29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID 1 ETSI TC GRID presented to 3rd...
-
Upload
walter-malone -
Category
Documents
-
view
217 -
download
0
Transcript of 29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID 1 ETSI TC GRID presented to 3rd...
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
1
ETSI TC GRID presented to3rd ProActive and GCM User Group
29 November 2006Sophia Antipolis
Patrick GUILLEMINETSI TC GRID Technical Officer
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
2
ETSI is… Recognized as Standards Development Organization Created in 1988 as an independent, not-for-profit entity Based in Sophia Antipolis, south of France,
the technology park 654 members from 61 countries http://www.etsi.org/ Download ETSI standards for free !
ETSI member companies…
manufacturers, network operators, service providers, administrations, research bodies and users
providing a forum in which all key players can contribute: GSM, UMTS, DECT, TETRA, SAT COM, DVB, NGN, VoIP, Wireless Access, Powerline, IP Cablecom, … and GRID!
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
3
GRID Potential for ETSI ETSI already has:
Clear Intellectual Property Rights IPR policy Many ETSI members are already active GRID stakeholders ETSI organized now 3 GRID PlugtestsTM events ETSI (PTCC) owns high GRID testing potential A neutral position to work and produce consensus based GRID
interoperability Gap Analysis and its evaluation.
Existing Technical Bodies already involved in related areas: TISPAN architecture, security and QoS control can be extended to
link GRID with telecom networks
ETSI has the « Know How » in Telecom required by GRID utility +60 cooperation agreements worldwide with SDOs and Foras
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
4
TC GRID – Current Members
TC GRID List – [email protected] 228 members as of 24th November 2006
Includes early stakeholders: Alcatel, CETECOM, BT, EADS, Ericsson, France Telecom,
Fraunhofer, Fujitsu, IBM, INRIA, Intel, MINEFI, NEC, OFCOM, Philips, Siemens, FSCOM, Sun, Telefonica, Hitachi, Telecom Italia, Nortel, HP, Ascom, Cisco, Microsoft, SUN, Telenor, Thales, Oracle, Huawei…
Also: European Commission DG INFSO Units F2+F3, NESSI ETP,
OGF, ITU-T links and ETSI Secretariat Staff
http://list.etsi.org/GRID.html
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
5
TC GRID – work
GRID#1: 18 Sep 2006 (EGTD 2006, NESSI-GRID, GSCG) GRID#2: 1 Dec 2006 here on Friday 3 work items approved that will become ETSI GRID
standards Inventory of ICT GRID Stakeholders Identification of GRID Interoperability Gaps ICT GRID Interoperability Testing Framework
Discussion of additional work items at GRID#2 N-Queens GRID Plugtests technical report GCM (CoreGRID and GridCOMP) (G)GMPLS (Fiber Optic)
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
6
QUESTIONS / ANSWERS
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
7
Background Slides
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
8
TC GRID Terms of Reference (1)
Approved during Board #57 (2006-06-22) Address IT and Telecommunications convergence
Note lack of interoperable GRID solutions Focus on GRID applications and services based on global standards
and associated validation tools
Actively involve and support GRID stakeholders Complement existing activities Interoperability in end-to-end applications Formal test specifications
Develop consensus-based technical specifications and reports Networking widely with relevant standardisation bodies Roadmap to interoperable ICT GRID standards
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
9
TC GRID Terms of Reference (2)
Broad technical scope Resource and service access Protocols, middleware Security
Broad view of convergence GRID and Web Services IT and Telecommunications Fixed and mobile communications Ubiquitous services
Broad range of stakeholders Standardisation bodies, fora, organisations Industry (software vendors, manufacturers, network operators,
service providers, …) Research and innovation
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
10
Focus of ETSI TC GRID
NOT trying to duplicate standards development already underway in other bodies Aim is to complement progress being made with more formal
standards and test specifications so we can achieve levels of interoperability needed in next generation networks and GRIDs
ETSI uniquely placed to do this: Focus on “the big picture” Ability to address IT and networking convergence Experience in interoperability specification, testing and certification
(e.g. GSM/UMTS, DVB, WiMAX, IPv6, Parlay) Global organisation with extensive cooperation agreements Clear IPR policies Formal recognition by the EC
• One of 3 ESOs
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
11
Work Item: Inventory of ICT stakeholders(DTR/GRID-000001-1)
Inventory and analysis of existing and emerging international GRID standards Across range of standards-making bodies
• current, proposed and de facto GRID standards
Determine shortcomings• overlaps, loopholes, inconsistencies• all levels: network to application interfaces
Supporting organisations BT, Alcatel, Siemens, Minefi, INRIA, EADS, FSCOM
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
12
Work Item: Identification of interoperability gaps (DTR/GRID-000001-2)
Select and propose solutions for identified interoperability gaps
Series of practical recommendations to address them For example:
• compilation of application best practice• definition of profiles, guidelines for operational use• (open source) reference implementations• conformity, compliance test suite specifications• development of test tools• recommendations for additional standards
Supporting organisations BT, Alcatel, Siemens, Minefi, INRIA, EADS, FSCOM
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
13
Work Item: ICT GRID Interoperability Testing Framework (DTR/GRID-000002)
Define a GRID testing framework Test and validation methodology, approach and tools Propose reuse of tools developed by MTS-IPT (IP testing)
• generate “Requirements Catalogue”• transform existing specifications into formal test scenarios
corresponding to selected interoperability case studies Best practice recommendations in both IT and Telecom Use and complement existing interoperability activities
• events (e.g. Plugtests), profiles, testbeds, test suites, …• GRID but also consider NGN, IPv6 etc
Supporting organisations BT, Alcatel, Siemens, Minefi, INRIA, EADS, FSCOM
29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID
14
TC GRID Cooperation and Liaison
Intention is to identify/foster consensus and move to interoperable solutions supported by conformance tests
Initial positive contact with a number of organisations OGF, NESSI, ITU, Parlay Group, … European Commission
• DG ENTR• DG INFSO Unit F2 and F3
EC Research Programme• GSCG, UniGrids, CoreGRID, NextGRID, GridCoord, COPRAS etc)
ETSI • TISPAN/NGN TC, TC MTS (PTCC)
Need to formalise and develop cooperation