    The European Organisation for the Safety of Air Navigation

    AOT/02AOT/02

    Disruption and Crisis Management

    Christian Faber

    ATFCM Expert - DNM Network Operations

    EUROCONTROL

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    2/10

    Airport Operations Team AOT/02 2

    CRISIS?CRISIS?

    WHAT CRISIS?WHAT CRISIS?

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    3/10

    Airport Operations Team AOT/02 3

    Definition

    Network Disruptions

    ATM disruptions that impact the

    network operations which may be

    escalated to a crisis.

    Network crisis

    means a state ofinability to provide air navigation serviceinability to provide air navigation service at

    required level resulting in a major loss of network capacitymajor loss of network capacity, or amajor imbalance between network capacity and demandmajor imbalance between network capacity and demand, or a

    major failure in the information flowmajor failure in the information flow in one or several parts of the

    network following an unusual and unforeseen situation.

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    4/10

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    5/10

    Airport Operations Team AOT/02 5

    Phases of OperationsPhases of Operations

    PRE ALERTe.g. bad weather

    StakeholdersStakeholders:Inform NM

    Network Manager:Network Manag

    er:Gather infoNOM Mgt alertedAOCC alertedHandled within NM

    Disruptions

    Managemente.g. strike

    StakeholdersStakeholders:Apply local contigencyInform NMRequest measure

    Network Manager:Network Manage

    r:Gather infoApply measureInform ATCActivate NDMCEvaluate activation of

    EACCC

    Crisis Managemente.g. ash

    StakeholdersStakeholders:Apply local contingencyInform NMRequest measure

    Network Manager:Network Manage

    r:Declares Crisis

    Activates EACCCApplies measuresInforms ATCActivates AOCCTelecon

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    6/10

    Airport Operations Team AOT/02 6

    EACCC Process

    The EACCC Chairman will contactChairman will contact the affected State FocalPoints and those at risk at the start of any crisis,

    EACCC is convenedEACCC is convened via meeting or teleconference,

    A crisis mitigation policy is discussedpolicy is discussed, agreed and approvedby EACCC. The relevant State Focal Points are responsible for

    the endorsement of the policy by their respective states, The remaining State Focal Points are contactedState Focal Points are contacted,

    Information is disseminatedInformation is disseminated to r

    elevantparties,

    When the crisis is resolved, EACCC isEACCC isdeactivateddeactivated,

    A debriefing EACCC sessiondebriefing EACCC session is held toaddress the lessons-learned and remainingactions.

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    7/10Airport Operations Team AOT/02 7

    Network Managers Role

    During crisis: NM, with the support of EACCC, will coordinate the responsecoordinate the response,

    mitigate the impact, and escalate issues to appropriate bodies.

    EACCC composition shall be extendedEACCC composition shall be extended to include impacted staterepresentatives and other operational contacts where deemed

    necessary by NM. The State Focal Points will be the linklink between their respective locallocalCrisis StructuresCrisis Structures and the EACCC.

    During normal times: NM will lead and coordinate the follow-uplead and coordinate the follow-up actions/lessons-learned

    stemming from previous crises. EACCC membersEACCC members shall provide feedbackprovide feedback concerning these actions to

    NM keeping NM always in the loop.

    NM and EACCC will conduct exercisesNM and EACCC will conduct exercises to maintain the high level ofpreparedness for possible crisis events.

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    8/10Airport Operations Team AOT/02 8

    EACCC Members

    New EACCC shall have 8 permanent members:

    The Member State holding the Presidency of the Council,

    The Commission,

    The EASA,

    Eurocontrol, The military,

    The air navigation service providers,

    The airports, and

    The airspace users.

    This membership shall be extended

    to the State Focal Points when

    necessary.

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    9/10Airport Operations Team AOT/02 9

    Contacts

    Approx. 20 airport contacts available

  • 8/2/2019 26disruptionandcrisismanagement-13330946119671-phpapp01-120330030716-phpapp01

    10/10Airport Operations Team AOT/02 10

    Questions?