Gulf House EngineeringJanuary 2010
07-C106 NOVOTEL AL DANA RESORT TOWERS PAGE 25
SECTION 15010 MECHANICAL GENERAL PROVISIONS
Upon approval, any necessary changes to the engineering and installation as aresult of these deviations shall be the responsibility of the Sub-contractor.
Proposed equipment shall be submitted for approval by the SupervisionEmployer’s Representative before ordering is placed. All necessary information
requested by the Supervision Employer’s Representative for the review of theproposal shall be submitted.
PART 3 – EXECUTION
3.1 COORDINATION OF WORK
A master programme shall be discussed and issued to the Contractor after thekick-off meeting. The Contractor to submit a detailed construction schedule level1 within 21 days of the kick-off meeting for approval along with a list of the long
lead items. Upon approval, the Contractor shall submit detailed constructionschedule level 2 for approval.
Sub-contract documents establish scope, materials and quality but are notdetailed installation instruction.
Coordinate work with related trades and furnish, in writing, any informationnecessary to permit the work of related trades to be installed satisfactorily andwith the least possible conflict or delay. The time frame to answer for request of information (RFI) shall be 14 days and should be signed by the Employer’sRepresentative.
The drawings show the general arrangement of equipment and appurtenances.Follow these drawings as closely as the actual construction and the work of otherdivisions will permit. Provide off-sets, fittings, and accessories which may berequired but not shown on the drawings. Investigate the site, and reviewdrawings of other divisions to determine conditions affecting the work, andprovide such work and accessories as may be required to accommodate suchconditions.
The locations of thermostats, switches, panels, grilles, faucets, taps, and otherequipment indicated on the drawings are approximately correct. Exerciseparticular caution with reference to the location of panels, thermostats, switches,etc., and have the precise and definite locations accepted by the Supervision
Employer’s Representative before proceeding with the installation.
The drawings show only the general run of services and approximate location of equipment, outlets, panels, etc. Any significant changes in location of equipment,outlets, panels, etc., necessary in order to meet field conditions shall be broughtto the determine attention of the Supervision Employer’s Representative forreview before such alterations are made. Modifications shall be made at noadditional cost to the Sub-contract.
Carefully check space requirements with other division works to ensure thatequipment can be installed in the space allotted.