2Natural Gas Field
Transcript of 2Natural Gas Field
![Page 1: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/1.jpg)
Natural Gas Field Development andNatural Gas Field Development and Environmental Issues
IndonesiaIndonesiaResearch and Development Centre for Oil and Gas Technology gy“LEMIGAS”Ministry of Energy and Mineral Resources Republic of IndonesiaRepublic of Indonesia
![Page 2: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/2.jpg)
INDONESIA GAS DEVELOPMENT
Overview of geology & map showing gas fields andOverview of geology & map showing gas fields and marketsGas resources & potentialCurrent supply demand scenario (outlook for the next 10 years)Natural gas development policy & roadmapNatural gas development policy & roadmapIdentify projects and/or research activities (current & planned) related to natural gas development –institutions involved & contact detailsinstitutions involved & contact detailsIssues & Challenges (including environmental issues)
![Page 3: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/3.jpg)
INDONESIA SEDIMENTARY BASININDONESIA SEDIMENTARY BASIN (2009)
Overall 128 sedimentary basins, based on surface geology boundaries and gravity data of IndonesiaC i i f T i B i P T i B i d C i B iConsisting of Tertiary Basins, Pre-Tertiary Basins and Composites Basins
3
![Page 4: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/4.jpg)
INDONESIA GAS RESERVE(STATUS : 1 JANUARY 2008, DJ MIGAS 2008)( , )
NAD
NATUNA5.72
ACEH (NAD)
1.2752.59
NATUNA
SUMATERA UTARA KALIMANTAN TIMUR
3.18
8.1524.96
24.21
PAPUASUMETERA TENGAH
28 00
4.16
SUMATERA SELATAN
JAWA TIMUR
JAWA BARAT
SULAWESIMALUKU
13.65
28.00
6.305.08
PROVEN = 112 47 TSCF
JAWA TIMUR
GAS RESERVE (TSCF)
PROVEN 112.47 TSCFPOTENTIAL = 57.60 TSCFTOTAL = 170.07 TSCF
![Page 5: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/5.jpg)
INDONESIA GAS RESERVE(2001 – 2008, DJ MIGAS 2008)
180
200
140
160
80
100
120
TSC
F
40
60
0
20
Terbukti 92 1 90 3 91 2 90 5 97 3 94 0 106 0 112 5
2001 2002 2003 2004 2005 2006 2007 2008
PROVENTerbukti 92.1 90.3 91.2 90.5 97.3 94.0 106.0 112.5Potensial 76.1 86.3 87.0 97.8 88.5 93.1 59.0 57.6Total 168.2 176.6 178.1 188.3 185.8 187.1 165.0 170.1
PROVEN
POTENTIAL
TOTAL
![Page 6: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/6.jpg)
GAS RESOURCES & POTENTIAL(bp migas web 2004)(bp migas web, 2004)
![Page 7: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/7.jpg)
INDONESIA GAS PRODUCTION ANDINDONESIA GAS PRODUCTION AND CONSUMPTION(DESDM 2009)(DESDM, 2009)
GAS PRODUCTION AND UTILIZATION
9.00
8.00
8.50
7.50
BSC
FD
6.50
7.00
200820072006200520042003200220012000
Production Utilization
![Page 8: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/8.jpg)
NATIONAL GAS SUPPLY AND DEMAND FORECAST
![Page 9: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/9.jpg)
GAS UTILIZATIONGAS UTILIZATION
ElectricityFertilizerIndustry, etc.
Contracts = 29Volume = 10 7 TCFVolume = 10.7 TCFValue = US$ 24.3 Millions
![Page 10: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/10.jpg)
GAS RESERVE AND PIPELINE SYSTEM(2005)(2005)
![Page 11: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/11.jpg)
TRANS ASEAN GAS PIPELINE (TAGP)
![Page 12: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/12.jpg)
![Page 13: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/13.jpg)
TRANSMISSION PIPELINE AND FLOW
![Page 14: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/14.jpg)
TRANSMISSION PIPELINESumatra and Natuna
![Page 15: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/15.jpg)
GAS TRANSMISION SYSTEMSouth Sumatra – West Java
![Page 16: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/16.jpg)
GAS TRANSMISION SYSTEMGAS TRANSMISION SYSTEMEast Java
![Page 17: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/17.jpg)
GAS MILL DISTRIBUTIONGAS MILL DISTRIBUTION
![Page 18: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/18.jpg)
INDONESIA ENERGY INDONESIA ENERGY POLICY & ROADMAP 2025*)POLICY & ROADMAP 2025*)
![Page 19: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/19.jpg)
NATIONAL ENERGY PROJECTION
20052005
20252025
![Page 20: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/20.jpg)
LNG TERMINAL MILESTONE
CUMULATIVE PRODUCTION 312,000 TON/DAYCUMULATIVE INVESTATION US$3.6 BILLION
PRODUCTION GAIN26,000/DAY
PRODUCTION GAIN52,000/DAY
PRODUCTION GAIN104,000/DAY PRODUCTION GAIN
130,000/DAY
INVESTATIONUS$ 300 M
INVESTATIONUS$ 600 M
INVESTATIONUS$ 1,200 M
INVESTATIONUS$ 1,500 M
![Page 21: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/21.jpg)
CBM MILESTONECBM MILESTONECUMULATIVE PRODUCTION 4.64 TCF
CUMULATIVE INVESTATION US$382.5 BILLION
PRODUCTION GAIN1.04 TCF
PRODUCTION GAIN2.44 TCF
PRODUCTION GAIN3.87 TCF
PRODUCTION GAIN5.34 TCF
INVESTATIONUS$ 31,536 M
INVESTATIONUS$ 73,584 M
INVESTATIONUS$ 116,800 M
INVESTATIONUS$ 160,608 M
![Page 22: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/22.jpg)
ISSUES AND CHALENGE
Increasing energy demand and decreasing oil reserve. CurrentlyIncreasing energy demand and decreasing oil reserve. CurrentlyIndonesia is net oil importer, and need other resources for oilsubstitution, gas is one of them.11 non producing basins with discovery and 22 virgin basins in tertiarysedimentssediments.Some stranded gas fields (marginal fields) for local energy and oilsubstitution. Usually located far from civilization. Current issuesubtituting oil fuel to gas for power plant.Non Fossil fuel cost is still high compare to Fossil fuelGas issues post Arun dan East Kalimantan era: TANGGUH, SENOROand SUBAN. Last issue is MASELA gas development (big reserveremote location)remote location)EAST NATUNA FIELD, large reserve with high impurities (70% CO2).Need high capital and high technology. Possibly using CCS. 222 TCFOGIP dan 46 TCF Reserve.
![Page 23: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/23.jpg)
CONTACT DETAIL
Directorate General Oil and GasDirectorate General Oil and GasGedung Plaza Migas CentrisGedung Plaza Migas CentrisJl H R Rasuna Said Kav BJl H R Rasuna Said Kav B--55Jl. H.R Rasuna Said Kav. BJl. H.R Rasuna Said Kav. B--55Jakarta 12910Jakarta 12910Phone : +62 21 5268910Phone : +62 21 5268910
ororGeological AgencyGeological Agencyg g yg g y
Jl. Diponegoro No. 57Jl. Diponegoro No. 57Bandung 40122Bandung 40122Phone : +62 22 7219573Phone : +62 22 7219573
ororooBP MIGASBP MIGAS
Patra Office Tower Patra Office Tower Jl. Jend. Gatot Subroto Kav. 32Jl. Jend. Gatot Subroto Kav. 32--3434Jakarta 12950Jakarta 12950Jakarta 12950Jakarta 12950Phone: +62 21 52900245Phone: +62 21 52900245--4848
ororENERGY AND MINERAL RESOURCES RESEARCH AND DEVELOPMENT AGENCYENERGY AND MINERAL RESOURCES RESEARCH AND DEVELOPMENT AGENCY
Jl Ciledug Raya Kav 109Jl Ciledug Raya Kav 109Jl. Ciledug Raya Kav. 109Jl. Ciledug Raya Kav. 109CipulirCipulirJakarta 12230Jakarta 12230Phone : +62 21 Phone : +62 21 73944227394422
![Page 24: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/24.jpg)
Thank YouThank You Terima Kasih
![Page 25: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/25.jpg)
HYDROCARBON POTENTIALEAST NATUNAEAST NATUNA
S R k A G b d T b F tiSource Rocks: Arang, Gabus dan Terumbu Formation.Primary Reservoir : Gabus, Terumbu FormationTrap: Stucture and StratigraphicTrap: Stucture and StratigraphicCap Rock : Intra Arang ShaleResources : Gas Reef, 222 TCF OGIP dan 46 TCF Reserve.
![Page 26: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/26.jpg)
SUPPORTED SLIDES
![Page 27: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/27.jpg)
NATIONAL ENERGY PROJECTIONNATIONAL ENERGY PROJECTION(MBOE)
Energy Type 2005 2010 2015 2020 2025
Oil 524.00 550.70 578.00 605.80 638.90Coal 160 40 210 30 349 70 743 80 1099 40Coal 160.40 210.30 349.70 743.80 1099.40Gas 212.80 363.70 382.50 477.10 832.00CBM 0.00 0.00 23.00 74.60 127.80Water 34.00 41.70 56.60 60.50 65.12Geothermal 23.70 23.70 61.80 115.80 167.50Nuclear 0.00 0.00 0.00 27.90 55.80Other Renewable 1.60 3.50 7.40 11.70 17.40Biofuel 0 00 32 50 89 00 102 40 166 90Biofuel 0.00 32.50 89.00 102.40 166.90Coal Liquefaction 0.00 0.00 14.20 47.40 80.50
TOTAL 956.50 1226.10 1562.20 2267.00 3251.32
![Page 28: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/28.jpg)
GEOLOGICAL CROSS SECTIONEAST NATUNA
![Page 29: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/29.jpg)
STRATIGRAPHYEAST NATUNAEAST NATUNA
![Page 30: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/30.jpg)
EXPLORATION HISTORYEAST NATUNA
70 Period : Intial Exploration Activity for Blok D-Alpha, 1973. Agip found AL Structure.80 Period : 2D additional seismic acquisition as long as 2500 km80 Period : 2D additional seismic acquisition as long as 2500 km. Gas discovery in L-2X (1981), continued similar discovery in L-3X, L-4X, dan L-5X (1983) well.Estimated OGIP 222 TCF, Formasi Terumbu (Reef Formation).
![Page 31: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/31.jpg)
WELLS IN NATUNA
![Page 32: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/32.jpg)
TECTONIC SETTINGEAST NATUNA
![Page 33: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/33.jpg)
WEST NATUNA GAS PIPELINEWEST NATUNA GAS PIPELINE
![Page 34: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/34.jpg)
![Page 35: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/35.jpg)
![Page 36: 2Natural Gas Field](https://reader036.fdocuments.net/reader036/viewer/2022071602/613d5f96736caf36b75c9016/html5/thumbnails/36.jpg)