2.5.2 Student Book © 2004 Propane Education & Research Council Page 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe and efficient operation of the ASME tank-setting trailer, propane personnel should understand the basic components, maintenance, and operation. In this module you will learn to: (1)Inspect and maintain the tank setting trailer (2)Identify procedures for transporting, loading, and unloading an ASME tank (3)Identify requirements and precautions for tank installation

Transcript of 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining...

Page 1: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 1

2.5.2

Examining, Maintaining and Operating ASME Tank

Setting Trailers

For the safe and efficient operation of the ASME tank-setting trailer, propane personnel should understand the basic components, maintenance, and operation.

In this module you will learn to:

(1) Inspect and maintain the tank setting trailer

(2) Identify procedures for transporting, loading, and unloading an ASME tank

(3) Identify requirements and precautions for tank installation

Page 2: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 1

Inspect & Maintain the Tank Setting Trailer

Read and follow manufacturer’s instructions for inspecting, maintaining, and operating tank setting trailers. Always be sure to comply with any applicable company-specific procedures.

Tank Setting Trailer Components – designs vary in the following ways:

• type of lifting mechanism

• method for activating braking systems

• method for securing the tank support cross-members (called “bunks”, in their tank transporting and empty traveling configurations)

Page 3: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 1

Inspect & Maintain the Tank Setting Trailer

Braking Systems

On electric/hydraulic brake systems, the electrical current flows when the towing vehicle’s brake lights are activated. Proper operation of the brake lights is critical to the operation of the trailer braking system, along with proper electrical connection to the towing vehicle.

On coupler-activated hydraulic systems, proper lubrication and movement of the trailer tongue-mounted hydraulic cylinder levers is critical to proper braking system operation.

Page 4: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 2

Inspect & Maintain the Tank Setting Trailer

Figure 1. Components of a Typical Tank Setting Trailer

Page 5: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Pages 2 & 3

Inspecting the Tank Setting Trailer

Pre-Trip Inspection – If the trailer is towed on public roadways a pre-trip inspection is required by DOT regulations.

Pre-use inspection items on tank trailers should, as a minimum, include:

• Hydraulic Systems

• Electrical System

• Mechanical Components

• Mounting Hardware

• Brake Master Cylinder Reservoir

• Lights

• Reflectors

• Tongue & Tow Coupling

• Tongue Jack

• Bunks

• Safety Breakaway Mechanism

• Safety Chains

• Rims and Tires

• Placard Holder

Page 6: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 3

Inspecting the Tank Setting Trailer

Post-Trip Inspection

A towed tank trailer used to transport ASME tanks is a commercial motor vehicle (CMV) under U.S. Department of Transportation regulations.

Before the vehicle is operated on a public roadway, the driver must complete a pre-trip inspection, including a review of the previous Driver Vehicle Inspection Report (DVIR).

At the end of the day, or when use of the CMV is finished for the day, a post-trip inspection and a DVIR must be completed. The towing vehicle as well as the trailer must be included in the CMV pre-trip and post-trip inspections and DVIR.

Page 7: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 4

Maintaining the Tank Setting Trailer

Basic Trailer Maintenance – The best source for guidance for trailer maintenance is the manufacturer owner’s manual.

General maintenance items include:

Trailer Tires Check for proper inflation and condition, loss of flexibility, dry rot, and becoming out-of-round.

Brake Pads and Drum

Check condition as part of the scheduled maintenance program for the complete braking system.

Storage Battery (if used)

Check for terminal corrosion, proper electrolyte levels, and periodically recharge

Page 8: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 4

Maintaining the Tank Setting Trailer

Hydraulic System

Check for leaks and defects

Hitch and Tongue Jack

Lubricate as specified by the manufacturer. If a defect is found in the hitch, it should be repaired or replaced without delay.

Lifting Cables and Slings

Inspect for defects or damage and make sure there is adequate lubrication applied to extend the cable life.

Page 9: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 4

Maintaining the Tank Setting Trailer

Protective Rubber Coatings

Check coatings to electrical wiring insulation, hydraulic hoses, and tires.

Corrosion Protection

Metal primers and coatings should be applied to prepared metal surfaces when the original finish is lost or damaged.

Lifting Cables and Slings

Inspect for defects or damage and make sure there is adequate lubrication applied to extend the cable life.

Page 10: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 5

Loading, Unloading & Transporting Tanks

Vehicle Placards – If the weight of the tank and LP-gas exceed 1,001 pounds, the vehicle must be placarded on the front, back and both sides with placards.

2.1 Re d Ed g eM inim um10.8 Inc he s

Pla c a rd lo c a te d tha n 3 inc he sto a ny o the r m a rking o r la b e ling .

no c lo se r

Ha za rd C la ss o rDivisio n no t m o retha n 18 p o ints hig h

To p o f 3 .9 inc hhig h white b oxa p p ro xim a te ly1.6 inc hes a b o ve p la c a rd c e nte r line

Alp ine G o thic (Bla c k) o rAlte rna te G o thic No . 33.5 inc hes hig h

Figure 2. LP-Gas Placard(Either Hazard Class 2 or Division 2.1 may be used.)

Page 11: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 5

Loading, Unloading & Transporting Tanks

Tank Labels – Tanks having water capacities less than 1,000 gallon must be labeled on two sides.

Figure 3. (4 x 4) Flammable Gas Shipping Label

3.9 incheseach side

solid lineinner border0.2 to 0.25 in .from ed eg

h a z a r d c l a s s0 . 2 5 t o 0 . 5 i n .h i g h

h a z a r d0 . 3 i n .h i g h

Page 12: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 6

Loading, Unloading & Transporting Tanks

Tank Labels

During transportation, ASME tanks that contain propane must be labeled using either flammable gas shipping labels or placards. Flammable gas shipping labels or placards must be placed on two sides of tanks with less than 1,000 gallons capacity during transportation in addition to the four placards required for the vehicle. Tanks with 1,000 gallon capacity and larger must have labels or placards placed on both sides and both ends.

Page 13: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 6

Loading, Unloading & Transporting Tanks

Securing the Tank – Straps or chains should be secured in at least two locations, one on either side of the tank dome or the valves, if the dome is removed.

Figure 4. 1,000 Gallon Water Capacity ASME Tank Being Prepared for Transportation

Page 14: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 7

Loading, Unloading & Transporting Tanks

Backing the Trailer

Figure 6. Starting a Trailer Backing Turn

Pla c e ha nd a t b o tto mo f ste e ring whe e l with thum bp o inting in d ire c tio n whe re yo uwa nt the tra ile r to g o .

To b e g in b a c king a tra ile r:

To b a c k a tra ile r, yo u m ust b e g inb y turn ing the ste e ring whe e lin the o p p o site d ire c tio n fro m whe re yo u wa nt the tra ile r to g o .

Page 15: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 7

Loading, Unloading & Transporting Tanks

Loading the Tank

Figure 5. Positioning the Trailer Tank for Loading

Figure 7. Securing the Bunks to

the Trailer Frame

Page 16: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 7

Loading, Unloading & Transporting Tanks

Loading the Tank

Follow manufacturer instructions for installing the bunks and be sure that they are secured as directed. If lock pins or clips are required, be sure that they are in place. If the bunk shows any defect such as a broken weld, or if it is bent so that it does not fit properly, do not continue the loading operation until the bunk is repaired or replaced.

Page 17: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 8

Loading, Unloading & Transporting Tanks

Loading the Tank

Figure 8. Lowering Tank Onto Bunks

Figure 9. Securing the Tank with Cargo Straps

Page 18: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 9

Requirements & Precautions for Tank Installation

Tank Installation

When tanks are installed at customer locations, propane personnel should consider the following factors before driving on the customer’s property or unloading the tank.

1. Is the soil around the installation location sufficiently dry to support the towing vehicle and trailer ?

2. Are all underground facilities marked ?

3. Does the tank installation location meet NFPA 58 code, and can it be serviced ?

Page 19: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 9

Requirements & Precautions for Tank Installation

Precautions

1. DO NOT use a tank trailer that has any mechanical or structural defect.

2. Be sure that the towing hitch is rated to carry the load & in sound condition.

3. Be sure safety chains and breakaway connections are properly secured to the towing vehicle.

4. Check the tongue jack and dolly to be sure that it is locked in the transport position.

5. Be sure that the trailer hitch is secured and locked on the towing vehicle’s towing hitch before lifting the tank.

Page 20: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 10

Requirements & Precautions for Tank Installation

Precautions

6. Check the condition of the trailer’s lifting equipment before attaching or lifting a tank.

7. Do not lift a tank by its lifting lugs if it contains more than 5% liquid propane.

8. Avoid placing hands, arms, or any body part beneath a suspended tank.

9. Be sure that tank bunks are secured according to manufacturer’s instructions before lowering the tank.

10. Secure the tank with at least two suitable securing devices

Page 21: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Page 10

Requirements & Precautions for Tank Installation

Precautions

11. Be sure that the trailer tongue weight does not overload the towing vehicle hitch. If too much weight is carried on the rear axle of the towing vehicle, it can cause loss of steering control, fishtailing, or unstable braking.

12. Secure any loose tools, slings or chains in a toolbox on the trailer or towing vehicle before transporting the tank, or after setting a tank and returning to the bulk plant.

13. Be sure that bunks are secured and locked onto the trailer according to manufacturer instructions before leaving the tank installation location.

Page 22: 2.5.2 Student Book © 2004 Propane Education & Research CouncilPage 1 2.5.2 Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.

2.5.2 Student Book © 2004 Propane Education & Research Council Pages 11 - 13

Time to See If You Got the Key Points of This Module…

• Complete the Review on pages 11 & 12.

• See if you are ready for the Certification Exam by checking off the performance criteria on page 13.