23 rd January 2014 Teleconference
description
Transcript of 23 rd January 2014 Teleconference
1
23rd January 2014Teleconference
26th IG Meeting South Gas Regional Initiative
2
Agenda
I. Opening
I.1 Welcome
I.2 Approval of the agenda and minutes of the last meeting (for approval)
II. Steps to progress on the implementation of the CAM NC
II.1 Update of the PRISMA training sessions (for information by TSOs) II.2 Status of the approval of regulatory provisions in each country (for information by
NRAs) II.3 Issues to be agreed (for discussion)
- Capacity figures to be offered in March: firm and interruptible for each year. - Transferring of existing contracts from physical IPs to the VIP. - Definition of large and small price steps for each type of product. - Documents to upload by TSOs: General Terms and Conditions for shippers. - How to offer the capacity (bundled or unbundled) when interruptible capacity is
offered on one side and on both sides of the border. - Unbundled capacity sale: VIP, dates.... - Secondary market: when and where trades will take place, public information. - Exchange of information between TSOs: procedure, type, coordination. - Stakeholders’ information: communication by TSOs. - Monitoring by NRAs. - Information about other capacity allocations calendar in the region and beyond.
III. AOB and next meetings – SG meeting in February
3
II.1.Update of the PRISMA training session II.2. Status of the approval of regulatory provisions in each countryII.3. Issues to be agreed
II. Steps to progress on the CAM NC implementation
4
II.1 Update of the PRISMA training session
(for information by TSOs)
II. Steps to progress on the CAM NC implementation
5
II.2 Status of the approval of regulatory provisions in each country
(for information by regulators)
II. Steps to progress on the CAM NC implementation
6
II. Steps to progress on the CAM NC implementation
• Spain: A CNMC Circular to be approved by the BoR. Last revision has
taken into account the comments received (10) in Public Consultation, in particular focused on clarification of some provisions.
• France: The tariff related aspects have been reflected in the yearly
deliberation on transmission tariffs (11 December 2013). A Public Consultation has been launched by CRE, on the basis
of GRTgaz’ and TIGF’s proposals. It is open until 31 January 2014. CRE’s deliberation is due by mid-February.
• Portugal: A ERSE Deliberation based on the conclusions of the SGRI.
NRAs regulatory development
7
II.3 Issues to be agreed
(for discussion)
II. Steps to progress on the CAM NC implementation
8
• Capacity figures to be offered in March and June: TSO must provide ASAP the available capacity according to the following principles: ES-PT:
90% of available technical capacity for yearly auction 10% of available technical capacity for quarterly auction.
ES-FR: 80% of available technical capacity for yearly auction for 15 years 10% of available technical capacity for yearly auction for 5 years 10% of available technical capacity for quarterly auction. Default rule (unless otherwise stated) is that interruptible capacity is
offered only if 98% of the corresponding technical capacity has previously been sold
Issues to be agreed
II. Steps to progress on the CAM NC implementation
9
• Transferring of existing contracts from physical IPs to the VIP.
Before 1 October existing contracts must be adapted TSOs will establish deadlines in relation to:
Communication to shippers TSOs and shippers agreements Information to the NRAs in the Region
• Definition of large and small price steps for each type of product. For the annual auction in March 2014, TSOs inform the NRAs of the price
increments envisaged, at the latest one month in advance.
Issues to be agreed
II. Steps to progress on the CAM NC implementation
10
• Documents to upload by TSOs in PRISMA: General Terms and Conditions
for shippers. Deadline to be published: 1 February 2014 Deadline for shippers to accept them
• Clarification on the potential offer of unbundled capacity and interruptible capacity in 2014? Is there any interruptible capacity to be offered for March and June
auctions? Is there any unbundled capacity to be offered? When will it be offered to the market?
• Secondary market: when and where trades will take place, public information. PRISMA secondary market functions will be available in April 2014.
Issues to be agreed
II. Steps to progress on the CAM NC implementation
11
• Exchange of information between adjacent TSOs
Coordination between TSOs is required. Information to be exchanged and published in:
TSOs websites: link to PRISMA, data included in TSOs regular publications NRAs to be informed after the auction NRAs and the market if needed following the REMIT provisions. NRAS and the market to be informed as soon as possible in case of
disruption Identify improvements for next auctions: TSOs, potentially in coordination with
PRISMA, to submit an annual report of the results and ways to improve the process to NRAs.
• Stakeholders information: TSO will communicate results of the auctions: aggregated to the market,
allocated capacity to the participant –need to define the procedure specifically for day and intraday auction results (immediately after auctions)
Issues to be agreed
II. Steps to progress on the CAM NC implementation
12
• Monitoring by NRAs
NRAs will have access to auctions information via PRISMA. NRAs could request TSOs information to perform the monitoring task.
• Information about other capacity allocations calendar in the region and beyond OSP 2014 ES-FR: Short term capacity to be allocated at Larrau IP from 1 April
2014 to 30 September 2014 ONGOING Calendar of national allocations that could be interesting for the market.
Issues to be agreed
II. Steps to progress on the CAM NC implementation
13
Deadline Task/Event Responsible Tool
3 March Annual yearly capacity auction TSOs PRISMA
19 February SG meeting Stk, NRAs,TSO meeting
3 February Communication of capacity/procedures for the annual auction to the market
TSOs TSOs WebsitePRISMA
1 February Final agreements among TSOs and regulators: price steps, capacity offer, GTCs, etc.
TSOs TSOs WebsitePRISMA
February 2014 Approval of NRAs regulatory developments NRAs -
To be determinedJan/Feb 2014
IT testing TSOs IT systems
End Jan – early February
Publication of calendar, timings for auctions, starting dates, standard capacity products to be offered
TSOs TSOs WebsitePRISMA
14 Jan 2014 WS training for stakeholders to use PRISMA TSOs, PRISMA meeting
December 2013 Final agreements on points in discussion NRAs/TSOs -
II. Steps to progress on the CAM NC implementation
14
IV. AOB and next meetings
15
Proposal of next meetings dates: for the 1st semester (auctions: 3 March, 2 June)• 21st SG meeting: 19 February • 27th IG meeting: 28 March - telco• 28th IG meeting: 30 April - telco • 22nd SG meeting: 21 May
V. AOB and next meetings - 2014JANUARY FEBRUARY MARCH
L M X J V S D L M X J V S D L M X J V S D1 2 3 4 5 1 2 1 2
6 7 8 9 10 11 12 3 4 5 6 7 8 9 3 4 5 6 7 8 913 14 15 16 17 18 19 10 11 12 13 14 15 16 10 11 12 13 14 15 1620 21 22 23 24 25 26 17 18 19 20 21 22 23 17 18 19 20 21 22 2327 28 29 30 31 24 25 26 27 28 24 25 26 27 28 29 30
31
APRIL MAY JUNEL M X J V S D L M X J V S D L M X J V S D
1 2 3 4 5 6 1 2 3 4 17 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8
14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 1521 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 2228 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29
30Auctions Spanish Bank Holiday Portuguese Bank Holiday French Bank Holiday
JANUARY FEBRUARY MARCHL M X J V S D L M X J V S D L M X J V S D
1 2 3 4 5 1 2 1 26 7 8 9 10 11 12 3 4 5 6 7 8 9 3 4 5 6 7 8 9
13 14 15 16 17 18 19 10 11 12 13 14 15 16 10 11 12 13 14 15 1620 21 22 23 24 25 26 17 18 19 20 21 22 23 17 18 19 20 21 22 2327 28 29 30 31 24 25 26 27 28 24 25 26 27 28 29 30
31
APRIL MAY JUNEL M X J V S D L M X J V S D L M X J V S D
1 2 3 4 5 6 1 2 3 4 17 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8
14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 1521 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 2228 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29
30
JULY AUGUST SEPTEMBERL M X J V S D L M X J V S D L M X J V S D
1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 77 8 9 10 11 12 13 4 5 6 7 8 9 10 8 9 10 11 12 13 14
14 15 16 17 18 19 20 11 12 13 14 15 16 17 15 16 17 18 19 20 2121 22 23 24 25 26 27 18 19 20 21 22 23 24 22 23 24 25 26 27 2828 29 30 31 25 26 27 28 29 30 31 29 30
OCTOBER NOVEMBER DECEMBERL M X J V S D L M X J V S D L M X J V S D
1 2 3 4 5 1 2 1 2 3 4 5 6 76 7 8 9 10 11 12 3 4 5 6 7 8 9 8 9 10 11 12 13 14
13 14 15 16 17 18 19 10 11 12 13 14 15 16 15 16 17 18 19 20 2120 21 22 23 24 25 26 17 18 19 20 21 22 23 22 23 24 25 26 27 2827 28 29 30 31 24 25 26 27 28 29 30 29 30 31
SG MeetingIG MeetingRCC Meeting