2G 2960B Indoor Site Verification Report_Post
Transcript of 2G 2960B Indoor Site Verification Report_Post
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
1/26
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
2/26
SITE INFORMATION.............................................................................................................................................3
CELL DATA .........................................................................................................................................................3
SITE ALARM CHECK.............................................................................................................................................3
KPI RESULTS.......................................................................................................................................................4
DEFINED WALK TEST ROUTE AND FLOOR SELECTION..............................................................................................6
INDOOR WALK TEST RESULTS (CS)........................................................................................................................7
7 INDOOR BCCH BEST SERVER PLOT...................................................................................................................14
INDOOR WALK TEST RESULTS (PS)......................................................................................................................17
8WALK TEST HANDOVER INDOOR-OUTDOOR DT BCCH BEST SERVER PLOT.............................................................20
9WALK TEST FAILED EVENTS AND ANALYSIS........................................................................................................22
ISSUES AND ACTION/RECOMMENDATION............................................................................................................24
CONCLUSION....................................................................................................................................................25
REMARK...........................................................................................................................................................25
Confidential SSV Report 2(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
3/26
Site Information
Site Name Plaza Idaman Ready for Opti Date After swapSite ID 2960B Walk Test Date 14/09/2012
BSC / MSC 207 Region Central
Longitude (Decimal) (E) 101.713329 BTS type SDR R8882
Latitude (Decimal)(N) 3.21362582 Band DCS1800
Cell Data
Info Sector 1 / Omni Sector 2 Sector 3 Sector 4
LAC 3302 N/A N/A N/A
CI 29606 N/A N/A N/A
BCCH 869 N/A N/A N/A
BSIC 14 N/A N/A N/A
Frequency Hopping 880 N/A N/A N/A
Azimuth 0 N/A N/A N/A
Site Alarm Check
Site Name Commission Date Alarm
2960B dd/mm/yyyy No Alarm
The alarm information will be provided by BSS engineer before test.
Confidential Cluster performance verification report 3(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
4/26
KPI Results
1.1 Walk Test KPI Results
No. KPI Parameter KPI Target KPI BeforeSwap
KPI AfterSwap
Status
Voice Network Accessibility
GT_01 Call Set up Success Rate 99.0% 100% 100.00% Pass
GT_02 Location Update Success Rate 99.0% 100% N/A Pass
Voice Retainability
GT_03 TCH Drop Call Rate 0.5% 0% 0.00% Pass
GT_04 Handover Success Rate 99.0% 100% N/A Pass
Coverage & Quality
GT_05 RxLevSub (dBm) - Priority 1 Area 80% of samples -75dBm 18.14% 100.00% Pass
GT_06 RxLevSub (dBm) - Priority 2 Area 90% of samples -85dBm 99.26% 100.00% Pass
GT_07 Call Setup Time average
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
5/26
1.1 IndoorOSS Statistical KPI Results
No. KPI Parameter KPI BeforeSwap
KPI AfterSwap
Status
Voice Network Accessibility
GO_01 Call Set up Success Rate
GO_02 Location Update Success Rate
GO_03 Paging Success Rate
GO_04 Random Access Success Rate
GO_05 SDCCH Blocking
GO_06 SDCCH Drop
GO_07 SDCCH Setup Success Rate
Voice RetainabilityGO_08 TCH Drop
GO_09 MPD (applicable for swap sites)
GO_10 Handover Success Rate
Data Quality
GO_12 GPRS/EDGE Blocking DL %
GO_13 GPRS/EDGE Blocking UL %
GO_14 Downlink Throughput (Kbps)
GO_15 Uplink Throughput (Kbps)
GO_16 Downlink TBF Allocation Success Rate (%)
GO_17 PDCH Allocation Success Rate (%)
Confidential Cluster performance verification report 5(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
6/26
Defined Walk Test Route and Floor selection
The walk test route covers mainly floors of 2960B, and the concrete route map is as follows:Pre Floor plans:
Level G Level 1 Level 3
Post Floor Plans:
Confidential Cluster performance verification report 6(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
7/26
GF 1F 2F
3F
Indoor Walk Test Results (CS)
CS RxLev_Sub Before Swap RxLev_Sub After Swap
Rxlev_SubBenchmar
Average (dbm) -77.73 Average (dbm) -55.32
Confidential Cluster performance verification report 7(26)GF 10F 19F
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
8/26
k Result GF
1F
3F
GF
1F
2F
Confidential Cluster performance verification report 8(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
9/26
3F
Legend PDF[#]
PDF[%]
CDF[#] CDF[%] Legend PDF[#] PDF[%]
CDF[#]
CDF[%]
-60
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
10/26
-85
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
11/26
3F
2F
3F
Legend PDF[#]
PDF[%] CDF[#]
CDF[%] Legend PDF[#]
PDF[%] CDF[#]
CDF[%]
0
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
12/26
7
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
13/26
3F
N/A
Legend PDF[#]
PDF[%] CDF[#] CDF[%] Legend PDF[#] PDF[%] CDF[#]
CDF[%]
Confidential Cluster performance verification report 13(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
14/26
0
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
15/26
N/A
N/A
2F
3F
Confidential Cluster performance verification report 15(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
16/26
Confidential Cluster performance verification report 16(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
17/26
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
18/26
3F
PS Uplink Average Throughput(kbps)-Before Swap
96.30 Uplink Average Throughput (kbps)-AfterSwap
155.86
Confidential Cluster performance verification report 18(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
19/26
FTPEDGE
ULtest
GF
1F
3F
GF
1F
2F
Confidential Cluster performance verification report 19(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
20/26
3F
8 Walk Test Handover Indoor-outdoor DT BCCH Best server Plot
Indoor toOutdoorResult
Indoor to Outdoor - Before Swap Indoor to Outdoor - PAC
Confidential Cluster performance verification report 20(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
21/26
N/A
GF
Outdoor to Indoor - Before Swap Outdoor to Indoor - PAC
Confidential Cluster performance verification report 21(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
22/26
N/A
GF
9 Walk Test Failed Events and Analysis
9.1 Walk Test failed Event Statistical
Event Name Before After
Confidential Cluster performance verification report 22(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
23/26
Event times Attempttimes
Eventtimes
Attempttimes
Call Setup Fail 26 0 0 18
Dropped Call26 0 0 18
Handover Failure 5 0 N/A N/A
Location Area Update Failure 0 0 N/A N/A
9.2 Walk Test Failed Events Plots
Call Setup Fail Plot- Before Swap Call Setup Fail Plot- After SwapCount of Failure 0 Count of Failure 0 N/A N/A
Dropped Call- Before Swap Dropped Call- After SwapCount of Failure 0 Count of Failure 0 N/A N/A
Handover Failure- Before Swap Handover Failure- After Swap
Confidential Cluster performance verification report 23(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
24/26
Count of Failure 0 Count of Failure 0 N/A N/A
Location Area Update Failure- Before Swap Location Area Update Failure- After SwapCount of Failure 0 Count of Failure 0
N/A N/A
1.2 Analysis of Failed Events and actions taken
To analysis the chief events and give suggestion for solve.
Issues and action/recommendation
Confidential Cluster performance verification report 24(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
25/26
1.3 List of other optimization activities
1.4 List of outstanding items
This site meets the KPI acceptance criteria. No outstanding item.
Conclusion
Remark
Vendors
Remark
DiGi's Remark
Confidential Cluster performance verification report 25(26)
-
7/31/2019 2G 2960B Indoor Site Verification Report_Post
26/26
Performed By Verified By
Sign Sign
Date Date
Mobile No Mobile No
Confidential Cluster performance verification report 26(26)