2G 2960B Indoor Site Verification Report_Post

download 2G 2960B Indoor Site Verification Report_Post

of 26

Transcript of 2G 2960B Indoor Site Verification Report_Post

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    1/26

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    2/26

    SITE INFORMATION.............................................................................................................................................3

    CELL DATA .........................................................................................................................................................3

    SITE ALARM CHECK.............................................................................................................................................3

    KPI RESULTS.......................................................................................................................................................4

    DEFINED WALK TEST ROUTE AND FLOOR SELECTION..............................................................................................6

    INDOOR WALK TEST RESULTS (CS)........................................................................................................................7

    7 INDOOR BCCH BEST SERVER PLOT...................................................................................................................14

    INDOOR WALK TEST RESULTS (PS)......................................................................................................................17

    8WALK TEST HANDOVER INDOOR-OUTDOOR DT BCCH BEST SERVER PLOT.............................................................20

    9WALK TEST FAILED EVENTS AND ANALYSIS........................................................................................................22

    ISSUES AND ACTION/RECOMMENDATION............................................................................................................24

    CONCLUSION....................................................................................................................................................25

    REMARK...........................................................................................................................................................25

    Confidential SSV Report 2(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    3/26

    Site Information

    Site Name Plaza Idaman Ready for Opti Date After swapSite ID 2960B Walk Test Date 14/09/2012

    BSC / MSC 207 Region Central

    Longitude (Decimal) (E) 101.713329 BTS type SDR R8882

    Latitude (Decimal)(N) 3.21362582 Band DCS1800

    Cell Data

    Info Sector 1 / Omni Sector 2 Sector 3 Sector 4

    LAC 3302 N/A N/A N/A

    CI 29606 N/A N/A N/A

    BCCH 869 N/A N/A N/A

    BSIC 14 N/A N/A N/A

    Frequency Hopping 880 N/A N/A N/A

    Azimuth 0 N/A N/A N/A

    Site Alarm Check

    Site Name Commission Date Alarm

    2960B dd/mm/yyyy No Alarm

    The alarm information will be provided by BSS engineer before test.

    Confidential Cluster performance verification report 3(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    4/26

    KPI Results

    1.1 Walk Test KPI Results

    No. KPI Parameter KPI Target KPI BeforeSwap

    KPI AfterSwap

    Status

    Voice Network Accessibility

    GT_01 Call Set up Success Rate 99.0% 100% 100.00% Pass

    GT_02 Location Update Success Rate 99.0% 100% N/A Pass

    Voice Retainability

    GT_03 TCH Drop Call Rate 0.5% 0% 0.00% Pass

    GT_04 Handover Success Rate 99.0% 100% N/A Pass

    Coverage & Quality

    GT_05 RxLevSub (dBm) - Priority 1 Area 80% of samples -75dBm 18.14% 100.00% Pass

    GT_06 RxLevSub (dBm) - Priority 2 Area 90% of samples -85dBm 99.26% 100.00% Pass

    GT_07 Call Setup Time average

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    5/26

    1.1 IndoorOSS Statistical KPI Results

    No. KPI Parameter KPI BeforeSwap

    KPI AfterSwap

    Status

    Voice Network Accessibility

    GO_01 Call Set up Success Rate

    GO_02 Location Update Success Rate

    GO_03 Paging Success Rate

    GO_04 Random Access Success Rate

    GO_05 SDCCH Blocking

    GO_06 SDCCH Drop

    GO_07 SDCCH Setup Success Rate

    Voice RetainabilityGO_08 TCH Drop

    GO_09 MPD (applicable for swap sites)

    GO_10 Handover Success Rate

    Data Quality

    GO_12 GPRS/EDGE Blocking DL %

    GO_13 GPRS/EDGE Blocking UL %

    GO_14 Downlink Throughput (Kbps)

    GO_15 Uplink Throughput (Kbps)

    GO_16 Downlink TBF Allocation Success Rate (%)

    GO_17 PDCH Allocation Success Rate (%)

    Confidential Cluster performance verification report 5(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    6/26

    Defined Walk Test Route and Floor selection

    The walk test route covers mainly floors of 2960B, and the concrete route map is as follows:Pre Floor plans:

    Level G Level 1 Level 3

    Post Floor Plans:

    Confidential Cluster performance verification report 6(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    7/26

    GF 1F 2F

    3F

    Indoor Walk Test Results (CS)

    CS RxLev_Sub Before Swap RxLev_Sub After Swap

    Rxlev_SubBenchmar

    Average (dbm) -77.73 Average (dbm) -55.32

    Confidential Cluster performance verification report 7(26)GF 10F 19F

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    8/26

    k Result GF

    1F

    3F

    GF

    1F

    2F

    Confidential Cluster performance verification report 8(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    9/26

    3F

    Legend PDF[#]

    PDF[%]

    CDF[#] CDF[%] Legend PDF[#] PDF[%]

    CDF[#]

    CDF[%]

    -60

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    10/26

    -85

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    11/26

    3F

    2F

    3F

    Legend PDF[#]

    PDF[%] CDF[#]

    CDF[%] Legend PDF[#]

    PDF[%] CDF[#]

    CDF[%]

    0

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    12/26

    7

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    13/26

    3F

    N/A

    Legend PDF[#]

    PDF[%] CDF[#] CDF[%] Legend PDF[#] PDF[%] CDF[#]

    CDF[%]

    Confidential Cluster performance verification report 13(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    14/26

    0

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    15/26

    N/A

    N/A

    2F

    3F

    Confidential Cluster performance verification report 15(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    16/26

    Confidential Cluster performance verification report 16(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    17/26

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    18/26

    3F

    PS Uplink Average Throughput(kbps)-Before Swap

    96.30 Uplink Average Throughput (kbps)-AfterSwap

    155.86

    Confidential Cluster performance verification report 18(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    19/26

    FTPEDGE

    ULtest

    GF

    1F

    3F

    GF

    1F

    2F

    Confidential Cluster performance verification report 19(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    20/26

    3F

    8 Walk Test Handover Indoor-outdoor DT BCCH Best server Plot

    Indoor toOutdoorResult

    Indoor to Outdoor - Before Swap Indoor to Outdoor - PAC

    Confidential Cluster performance verification report 20(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    21/26

    N/A

    GF

    Outdoor to Indoor - Before Swap Outdoor to Indoor - PAC

    Confidential Cluster performance verification report 21(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    22/26

    N/A

    GF

    9 Walk Test Failed Events and Analysis

    9.1 Walk Test failed Event Statistical

    Event Name Before After

    Confidential Cluster performance verification report 22(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    23/26

    Event times Attempttimes

    Eventtimes

    Attempttimes

    Call Setup Fail 26 0 0 18

    Dropped Call26 0 0 18

    Handover Failure 5 0 N/A N/A

    Location Area Update Failure 0 0 N/A N/A

    9.2 Walk Test Failed Events Plots

    Call Setup Fail Plot- Before Swap Call Setup Fail Plot- After SwapCount of Failure 0 Count of Failure 0 N/A N/A

    Dropped Call- Before Swap Dropped Call- After SwapCount of Failure 0 Count of Failure 0 N/A N/A

    Handover Failure- Before Swap Handover Failure- After Swap

    Confidential Cluster performance verification report 23(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    24/26

    Count of Failure 0 Count of Failure 0 N/A N/A

    Location Area Update Failure- Before Swap Location Area Update Failure- After SwapCount of Failure 0 Count of Failure 0

    N/A N/A

    1.2 Analysis of Failed Events and actions taken

    To analysis the chief events and give suggestion for solve.

    Issues and action/recommendation

    Confidential Cluster performance verification report 24(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    25/26

    1.3 List of other optimization activities

    1.4 List of outstanding items

    This site meets the KPI acceptance criteria. No outstanding item.

    Conclusion

    Remark

    Vendors

    Remark

    DiGi's Remark

    Confidential Cluster performance verification report 25(26)

  • 7/31/2019 2G 2960B Indoor Site Verification Report_Post

    26/26

    Performed By Verified By

    Sign Sign

    Date Date

    Mobile No Mobile No

    Confidential Cluster performance verification report 26(26)