Michael Pacholok, Chief Purchasing Officer and Director Purchasing & Materials Management City Hall, 19th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe, Manager Construction Services November 8, 2017 Via Website Posting (21 pages) Addendum No. 19 TENDER No. 267-2017 Closing: 12:00 NOON (LOCAL TIME), November 29, 2017 For: the supply of all materials, equipment, labour and supervision necessary for the construction of the new Bessarion Community Centre. Please refer to the above Tender Call document in your possession and be advised of the following: 1.0 CLARIFICATIONS & REVISIONS: Section 4, Scope of Work: Please refer to Architectural Addendum A3 dated November 3, 2017 (218 pages or drawings total) which includes the following documents: i. Electrical Addendum E2 dated November 3, 2017 (33 pages + 26 sheets of AV Drawing Set); Part 2 of 3 of the Electrical Addendum E2 (20 drawing sheets) issued herein; (Part 1 of 3 of the Electrical Addendum E2 (33 pages) was issued in Addendum No. 18); (Part 3 of 3 of the Electrical Addendum E2 (6 drawing sheets) will be included in Addendum No. 20). The complete architectural addendum and the associated sub-consultant addenda (i.e. addenda of the other disciplines) included in Architectural Addendum A3 are included in Addenda No. 13 through 20. Refer to these addenda and be governed accordingly. All other aspects of the Tender remain the same. Please attach this addendum to your RFT document and be governed accordingly. Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 8 - Addenda, of the Tender Call document. Should you have any questions regarding this addendum, please contact Mike Voelker at [email protected]. Yours truly, Joanne Kehoe, Manager, Construction Services Purchasing and Materials Management 1 of 21

Transcript of 267-2017 Add Nr19 revFINAL · tpa elev 1 elev 1 tpa elev 2 elev 2 entrance vestibule g100 reception...

  • Michael Pacholok, Chief Purchasing Officer and Director

    Purchasing & Materials Management City Hall, 19th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2

    Joanne Kehoe, Manager Construction Services

    November 8, 2017 Via Website Posting (21 pages)

    Addendum No. 19

    TENDER No. 267-2017 Closing: 12:00 NOON (LOCAL TIME), November 29, 2017

    For: the supply of all materials, equipment, labour and supervision necessary for

    the construction of the new Bessarion Community Centre.

    Please refer to the above Tender Call document in your possession and be advised of the following:

    1.0 CLARIFICATIONS & REVISIONS: Section 4, Scope of Work:

    Please refer to Architectural Addendum A3 dated November 3, 2017 (218 pages or drawings total) which includes the following documents:

    i. Electrical Addendum E2 dated November 3, 2017 (33 pages + 26 sheets of AV Drawing Set);

    Part 2 of 3 of the Electrical Addendum E2 (20 drawing sheets) issued herein;

    (Part 1 of 3 of the Electrical Addendum E2 (33 pages) was issued in Addendum No. 18);

    (Part 3 of 3 of the Electrical Addendum E2 (6 drawing sheets) will be included in Addendum No. 20).

    The complete architectural addendum and the associated sub-consultant addenda (i.e. addenda of the other disciplines) included in Architectural Addendum A3 are included in Addenda No. 13 through 20. Refer to these addenda and be governed accordingly.

    All other aspects of the Tender remain the same.

    Please attach this addendum to your RFT document and be governed accordingly. Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 8 - Addenda, of the Tender Call document.

    Should you have any questions regarding this addendum, please contact Mike Voelker at [email protected].

    Yours truly,

    Joanne Kehoe, Manager, Construction Services Purchasing and Materials Management

    1 of 21

  • Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    2 of 21

  • Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    3 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    OFFICEA104

    LOBBYG101

    ELECT/COMMSG102

    RECEPTIONA101

    Fx

    EXIT/SERVICEG107

    6

    6

    RECEPTION ROOMA101ABy

    A

    D

    Cx

    H

    GARBAGE ROOMG114

    STAFF ROOML112

    BF WASHROOML114

    MIDDLE AGE CHILDRENL110

    MEDIA ROOM AL106

    PROG

    RAM

    ROOM

    STO

    RAGE

    L108

    OFFICE / PROGRAM PLANNINGL109

    LIBRARY CUSTODIALL116

    LOUNGEL101

    TPA ELEV 1ELEV 1

    TPA ELEV 2ELEV 2

    ENTRANCE VESTIBULEG100

    RECEPTIONL100

    WORK ROOML103

    1x

    1x

    PROGRAM ROOML102

    ELECTRICALL117

    STAFF WCL113

    COMML118 WOMENS WC

    G105

    MENS WCG103

    AQUATICS LOBBYA100

    EXIT VESTG109

    ELECT SWITCH VAULTG113

    EXIT STAIR BSTR B

    CUSTODIALG112

    BCC ELEV 3ELEV 3

    STAIR B EXIT VESTG108

    ADULT AREAL104

    QUIET STUDYL119

    STAIR HSTR H

    ADMIN MECH.G111

    RECEIVINGG110

    TEEN AREAL105

    Ex

    SERV

    ICE

    VEST

    L115

    MEDIA ROOM BL107

    EXIT STAIR ASTR A

    FD

    E.W.

    TPA VESTIBULEG100A

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101B

    -1

    4 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    POOL HALLA123

    18

    18

    19

    19

    E south

    OFFICEA104

    TTC

    TTC

    20

    20

    CHEM.A121

    VIEWING AREAA123A

    DECK SHOWER AA117A

    WC CORRIDORA114B

    UNIVERSAL CHANGEROOM BA113B

    GUARDSA111

    CUSTODIALA106

    POOL STORAGEA110

    STAFF ROOMA105

    FIRST AIDA109

    FILES/STORAGEA107

    STROLLER PARKINGA103A

    LOBBYG101

    ELECT/COMMSG102

    AQUATIC CORRIDORA103

    WOMEN CHANGEA108

    MEN CHANGEA112

    POOL STORAGEA122

    WCA116A

    WCA116B

    WCA116C

    WCA116D

    WCA116E

    WCA116F

    RECEPTIONA101

    DECK SHOWER BA117B

    POOL HALLA123

    Fx

    RECEPTION ROOMA101A By

    A

    D

    Cx

    H

    MECHANICAL EXHAUST SHAFTP121

    15x

    15x

    GENERATOR ROOMG115

    MECH VESTA118

    11x

    11x

    UNIVERSAL CHANGE BA115B

    UNIVERSAL CHANGE AA115A

    WC CORRIDORA114A

    ELECTA120

    AQUATIC CORRIDORA103

    EXIT STAIR CSTR C

    EXIT STAIR DSTR D

    STAIR FSTR F

    BCC ELEV 3ELEV 3

    BCC ELEV 4ELEV 4

    STAIR HSTR H

    UNIVERSAL CHANGEROOM AA113A

    Ex

    MECH INTAKE AIRP207

    PARKING INTAKE AIRP308

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101A

    -1

    5 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    OFFICEA104

    LOBBYG101

    ELECT/COMMSG102

    RECEPTIONA101

    Fx

    EXIT/SERVICEG107

    6

    6

    RECEPTION ROOMA101ABy

    A

    D

    Cx

    H

    GARBAGE ROOMG114

    STAFF ROOML112

    BF WASHROOML114

    MIDDLE AGE CHILDRENL110

    MEDIA ROOM AL106

    PROG

    RAM

    ROOM

    STO

    RAGE

    L108

    OFFICE / PROGRAM PLANNINGL109

    LIBRARY CUSTODIALL116

    LOUNGEL101

    TPA ELEV 1ELEV 1

    TPA ELEV 2ELEV 2

    ENTRANCE VESTIBULEG100

    RECEPTIONL100

    WORK ROOML103

    1x

    1x

    PROGRAM ROOML102

    ELECTRICALL117

    STAFF WCL113

    COMML118 WOMENS WC

    G105

    MENS WCG103

    AQUATICS LOBBYA100

    EXIT VESTG109

    ELECT SWITCH VAULTG113

    EXIT STAIR BSTR B

    CUSTODIALG112

    BCC ELEV 3ELEV 3

    STAIR B EXIT VESTG108

    ADULT AREAL104

    QUIET STUDYL119

    STAIR HSTR H

    ADMIN MECH.G111

    RECEIVINGG110

    TEEN AREAL105

    Ex

    SERV

    ICE

    VEST

    L115

    MEDIA ROOM BL107

    EXIT STAIR ASTR A

    FD

    E.W.

    TPA VESTIBULEG100A

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101B

    -2

    6 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    POOL HALLA123

    18

    18

    19

    19

    E south

    OFFICEA104

    TTC

    TTC

    20

    20

    CHEM.A121

    VIEWING AREAA123A

    DECK SHOWER AA117A

    WC CORRIDORA114B

    UNIVERSAL CHANGEROOM BA113B

    GUARDSA111

    CUSTODIALA106

    POOL STORAGEA110

    STAFF ROOMA105

    FIRST AIDA109

    FILES/STORAGEA107

    STROLLER PARKINGA103A

    ELECT/COMMSG102

    AQUATIC CORRIDORA103

    WOMEN CHANGEA108

    MEN CHANGEA112

    POOL STORAGEA122

    WCA116A

    WCA116B

    WCA116C

    WCA116D

    WCA116E

    WCA116F

    DECK SHOWER BA117B

    POOL HALLA123

    Fx

    RECEPTION ROOMA101A By

    A

    D

    Cx

    H

    MECHANICAL EXHAUST SHAFTP121

    15x

    15x

    GENERATOR ROOMG115

    MECH VESTA118

    11x

    11x

    UNIVERSAL CHANGE BA115B

    UNIVERSAL CHANGE AA115A

    WC CORRIDORA114A

    ELECTA120

    AQUATIC CORRIDORA103

    EXIT STAIR CSTR C

    EXIT STAIR DSTR D

    STAIR FSTR F

    BCC ELEV 3ELEV 3

    BCC ELEV 4ELEV 4

    STAIR HSTR H

    UNIVERSAL CHANGEROOM AA113A

    Ex

    MECH INTAKE AIRP207

    PARKING INTAKE AIRP308

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101A

    -2

    7 of 21

  • DN

    DN

    1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    PRESCHOOL PLAYROOM 2C208B

    LAUN

    DRY/

    TOY

    WAS

    HC2

    11

    TEACHING KITCHENC213

    SOUTH CORRIDORC209

    STORAGEC205D

    FAMILY STROLLERSC202

    L2 LOBBYG200

    OFFICEC220

    GROSS MOTORC218

    LOBBY/WAITINGC217

    ELECC210

    TODDLER CUBBIESC206A

    PRESCHOOL WCC208C

    PRESCHOOL CUBBIES 2C208A

    KITCHENC215

    CC CORRIDORC201

    KITCHEN / LOCKERSC224

    Fx

    6

    6

    CC STROLLERSC203

    EXIT VESTC212A

    By

    SUPERVISORC219

    MTGC221

    LOUNGEC223

    CC WCC222

    A

    D

    Cx

    H

    EXIT STAIR A VEST L2C225

    SECURITY/COMMC204

    1x

    1x

    CUSTODIALC214

    PRESCHOOL PLAYROOM 1C207B

    EXIT STAIR LSTR L

    TPA ELEV 2ELEV 2

    TPA ELEV 1ELEV 1

    PRESCHOOL CUBBIES 1C207A

    INFANT PLAYROOMC205B

    INFANT SLEEP ROOMC205C

    INFANT / TODDLER WCC206C

    INFANT CUBBIESC205A

    TODDLER PLAYROOMC206B

    CHILDCARE STORAGE SHED 1 CHILDCARE STORAGE SHED 2

    Ex

    EXIT STAIR ASTR A

    CUSTODIALR203

    MAINT. VESTR201A

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V102B

    -1

    8 of 21

  • DN

    DN

    DN

    DN

    C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    TTC

    TTC

    20

    20

    EXIT STAIR ESTR E

    AMENITY / MEETINGR210

    MAINTENANCER201

    VESTIBULEG201

    BF WCR205

    BF WCR204

    MEETING ROOM / OFFICER206

    KITCHENR207COMMS

    R202A

    Fx

    By

    A

    D

    STORAGER208A

    ELECTR202

    Cx

    H

    ELECT CLS.R211

    MEETINGR208

    PANTRYR207A

    15x

    15x

    11x

    11x

    L2 CORRIDORG202

    EXIT STAIR DSTR D

    BCC ELEV 4ELEV 4

    BCC ELEV 3ELEV 3

    Ex

    CUSTODIALR203

    MAINT. VESTR201A

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    NO

    A

    V D

    EV

    IC

    ES

    O

    N S

    OU

    TH

    S

    ID

    E O

    F B

    UILD

    IN

    G

    9 of 21

  • DN

    DN

    DN

    DN

    C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    TTC

    TTC

    20

    20

    EXIT STAIR ESTR E

    AMENITY / MEETINGR210

    MAINTENANCER201

    VESTIBULEG201

    BF WCR205

    BF WCR204

    MEETING ROOM / OFFICER206

    KITCHENR207COMMS

    R202A

    Fx

    By

    A

    D

    STORAGER208A

    ELECTR202

    Cx

    H

    ELECT CLS.R211

    MEETINGR208

    PANTRYR207A

    15x

    15x

    11x

    11x

    L2 CORRIDORG202

    EXIT STAIR DSTR D

    BCC ELEV 4ELEV 4

    BCC ELEV 3ELEV 3

    Ex

    CUSTODIALR203

    MAINT. VESTR201A

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    NO

    A

    V D

    EV

    IC

    ES

    O

    N S

    OU

    TH

    S

    ID

    E O

    F B

    UILD

    IN

    G

    10 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    FEMALE WASHROOMR339

    DANCE STUDIOR330

    FITNESS STUDIOR329

    GAMES/LOUNGER300F

    CROS

    S BR

    ACE

    BAY

    MALE WASHROOMR337

    ARTS&CRAFTSR334

    MULTI-PURPOSE/MEETINGR326

    MULTI-PURPOSE/ARTR323

    ROOF TERRACER322

    CLASSROOMR335

    STORAGER324

    STORAGER325

    STORAGER328

    STORAGER327

    Fx

    6

    6

    STORAGER333

    CU-1

    PUBL

    IC C

    ORRI

    DOR/

    SEAT

    ING

    R300

    E

    By

    EXIT STAIR LSTR L

    A

    D

    ELECTR301A

    Cx

    H

    CLASSROOM STORAGER335A

    CLASSROOM WCR336

    REC CORRIDORR300B

    DANC

    E FI

    TNES

    S CO

    RRID

    ORR3

    00C

    PUBLIC CORRIDORR300G

    REC CORRIDOR/SEATINGR300D

    L3 CORRIDORR300

    1x

    1x

    ELECTRICALR332

    CUSTODIALR331

    BCC ELEV 3ELEV 3

    Ex

    CROS

    S BR

    ACE

    BAY

    L3 CORRIDORR300

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V103B

    -1

    11 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    TTC

    TTC

    20

    20

    WEIGHT ROOM MECHR319

    GYM STORAGER320

    CUSTODIALR308

    RECEPTIONR302

    FEMALE CHANGEROOM W/CR310A

    MALE CHANGEROOM W/CR309A

    MALE CHANGEROOM LOCKERSR309

    FEMALE CHANGEROOM LOCKERSR310

    MALE SHOWERR309B

    UNIVERSAL CHANGER312

    UNIVERSAL W/CR313

    MULTI-ACTIVITY ROOMR317

    WEIGHT ROOMR321

    UNIVERSAL SHOWERR314

    UNIVERSAL SHOWERR315

    GYMNASIUMR318

    Fx

    FEMALE SHOWERR310B

    EXIT STAIR ESTR E

    ELECR311

    GYM STORAGER316

    ATHLETICS CORRIDORR300A

    By

    A

    D

    ELECTR301A

    Cx

    H

    15x

    15x

    11x

    11x

    MEETING ROOMR301

    COMMSR301B

    EXIT STAIR DSTR D

    STAFF ROOMR306

    OPEN OFFICER302B

    COPY AREAR305

    MEETINGR304

    SUPERVISOR'S OFFICER303

    CHANGER307

    BCC ELEV 4ELEV 4

    BCC ELEV 3ELEV 3

    Ex

    OFFICECORRIDORR302A

    E.W.

    L3 CORRIDORR300

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V103A

    -1

    12 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    B

    F

    E

    G

    8

    8

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    FEMALE WASHROOMR339

    DANCE STUDIOR330

    FITNESS STUDIOR329

    GAMES/LOUNGER300F

    CROS

    S BR

    ACE

    BAY

    MALE WASHROOMR337

    ARTS&CRAFTSR334

    MULTI-PURPOSE/MEETINGR326

    MULTI-PURPOSE/ARTR323

    ROOF TERRACER322

    CLASSROOMR335

    STORAGER324

    STORAGER325

    STORAGER328

    STORAGER327

    Fx

    6

    6

    STORAGER333

    CU-1

    PUBL

    IC C

    ORRI

    DOR/

    SEAT

    ING

    R300

    E

    By

    EXIT STAIR LSTR L

    A

    D

    Cx

    H

    CLASSROOM STORAGER335A

    CLASSROOM WCR336

    REC CORRIDORR300B

    DANC

    E FI

    TNES

    S CO

    RRID

    ORR3

    00C

    PUBLIC CORRIDORR300G

    REC CORRIDOR/SEATINGR300D

    L3 CORRIDORR300

    1x

    1x

    ELECTRICALR332

    CUSTODIALR331

    Ex

    CROS

    S BR

    ACE

    BAY

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V103B

    -2

    13 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    TTC

    TTC

    20

    20

    WEIGHT ROOM MECHR319

    GYM STORAGER320

    CUSTODIALR308

    RECEPTIONR302

    FEMALE CHANGEROOM W/CR310A

    MALE CHANGEROOM W/CR309A

    MALE CHANGEROOM LOCKERSR309

    FEMALE CHANGEROOM LOCKERSR310

    MALE SHOWERR309B

    UNIVERSAL CHANGER312

    UNIVERSAL W/CR313

    MULTI-ACTIVITY ROOMR317

    WEIGHT ROOMR321

    UNIVERSAL SHOWERR314

    UNIVERSAL SHOWERR315

    GYMNASIUMR318

    Fx

    FEMALE SHOWERR310B

    EXIT STAIR ESTR E

    ELECR311

    GYM STORAGER316

    ATHLETICS CORRIDORR300A

    By

    A

    D

    ELECTR301A

    Cx

    H

    15x

    15x

    11x

    11x

    MEETING ROOMR301

    COMMSR301B

    EXIT STAIR DSTR D

    STAFF ROOMR306

    OPEN OFFICER302B

    COPY AREAR305

    MEETINGR304

    SUPERVISOR'S OFFICER303

    CHANGER307

    BCC ELEV 4ELEV 4

    BCC ELEV 3ELEV 3

    Ex

    OFFICECORRIDORR302A

    E.W.

    L3 CORRIDORR300

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V103A

    -2

    14 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    TTC

    TTC

    20

    20

    L4 MEZZANINER401

    WALKING TRACKR402

    STRE

    TCHI

    NGR4

    02A

    VESTIBULER404

    Fx

    By

    T

    A

    D

    ELECTR406

    Cx

    H

    15x

    15x

    11x

    11x

    WALKING TRACKR402

    FHC - TYPE D

    BCC ELEV 3ELEV 3

    BCC ELEV 4ELEV 4

    STORAGER407

    CUSTODIALR405

    Ex

    EXIT STAIR DSTR D

    R2A

    L4 MEZZANINER401A

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    NO

    A

    V D

    EV

    IC

    ES

    O

    N S

    OU

    TH

    S

    ID

    E O

    F B

    UILD

    IN

    G

    15 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    TPA ELEV VEST. P1P101

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    MIN inside turning radius 6600mm(7000mm provided)MIN outside turning radius 9600mm(10500mm provided)

    E south

    MECH. VESTP112

    Fx

    6

    6

    By

    A

    D

    Cx

    H

    EXIT STAIR BSTR B

    TPA ELEV 1ELEV 1

    TPA ELEV 2ELEV 2

    TPA CONTROLP104

    1x

    1x

    BCC ELEV VEST. P1P102

    EXHAUST SHAFTP204

    EXIT STAIR ASTR A

    BCC ELEV 3ELEV 3

    STAIR B VEST P1P10B

    P1 PARKINGP100

    TPA WCP105

    Ex

    TPL MECHANICALP106

    TPA STORAGEP108

    PARK

    ING

    INTA

    KE A

    IRP3

    08

    PARKING INTAKE AIRP308

    TPA CUSTODIALP107

    P1 PARKINGP100

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101B

    -1

    16 of 21

  • AD

    C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    IRRIGATION ROOMP114

    11

    11

    15

    15

    17

    17

    16

    16

    BOILER ROOMP119

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    TTC

    TTC

    20

    20

    MECH. VESTP112

    TPA SCRUBBERP110

    SERVICE VESTIBULEP117

    ELECT ROOMP115

    Fx

    POOL

    SER

    VICE

    TUN

    NELS

    P120

    By

    A

    D

    Cx

    POOL MECHANICAL FILTRATIONP206

    H

    MECHANICAL EXHAUST SHAFTP121 15x

    15x

    11x

    11x

    BCC ELEV VEST. P1P102

    TPA MAIN ELECTP116

    EXIT STAIR CSTR C

    EXIT STAIR DSTR D

    STAIR KSTR K

    BCC ELEV 3ELEV 3

    BCC ELEV 4ELEV 4

    min 6x3.6m

    STAIR C VEST L1P10C

    EXIT STAIR CSTR C

    MAIN COMMSP118

    Ex

    PARK

    ING

    INTA

    KE A

    IRP3

    08

    PARKING INTAKE AIRP308

    STAIR JSTR J

    EXIT STAIR CSTR C

    POOL SERVICE TUNNELSP120

    POOL

    REE

    L TUN

    NEL

    P120

    A

    MECH INTAKE AIRP207

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101A

    -1

    17 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    Bx

    2x

    2x

    Ax

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    TPA ELEV VEST. P2P201

    Fx

    6

    6

    By

    A

    D

    Cx

    H

    1x

    1x

    EXHAUST SHAFTP204

    EXIT STAIR BSTR B

    EXIT STAIR ASTR A

    TPA ELEV 2ELEV 2

    TPA ELEV 1ELEV 1

    BCC ELEV 3ELEV 3

    STAIR B VEST P2P20B

    Ex

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101B

    -1

    18 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    BCC ELEV VEST. P2P202

    9

    9

    POOL MECHANICAL FILTRATIONP206

    Wsite

    E site

    18

    18

    19

    19

    E south

    20

    20

    TPA EMERGENCY LIGHTINGP203

    Fx

    By

    A

    D

    Cx

    H

    15x

    15x

    11x

    11x

    SPRINKLER/WATER METERP210

    STAIR C VEST P2P20C

    EXIT STAIR CSTR C

    EXIT STAIR DSTR D

    BCC ELEV 3ELEV 3

    BCC ELEV 4ELEV 4

    STAIR D VEST P2P20D

    Ex

    SPRINKLER/WATER METERP210

    MECH INTAKE AIRP207

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101A

    -1

    19 of 21

  • 1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    C

    7

    7

    10

    10

    B

    F

    E

    G

    8

    8

    TPA ELEV 1ELEV 1

    Bx

    TPA ELEV 2ELEV 2

    2x

    2x

    Ax

    TPA ELEV VEST. P3P301

    9

    9

    Wsite

    Ssite

    Ssite

    E site

    E south

    Fx

    6

    6

    WATER TREATMENTP306

    By

    A

    D

    Cx

    P3 PARKING

    TPA ELEVATOR CONTROLP305

    H

    SUMP PIT ROOMP307

    1x

    1x

    BCC ELEVATOR CONTROLP304

    EXIT STAIR BSTR B

    EXIT STAIR ASTR A

    BCC ELEV 3ELEV 3

    STAIR B VEST P3P30B

    Ex

    PARK

    ING

    INTA

    KE A

    IRP3

    08

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101B

    -1

    20 of 21

  • C

    10

    10

    12

    12

    13

    13

    14

    14

    B

    F

    E

    G

    Bx

    Ax

    11

    11

    15

    15

    17

    17

    16

    16

    BCC ELEV VEST P3P302

    9

    9

    Wsite

    E site

    18

    18

    19

    19

    E south

    20

    20

    Fx

    By

    TPA EMERGENCY LIGHTINGP303

    A

    D

    Cx

    P3 PARKINGP300

    H

    15x

    15x

    11x

    11x

    BCC ELEVATOR CONTROLP304

    EXIT STAIR CSTR C

    BCC ELEV 4ELEV 4

    BCC ELEV 3ELEV 3

    STAIR C VEST P3P30C

    Ex

    PARK

    ING

    INTA

    KE A

    IRP3

    08

    Contractor must check and verify all dimensions on the job, and report anydiscrepancies to the Architect before proceeding with the work.

    Do not scale this drawing.

    CIVIL ENGINEERS

    STRUCTURAL ENGINEERS

    MECHANICAL ENGINEERS

    ELECTRICAL ENGINEERSHYDROGEOLOGICAL ENGINEERS

    GEOTECHNICAL ENGINEERS

    REV DESCRIPTION DATE

    FO

    R C

    ON

    TIN

    UA

    TIO

    N R

    EF

    ER

    T

    O D

    RA

    WIN

    G A

    V101A

    -1

    21 of 21