Introduction
Four main reports regarding consultants• Performance audit of the acquisition and utilisation
of consultancy services in the PS - June 1996• Use of Consultants in the PS - June 2001 (Cabinet
resolutions, progress with implementation)• Performance audit Gauteng provincial
administration - September 2001 (Presented at SCOPA Gauteng, workshop with Committee and HODs)
• Appointment and utilisation of consultants at certain national departments and provincial administrations - August 2002
3
Purpose of Presentation
• Facilitate public accountability by bringing audit findings as well as suggested corrective measures to the attention of Parliament
• Indicate progress with corrective measures concerning consultants in the PS
4
Key Focus Areas
• Appointment and use of consultants
• Monitoring and control of performance
• Responsibilities of Departments and implementation
• Interventions implemented and envisaged by the DPSA
5
Appointment and use of consultants:
Consider alternatives
• Alternative ways of addressing needs such as training and capacity building not always considered -
Consider filling of vacant posts, setting productivity standards for staff, networking, information sharing and work overtime
6
Appointment and use of consultants:Procurement
• Sound procurement principles not always applied - comparing tenders not only on the basis of price but also functionality, expertise and knowledge of tenderers
Strengthening existing guidelines and procurement procedures for consultants and determining national norms and standards.
7
Appointment and use of consultants:
Competencies of Consultants
• Appointed without required experience of competencies
• Competencies not evaluated before awarding tender
• Resulted in staff having to be withdrawn from their functions to assist the consultants
8
Appointment and use of consultants:
Competencies of Consultants
Greater awareness of the internal cost of own staff's time in providing information and managing relationships
References of consultants should be followed up
Require consultants to provide proof of previous successes and the knowledge of consultants should be tested when tenders are evaluated
The DPSA should consider introducing a code of conduct or system of accreditation
9
Appointment and use of consultants:
Transfer of skills
• Contracts and TOR’s do not always provide for skills transfer
• Capacity building not closely monitored Provide opportunities for staff to learn
from consultants by creating mixed teams
Consider how the DPSA and the SAMDI could assist departments to follow best practice frameworks for skills transfer
10
Appointment and use of consultants:
Appointment permanent basis
• Appointed on a permanent basis or contract periods were continually extended
• This often resulted in the approved establishment being extended and departments becoming reliant on consultants to perform certain primary functions
11
Appointment and use of consultants:
Appointment permanent basis
Vacancies must be filled as soon as possible The duration of the appointment of consultant
must be limited to a reasonable period to ensure that the position is filled
Consider cost-effectiveness of the appointment of consultants compared to the filling of vacant posts
The DPSA should evaluate remuneration structures for positions in the public service in terms of similar job descriptions and remuneration structures in the private sector
12
Appointment and use of consultants:
Unclear need of appointment
• Lack of detailed specification of -– the services required– available resources– intended outcomes or product– required expertise – timetable for completion – long-term implications and risks
• Tenders was extended thus not complying with the requirements of transparent, fair and competitive procurement
13
Appointment and use of consultants:
Unclear need of appointment
Rigorous assessment of the need to appoint consultants with prove of not meeting challenges internally
Prospective tenders are appropriately briefed and the nature, outcomes, responsibilities and time frame of the work is clear
Provide TOR’s that serve as a guide to consultants regarding the size and scope of the work.
14
Performance Monitoring and Control
• Poor monitoring and verification of – consultants’ performance– progress with projects – extent to which set objectives were
achieved before payments are made• Thus the impact of the work of
consultants on service delivery were not evaluated
15
Performance Monitoring and Control
Undertake more regular evaluations while an assignment is in progress and when it has been completed
Link consultants’ remuneration to achieved performance
Evaluate performance by independent internal auditors
Disseminate and implement lessons learned from evaluations.
16
Responsibilities of and Implementation by Departments
Departments did not create an environment where consultants could perform their duties effectively
Interventions proposed were not always implemented due to -- inadequate human or financial
resources- a lack of commitment- lack of computer skills
17
Responsibilities of and Implementation by Departments
Create organisational climate and put processes in place that are supportive to achieving the objective for which the consultant was appointed
Assess capacity to absorb outside assistance and implement proposals before tender specifications are finalised
Management should accept ownership of the business plan before the project starts
18
Interventions implemented and envisaged by the DPSA
Conducted research on the use of consultants in the Public Service - Report published and presented to Cabinet
The findings of the research are similar to those made by the AG in this and previous performance reports
Departments were informed to have approved guidelines on the use and management of consultants with due consideration to specific issues raised in the Report (compliance audit by sampling 10 Departments)
19
Interventions implemented and envisaged by the DPSA
Amending the Public Service Regulations to (June 2002) to provide for -- A definition of a consultant- Departments to report in their annual reports on
the use of consultants- The MPSA to determine the format for reporting in
annual reports The MPSA approved the format in which
departments must report in their annual reports, namely -- Report and analysis of consultant appointments using
appropriated funds and donor funds, including historically disadvantaged individuals
20
Interventions implemented and envisaged by the DPSA
Provided substantive inputs into the draft National Treasury procurement framework, which will include procedures for the appointment and management of consultants
Finalising a Guide on hourly fee rates for consultants based on PS remuneration levels
Finalising a data base of 2113 consultant reports produced for the Public Service that will be made available to Departments
21
Summary
The DPSA is continuing to work with the Office of the AG and the National Treasury in order to promote the efficient and effective use of consultants in the Public Service in support of service delivery to our citizens