24X7 WATER IN THREE STATES OF KARNATAKA
By Ankur Upadhyay
MBA IFM
500021690
![Page 2: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/2.jpg)
OBJECTIVE OF THE PROJECT Reforms & service improvements through
Private Sector Participation (PSP) in the water sector in Karnataka
Implement the strategy enunciated in the Urban Drinking Water & Sanitation Policy of GoK.
Phased approach.
![Page 3: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/3.jpg)
TOWNS SELECTED Belgaum, Gulbarga
& Hubli-Dharwad (Phase I).
Continuous water supply in selected DZs of Phase I cities.
Scaling up to the rest of the areas in the three cities and also to more cities.
![Page 4: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/4.jpg)
KEY ASPECT OF THE PROJECT Core of the project is a performance based
contract with private sector firm for rehabilitation, operation and management of water service in small areas in Belgaum, Gulbarga and Hubli-Dharwad (called Demonstration Zones).
The role of private sector is limited to demonstration of improved service. Assets remain with ULBs, staff continue on ULB rolls though working under PSP, no investment risk to PSP, no role in tariff fixation & bill collection (though the PSP would develop a computerized billing & collection software system)
Fee based contract
![Page 5: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/5.jpg)
This is the first such structured initiative in India, coming to fruition after several years of work.
Extensive consultations with all stake holders during project preparation; ULB support by resolutions already passed.
Extensive consultations and reviews for drafting the contract/bid document; no previous model document, even with Bank, to follow.
First service improvement, then tariff hike.
![Page 6: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/6.jpg)
CONTRACT DETAILS Operator Contract period: 3 ½ years Single contract for all three ULBs Single contract between five parties Vs
Operator Distinct obligations for all parties Vs the
Operator KUIDFC authorized to act on their behalf
vis-à- vis the Operator Prime contractual responsibility –
Operator
![Page 7: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/7.jpg)
CONTRACT PRICE DETAILS Performance based contract. Total contract price Rs. 28 crore (Rs.
22.40 crore Remuneration; Rs. 5.60 crore Max. Bonus).
60% of Rs. 22.40 crore i.e., Rs. 13.50 crore Fixed Remuneration:
40% of Rs.22.40 crore i.e., Rs.8.90 crore Performance Remuneration.
![Page 8: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/8.jpg)
Fixed Remuneration: 15 equal quarters 12% of Performance Remuneration, if all
targets achieved, 18 months after effective date; 28% of Performance Remuneration spread over two year Operation & Management Period, if targets achieved.
Penalties (max. 10%) for failure; termination.
![Page 9: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/9.jpg)
WHAT THE OPERATOR WILL DO Preparatory Period A - Survey, Design,
Estimation; Preparation of Draft/Final Investment Programme.
Preparatory Period B - Selection of sub-contractors (contract document preparation, tender process management); meeting performance targets for Preparatory Period B.
Demonstration of performance targets in preparatory period B and O & M period.
Customer grievance redressal.
![Page 10: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/10.jpg)
PERFORMANCE TARGETS
![Page 11: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/11.jpg)
END OF IMPLEMENTATION To demonstrate Continuous Pressured Water
Supply to every Customer in each Demonstration Zone
Metering of minimum of 90% property connections.
Maintenance of computerized records of readings.
Reduction of the losses to 30 litre / connection / day / metre pressure in each DZs.
Operation on a 24 hour basis of the Customer SCs
![Page 12: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/12.jpg)
DURING O&M PERIOD Continuous Pressured Water Supply Emergency stoppages shall not exceed 12
hours & max of 4 emergency stoppages in 12 months.
100% of all property connections and public stand-posts must be metered.
100% of Customer meters must be read and billed every month.
![Page 13: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/13.jpg)
Losses must be reduced to 20 litres per connection / day / metre pressure by the end of 24 months
System connection requests must be fulfilled within 7 days.
All Customer complaints to be responded to within 24 hours and redressed within 7 days of such complaint.
Leaks appearing at the surface must be repaired within 24 hours of notification/observance.
![Page 14: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/14.jpg)
STATUS OF THE PROJECT 8 Priority Investment works for augmenting bulk
water supply completed and commissioned. Laying of distribution network in 5 Demo Zones –
completed. House service connections - completed. All the five DZs operationalized Technical Assistance Studies - 3 completed, 3 in
progress Social Intermediation & Communication activities
are being conducted.
![Page 15: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/15.jpg)
15
Sl.No.
Demo Zone No. of Wards. HSCs Target
(Nos.)HSCs Achievement
(Nos.)
1. Belgaum (South) 5 3610 4216
2. Belgaum (North) 5 3510 3909
3. Hubli 4 6410 7258
4. Dharwad 4 4900 5581
5. Gulbarga 11 4020 3201
6. Total 29 22450 24165
![Page 16: 24 x7 water in three states of karnataka](https://reader033.fdocuments.net/reader033/viewer/2022052900/555c91a9d8b42a85758b4b0d/html5/thumbnails/16.jpg)