criteria

of §115.427(7)?

End

Yes

No

§115.420(a)

70

Below is a flowchart describing 30 TAC Chapter 115, Surface Coating Processes. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to

30 TAC Chapter 115, Surface Coating Processes(1 of 39)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

Page 2: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(2 of 39)

60

30 TAC Chapter 115, Subchapter E, Division 2:

Surface Coating Processes

does not apply.

End

Is the surface

coating operation one of the

processes listed in §115.427(8)(A)-(E)

in the Dallas/Fort Worth, or Houston/

Galveston/Brazoria

areas?

Is the surface

coating operation re-coating

of used miscellaneous metal parts

at an on-site maintenance shop that began operating before

January 1, 2012?

No

No

Yes

§115.427(8)

1

§115.427(9)

Yes

Page 3: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(3 of 39)

Comply with the following:

Standard

§115.427(3)(A)

§115.427(3)(A)

[G]§115.422(6)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping

§115.426, (4)

Reporting

[G]§115.422(6)

No

Are

coatings or

solvents used in a vehicle

refinishing (body)

shop?

§115.421(12)

Yes

2

8

End

Do all surface

coating operations on

the property when uncontrolled

emit a combined weight of VOC of less than3 lb/hr and less than 15 pounds in

any consecutive 24-hour

period?

Is the

operation located in

the Dallas/Fort Worth, or Houston/ Galveston/Brazoria Areas and

recoating of used miscellaneous metal

parts and products at an

on-site maintenanceshop?

§115.427(9)

No

§115.427(9)

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes

does not apply.

Is the

operation

located in Wisecounty?

No

Yes

Yes

1

Page 4: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(4 of 39)

Comply with the following:

Standard

§115.427(3)(B)

§115.427(3)(B)

[G]§115.422(6)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping

§115.426, (4)

Reporting

[G]§115.422(6)

2

Do all surface

coating operations on the

property when uncontrolled emit acombined weight of VOC of < 100 pounds in any

consecutive 24-hour period, and

approved as per the criteria of§115.427(3)(B)?

No

62

Is the

operation located

in the Dallas/Fort Worth,

or Houston/ Galveston/Brazoria Areas and

recoating of used miscellaneous metal parts

and products at an on-site

maintenance

shop?

§115.427(9)

Yes

End

Yes

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes

does not apply.

Page 5: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(5 of 39)

End

Comply with the following:

Standard

§115.427(3)(C)[G]§115.422(6)

§115.426

Monitoring/Testing

[G]§115.426(1), (4)

Recordkeeping

§115.426, [G](1), (4)

Reporting

[G]§115.422(6)

3

52

Is the operation

to coat aerospace vehicles

or components?

§115.427(1)(A)No

Does the total coating and solvent

usage not exceed 150 gallons in any consecutive 12-month period for all

surface coating operations on the property?

Yes

62

Is the

operation located in the

Dallas/Fort Worth or Houston/

Galveston/Brazoria Areas and recoating

of used miscellaneous metal parts

and products at an on-site

maintenance

shop?

§115.427(9)

No

Yes

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes does not apply.

Yes

No

§115.427(3)(C)

70

Page 6: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(6 of 39)

Are ships or offshore oil or gas

drilling platforms coated at shipbuilding or ship

repair operation?

§115.421(16)

Is flat-

wood paneling factory

coated?

14

No

Yes

12

No

4

3

Are the

surfaces of mirror backs

coated?

16

No

End

30 TAC Chapter 115, Subchapter E, Division 2:

Surface Coating Processes

does not apply.

Are all

mirror backing

coating operations

located on the property when

uncontrolled emit a combined

weight of VOC <

25 tons in

one year?

§115.421(9)

§115.421(13)

§115.427(3)(D)

No

Is the

surface coating

process in the Beaumont/

Port Arthur or Houston

Galveston

areas?

§115.420(16)

Yes

§115.420(13)

Is the

operation

located in Gregg, Nueces,

Victoria or Wisecounty?

Yes

Yes

Yes

No

Yes

No

Page 7: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(7 of 39)

Does the

facility surface coat

wood parts and

products?

17

Is the facility a wood

parts and products coating facility located in Hardin,

Jefferson, or Orange

County?

Comply with the following:

Standard

§115.427(3)(G)

[G]§115.422(6)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping

§115.426, (4)

Reporting

[G]§115.422(6)

Yes

§115.421(14)

Does the

facility perform surface

coating at a wood furniture

manufacturing

facility?

21

§115.421(15)

No

5

No

4

End

Are

miscellaneous metal

parts and products

coated?

Yes 28

No

§115.427(3)(G)

Yes

§115.421(8)

65

Yes

No

Page 8: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(8 of 39)

Comply with the following:

Standard

§115.423(3)(A)

Is a vapor

recovery system

used to control emissions

from the coating

operations?

Yes

§115.423(3)

30

Is an alternative

compliance method in

use or to be used for coating

operations regulated

by §115.421?

Comply with the following:

Standard

§115.423(2)

§115.423(1)

§115.427(6)

[G]§115.910

§115.423(2)

Yes

EndNo

5

6

Are newly manufactured automobiles

or light duty trucks

coated?

§115.421(11)Comply with the following:

Standard

§115.421(11)

§115.421

§115.426Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), [G](3), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

No

§115.420(8)

Is the

operation

located in Gregg, Nueces

or Victoria

county?

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes

does not apply.

End

Page 9: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(9 of 39)

Are

large appliances

coated?

Comply with the following:

Standard

§115.421(1)

§115.421§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

§115.421(1)

No

Is

metal furniture

coated?

Comply with the following:

Standard

§115.421(2)

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Yes

No

End

§115.421(2)

7

6

Comply with the following:

Standard

§115.421(3)§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Are

metal coils

coated?

§115.421(3)

Page 10: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(10 of 39)

7 Comply with the following:

Standard

§115.421(4)

§115.421§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Is paper

coated?

§115.421(4)

Yes

No Comply with the following:Standard

§115.421(5)

§115.421

§115.426

Monitoring/Testing§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Is fabric

coated?

§115.421(5)

Yes

No Comply with the following:

Standard

§115.421(6)§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Is vinyl

coated?

§115.421(6)

Yes

Comply with the following:

Standard

§115.421(7)

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

This must be a can

coating operation.

End

61

No

Page 11: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(11 of 39)

8

Is the facility

located in Hardin, Jefferson, or

Orange County?

Comply with the following:

Standard

§115.427(4)

[G]§115.422(6)§115.426

Monitoring/Testing

§115.426(4)Recordkeeping

§115.427(4) §115.426, (4)Reporting

[G]§115.422(6)

Yes

No

§115.427(5)

Is repair

or recoating of

vehicles at in-house

refinishing operations or by private

individuals not at

a commercial

operation?

Comply with the following:

Standard

§115.427(5)

[G]§115.422(6)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping

§115.426, (4)

Reporting

[G]§115.422(6)No

9 End

Comply with the following:

Standard

§115.423(3)(A)

§115.422(2)

Is a vapor

recovery system

used to control emissions

from the coating

operations?

Yes

§115.423(3)

No

Is an

alternative compliance

method in use or to

be used?

Comply with the following:

Standard

§115.423(2)

§115.422(2)

§115.423(1)

§115.427(6)§115.423(2) [G]§115.910

Yes

No

Yes

30

Page 12: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(12 of 39)

Is the coating

a primer or primer surfacer?

Comply with the following:Standard

§115.421(12)|2§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

§115.421(12)|3

No

Yes

9

§115.421(12)|2

Is the coating

a precoat?

Comply with the following:

Standard

§115.421(12)|3

§115.421

[G]§115.422(1), (2)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

10

Is the coating a

pretreatment?

§115.421(12)|4

Comply with the following:

Standard

§115.421(12)|4

§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

Yes

No

End

Page 13: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(13 of 39)

Is the

coating a single-stage topcoat?

10

Is the coating

for clearcoat/basecoat

systems?

Comply with the following:

Standard

§115.421(12)|5

§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Comply with the following:

Standard

§115.421(12)|6§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

11

Yes

Yes

No

No

Is the

coating for a three-stage systems?

Comply with the following:Standard

§115.421(12)|7

§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

No

End

§115.421(12)|5

§115.421(12)|6

§115.421(12)|7

Page 14: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(14 of 39)

Is the

coating a specialty coating?

§115.421(12)|8

Comply with the following:

Standard

§115.421(12)|8

§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

Is

the coating a

sealer?

§115.421(12)|9

Comply with the following:

Standard

§115.421(12)|9§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

No

11

No

End

Comply with the following:

Standard

§115.421(12)|10

§115.421

[G]§115.422(1), (2)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Page 15: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(15 of 39)

12

Comply with the following:

Standard

§115.427(3)(H)

§115.427(3)(H)

[G]§115.422(6)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping

§115.426, (4)

Reporting[G]§115.422(6)

Is the facility located

in Hardin, Jefferson, or Orange

County?

Are VOC emissionsfrom ship and offshore oil

or gas drilling platform surface coating operations < 50 tons/yr

when uncontrolled?

§115.427(3)(H)

13

Yes

Are VOC

emissions fromship and offshore oil

or gas drilling platform surface

coating operations

< 25 tons/yr when

uncontrolled?

§115.427(3)(I)

Yes

Comply with the following:Standard

§115.427(3)(I)

[G]§115.422(6)§115.426

Monitoring/Testing§115.426(4)

Recordkeeping

§115.426, (4)

Reporting

[G]§115.422(6)

End

YesNo

No

13

No

Is the facility located in Brazoria, Chambers,

Fort Bend, Galveston, Harris,

Liberty, Montgomery, or

Waller County?

§115.427(3)(I)

Yes 13

No

Page 16: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(16 of 39)

Comply with the following:

Standard

§115.421(16)(A)

§115.421, [G](16)(B)

[G]§115.422(4)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

No

End

Comply with the following:

Standard§115.423(3)(A)

Is a vaporrecovery system

used to control emissionsfrom the coating

operations?

Yes

§115.423(3)

No

Is an

alternative

compliance method

in use or to

be used?

Comply with the following:

Standard

§115.423(2)

§115.423(1)

§115.427(6)

[G]§115.910

§115.423(2)

Yes

13

30

Page 17: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(17 of 39)

Is the operaton

one of the following: coating

in the manufacture of exterior siding;

coating of tile board; or coating of particle

board used as a furniture

component?

§115.427(2)(A)-(C)Comply with the following:

Standard

§115.427(2)

[G]§115.422(6)

§115.426

Monitoring/Testing

§115.426(4)

Recordkeeping§115.426, (4)

Reporting

[G]§115.422(6)

No

Yes

14

15

End

Comply with the following:

Standard

§115.423(3)(A)

Is a vapor

recovery system

used to control emissions

from the coating

operations?

§115.423(3)

No

Yes

30

Page 18: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(18 of 39)

End

Is an

alternative compliance

method in use or to be

used?

Comply with the following:

Standard

§115.423(2)

§115.423(1)

§115.427(6)[G]§115.910

§115.423(2)

15

Yes

Comply with the following:

Standard

§115.421(9)|2

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Comply with the following:

Standard§115.421(9)|3

§115.421§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Comply with the following:

Standard

§115.421(9)|4

§115.421Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Are printed wall

panels made of hard-

wood plywood and thin

particle-board (less

than ¼ inch in

thickness)?

Are natural finish

hardwood plywood

panels made? Yes

No

Yes

No

Hardwood paneling

with class II finish.

End

§115.421(9)|2

§115.421(9)|3

End

No

Page 19: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(19 of 39)

Comply with the following:

Standard

§115.421(13)(A)(ii)

§115.421, (13)(B)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Comply with the following:Standard

§115.423(3)(A)

Is a vapor

recovery system used to control emissions

from the coating

operations?

Yes

§115.423(3)

Is an

alternative compliance

method in use or to be

used?

Comply with the following:

Standard§115.423(2)

§115.423(1)

§115.427(6)

[G]§115.910

§115.423(2)

No

Comply with the following:

Standard

§115.421(13)(A)(i)

§115.421, (13)(B)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Is the coating delivered to

a curtain coating

system?

§115.421(13)(A)(i)

16

No

No

End

Yes

Yes

30

Page 20: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(20 of 39)

17

Is an

alternative

compliance method in

use or to be

used?

Comply with the following:

Standard

§115.423(2)§115.423(1)

§115.427(6)

[G]§115.910

§115.423(2)

Yes

Is thecoating a clear

topcoat?

§115.421(14)|2

Comply with the following:

Standard

§115.421(14)|2

§115.421

§115.426Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)18

Yes

No

No End

Comply with the following:Standard

§115.423(3)(A)

Is a vapor

recovery system used to control emissions

from the coating

operations?

Yes

§115.423(3)

No

§115.420(14)

Is the

operation

located in Gregg, Nueces, Victoria or Wise

county?

End

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes does not apply.

No

30

Page 21: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(21 of 39)

Is

the coating a wash

coat?

§115.421(14)|3

Is the

coating a final repair

coat?

§115.421(14)|4

18

Comply with the following:

Standard

§115.421(14)|4

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Comply with the following:

Standard

§115.421(14)|3

§115.421§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

19

Yes

Yes

No

No

End

Is the

coating a semi-

transparent wiping or

glazing

stain?

§115.421(14)|5

Comply with the following:

Standard

§115.421(14)|5

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

No

Page 22: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(22 of 39)

Is the coating a

semi-transparent spray

stain or

toner?

§115.421(14)|6

Comply with the following:

Standard

§115.421(14)|6

§115.421§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

19

20

Yes

No

Is the coating

an enamel or opaque

ground coat?

§115.421(14)|7

Is the

coating a clear

sealer?

§115.421(14)|8

Comply with the following:

Standard

§115.421(14)|7

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Comply with the following:

Standard§115.421(14)|8

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Yes

Yes

No

No

End

Page 23: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

§115.421(14)|10

Is the

coating a clear

shellac?

Is the

coating an opaque

shellac?

Comply with the following:

Standard

§115.421(14)|9

§115.421§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Comply with the following:

Standard

§115.421(14)|10

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

20

Yes

Yes

No

§115.421(14)|9

No

Is the coating a

varnish?

§115.421(14)|11

Comply with the following:

Standard

§115.421(14)|12

§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Comply with the following:

Standard

§115.421(14)|11§115.421

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

No

End

Yes

30 TAC Chapter 115, Surface Coating Processes(23 of 39)

Page 24: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(24 of 39)

Is the facility a

wood furniture manufacturing

facility which emits a combined total

weight of VOC < 25 tpy when

uncontrolled?

§115.427(3)(F)

No

Is an

alternative compliance method

in use or to

be used?

Comply with the following:

Standard

§115.423(2)

§115.423(1)

§115.427(6)

[G]§115.910

§115.423(2)

Yes

No

21

End

Yes

22

§115.420(15)

65

Is the operation

located in Gregg, Nueces, Victoria or Wise

county?

End

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes

does not apply.

Yes

No

Page 25: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(25 of 39)

Is the

facility using only

topcoats?

Yes

§115.421(15)(A)(i)

25

No

Comply with the following:

Standard

§115.421(15)(A)(i)

§115.421

[G]§115.422(3)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

26

22

Is the facility

using a combination of§115.421(15)(A)(i)-(v)?

Comply with the following:Standard

§115.421(15)(A)(vi)§115.421

[G]§115.422(3)

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Yes

§115.421(15)(A)(vi)

No

23

Is the

facility using

a finishing system of

sealers and

topcoats?

Comply with the following:

Standard

§115.421(15)(A)(ii)

§115.421

[G]§115.422(3)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Yes

§115.421(15)(A)(ii)

No

Page 26: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(26 of 39)

Is the facility using

topcoats?

§115.421(15)(A)(i)

Is the

facility using

a finishing system of

sealers and

topcoats?

§115.421(15)(A)(ii)

Comply with the following:Standard

§115.421(15)(A)(i)

Comply with the following:

Standard

§115.421(15)(A)(ii)

24

23

Yes

No

Yes

No

Comply with the following:

Standard§115.421(15)(A)(iii)(I)

Is the facility using acid-cured alkyd

amino vinyl sealers AND acid-cured alkyd amino conversion

varnish topcoats?

§115.421(15)(A)(iii)(I)

Yes

No

Is the

averaging approach being

utilized?

§115.421(15)(A)(iv)

Yes

Comply with the following:

Standard

§115.421(15)(A)(iv)

No

Page 27: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(27 of 39)

No

25

27

Is the

facility using a sealer other than an acid-

cured alkyd amino vinyl sealer and

acid-cured alkyd amino

conversion varnish

topcoats?

Yes

Comply with the following:Standard

§115.421(15)(A)(iii)(II)

§115.421

[G]§115.422(3)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.421(15)(A)(iii)(II) §115.426, [G](1)

No

Is the facility using

acid-cured alkyd amino vinyl sealers AND acid-cured alkyd

amino conversion varnish

topcoats?

§115.421(15)(A)(iii)(I)

Comply with the following:

Standard§115.421(15)(A)(iii)(I)

§115.421

[G]§115.422(3)

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)Recordkeeping

§115.426, [G](1)

Yes

Is the

facility using an

acid-cured alkyd amino vinyl

sealer and a topcoat other than an

acid-cured alkyd amino conversion varnish

topcoat?

Yes

Comply with the following:

Standard

§115.421(15)(A)(iii)(III)

§115.421

[G]§115.422(3)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)§115.421(15)(A)(iii)(III)No

26

Page 28: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

No

Is the facility

using a vapor recovery

system?

24

Comply with the following:

Standard

§115.421(15)(A)(v)

§115.421(15)(A)(v)

No

Is the facility using a

sealer other than an acid-cured alkyd amino vinyl sealer and

acid-cured alkyd amino

conversion varnish

topcoats?

§115.421(15)(A)(iii)(II)

Comply with the following:Standard

§115.421(15)(A)(iii)(II)

Is the facility

using an acid-cured

alkyd amino vinyl sealer and a

topcoat other than an acid-cured

alkyd amino conversion

varnish topcoat?

§115.421(15)(A)(iii)(III)

Comply with the following:

Standard

§115.421(15)(A)(iii)(III)

No

Yes

Yes

Yes

26

30 TAC Chapter 115, Surface Coating Processes(28 of 39)

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

Page 29: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(29 of 39)

Is the

averaging approach being utilized?

§115.421(15)(A)(iv)

No

Comply with the following:Standard

§115.421(15)(A)(iv)§115.421

[G]§115.422(3)

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

27

Yes

Is the facility using a

vapor recovery

system?

Yes

Comply with the following:Standard

§115.421(15)(A)(v)

§115.421

[G]§115.422(3)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)§115.421(15)(A)(v)Recordkeeping

§115.426, [G](1)

26

Is the

facility using

strippable booth coatings

in cleaning operations?

§115.421(15)(B)

Yes

Comply with the following:

Standard

§115.421(15)(B)

EndNo

No

Page 30: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(30 of 39)

End

Have

alternative requirements

to §115.421(8) been

approved?

§115.423(4)

Comply with the following:Standard

§115.423(4)§115.422(2)

§115.423(1)

Yes

No

28

Comply with the following:

Standard

§115.423(3)(A)

Is a vapor

recovery system

used to control emissions

from the coating

operations?

Yes

§115.423(3)

No

30

Is coating

a clearcoat or an

interior protective coating for

pails and

drums?

29

Comply with the following:

Standard

§115.421(8)(A)|2§115.421, (8)(B)-(C)

§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

§115.421(8)(A)|2 Recordkeeping

§115.426, [G](1)

Yes

End

No

Per §115.421(8)(B) if more

than one emission limitationin §115.421(8)(A) applies to

a specific coating, then the

least stringent shall apply.

Page 31: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(31 of 39)

29

Is coating a

low-bake, or utilizes air or forced air driers?

§115.421(8)(A)|3

Comply with the following:

Standard

§115.421(8)(A)|3

§115.421, (8)(B)-(C)§115.426

Monitoring/Testing§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

Yes

Is the coatingan extreme performance

coating, including chemical

milling maskants?

§115.421(8)(A)|4

Comply with the following:

Standard

§115.421(8)(A)|4

§115.421, (8)(B)-(C)§115.426

Monitoring/Testing

§115.424(a)-(b)

[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping

§115.426, [G](1)

No

Comply with the following:

Standard

§115.421(8)(A)|5

§115.421, (8)(B)-(C)

§115.426

Monitoring/Testing

§115.424(a)-(b)[G]§115.425(1), (6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1)

Yes

No

End

Page 32: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(32 of 39)

Comply with the following:

Standard

§115.423(1)

§115.425(4)(C)(ii)

§115.426

Monitoring/Testing

[G]§115.425(2), (4), [G](4)(B)

§115.425(4)(C)(i), (4)(C)(iii)

[G]§115.426(1)

§115.426(2)(A), (2)(A)(i)

§115.426(2)(A)(ii), (2)(A)(iii)

§115.426(2)(A)(iv)

§115.426(2)(B)-(C), (3)

Recordkeeping

§115.425(4)(C)(iii)

§115.426, [G](1)

§115.426(2)(A), (2)(A)(iv)

§115.426(2)(B)-(C), (3)

Reporting

§115.423(3)(B)§115.426(3)

30

Has the facility installed a

permanent total enclosure that

directs all VOC to a

control device?

§115.425(4)(A)(i)

Does the source use a

control device designed to

collect and recover

VOC?

§115.425(4)(A)(ii)

Comply with the following:

Monitoring/Testing

[G]§115.425(4)(A)(ii)

Comply with the following:

Monitoring/Testing

§115.425(4)(A)(i)

Yes

No

End

Comply with the following:

Standard

§115.423(1)

§115.426

Monitoring/Testing

[G]§115.425(2), (4)

[G]§115.426(1)

§115.426(2)(A), (2)(A)(i)

§115.426(2)(A)(ii), (2)(A)(iii)

§115.426(2)(A)(iv)

§115.426(2)(B)-(C), (3)

Recordkeeping

§115.426, [G](1)

§115.426(2)(A), (2)(A)(iv)

§115.426(2)(B)-(C)

§115.426(3)

Reporting

§115.423(3)(B)

§115.426(3)

No

Page 33: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(33 of 39)

Comply with the following:

Standard

§115.423(3)(A)

Is a vapor

recovery system

used to control emissions

from the coating

operations?

§115.423(3)No

Is an

alternative compliance

method in use or to be

used?

Comply with the following:

Standard

§115.423(2)

§115.423(1)

§115.427(6)

[G]§115.910

§115.423(2)

No

52

53

Are only cleaning and

coating activities specified in §115.427(3)(J)

taking place?

§115.427(3)(J)

End

30 TAC Chapter 115,

Subchapter E, Division 2:

Surface Coating Processes

does not apply.

Yes

No

Yes

Yes

30

Page 34: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(34 of 39)

53

Is the coating a

primer?

Comply with the following:Standard

§115.421(10)(A)(i)

No§115.421(10)(A)(i)

Is the

coating a topcoat?

§115.421(10)(A)(ii)

Is the

coating a Type I

Maskant?

No

§115.421(10)(A)(iii)(I)

54

Is the

coating a Type II

Maskant?

§115.421(10)(A)(iii)(II)

55

Comply with the following:

Standard

§115.421, (10)

[G]§115.422(5)(A), [G](5)(D)

§115.422(5)(E)

§115.426

§115.427(6)

Monitoring/Testing

§115.424(a)-(b)

§115.425(6)

[G]§115.426(1)

Recordkeeping§115.426, [G](1), [G](5)(A)

Comply with the following:

Standard§115.421(10)(A)(ii)

Comply with the following:

Standard

§115.421(10)(A)(iii)(I)

Comply with the following:

Standard

§115.421(10)(A)(iii)(II)

Comply with the following:

Standard

§115.421(10)(B)

§115.421, (10)[G]§115.422(5)(A), [G](5)(D)

§115.422(5)(E)§115.426

§115.427(6)

Monitoring/Testing

§115.424(a)-(b)

§115.425(5)(A), (6)

[G]§115.425(1)[G]§115.426(1)

Recordkeeping

§115.426, [G](1), [G](5)(A)

No

No

Yes

Yes

Yes

Yes

Page 35: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(35 of 39)

54

Does the

facility comply with the test method requirements of 40 CFR

§63.750?

§115.425(5)(D)

No 56

Comply with the following:

Monitoring/Testing

§115.425(5)(D)Recordkeeping

§115.426(6)

55

Page 36: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(36 of 39)

Are hand

wipe cleaning solvents

used?

§115.422(5)(B)

Yes

Is the

cleaning solvent vapor

pressure < 45 mm Hg at 20° C?

Comply with the following:

Recordkeeping

[G]§115.426(5)(D)

§115.426(5)(C)

Comply with the following:

Recordkeeping

[G]§115.426(5)(C)

55

Are aqueous or

semiaqueous cleaning

solvents used?

Comply with the following:

Monitoring/Testing

§115.425(5)(B)

Recordkeeping

§115.426(5)(B)§115.425(5)(B)

No

End

Comply with the following:

Standard

§115.422(5)(C)

§115.422(5)(C)

Yes

Comply with the following:

Standard

[G]§115.422(5)(B)

Monitoring/Testing

§115.425(5)(C)

No

No

No

Yes

Yes

Are parts,

assemblies, or

components flush

cleaned with

solvent?

End

Page 37: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(37 of 39)

Comply with the following:

Monitoring/Testing

[G]§115.425(1)

§115.425(5)(A)

56

Are parts,

assemblies, or components flush

cleaned with

solvent?

Comply with the following:Standard

§115.422(5)(C)

§115.422(5)(C)

Yes

57

Are

hand-wipe

cleaning solvents

used?

§115.422(5)(B)

Yes

No End

No

Page 38: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(38 of 39)

57

End

Comply with the following:

Standard

[G]§115.422(5)(B)Monitoring/Testing

§115.425(5)(C)

Is the

cleaning solvent vapor

pressure < 45 mm Hg

at 20° C?

Yes

No

Comply with the following:

Recordkeeping

[G]§115.426(5)(D)

§115.426(5)(C)

Comply with the following:

Recordkeeping

[G]§115.426(5)(C)

Are aqueous or

semiaqueous cleaning

solvents used?

Yes

Comply with the following:

Monitoring/Testing

§115.425(5)(B)

Recordkeeping

§115.426(5)(B)

§115.425(5)(B)

No

Page 39: 30 TAC Chapter 115, Surface Coating Processes flowchart · 30 TAC Chapter 115, Surface Coating Processes (2 of 39) 60 30 TAC Chapter 115, Subchapter E, Division 2: Surface Coating

Last Modified: March 25, 2019 From 30 TAC Chapter 115, Effective June 25, 2015 LayeredThese flowcharts are for use by sources subject to the Federal Operating Permit Program only and are subject to change.

30 TAC Chapter 115, Surface Coating Processes(39 of 39)

End

61

Comply with the following:

Standard

[G]§115.422(7)

Is the paper coating operation located

in the Dallas/Fort Worth, or Houston/Galveston/Brazoria

areas?

Yes

No