1 CONFIDENTIAL |
Jeremy Shulman
Country Manager – Aconex Qatar
Technology is the key to success: Document control and collaboration
2 CONFIDENTIAL |
“Ancient Egyptians wrote their history on walls because they knew that if they put it in the files it would be lost forever”
3 CONFIDENTIAL |
12,000 projects across 70 countries
280,000 people from 40,000 organizations
Worldwide Research
Eureka Tower
Melbourne
The Panama Canal
Expansion Project
Panama
New York City Hall,
New York
Nui Phao Open Pit Mine
Vietnam
Marina Bay Sands
Integrated Resort
Singapore King Shaka
International Airport
South Africa
Dubai Metro
Light Rail
UAE
The Savoy
London New Delhi
International Airport
India
Lusail City
Doha
4 CONFIDENTIAL |
Explosion of BIM...
Source: Aconex project data to 31 July 2012
Actual
Forecast
Compound
Annual
Growth of
over 200%
2008 2009 2010 2011 2012
Nu
mb
er
of
mo
del
file
s
Models stored on Aconex
5 CONFIDENTIAL |
“Building Information
Modeling is the process of
generating and managing
building data during its life
cycle”
Source: wikipedia.com, Lee, G., Sacks, R., and Eastman, C. M.
It’s all about the “ing”
6 CONFIDENTIAL |
• Reviews & audit trail
• Workflows and approvals
• Version control
• Real-time clash detection
• 2D doc distribution
• Point in time archiving
• Remote model viewing
But I’m already doing BIM…
3D, 4D, 5D
Model Authoring
Model
Management
Linking
additional info
Coordination &
Collaboration
Model generation with
BIM authoring tools
• Model distribution
• Combining
models
• Clash
detection
• Link manuals /
specs etc. to
model objects
• Link RFI’s to
model views
• Link RFI’s to
commissioning
data / defects
All of
project
team
Model
Authors
& Design
team
7 CONFIDENTIAL |
Common Collaboration Challenges…
How do I keep point in
time archives of the
model?
BIM files are huge – how do
I distribute them?
How do I reduce cycle
times on clash resolution?
How do I link other
information into my model
so I have a complete BIM?
How do I have an
audit trail of
decisions made? How do I view a part
of the model without
having to download
the whole thing?
How do I access the
model in the field? How do I easily get
2D plans out of my model
and distribute them?
8 CONFIDENTIAL |
True project collaboration – the right tools for the job
Corporate EDMS
Internal, enterprise focus
What are the limitations
in a project environment?
How are users across
project organizations
supported and trained?
Generic collaboration functionality
Deploy, develop & maintain internally
Train & support users internally
9 CONFIDENTIAL |
Subcontractor Main Contractor Subcontractor Subcontractor
CPO Quantity Surveyor
Engineer
Services
Consultants
Corporate EDMS: A barrier to project-wide acceptance
Architect
System Owner
10 CONFIDENTIAL |
Architect
Subcontractor Subcontractor Subcontractor Subcontractor
Cost Consultant
Quantity Surveyor
Engineer
Services Consultants
Which leads to…
Client
PM
General Contractor
11 CONFIDENTIAL |
One platform, agreed processes
Consultant
PM
Contractor
Client
12 CONFIDENTIAL |
What are the results if your entire project team has access to:
Definite latest &
approved version
Complete trail of
RFIs, Clarifications
and Site Instructions
Full documentation
history
Through a trusted, auditable and reportable Project EDMS
13 CONFIDENTIAL |
Accelerate decision making, reduce cycle times
68%
less time
Compared to
FTP sites
($800m project)
Faster
design reviews
43%
less time
Compared to
US industry
average
Faster
RFI turnaround
50%
less time
Compared to
previous method
(Large GC)
Faster
bid preparation
“Where typically it would be a 14 day turn around on documents, or on some of
the faster documents 5 days, we’ve been able to turn them around in hours”
Source: Industry Standards and Client Case Studies to 31 July 2012
14 CONFIDENTIAL |
Boost productivity and profits
84%
less time
More efficient
doc control
$628k saving
Compared to
internal EDMS
($268m project)
60%
less time
Reduced
search time
$725k saving
Compared to internal
systems (CM firm,
$100m project)
80%
less time
Faster record
assembly
$81k saving
Compared to
previous method
($100m project)
“We are now going to support over 40 projects
with a staff of nine! And that is huge in terms of cost saving”
Source: Industry Standards and Client Case Studies to 31 July 2012
15 CONFIDENTIAL |
Andre Stockbridge,
Project Director
My document control system is my
insurance policy. I have a clear
record of who did what and when. If
something goes wrong I can
indisputably identify the party at fault
“
”
16 CONFIDENTIAL |
Mobile is changing the way people work…
17 CONFIDENTIAL |
Rest of Project Team BIM Authors
Full Mobile Collaborative BIM
1. Collaborative Platform
Workflow & point -in –time
approved models
Docs, Specs,
Manuals
RFIs etc
2. Visualization
3D Visualization,
Part model streaming
& Mark-up
1. Distribute models
2. Review & approval
3. Manage coordination and issues
4. Publish, archive, version
5. View. Walkthrough. Annotate
6. Publish & manage 2D
4. BIM Server
Server side converter
5. Mobile BIM in the field 3. Plugins to Revit + more
18 CONFIDENTIAL |
This is what happens if you forget the “ing”
Problem:
“Project was “designed” in BIM, but…
there was no communication and collaboration
Result:
The contractor sued the
owner, the owner sued the
architect, and the insurer
brought in the MEP engineer.
“There was a
“pretty significant cost,”
totalling millions of dollars,
which was shared by the
architect, the MEP engineer
and the contractor.”
19 CONFIDENTIAL |