    Supply Chain Planning

    1. Demand Planning

    2. Product Design Planning

    3. Supply Chain Operations Planning

    4. Logistics Planning

    Supply Demand

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    3/47

    Demand Planning strategicaspects

    Bullwhip

    Demand Variability Forecasting

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    4/47

    Bull Whip

    Magnified Variation acrossthe Supply Chain

    Variation from Customer to

    Producer

    Whats the reason for bull

    whip effect?

    Whats the solution?

    Actual Demand Variation

    Induced Variation in Distribution Demand

    Felt Variation at Factory/RM/Up stream SC etc.

    Bullwhip

    Demand Variability

    Forecasting

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    5/47

    Increasing Variability of OrdersUp the Supply Chain

    Lee, H, P. Padmanabhan and S. Wang (1997), Sloan Management Review

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    6/47

    Coping with the Bullwhip Effectin Leading Companies Reduce uncertainty

    POS, Sharing information/forecast/policies

    Reduce variability

    Minimise promotions/ Pricing consistency

    Reduce lead times

    EDI, Cross docking

    Strategic partnerships Vendor managed inventory (VMI)

    Data sharing

    Collaborative Planning Forecasting and

    Replenishment (CPFR) Role of IT

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    7/47

    Demand Variability

    Competition

    Seasonality

    Product Life Cycle effect External factors

    Promotions

    Bullwhip

    Bullwhip

    Demand Variability

    Forecasting

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    8/47

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    9/47

    Product Design Planning

    Traditional Design Process Sequential

    Over-the-wall design/development

    Product Design for Supply Chain CE - DFM, DFL

    Other Design Strategies Standardisation & Component commonality

    Modularity

    Postponement; Mass-customisation

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    10/47

    Supply Chain Planning

    1. Demand Planning

    2. Product Design Planning

    3. Supply Chain Operations Planning

    4. Logistics Planning

    Supply Demand

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    11/47

    Sales and operations

    planning

    Demand

    management

    Master productionscheduling

    Detailed materialPlanning (MRP)

    Shop-floorsystems

    Suppliersystems

    Supply Chain Operations Planning Framework

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    12/47

    Demand Management

    Includes

    Forecasting

    Order Management

    Order processing (entry, book, acknowledgement,confirm)

    Customer promising

    CRM

    Main interaction with Strategic Planning

    S&OP

    MPS

    Demand mgmt should address complete demand aspects incl. spare parts, service levels etc.

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    13/47

    Forecasting

    Whats a Forecast?

    Whats a Plan?

    Forecasts & Plans

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    14/47

    Two Types of Demand

    Independent demand

    Dependent demand

    Which demand that a firm has complete control over?

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    15/47

    Customer Order Decoupling Point

    It is the point at which the firm (as opposed tothe customer) becomes responsible fordetermining the timing and quantity ofmaterial to be produced

    The point at which demand changes from

    independent to dependent

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    16/47

    Forecasting Output

    Strategic Planning

    S&OP

    MPS

    for

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    17/47

    Sales and operations

    planning

    Demand

    management

    Master productionscheduling

    Detailed materialplanning

    Shop-floorsystems

    Suppliersystems

    Forecast

    Forecasting

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    18/47

    Forecasting Techniques

    Judgment

    Market Research

    Intrinsic (Time Series)

    Extrinsic (Causal)

    Other models

    Forecasting

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    19/47

    Judgment Methods

    Sales-force Estimation

    Panels of Experts internal,external, both

    Delphi method

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    20/47

    Market Research

    Market Survey

    Test Marketing Focus groups assembled

    Responses tested

    Extrapolations made

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    21/47

    Time Series (Intrinsic)

    Moving Average

    Weighted Moving Averages

    Exponential Smoothing

    Regression

    Trend, Seasonality(Decomposition)

    Other Models Holts

    Box Jenkins

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    22/47

    Time Series Method Moving Average Weighted Moving Average Exponential Smoothing

    Evaluating & Using Forecasts Forecast Error, Bias & MAD Aggregation

    Pyramid Forecasts

    Time-Series Forecasting

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    23/47

    Time-Series Forecasting

    Moving Average Model

    Forecast = Average demand of the past N periods

    Weighted Moving Average

    Trade off : Stability Vs Responsiveness

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    24/47

    Exponential Smoothing

    : Alpha, smoothing constant Dn : Demand for nth period

    Fn : Forecast of nth period

    Forecast(n+1) = Fn + (Dn - Fn )

    Forecast(n+1) = . Dn + (1 ) . Fn

    Time-Series Forecasting

    Trade off : Stability Vs Responsiveness

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    25/47

    Causal Methods (Extrinsic)

    Based on data other than the databeing predicted

    Examples include

    Sales of other products

    Inflation rates

    GNP

    Unemployment rates

    Weather

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    26/47

    Forecast Error

    Forecast Error = D F

    Mean Error (Bias)

    Mean Absolute Deviation (MAD)

    Average past absolute error

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    27/47

    Pyramid Forecasting

    TotalBusinessForecast ($)

    Product Lines

    Individual items

    Roll up

    Force down

    Level 1

    Level 2

    Level 3

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    28/47

    Forecasting Approach

    A Forecasting Framework

    Aggregation

    Time frame Technique

    Mgmt involvement

    Short term/tactical Vs strategic/long term

    CRM application to learn specific customer needs

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    29/47

    How to

    choose aforecastingtechnique/

    model?

    Judgment

    Market Research

    Intrinsic (Time Series)

    Moving Average Weighted Moving Average

    Exponential Smoothing

    Extrinsic (Causal)

    Pyramid forecast

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    30/47

    Choosing a ForecastingTechnique some guidelines

    What is the purpose of the forecast? Gross or detailed estimates?

    Dynamics of the system being forecast?

    Is it seasonal? Trending?

    How important is the past in estimating the future?

    Product Life Cycle

    Most effective tocombine approaches

    JudgmentMarket researchIntrinsic(Timeseries)Extrinsic(Causal)

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    31/47

    Planning Framework with DRP

    Sales and operationsplanning

    Demandmanagement

    Master productionscheduling

    Detailed materialplanning

    Shop-floorsystems

    Suppliersystems

    DRP

    Logistics

    &Transportation

    DRP : Distribution Requirement Planning

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    32/47

    Sales and operationsplanning

    Demandmanagement

    Master productionscheduling

    Detailed materialPlanning (MRP)

    Shop-floorsystems

    Suppliersystems

    Sales & Operations Planning

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    33/47

    Supply Chain Operations Planning- Traditional planning sequence

    Traditional Operations Planning

    Business Planning

    Sales Planning

    Resource Planning Production Planning

    Rough-cut Capacity

    PlanningMaster Scheduling

    Capacity Planning MRP

    Execution System

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    34/47

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    35/47

    S&O Planning-led Approach

    Business Planning

    Resource PlanningSales & Operation

    Planning

    Rough-cut Capacity

    PlanningMaster Scheduling

    Capacity Planning MRP

    Execution System

    Supply Chain Operations Planning

    - S&OP led

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    36/47

    Sales and operationsplanning

    Demandmanagement

    Master productionscheduling

    Detailed materialPlanning (MRP)

    Shop-floorsystems

    Suppliersystems

    Supply Chain Operations Planning Framework

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    37/47

    Master

    ProductionSchedule

    Period 1 2 3 4

    Forecast 20 70 70 20

    ProjectedAvailable 50 20 30 50

    MPS 40 40 80 40

    On Hand=30Safety Stock=20Batch = 40x

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    38/47

    What should be planned in MPS

    MTS scenario End-items

    ATO scenario Options or modulesfrom which a variety of end

    products could be assembled

    ATO/ MTO scenario Numbers of units of an average final product

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    39/47

    Sales and operationsplanning

    Demandmanagement

    Master productionscheduling

    Detailed materialPlanning (MRP)

    Shop-floorsystems

    Suppliersystems

    Supply Chain Operations Planning Framework

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    40/47

    BOM Bill of Materials

    A

    X (3) Y(2)

    X Z

    BOM explosion to generate material requirements

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    41/47

    Period 1 2 3 4 5 6

    Gross Requirements 20 20 40 30 30 30

    Scheduled Receipts 50

    Projected Available Balance 15 45 25 55 25 65 35

    Planned Order Release 70 70

    Typical MRP Record

    Lot Size (Q) = 70, LT=2, SS = 20

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    42/47

    Period 1 2 3 4 5 6

    Gross Requirements 20 30 40 30 30 30

    Scheduled Receipts

    Projected Available Balance

    Planned Order Release 150 200 150

    MPS to MRP linkage

    Period 1 2 3 4 5 6

    Forecast 20 70 70 20

    Projected Available

    MPS 20 30 40 30 30 30

    On Hand=30Safety Stock=0Batch = Any

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    43/47

    Sales and operationsplanning

    Demandmanagement

    Master productionscheduling

    Detailed materialPlanning (MRP)

    Shop-floorsystems

    Suppliersystems

    Supply Chain Operations Planning Framework

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    44/47

    Theory of

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    45/47

    Drum - Buffer Rope Scheduling

    15

    A

    20

    B

    10

    C

    18

    D

    16

    E

    DRUM

    ROPE

    BUFFER

    B

    20

    Capacity Constrained Resource

    eo y oConstraints

    Th f C t i t

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    46/47

    Throughput- rate at which money is generated by the system

    through sales.

    Inventory- all the money the system has invested in

    purchasing things it intends to sell.

    Operating expenses- all the money that the system spends to turninventory into throughput.

    Increase Throughput, Reduce Inv. & Op. Ex.

    Theory of Constraints

    Fundamentals of Business Redefined

  • 8/8/2019 3. Supply Chain Planning - Jul2010

    47/47

    Planning Framework with Capacity Planning

    Resource

    Planning

    CapacityRequirementPlanning (CRP)

    Sales and operations

    planning

    Demand

    management

    Master productionscheduling

    Detailed materialPlanning (MRP)

    Shop-floorsystems

    Suppliersystems

    Rough-cut CapPlanning

    Advanced ProductionScheduling (APS) orFinite Loading,Input/Output Analysis

    PAC