FORMAT NO.-LT/ LARSEN & TOUBRO LIMITED MSQ UPGRADATION (EPCC-1) PROJECT, IOCL PANIPAT RECORD OF EQUIPMENT ERECTION READINESS OWNER :-INDIAN OIL CORPORATION LTD. Job No.: 18-3177 REPORT NO. PMC:- JACOBS ENGINEERING INDIA PVT. LTD. DATE - EPCC:- LARSEN & TOUBRO LIMITED UNIT - EQPT. TYPE & NO. - MANUFACTURER - LENGTH/HEIGHT - DIAMETER - DRG.NO.& REV.- WEIGHT - A) Sl.No. Description Actual Deviation 1 C/L COORDINATES N E 2 Concrete Top (EL) 3 Height of Bolt 4 Thread Length 5 B) Required facility for transportation, Loading and Unloading of Equipment is available Yes / No C) ERECTION SCHEME SUBMITTED / APPROVED / NOT REQUIRED SIGNATURE NAME L&T JACOBS D) Site Checking Yes No L&T Sign 1 Sliding Plate Dimensions 2 Centre Line Marking on Equipment 3 Pocket Dimensions / Cleaning 4 Foundation Roughening 5 Surface Coating (UG Equipment) 6 Fixing of Packing Plate 7 Fixing of Sliding Plate and Greasing 8 Corractness of Bolt / Nuts 9 Bolt ThreadUnhammered 10 Bolt Movable in Foundation 11 Foundation Surface Acceptabel 12 Bolt / Nut Delivered ? Available 13 Description of Repair to be carried out before erectio of equi 14 Equipment Acceptance MRIR No. 15 Signature Name L&T JACOBS E) 16 Equimpent Is Placed on Foundation as per Drawings on………………………. Signature Name L&T JACOBS LEGEND: BTL - BOTTOM TANGENT LINE TOC - TOPE OF CONCRETE CL - CENTRE LINE H - HEIGHT OF BTL / CL FROM BOTTOM O CHECKED BY L&T JACOBS Required as per Equipment Drawing / Equipment Grout Thickness (BTL / CL-H-TOC) Based on above observations and approved erection scheme of equipments is cleared for erection PMC

description

Static Equipment Inspection Sheet

Transcript of 29 1 Static Equip

Page 1: 29 1 Static Equip

FORMAT NO.-LT/MSQ/STAT-EQPT/029,Rev.01

LARSEN & TOUBRO LIMITEDMSQ UPGRADATION (EPCC-1) PROJECT, IOCL PANIPAT

RECORD OF EQUIPMENT ERECTION READINESS

OWNER :-INDIAN OIL CORPORATION LTD. Job No.: 18-3177 REPORT NO.

PMC:- JACOBS ENGINEERING INDIA PVT. LTD. DATE -

EPCC:- LARSEN & TOUBRO LIMITED UNIT -

EQPT. TYPE & NO. - MANUFACTURER -

LENGTH/HEIGHT - DIAMETER -

DRG.NO.& REV.- WEIGHT -

A) Sl.No. Description Actual Deviation

1 C/L COORDINATESN

E

2 Concrete Top (EL)

3 Height of Bolt

4 Thread Length

5

B) Required facility for transportation, Loading and Unloading of Equipment is available Yes / No

C)

ERECTION SCHEME SUBMITTED / APPROVED / NOT REQUIRED SIGNATURE NAME DATE

L&T

JACOBS

D) Site Checking Yes No L&T Sign Remarks

1 Sliding Plate Dimensions

2 Centre Line Marking on Equipment

3 Pocket Dimensions / Cleaning

4 Foundation Roughening

5 Surface Coating (UG Equipment)

6 Fixing of Packing Plate

7 Fixing of Sliding Plate and Greasing

8 Corractness of Bolt / Nuts

9 Bolt ThreadUnhammered

10 Bolt Movable in Foundation

11 Foundation Surface Acceptabel

12 Bolt / Nut Delivered ? Available

13 Description of Repair to be carried out before erectio of equipment

14 Equipment Acceptance MRIR No.

15

Signature Name Date

L&T

JACOBS

E) 16 Equimpent Is Placed on Foundation as per Drawings

on………………………. Signature Name Date

L&T

JACOBS

LEGEND: BTL - BOTTOM TANGENT LINE TOC - TOPE OF CONCRETE

CL - CENTRE LINE H - HEIGHT OF BTL / CL FROM BOTTOM OF BASE PLAE

CHECKED BY

L&T JACOBS

Required as per Equipment Drawing / Equipment

Remarks (Accepted / Rejected)

Grout Thickness (BTL / CL-H-TOC)

Based on above observations and approved erection scheme of equipments is cleared for erection

PMC