2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation,...

14
Welcome to Columbia Powering the Future of South Carolina SMR Conference

description

 

Transcript of 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation,...

Page 1: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

Welcome to Columbia

Powering the Future of South Carolina

SMR Conference

Page 2: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

What to Do? • USC Baseball National Champions

• t

• 1

• 1

Statehouse Sherman’s March

State Museum

Page 3: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

Gamecocks Capture Back-to-Back National Titles

• 5-2 Win Over Florida Carolina Sets NCAA Record with 16 Straight Postseason Wins

• Games vs Alabama Wednesday, Thursday & Friday in Columbia

3

Page 4: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

Lake Murray

•50,000 Acres

•Fishing/boating

•1930 works project

•200 MW hydro

•RCC backup dam completed in 2005

•Won ASCE OPAL award in 2006

Page 5: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

5

SCE&G • Established 1846 (Charleston Gas Light Co.)

• Generation ~5800 MWe

• ~3,300 Employees

• Subsidiary of

• SCANA is Fortune 500

• Operated Parr nuclear plant

from 1963 - 1967

• Building 2 AP1000 reactors

Page 6: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

Nuclear in South Carolina

HB Robinson

Catawba Lee

Oconee V.C. Summer & Parr

SRS

Barnwell

Westinghouse Fuels

Navy Nuclear training

6

Page 7: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G
Page 8: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

Contractor Parking

Concrete Batch Plants

Cooling Towers Unit #3

Module Assembly Bldg

8

Page 9: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

NRC License in Hand March 30

VC Summer is first Subsequent or “S-COL” under regulation; 10CFR Part 52

9

Page 10: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G
Page 11: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G
Page 12: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

12

Page 13: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G
Page 14: 2nd Small Modular Reactor Conference Opening Speech: Steve Byrne - President of Power Generation, SCE&G

Again, Welcome to Columbia