29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

17
28/04/22 1 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI

Transcript of 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

Page 1: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 1

UNCHAIN: Tempus project_Tunisia Section

WorkPakage WP1

Presented by : Mohamed TURKI

Page 2: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 2

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

Outline:

• Identification of necessary space for the Chair• Type of infrastructure installed• Additional resources to run the Chair•The Chair person and his supporting team• work plan for the Chair operation • photos of the Chair space and infrastructure • Process of selection the Chair and his team • work-plan and tasks of the chair

Page 3: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 3

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

Identification of necessary space for the Chair:

The space at ENIS has incubated many graduation project, three industrial projects has started:

- Renewable Energy: Solar and Wind Energy

- Recycle of solid waste: Elaboration of new material

Page 4: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 4

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

Type of infrastructure installed:

•Space for the chair innovation

•Equipment of Visio conference for dissemination e-learning the management of innovation, Wiki tools

•Two laptop and robot for dissemination

•prototype equipment coming from industrial partners

Page 5: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 5

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

Additional resources to run the Chair :

• The PAQ (control quality project) financed by the International Bank contribute and give an additional resources to run the Chair. The objective of this project is to establish a platform of sustainable development and to encourage the management of quality and innovation

• The partner conventions with two industrial allow and facilitate some additional resources to run the chair and to develop the project between them and ENIS, like the purchase of some

equipment for graduation projects

Page 6: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 6

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

The Chair person and his supporting team :

Chair: Professor Mohamed Adel ALIMI

Supporting Team:Chedly Bradai: Professor at ENIS and Manager of SME EnterpriseHamadi Attia: Professor at ENISSami Borgi: Professor at ENISSleh Kammoun: Professor at ENISKamel Halwani: Professor at IPESJorges Kantchev: Associate Professor at ENISJalel Bouzid: Conference Master at ENISHabib Ben Becha: Conference Master at ENIS and in arabie SaouditeMohamed TURKI: PhD Doctor at ENIS, AssistantSlim Abid: PhD Doctor at ENISAli Wali: Engineer of computer sciencesKaouther Mejdoub: Secretary

Page 7: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 7

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

work plan for the Chair operation :

• Management Policy of ENIS

• Process approach

• Evaluation of performance with quality assurance of research • internal and external communication • Valorisation of research

• Dissemination activities

Page 8: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 8

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

photos of the Chair space and infrastructure :

Page 9: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 9

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

photos of the Chair space and infrastructure :

Page 10: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 10

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

photos of the Chair space and infrastructure:

Page 11: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 11

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

photos of the Chair space and infrastructure:

Page 12: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 12

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

Process of selection the Chair and his team:

• Multidisplinary experience

• Scientific excellence

• Societal activities

• National and International experience

• Management experience at university

Page 13: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 13

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

work-plan and tasks of the chair:

The strategic of the chair is based largely on this concept with the following features:

• The development of natural resources typical of the country. • The ongoing management of human resources. • The sustainable development. • The quality control. • The orientation on innovation activities with higher added value• Developing partnerships with outside. • Creation and Investment in small businesses and upgrade. • The development of intangible investment.

Page 14: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 14

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

PLASTIC FILM RECYCLING.wmv

Page 15: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 15

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

For more information, you can visit the web site on the following adress:

www.asarit.net/tempus/unchain

Page 16: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/2316

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

Home page of the web site

Page 17: 29/04/20151 UNCHAIN: Tempus project_Tunisia Section WorkPakage WP1 Presented by : Mohamed TURKI.

18/04/23 17

UNCHAIN: Tempus project_Tunisia Section Activities of WP1

THANKS FOR YOUR ATTENTION